SlideShare une entreprise Scribd logo
1  sur  5
YOUSEF SOFYANAL KARAKI
00966-541021844 yousef109@gmail.com
Bachelor’s Degree in Mechanical Engineer (Thermal and Desalination) – King ABDUL AZEEZ University Jeddah, 1986
Degree in mechanical engineering thermal and desalination
Design and construction of large-scale mechanical systems, sewage treatment (MBR.SBR. Extend aeration
ext).water treatment(RO.SWRO.DAF, Filtration ext) and infrastructure -pump station – construction of
water tanks, pumps centrifugal. Positive displacement, piping systems for water piping distribution,
wastewater collection, drainage piping extra
. Key Accountabilities:
• Performs complex engineering tasks and particularly important engineering work efficiently and
accurately.
• hydraulic piping calculation for water distribution , sewage piping , storm water , fire fighting , drinking
•water calculation , design and workshop drawing.
•Experience in undertaking water/wastewater analysis, concept to detailed design of pump stations, water
treatment plants, sewage treatment facilities in modeling and design
•.prepare process calculations for STP/WTP and sizing of different plant units; Preparation of hydraulic
calculations for STP/WTP and preparation of hydraulic profiles
• Oversees the preparation of contract drawings, specifications, and other materials suitable for procurement
and construction purposes. Regularly interfaces with other engineering disciplines as well as other
departments.
• Reviews contract drawings, specifications and other procurement materials that have been prepared by
others and provides comments on the results of the reviews.
• Reviews supplier drawing submittals and performs technical bid analyses.
• Prepares and issues specifications, data sheets, and other construction documents.
• Provides technical guidance to CAD designer/drafters, designers and engineers working on the same
project.
• Leads, manages and coordinates the activities of all mechanical engineering staff; and coordinates with the
Infrastructure Design Manager.
• Serves as primary interface with the design consultants and construction contractor in performing design
reviews or addressing construction-related issues related to the mechanical systems.
• Understands all related codes and their application to the project; and overseas/manages the interface with
local agencies to coordinate design standards usage and monthly approvals’ process.
• Act in an advisory capacity to senior management personnel on engineering related matters.
• Maintains awareness of the project mechanical specifications, drawings and design criteria.
• Provides regular reports on progress to the Infrastructure Design Manager; and needs for additional or
specialty staffing.
Solar energy pv on grid / off grid / water heating
CAREER HIGHLIGHTS – Currently working in international consultant co as senior Eng
STRENGTHS
 Equipped with strong analytical, problem-solving and technical skills.
 Follow up latest technology for water lines , sewage line and infrastructure
 Knowledge in all types of pipes ss,duplex. Grp pp .hdpe. ductile . steel.pvc extra , pumping station , pumps advantages
,disadvantages , and the best application
 Infrastructure water piping , storm water, sewage piping , pumps stations
 Infrastructure water piping , sewage piping , pump station , sewage plant , water plant ext
 Expert in the field of (water projects & renewable energy).Design and excitation
 Can easily adapt to corporate culture that values excellence, quality and productivity.
 Capable of working independently to achieve stated objective with high level of confidence & professionalism.
 Aggressive, self-motivated, high level of initiative, reliable, and good sense of responsibility.
 Excellent written and verbal communication skills – Arabic and English.
 handling multiple tasks with awareness of deadlines. Ability to handle all phases of a project from conceptual
design to engineering, procurement and construction
 Work with high confidentiality.
WORK EXPERIENCE
International consultant co
Saudi Arabia
Senior MEP Eng from feb 2015 to
present( FOR 80,000 people )
Reason for leaving – better position
Engineering Center for Water and
Renewable Energy
February 2011 till Feb 2015
Manager
And alkaraki consultant office
 Infrastructurepipingwater , sewer , storm
 Storm pumping station design
 Ro plant
 Sewage water treatment
 chlorination
 firefighting
 Pumping station water
 Energy savingtechniques
 Pumping station sewage and storm water
 HAVC
 Odor control
 Plumping
 Heat pump , heating coolingprojects
 Solar water heating
 Pv – on grid /off grid /standalonesystem
 Sewage water treatment
 Gray water treatment
 Solar heatingprojects for domestic useand pool heating
 Power generation usingphotovoltaic technology
 Energy savingtechniques
 Contract work as expert consultant for osaily ( HEBRON) regardingNablus
STP
 Hydraulic profileverification
 Pipe intersection/cables/instrumentation
 PlantWater supply (process and fresh)
 FireFighting System
 DrainageSystem for Planttender for several projectfor main lift
station of TOLKARM Hebron ext.
 Deep well pumps
Concorde Corodex Group
Dubai,U.A.E.
February 2009 – January 2011
Projects operation manager
Reason for leaving – For better
opportunity
 Project Integration Management - Lead and support Operation Managers and
Project Managers for Planning, Execution and Change control for implementation
of ALL projects of CCG in accordance with Project requirement and International
Standard/methodology.
 Scope Management- Lead the Operations Managers & Project Managers to
initiate, Plan, verify and manage Change Control of projects and monitor the
progress regularly.
 Time Management- Lead the Operations Managers & Project Managers for
Activity Definition, Activity Sequencing , Activity Duration and Schedule
Development & Schedule Control ; monitor the status regularly.
 Cost Management- Issue guidelines and directions to Operations and Project
Managers for effective utilization of Resources for multiple projects by proper
planning, Cost estimating, Co-ordinate with Finance department for Budgeting &
Cost Control ; monitoring the performance and reporting to Directors
 Quality Management- Ensure Quality Planning , Quality Assurance & Quality
Control of projects through Operations Manager & Project Manager.
 Human Resource Management- Organization Planning , Staffing & Team
Development for multiple projects.
 Communication Management - Issue guidelines, implementation of proper
Communication Planning, Information Distribution, Performance Reporting
(status reporting) & Administrative Closure for phase completion &/or project
completion.
 Risk Management- Risk Management Identification,Risk Analysis,Risk Monitoring
& Control of CCG projects and issue regular updates to Directors.
 Procurement Management- Support and direct Operations Managers for any
assistance required Procurement Planning, Solicitation Planning, and Source
Selection & Contract Closeout as required.
 Ensure and maintain good relationship and contacts with Project Consultants ,
Clients and Sub-contractor; attend project meetings based on the importance.
CORODEX INDUSTRIES CO, LLC -
Dubai,U.A.E.
December 2007 - January 2009
Projects Manager
Reason for leaving – For growth
 Infrastructure full net work , piping sewage , water , rain water
 Primary and secondary screens (6 and 3 mm)
 Split boxes,
 Process Tanks (3 lanes of BDO/Anoxic and MBR tanks and 1 storage tank)
 Auxiliary Tanks (Sludge tank, Thickening Tank, Drain Pit, Sampling Chambers, etc.)
 Microbiological Reactors (MBR) Membranes
 UV System
 Electrical Control System
 Machine Shop, Admin Building and Workshop Building
 GRP, CPVC and Stainless Steel Piping System
 Water and Chemical Cleaning System
 Set of Pumps and Motors
 Boundary Walls, Gate, Access Roads and Footpaths
 Handrails and Railways
 AC System and Controls
 Other related items
GULF SPECIALIZED WATER SERVICES
KSA
Dec. 1991- Dec. 1, 2007
Executive manager
Site infrastructure Eng 89 to 91
Arabian co for international projects
R, ZALOOM CONSTUNCE OFFICE
86 TO 89
Executive AGM (from 2001 to 2007)
 Yearly Plans and Targets
 Organization of Manpower (270 personnel)
 O & M Tendering for Water Treatment, Sewage Treatment
 Associated from Tendering to Installation Stage of 25500 m3/d Seawater
Desalination,directly involved as ProjectManager.
 Responsibilities includebutnot limited to the following:
 Sea water intake system, automatic screens , MMF, UF, HPP (18T weight) Booster
pumps, ER, 555 PV, 3330 Membranes, 200 (T) steel structure, TravelingBands,
Penstocks, Overhead LiftingEquipment, Chlorination distribution system, Sludge
and screen wash pumps.
 Fabrication and erection of complete system utilizingthefollowingfree-issue
materials:Dual Media Filters,Air Scour Blowers, Acoustic Enclosures,Coarse
Strainers,Water Pumps, Neutralization Pumps,Air Compressors (w/ motors,
receivers, After coolers and dryers) and main process piping.
 Projects Manager (from 1995-2001)
 Associated with Tendering to Commission stagefor more than 250 RO plants.50
m3/d SW and BW
 O and M, Manager for RO and STP, in 27 different areas
 Associated with Tendering to Commission stagefor 250,000m3/d, 4 sites of gas
chlorination
 Associated with Tendering to Commission stagefor STP and pressurized sewage
lines and several liftstations
 Associated with Tendering to Commission stagefor rehabilitation of STP and RO
 Head of Technical Department (RO and STP) (from 1991-1994)
 Technical supportfor Sales and Purchasing
 RO design
 STP design
 Pretreatment
 Post treatment
 RO cleaninginstructions
 Bottling factory,fillinglines –ext
 Ozone
 Gas chlorination 250,000 m3/d
 Infrastructure unique sewage full lines by pressurized lines
 Dammam port housingprojectinfrastructure( design and execution )
 Water piping
 Sewage piping
 Firefitting
 Drinkingwater
 Storm water
 Sewage liftstation
 Water pumping station
 Mechanical design engineer
 Central heating system
 Heating load calculation
 Infrastructure pipingwater supply and sewage lines
Max one project value was 160 million SR, 38 million SR , full details value will be at interview time
SEMINARS AND TRAININGS ATTENDED
 8 Weeks trainingin maintenanceWorkshop KSA AirportJeddah
 8 Weeks trainingin Central Heating and Water Distribution System
 PlanningCourse– MicrosoftProject98/2003
 Seminars about: pumps, RO design,Ultra filtration,Pretreatment
 PROJECT management coursePMP in UAE/Dubai
SKILL
Ms project, MS Office – Word. Auto cad(driving) Excel- Outlook
HaVC , POOL HEATING , solar energy heating, solar pv,
piping.STP
RO , infrastructure
PERSONAL INFORMATION
Nationality : JORDAINIAN
DrivingLicense : KSA, UAE
Notice Period : 2 month

Contenu connexe

Tendances

Tendances (20)

Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816
 
A Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainA Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plain
 
WilliamHarkabusResume
WilliamHarkabusResumeWilliamHarkabusResume
WilliamHarkabusResume
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
AA-CV-LinkedIn
AA-CV-LinkedInAA-CV-LinkedIn
AA-CV-LinkedIn
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
PM Resume 9_30_15
PM Resume 9_30_15PM Resume 9_30_15
PM Resume 9_30_15
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Abhishek
AbhishekAbhishek
Abhishek
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resume
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
Alzagon engineering solutions 1
Alzagon engineering solutions 1Alzagon engineering solutions 1
Alzagon engineering solutions 1
 

En vedette

Past, Present and Future of Health apps
Past, Present and Future of Health appsPast, Present and Future of Health apps
Past, Present and Future of Health appsCurofy
 
Class seven seher i and iftar
Class seven seher i and iftarClass seven seher i and iftar
Class seven seher i and iftarCambriannews
 
Spicejet aviation technical analysis, fundamental indicators #investment anal...
Spicejet aviation technical analysis, fundamental indicators #investment anal...Spicejet aviation technical analysis, fundamental indicators #investment anal...
Spicejet aviation technical analysis, fundamental indicators #investment anal...Yash Dave
 
Friends of Fort Point Channel January 2016 presentation
Friends of Fort Point Channel January 2016 presentationFriends of Fort Point Channel January 2016 presentation
Friends of Fort Point Channel January 2016 presentationFortPointChan
 
Nikki B_Conference
Nikki B_ConferenceNikki B_Conference
Nikki B_ConferenceNikki Barot
 
Class seven holly quran mazid
Class seven holly quran mazidClass seven holly quran mazid
Class seven holly quran mazidCambriannews
 
Mathur A PLOS ONE 2014
Mathur A PLOS ONE 2014Mathur A PLOS ONE 2014
Mathur A PLOS ONE 2014Aditi Mathur
 
Apuntes sobre el PNFP "Nuestra Escuela" en el Chaco
Apuntes sobre el PNFP "Nuestra Escuela" en el ChacoApuntes sobre el PNFP "Nuestra Escuela" en el Chaco
Apuntes sobre el PNFP "Nuestra Escuela" en el ChacoPablo Fernando Garrido
 

En vedette (11)

La gripe
La gripeLa gripe
La gripe
 
Past, Present and Future of Health apps
Past, Present and Future of Health appsPast, Present and Future of Health apps
Past, Present and Future of Health apps
 
Class seven seher i and iftar
Class seven seher i and iftarClass seven seher i and iftar
Class seven seher i and iftar
 
Spicejet aviation technical analysis, fundamental indicators #investment anal...
Spicejet aviation technical analysis, fundamental indicators #investment anal...Spicejet aviation technical analysis, fundamental indicators #investment anal...
Spicejet aviation technical analysis, fundamental indicators #investment anal...
 
Friends of Fort Point Channel January 2016 presentation
Friends of Fort Point Channel January 2016 presentationFriends of Fort Point Channel January 2016 presentation
Friends of Fort Point Channel January 2016 presentation
 
Pia control de infecciones
Pia control de infeccionesPia control de infecciones
Pia control de infecciones
 
Nikki B_Conference
Nikki B_ConferenceNikki B_Conference
Nikki B_Conference
 
Class seven holly quran mazid
Class seven holly quran mazidClass seven holly quran mazid
Class seven holly quran mazid
 
Mathur A PLOS ONE 2014
Mathur A PLOS ONE 2014Mathur A PLOS ONE 2014
Mathur A PLOS ONE 2014
 
Clase N° 2 ECE - 15 de julio de 2016
Clase N° 2 ECE - 15 de julio de 2016Clase N° 2 ECE - 15 de julio de 2016
Clase N° 2 ECE - 15 de julio de 2016
 
Apuntes sobre el PNFP "Nuestra Escuela" en el Chaco
Apuntes sobre el PNFP "Nuestra Escuela" en el ChacoApuntes sobre el PNFP "Nuestra Escuela" en el Chaco
Apuntes sobre el PNFP "Nuestra Escuela" en el Chaco
 

Similaire à yousef_cv_mk

Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!Sayed Mosawi
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy GandhiNallu Samy
 

Similaire à yousef_cv_mk (20)

Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!
 
CV R46
CV R46CV R46
CV R46
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
RolandGildea_CV
RolandGildea_CVRolandGildea_CV
RolandGildea_CV
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
RichmondApande PM
RichmondApande PMRichmondApande PM
RichmondApande PM
 
vijay cv
vijay cvvijay cv
vijay cv
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 

yousef_cv_mk

  • 1. YOUSEF SOFYANAL KARAKI 00966-541021844 yousef109@gmail.com Bachelor’s Degree in Mechanical Engineer (Thermal and Desalination) – King ABDUL AZEEZ University Jeddah, 1986 Degree in mechanical engineering thermal and desalination Design and construction of large-scale mechanical systems, sewage treatment (MBR.SBR. Extend aeration ext).water treatment(RO.SWRO.DAF, Filtration ext) and infrastructure -pump station – construction of water tanks, pumps centrifugal. Positive displacement, piping systems for water piping distribution, wastewater collection, drainage piping extra . Key Accountabilities: • Performs complex engineering tasks and particularly important engineering work efficiently and accurately. • hydraulic piping calculation for water distribution , sewage piping , storm water , fire fighting , drinking •water calculation , design and workshop drawing. •Experience in undertaking water/wastewater analysis, concept to detailed design of pump stations, water treatment plants, sewage treatment facilities in modeling and design •.prepare process calculations for STP/WTP and sizing of different plant units; Preparation of hydraulic calculations for STP/WTP and preparation of hydraulic profiles • Oversees the preparation of contract drawings, specifications, and other materials suitable for procurement and construction purposes. Regularly interfaces with other engineering disciplines as well as other departments. • Reviews contract drawings, specifications and other procurement materials that have been prepared by others and provides comments on the results of the reviews. • Reviews supplier drawing submittals and performs technical bid analyses. • Prepares and issues specifications, data sheets, and other construction documents. • Provides technical guidance to CAD designer/drafters, designers and engineers working on the same project. • Leads, manages and coordinates the activities of all mechanical engineering staff; and coordinates with the Infrastructure Design Manager. • Serves as primary interface with the design consultants and construction contractor in performing design reviews or addressing construction-related issues related to the mechanical systems. • Understands all related codes and their application to the project; and overseas/manages the interface with local agencies to coordinate design standards usage and monthly approvals’ process. • Act in an advisory capacity to senior management personnel on engineering related matters. • Maintains awareness of the project mechanical specifications, drawings and design criteria. • Provides regular reports on progress to the Infrastructure Design Manager; and needs for additional or specialty staffing. Solar energy pv on grid / off grid / water heating CAREER HIGHLIGHTS – Currently working in international consultant co as senior Eng
  • 2. STRENGTHS  Equipped with strong analytical, problem-solving and technical skills.  Follow up latest technology for water lines , sewage line and infrastructure  Knowledge in all types of pipes ss,duplex. Grp pp .hdpe. ductile . steel.pvc extra , pumping station , pumps advantages ,disadvantages , and the best application  Infrastructure water piping , storm water, sewage piping , pumps stations  Infrastructure water piping , sewage piping , pump station , sewage plant , water plant ext  Expert in the field of (water projects & renewable energy).Design and excitation  Can easily adapt to corporate culture that values excellence, quality and productivity.  Capable of working independently to achieve stated objective with high level of confidence & professionalism.  Aggressive, self-motivated, high level of initiative, reliable, and good sense of responsibility.  Excellent written and verbal communication skills – Arabic and English.  handling multiple tasks with awareness of deadlines. Ability to handle all phases of a project from conceptual design to engineering, procurement and construction  Work with high confidentiality. WORK EXPERIENCE International consultant co Saudi Arabia Senior MEP Eng from feb 2015 to present( FOR 80,000 people ) Reason for leaving – better position Engineering Center for Water and Renewable Energy February 2011 till Feb 2015 Manager And alkaraki consultant office  Infrastructurepipingwater , sewer , storm  Storm pumping station design  Ro plant  Sewage water treatment  chlorination  firefighting  Pumping station water  Energy savingtechniques  Pumping station sewage and storm water  HAVC  Odor control  Plumping  Heat pump , heating coolingprojects  Solar water heating  Pv – on grid /off grid /standalonesystem  Sewage water treatment  Gray water treatment  Solar heatingprojects for domestic useand pool heating  Power generation usingphotovoltaic technology  Energy savingtechniques  Contract work as expert consultant for osaily ( HEBRON) regardingNablus STP  Hydraulic profileverification  Pipe intersection/cables/instrumentation
  • 3.  PlantWater supply (process and fresh)  FireFighting System  DrainageSystem for Planttender for several projectfor main lift station of TOLKARM Hebron ext.  Deep well pumps Concorde Corodex Group Dubai,U.A.E. February 2009 – January 2011 Projects operation manager Reason for leaving – For better opportunity  Project Integration Management - Lead and support Operation Managers and Project Managers for Planning, Execution and Change control for implementation of ALL projects of CCG in accordance with Project requirement and International Standard/methodology.  Scope Management- Lead the Operations Managers & Project Managers to initiate, Plan, verify and manage Change Control of projects and monitor the progress regularly.  Time Management- Lead the Operations Managers & Project Managers for Activity Definition, Activity Sequencing , Activity Duration and Schedule Development & Schedule Control ; monitor the status regularly.  Cost Management- Issue guidelines and directions to Operations and Project Managers for effective utilization of Resources for multiple projects by proper planning, Cost estimating, Co-ordinate with Finance department for Budgeting & Cost Control ; monitoring the performance and reporting to Directors  Quality Management- Ensure Quality Planning , Quality Assurance & Quality Control of projects through Operations Manager & Project Manager.  Human Resource Management- Organization Planning , Staffing & Team Development for multiple projects.  Communication Management - Issue guidelines, implementation of proper Communication Planning, Information Distribution, Performance Reporting (status reporting) & Administrative Closure for phase completion &/or project completion.  Risk Management- Risk Management Identification,Risk Analysis,Risk Monitoring & Control of CCG projects and issue regular updates to Directors.  Procurement Management- Support and direct Operations Managers for any assistance required Procurement Planning, Solicitation Planning, and Source Selection & Contract Closeout as required.  Ensure and maintain good relationship and contacts with Project Consultants , Clients and Sub-contractor; attend project meetings based on the importance. CORODEX INDUSTRIES CO, LLC - Dubai,U.A.E. December 2007 - January 2009 Projects Manager Reason for leaving – For growth  Infrastructure full net work , piping sewage , water , rain water  Primary and secondary screens (6 and 3 mm)  Split boxes,  Process Tanks (3 lanes of BDO/Anoxic and MBR tanks and 1 storage tank)  Auxiliary Tanks (Sludge tank, Thickening Tank, Drain Pit, Sampling Chambers, etc.)  Microbiological Reactors (MBR) Membranes  UV System  Electrical Control System  Machine Shop, Admin Building and Workshop Building  GRP, CPVC and Stainless Steel Piping System  Water and Chemical Cleaning System  Set of Pumps and Motors  Boundary Walls, Gate, Access Roads and Footpaths  Handrails and Railways  AC System and Controls  Other related items
  • 4. GULF SPECIALIZED WATER SERVICES KSA Dec. 1991- Dec. 1, 2007 Executive manager Site infrastructure Eng 89 to 91 Arabian co for international projects R, ZALOOM CONSTUNCE OFFICE 86 TO 89 Executive AGM (from 2001 to 2007)  Yearly Plans and Targets  Organization of Manpower (270 personnel)  O & M Tendering for Water Treatment, Sewage Treatment  Associated from Tendering to Installation Stage of 25500 m3/d Seawater Desalination,directly involved as ProjectManager.  Responsibilities includebutnot limited to the following:  Sea water intake system, automatic screens , MMF, UF, HPP (18T weight) Booster pumps, ER, 555 PV, 3330 Membranes, 200 (T) steel structure, TravelingBands, Penstocks, Overhead LiftingEquipment, Chlorination distribution system, Sludge and screen wash pumps.  Fabrication and erection of complete system utilizingthefollowingfree-issue materials:Dual Media Filters,Air Scour Blowers, Acoustic Enclosures,Coarse Strainers,Water Pumps, Neutralization Pumps,Air Compressors (w/ motors, receivers, After coolers and dryers) and main process piping.  Projects Manager (from 1995-2001)  Associated with Tendering to Commission stagefor more than 250 RO plants.50 m3/d SW and BW  O and M, Manager for RO and STP, in 27 different areas  Associated with Tendering to Commission stagefor 250,000m3/d, 4 sites of gas chlorination  Associated with Tendering to Commission stagefor STP and pressurized sewage lines and several liftstations  Associated with Tendering to Commission stagefor rehabilitation of STP and RO  Head of Technical Department (RO and STP) (from 1991-1994)  Technical supportfor Sales and Purchasing  RO design  STP design  Pretreatment  Post treatment  RO cleaninginstructions  Bottling factory,fillinglines –ext  Ozone  Gas chlorination 250,000 m3/d  Infrastructure unique sewage full lines by pressurized lines  Dammam port housingprojectinfrastructure( design and execution )  Water piping  Sewage piping  Firefitting  Drinkingwater  Storm water  Sewage liftstation  Water pumping station  Mechanical design engineer  Central heating system  Heating load calculation  Infrastructure pipingwater supply and sewage lines Max one project value was 160 million SR, 38 million SR , full details value will be at interview time SEMINARS AND TRAININGS ATTENDED  8 Weeks trainingin maintenanceWorkshop KSA AirportJeddah
  • 5.  8 Weeks trainingin Central Heating and Water Distribution System  PlanningCourse– MicrosoftProject98/2003  Seminars about: pumps, RO design,Ultra filtration,Pretreatment  PROJECT management coursePMP in UAE/Dubai SKILL Ms project, MS Office – Word. Auto cad(driving) Excel- Outlook HaVC , POOL HEATING , solar energy heating, solar pv, piping.STP RO , infrastructure PERSONAL INFORMATION Nationality : JORDAINIAN DrivingLicense : KSA, UAE Notice Period : 2 month