Personal Information
Entreprise/Lieu de travail
Moscow, Russian Federation Russian Federation
Profession
International (ICOLD) consultant and expert on high dams & large hydropower plants
Secteur d’activité
Real Estate/ Construction / Architecture
À propos
Brief biography of Chairman of Dam Safety & Design sessions of HydroVision Russia Conference (2010-2014) organized by PennWell Corp (USA), RusHydro (Russian State Hydropower Co):
Lyapichev Yury– Dr. (Techn. Sc.), Professor, member of Committee on Dam Analysis & Design of International Commission on Large Dams (ICOLD). He took part in design, construction supervision & safety assessment of many high dams & large hydropower plants: Aswan rockfill dam with clay core (RF-CC) (H=111m, P=2100 MW) in Egypt, Toktogul gravity dam (215m, 1000 MW), Nurek RF-CC dam (300 m, 2700 MW), Rogun RF-CC dam (335 m, 3600 MW) in USSR, Boguchansk rockfill dam with asphaltic core (RF-AC) (77m, 3000 MW), Kankun...
Présentations
(13)Documents
(31)J’aime
(3)ремонт центрального водосброса Саяно-Шушенской ГЭС
Yury Lyapichev
•
il y a 6 ans
Design of Hydraulic Structures
GAURAV. H .TANDON
•
il y a 10 ans
Seismic Remediation of Dams in California, An Engineering Geology Perspective
Karyn M Heim
•
il y a 9 ans
Personal Information
Entreprise/Lieu de travail
Moscow, Russian Federation Russian Federation
Profession
International (ICOLD) consultant and expert on high dams & large hydropower plants
Secteur d’activité
Real Estate/ Construction / Architecture
À propos
Brief biography of Chairman of Dam Safety & Design sessions of HydroVision Russia Conference (2010-2014) organized by PennWell Corp (USA), RusHydro (Russian State Hydropower Co):
Lyapichev Yury– Dr. (Techn. Sc.), Professor, member of Committee on Dam Analysis & Design of International Commission on Large Dams (ICOLD). He took part in design, construction supervision & safety assessment of many high dams & large hydropower plants: Aswan rockfill dam with clay core (RF-CC) (H=111m, P=2100 MW) in Egypt, Toktogul gravity dam (215m, 1000 MW), Nurek RF-CC dam (300 m, 2700 MW), Rogun RF-CC dam (335 m, 3600 MW) in USSR, Boguchansk rockfill dam with asphaltic core (RF-AC) (77m, 3000 MW), Kankun...