SlideShare une entreprise Scribd logo
1  sur  9
Télécharger pour lire hors ligne
LOT 1857
LOT 1856
REM OF 5333
Boundary 136235
Boundary83975
boundary 40505
Boundary 104900
Boundary 61805
Boundary 60589
Boundary75170
3m Building line
3m
Building
line
3m Building line
3mBuildingline
3m Building line
3m Building line
32.8
32.08
32.17
32.5
32.0
31.5
ALU
G
AN
G
R
O
AD
MH
31.51
PROPOSED
OFFICE BLOCK
proposed brick
paving to eng detail.
formal
parking
28620
SITE ENTRANCE
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
01/09
SITE PLAN
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:500 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
SITE PLAN scale 1 : 500
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
30m
FHR
ENTRANCE
31.900
1 2 3 4 5 6 7 8 9 10 11 12 13 14
AA
BB
A
B
RECEPTION
AREA
WAITING
AREA
TEA AREA TEA AREA
MALES
FEMALES
ABLUTIONS
MALES
FEMALES
ABLUTIONS
PLANTER
PLANTER
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
6240
6470
142060015706002706001410
230186011020601101860230
6470
142060015706002706001410
230186011020601101860230
1500
1 2 3 4 5 6 7 8
1000mm high balustrade in
compliance with SANS 10400-D
PLANTER
LIFT
1000mm high barrier stub wall
1000mm high balustrade in
compliance with SANS 10400-D
1000mm high barrier stub wall
as per Strc. Eng's specifications
and details with plaster and
paint finish as per finishes
schedule
OFFICE AREA
13251325350
2200
2800
1
2
3
3
2
1
300x300mm concrete column
plastered & painted,as per Strc. Eng
details & specifications
1000mm high balustrade in
compliance with SANS 10400-D
1000mm high barrier stub wall
as per Strc. Eng's specifications
and details with plaster and
paint finish as per finishes
schedule
ENTRANCE
39230
1010 1800 1200120012001200120012001200120012001200 1800 1800 1800 1800 1800 1800 1800 10201200 790 3260 79032602700
230 110 23028301102830 147205890 230110 11940
2960
39230
1010 1800 120012001200120012001200120012001200 1800 1800 1800 2440 1800 1800 1800 10201200 790 3260 46102700
230 110 23028301102830 5890110 2080 110 3000 110 6640 110 110 2080110 30009530
3230
4610
2400
risers @ 180mm
treads @ 300mm
in compliance with
SANS 10400-M
risers @ 180mm
treads @ 300mm
in compliance with
SANS 10400-M
RAMP UP
1:12 gradient in compliance
with SANS 10400-S
risers @ 180mm
treads @ 300mm
in compliance with
SANS 10400-M
RAMP UP
1:12 gradient in compliance
with SANS 10400-S
590
31.900
OFFICE AREA
4000 180180
MOSAIC TILESMOSAIC TILES
NON SLIP PORCELAIN TILES
CERAMIC TILES
NON SLIP PORCELAIN TILES
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
02/09
FLOORPLANS
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:100 Y.SEWPERSAD
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
300x300mm concrete column
plastered & painted
300x300mm concrete column
plastered & painted
300x300mm concrete column
plastered & painted
300x300mm concrete column
plastered & painted
300x300mm concrete column
plastered & painted
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
GROUND STOREY PLAN scale 1 : 100
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
North
N.E
East
S.E
South
S.W
N.W
W
est
RAMP UP
1:12 gradient in compliance
with SANS 10400-S
ss
ssss
RE 1
RE 2
RE 4
IE 3
IE 4
IE 5
IE 1
IE 2
30m
FHR
A
B
A
B
A
B
KITCHEN
6470
142060015706002706001410
230186011020601101860230
6470
147012002610600590
23023020901103810
35.200
TEA AREA
MALES
FEMALES
ABLUTIONS
OFFICE AREA2200
2800
3230
4610
31.900
OFFICE AREA
as per Strc. Eng's specifications
and details with plaster and
paint finish as per finishes
schedule
1 2 3 4 5 6 7 8
17 16 15 14 13 12 11
9 10
LIFT
risers @ 180mm
treads @ 300mm
in compliance with
SANS 10400-M 300x300mm concrete column
plastered & painted,as per Strc. Eng
details & specifications
300x300mm concrete column
plastered & painted,as per Strc. Eng
details & specifications
39230
1010 1800 1200120012001200120012001200120012001200 1800 1800 1800 1800 1800 1800 1800 10201200 790 3260 79032602700
28301105060 147203000110 12480 230230
230
4360
2960
2150
BALCONY
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
39230
1010 1800 120012001200120012001200120012001200 1800 1800 1800 2440 1800 1800 1800 10201200 790 3260 46102700
230 230 23028301102830 5890110 11830 110 110 2080110 30009530
3000
1410
1800
1650
1000mm high balustrade in
compliance with SANS 10400-D
MOSAIC TILES
MOSAIC TILES
MOSAIC TILES
NON SLIP PORCELAIN TILES
CERAMIC TILES
NON SLIP PORCELAIN TILES
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
03/09
FLOORPLANS
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:100 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
FIRST STOREY PLAN scale 1 : 100
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
SG
F
SG
SG
SG
SG
SG
SG
SG
SG
F
SG
SG
SG
SG
SG
SG
SG
SG
F
SG
SG
SG
SG
SG
SG
SG
220mm non-load bearing brick wall,
plastered & painted as per Specialist
details & specifications
Glazing in compliance with SANS
10400-N
1000mm high balustrade in
compliance with SANS 10400-D
1000mm high balustrade in
compliance with SANS 10400-D
1000mm high balustrade in
compliance with SANS 10400-D
Window openings in compliance
with SANS 10400-N & 10400-O
Window openings in compliance
with SANS 10400-N & 10400-O
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
as per Strc. Eng's specifications and
details with plaster and paint finish as per
finishes schedule
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
04/09
ELEVATIONS
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:100 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
NORTH EAST ELEVATION scale 1 : 100
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
SOUTH EAST ELEVATION scale 1 : 100
NGL
FFL
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
aluminium sun louvre by specialist
AA
BB
19 20 21 22 23 24 25 26
35 34 33 32 31 30 29
27 28
risers @ 180mm
treads @ 300mm
in compliance with
SANS 10400-M
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
05/09
ELEVATIONS & ROOF
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:100 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
ROOF PLAN scale 1 : 100
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
SOUTH WEST ELEVATION scale 1 : 100
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
fall to slope
aluminium sun louvre by specialist
aluminium sun louvre by specialist
aluminium sun louvre by specialist
aluminium sun louvre by specialist
re. concrete slab as per Strc. Eng
details & specifications
re. concrete pad foundation as per Strc. Eng
details & specifications, shown in dotted below
line of re. concrete column plastered & painted,
as per Strc. Eng details & specifications
220mm non-load bearing brick wall, plastered &
painted as per Specialist details & specifications
specifications and details with plaster and paint
finish as per finishes schedule
1000mm high balustrade in
compliance with SANS 10400-D
re. concrete beam plastered & painted,
as per Strc. Eng details & specifications
220mm non-load bearing brick wall, plastered &
painted as per Specialist details & specifications
DETAIL 2
DETAIL 1
precast reinforced concrete lintel.
line of 10mm thick plaster,painted to
architects approval
drip joint
precast reinforced concrete lintel.
drip joint
refer to door schedule
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
06/09
SECTION A - A
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:50 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
SECTION A - A scale 1 : 50
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
WAITING
AREA
31.900
CERAMIC TILES
OFFICE AREA
NON SLIP PORCELAIN TILES
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
OFFICE AREA
NON SLIP PORCELAIN TILES
31.900
OFFICE AREA
NON SLIP PORCELAIN TILES
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
07/09
SECTION B -B
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:50 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
SECTION B - B scale 1 : 50
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
aluminium sun louvre by specialist
Line of re. concrete column plastered &
painted as per Strc. Eng. details &
specifications Colour : White
details & specifications
Colour : Gun Metal Grey (RAL 9006)
Specialist details & specifications
Colour : Gun Metal Grey (RAL 9006)
Glazed aluminium shopfront with top hung openings &
waterproofing, to be powder coated as per Specialist details &
specifications
Colour : Gun Metal Grey (RAL 9006)
600x600mm non-slip porcelain tiles laid on 20mm thick screed
laid to fall, with expansion joints as per Specialist details details
& specifications
Colour : White
Re. concrete slab as per Strc. Eng details & specifications
12mm plaster to be skimmed to a smooth surface & to painted
as per Specialist details & specifications
Colour : White
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
08/09
DETAILED SECTIONS
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
20 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:10 Y.SEWPERSAD
DETAIL 1 scale 1 : 10
DETAIL 2 scale 1 : 10
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
900
1800
900
450
2700
2100
2100
860
1730
860
600
2100
600
1200
1500
600
2100
800
600
1200
2100
2700
900900 900
2100
1500
450
2100
900
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
09/09
SCHEDULES
CONSTRUCTION &
DETAILING III
PROPOSED OFFICE BLOCK
001
01 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:100 Y.SEWPERSAD
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
SCHEDULE OF AREAS
SITE AREA 14.450 sq.m.
ZONING COMMERCIAL
COVERAGE 0.039% OF 13773
P R O P O S E D W O R K
PARKING REQUIREMENT/PROVISION
F.A.R GROUND AREA 274.94
F.A.R FIRST FLOOR AREA 274.94
F.A.R ROOF AREA 274.94
TOTAL F.A.R 824.82
INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.)
OFFICES - 1 bays/100sq.m. (G.L.A.)
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.

Contenu connexe

Tendances

Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeRichard Clark
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019Ali Belal
 
Oretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetOretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetSadaf Mohammadi
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingMaja Myall
 
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGEMill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGESin Byrne
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit setSadaf Mohammadi
 
Residential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSWResidential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSWAlexeyRyabchenko
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Ian de Mink
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINELee Yung Anchor
 

Tendances (20)

Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO Office
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019
 
Oretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetOretsky Residence - Full Permit Set
Oretsky Residence - Full Permit Set
 
Greenbanks
GreenbanksGreenbanks
Greenbanks
 
Bryant Residence
Bryant ResidenceBryant Residence
Bryant Residence
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
 
You need the house plans
You need the house plansYou need the house plans
You need the house plans
 
3D
3D3D
3D
 
Working drawings sample
Working drawings sampleWorking drawings sample
Working drawings sample
 
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGEMill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGE
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set
 
Residential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSWResidential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSW
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
20150330_R4D_Permit Set
20150330_R4D_Permit Set20150330_R4D_Permit Set
20150330_R4D_Permit Set
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 

En vedette

HR2020 opzet Werkpleinen
HR2020 opzet WerkpleinenHR2020 opzet Werkpleinen
HR2020 opzet WerkpleinenHR2020
 
Stick with us! The Loyalty Business Model
Stick with us! The Loyalty Business ModelStick with us! The Loyalty Business Model
Stick with us! The Loyalty Business ModelTRG Arts
 
Lebon Co. Profile
Lebon Co. ProfileLebon Co. Profile
Lebon Co. ProfileM.H Miyar
 
Nuovii Blog 2
Nuovii Blog 2Nuovii Blog 2
Nuovii Blog 2Nuovii
 
Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...
Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...
Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...Sekheta Bros Company
 
How to Be Healthier in 3 Easy Steps
How to Be Healthier in 3 Easy StepsHow to Be Healthier in 3 Easy Steps
How to Be Healthier in 3 Easy StepsTalia Witherspoon
 
Prostorno i ortogonalno projektovanje
Prostorno i ortogonalno projektovanje Prostorno i ortogonalno projektovanje
Prostorno i ortogonalno projektovanje bbilja
 

En vedette (12)

HR2020 opzet Werkpleinen
HR2020 opzet WerkpleinenHR2020 opzet Werkpleinen
HR2020 opzet Werkpleinen
 
Resume Rajneesh B2B
Resume Rajneesh B2BResume Rajneesh B2B
Resume Rajneesh B2B
 
Stick with us! The Loyalty Business Model
Stick with us! The Loyalty Business ModelStick with us! The Loyalty Business Model
Stick with us! The Loyalty Business Model
 
Lebon Co. Profile
Lebon Co. ProfileLebon Co. Profile
Lebon Co. Profile
 
Nuovii Blog 2
Nuovii Blog 2Nuovii Blog 2
Nuovii Blog 2
 
Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...
Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...
Microchemical Journal Volume 37 issue 3 1988 [doi 10.1016_0026-265x(88)90135-...
 
Matt's CV Resume-1
Matt's CV Resume-1Matt's CV Resume-1
Matt's CV Resume-1
 
How to Be Healthier in 3 Easy Steps
How to Be Healthier in 3 Easy StepsHow to Be Healthier in 3 Easy Steps
How to Be Healthier in 3 Easy Steps
 
Prostorno i ortogonalno projektovanje
Prostorno i ortogonalno projektovanje Prostorno i ortogonalno projektovanje
Prostorno i ortogonalno projektovanje
 
Opasni putevi
Opasni puteviOpasni putevi
Opasni putevi
 
Мanastir grgeteg
Мanastir grgetegМanastir grgeteg
Мanastir grgeteg
 
Kucica za ptice
Kucica za pticeKucica za ptice
Kucica za ptice
 

Similaire à Proposed Office Block Floor Plans

PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMLuciano D'Amico Rebord
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15Antoinette Pope
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309Altamash Khan
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)Yousef Riad
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorJayson Ang
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Projectcharliewynn_3
 
Architectural design requirements
Architectural design requirementsArchitectural design requirements
Architectural design requirementsBharat Khadka
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 

Similaire à Proposed Office Block Floor Plans (20)

PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
House Dhanilal Submission
House Dhanilal SubmissionHouse Dhanilal Submission
House Dhanilal Submission
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
 
Bonner House - Set.pdf
Bonner House - Set.pdfBonner House - Set.pdf
Bonner House - Set.pdf
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
house plans
house planshouse plans
house plans
 
8 months work
8 months work8 months work
8 months work
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
Architectural design requirements
Architectural design requirementsArchitectural design requirements
Architectural design requirements
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 

Plus de Yolanda Sewpersad (11)

Office Layout
Office LayoutOffice Layout
Office Layout
 
Showroom
ShowroomShowroom
Showroom
 
Urban Space Furniture Catalogue
Urban Space Furniture Catalogue Urban Space Furniture Catalogue
Urban Space Furniture Catalogue
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Time square Casino
Time square CasinoTime square Casino
Time square Casino
 
Premier Foods
Premier FoodsPremier Foods
Premier Foods
 
Furniture Layout
Furniture LayoutFurniture Layout
Furniture Layout
 
Aspen Building Layouts
Aspen Building LayoutsAspen Building Layouts
Aspen Building Layouts
 
Render competition
Render competitionRender competition
Render competition
 
House 2
House 2House 2
House 2
 
House 1
House 1House 1
House 1
 

Dernier

call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.KathleenAnnCordero2
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
 
James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !risocarla2016
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comsaastr
 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxCarrieButtitta
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGYpruthirajnayak525
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxnoorehahmad
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Escort Service
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power
 

Dernier (20)

call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
 
James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptx
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
 

Proposed Office Block Floor Plans

  • 1. LOT 1857 LOT 1856 REM OF 5333 Boundary 136235 Boundary83975 boundary 40505 Boundary 104900 Boundary 61805 Boundary 60589 Boundary75170 3m Building line 3m Building line 3m Building line 3mBuildingline 3m Building line 3m Building line 32.8 32.08 32.17 32.5 32.0 31.5 ALU G AN G R O AD MH 31.51 PROPOSED OFFICE BLOCK proposed brick paving to eng detail. formal parking 28620 SITE ENTRANCE REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 01/09 SITE PLAN CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:500 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. SITE PLAN scale 1 : 500 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.)
  • 2. 30m FHR ENTRANCE 31.900 1 2 3 4 5 6 7 8 9 10 11 12 13 14 AA BB A B RECEPTION AREA WAITING AREA TEA AREA TEA AREA MALES FEMALES ABLUTIONS MALES FEMALES ABLUTIONS PLANTER PLANTER 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 6240 6470 142060015706002706001410 230186011020601101860230 6470 142060015706002706001410 230186011020601101860230 1500 1 2 3 4 5 6 7 8 1000mm high balustrade in compliance with SANS 10400-D PLANTER LIFT 1000mm high barrier stub wall 1000mm high balustrade in compliance with SANS 10400-D 1000mm high barrier stub wall as per Strc. Eng's specifications and details with plaster and paint finish as per finishes schedule OFFICE AREA 13251325350 2200 2800 1 2 3 3 2 1 300x300mm concrete column plastered & painted,as per Strc. Eng details & specifications 1000mm high balustrade in compliance with SANS 10400-D 1000mm high barrier stub wall as per Strc. Eng's specifications and details with plaster and paint finish as per finishes schedule ENTRANCE 39230 1010 1800 1200120012001200120012001200120012001200 1800 1800 1800 1800 1800 1800 1800 10201200 790 3260 79032602700 230 110 23028301102830 147205890 230110 11940 2960 39230 1010 1800 120012001200120012001200120012001200 1800 1800 1800 2440 1800 1800 1800 10201200 790 3260 46102700 230 110 23028301102830 5890110 2080 110 3000 110 6640 110 110 2080110 30009530 3230 4610 2400 risers @ 180mm treads @ 300mm in compliance with SANS 10400-M risers @ 180mm treads @ 300mm in compliance with SANS 10400-M RAMP UP 1:12 gradient in compliance with SANS 10400-S risers @ 180mm treads @ 300mm in compliance with SANS 10400-M RAMP UP 1:12 gradient in compliance with SANS 10400-S 590 31.900 OFFICE AREA 4000 180180 MOSAIC TILESMOSAIC TILES NON SLIP PORCELAIN TILES CERAMIC TILES NON SLIP PORCELAIN TILES REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 02/09 FLOORPLANS CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:100 Y.SEWPERSAD THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT. 300x300mm concrete column plastered & painted 300x300mm concrete column plastered & painted 300x300mm concrete column plastered & painted 300x300mm concrete column plastered & painted 300x300mm concrete column plastered & painted NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. GROUND STOREY PLAN scale 1 : 100 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) North N.E East S.E South S.W N.W W est RAMP UP 1:12 gradient in compliance with SANS 10400-S ss ssss RE 1 RE 2 RE 4 IE 3 IE 4 IE 5 IE 1 IE 2
  • 3. 30m FHR A B A B A B KITCHEN 6470 142060015706002706001410 230186011020601101860230 6470 147012002610600590 23023020901103810 35.200 TEA AREA MALES FEMALES ABLUTIONS OFFICE AREA2200 2800 3230 4610 31.900 OFFICE AREA as per Strc. Eng's specifications and details with plaster and paint finish as per finishes schedule 1 2 3 4 5 6 7 8 17 16 15 14 13 12 11 9 10 LIFT risers @ 180mm treads @ 300mm in compliance with SANS 10400-M 300x300mm concrete column plastered & painted,as per Strc. Eng details & specifications 300x300mm concrete column plastered & painted,as per Strc. Eng details & specifications 39230 1010 1800 1200120012001200120012001200120012001200 1800 1800 1800 1800 1800 1800 1800 10201200 790 3260 79032602700 28301105060 147203000110 12480 230230 230 4360 2960 2150 BALCONY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 39230 1010 1800 120012001200120012001200120012001200 1800 1800 1800 2440 1800 1800 1800 10201200 790 3260 46102700 230 230 23028301102830 5890110 11830 110 110 2080110 30009530 3000 1410 1800 1650 1000mm high balustrade in compliance with SANS 10400-D MOSAIC TILES MOSAIC TILES MOSAIC TILES NON SLIP PORCELAIN TILES CERAMIC TILES NON SLIP PORCELAIN TILES REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 03/09 FLOORPLANS CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:100 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. FIRST STOREY PLAN scale 1 : 100 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT.
  • 4. SG F SG SG SG SG SG SG SG SG F SG SG SG SG SG SG SG SG F SG SG SG SG SG SG SG 220mm non-load bearing brick wall, plastered & painted as per Specialist details & specifications Glazing in compliance with SANS 10400-N 1000mm high balustrade in compliance with SANS 10400-D 1000mm high balustrade in compliance with SANS 10400-D 1000mm high balustrade in compliance with SANS 10400-D Window openings in compliance with SANS 10400-N & 10400-O Window openings in compliance with SANS 10400-N & 10400-O 1 2 3 4 5 6 7 8 9 10 11 12 13 14 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 as per Strc. Eng's specifications and details with plaster and paint finish as per finishes schedule REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 04/09 ELEVATIONS CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:100 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. NORTH EAST ELEVATION scale 1 : 100 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) SOUTH EAST ELEVATION scale 1 : 100 NGL FFL THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT. aluminium sun louvre by specialist
  • 5. AA BB 19 20 21 22 23 24 25 26 35 34 33 32 31 30 29 27 28 risers @ 180mm treads @ 300mm in compliance with SANS 10400-M REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 05/09 ELEVATIONS & ROOF CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:100 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. ROOF PLAN scale 1 : 100 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) SOUTH WEST ELEVATION scale 1 : 100 THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT. fall to slope aluminium sun louvre by specialist aluminium sun louvre by specialist aluminium sun louvre by specialist aluminium sun louvre by specialist
  • 6. re. concrete slab as per Strc. Eng details & specifications re. concrete pad foundation as per Strc. Eng details & specifications, shown in dotted below line of re. concrete column plastered & painted, as per Strc. Eng details & specifications 220mm non-load bearing brick wall, plastered & painted as per Specialist details & specifications specifications and details with plaster and paint finish as per finishes schedule 1000mm high balustrade in compliance with SANS 10400-D re. concrete beam plastered & painted, as per Strc. Eng details & specifications 220mm non-load bearing brick wall, plastered & painted as per Specialist details & specifications DETAIL 2 DETAIL 1 precast reinforced concrete lintel. line of 10mm thick plaster,painted to architects approval drip joint precast reinforced concrete lintel. drip joint refer to door schedule REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 06/09 SECTION A - A CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:50 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. SECTION A - A scale 1 : 50 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) WAITING AREA 31.900 CERAMIC TILES OFFICE AREA NON SLIP PORCELAIN TILES THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT.
  • 7. OFFICE AREA NON SLIP PORCELAIN TILES 31.900 OFFICE AREA NON SLIP PORCELAIN TILES REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 07/09 SECTION B -B CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:50 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. SECTION B - B scale 1 : 50 GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT. aluminium sun louvre by specialist
  • 8. Line of re. concrete column plastered & painted as per Strc. Eng. details & specifications Colour : White details & specifications Colour : Gun Metal Grey (RAL 9006) Specialist details & specifications Colour : Gun Metal Grey (RAL 9006) Glazed aluminium shopfront with top hung openings & waterproofing, to be powder coated as per Specialist details & specifications Colour : Gun Metal Grey (RAL 9006) 600x600mm non-slip porcelain tiles laid on 20mm thick screed laid to fall, with expansion joints as per Specialist details details & specifications Colour : White Re. concrete slab as per Strc. Eng details & specifications 12mm plaster to be skimmed to a smooth surface & to painted as per Specialist details & specifications Colour : White REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 08/09 DETAILED SECTIONS CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 20 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:10 Y.SEWPERSAD DETAIL 1 scale 1 : 10 DETAIL 2 scale 1 : 10 THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT.
  • 9. 900 1800 900 450 2700 2100 2100 860 1730 860 600 2100 600 1200 1500 600 2100 800 600 1200 2100 2700 900900 900 2100 1500 450 2100 900 REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 09/09 SCHEDULES CONSTRUCTION & DETAILING III PROPOSED OFFICE BLOCK 001 01 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:100 Y.SEWPERSAD NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. SCHEDULE OF AREAS SITE AREA 14.450 sq.m. ZONING COMMERCIAL COVERAGE 0.039% OF 13773 P R O P O S E D W O R K PARKING REQUIREMENT/PROVISION F.A.R GROUND AREA 274.94 F.A.R FIRST FLOOR AREA 274.94 F.A.R ROOF AREA 274.94 TOTAL F.A.R 824.82 INDUSTRIAL - 1 Loading bay/1000sq.m (G.L.A.) OFFICES - 1 bays/100sq.m. (G.L.A.) THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF YOLANDA SEWPERSAD CANDIDATES CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT.