SlideShare une entreprise Scribd logo
1  sur  213
Application & Comparison of different Formwork
System used within Indian Construction Industry
A Project Report
Submitted by:
ABHISHEK SHAH 090670106002
ABHISHEK ASNANI 100673106003
RUDRADATTSINH CHUDASAMA 090670106049
MANISH VALAND 090670106043
1
SAL INSTITUTE OF TECHNOLOGY AND ENGINEERING RESEARCH
AHMEDABAD
Gujarat Technological University
December 2012
In fulfillment for the award of the degree
Of
BACHELOR OF ENGINEERING
In
CIVIL ENGINEERING DEPARTMENT
2
About the project site:
Name of the project site: Mondeal Square, HN Safal
Location: Near Karnavati Club, S. G. Highway,
Ahmedabad.
About the project site:
• Premium business landmark of Ahmedabad.
• Exclusively designed for business persons.
• No of floors is Ground+11 floors
• Designed by the German Architecture Blocher & Blocher.
• Structure Consultant is Mr. N.K.Shah
• Project Manager is Mr. Akshay Desai.
3
Chapter – 1
Introduction to
Formwork
4
1. Introduction:
1.1 Definition of Formwork:
When concrete is placed, it is in plastic state. It requires to be supported by temporary
supports and castings of desired shape till it becomes sufficiently strong to support its
own weight. This temporary casing is known as the formwork or forms or shuttering.
1.2 General Introduction:
• Formwork plays a key role in concrete construction.
• Forms are the moulds & dies of concrete construction.
• They mould the concrete to the desired size & shape & control its alignment &
position.
• Formwork also carries the weight of freshly placed concrete and itself besides live
load due to materials, equipment and workmen
5
1.3 Importance of Formwork:
•In the Construction of any building concreting and reinforcement binding is the main
activity after that to hold them in their position Formwork is most important
• Formwork constitutes 20% of the standard cost and 60% of the time in concrete
construction.
• Thus a good formwork system helps in achieving speed, quality, economy and safety
in reinforced concrete construction
6
1.4 Requirement of Formwork:
• To obtain the required shape, size, finish, position and alignment of concrete
members.
• To have enough load carrying, or transferring capacity to take pressure or
weight of fresh concrete and any other loads, without distortion, deflection,
leakage, failure or danger to workmen.
• To have design for quick erection and removal.
• To handle easily using available equipment or manpower.
• Joints between formwork must be tight enough to prevent leakage of grout.
1.5 Based on material Various Types of Formwork are :
 Plywood (Fig-1.1)
 Bamboo (Fig-1.2)
 Steel (Fig-1.3)
 Aluminium (Fig-1.4)
 Plastic (Fig-1.5)
8
Plywood :
Fig-1.1 Plywood Formwork
9
Bamboo:
Fig-1.2 Bamboo Formwork
10
Steel:
Fig-1.3 Steel Formwork
11
Aluminum:
Fig-1.4 Aluminium Formwork
12
Plastic:
Fig-1.5 Plastic Formwork
13
Chapter – 2
Mivan Formwork
System
14
15
The technology has been used extensively in other countries such as Europe, Gulf
Countries, Asia and all other parts of the world.
MIVAN technology is suitable for constructing large number of houses within short
time using room size forms to construct walls and slabs in one continuous pour on
concrete.
Early removal of forms can be achieved by hot air curing / curing compounds.
This facilitates fast construction, say two flats per day.
All the activities are planned in assembly line manner and hence result into more
accurate, well – controlled and high quality production at optimum cost and in shortest
possible time.
16
Fig-2.1 Wall Assembly Details
2.3 Mivan Formwork Assembly:
MIVAN aims in using modern construction techniques and equipment in all its projects.
On leaving the MIVAN factory all panels are clearly labeled to ensure that they are
easily identifiable on site and can be smoothly fitted together using the formwork
modulation drawings. All formwork begins at a corner and proceeds from there.
17
Chapter - 3
Procedure For Using
Mivan Formwork
18
3.0 Procedure For Using Mivan Formwork:
3.1 PRE – CONCRETE ACTIVITIES:
a) Receipt of Equipment on Site – The equipments is received in the site as ordered.
b) Level Surveys – Level checking are made to maintain horizontal level check.
c) Setting Out – The setting out of the formwork is done.
d) Control / Correction of Deviation – Deviation or any correction are carried out.
e) Erect Formwork – The formwork is erected on site.
f) Erect Deck Formwork – Deck is erected for labours to work.
g) Setting Kickers – kickers are provided over the beam.
19
i. Dislodging of pins/wedges due to vibration.
ii. Beam/deck props adjacent to drop areas slipping due to vibration.
iii. Ensure all bracing at special areas slipping due to vibration.
iv. Overspill of concrete at window opening etc.
3.2 ON CONCRETE ACTIVITIES:
20
A) CLEANING:
• All components should be cleaned with scrapers and wire brushes as soon as they are
struck. Wire brush is to be used on side rails only.
B) TRANSPORTING:
• The heaviest and the longest, which is a full height of wall panel, can be carried up
the nearest stairway. Passes through void areas.
C) STRIKING:
• Once cleaned and transported to the next point of erection, panels should be stacked at
right place and in right order.
•D. Erecting of Formwork:
• After that formwork is erect again on the next floor.
3.3 POST – CONCRETE ACTIVITIES:
21
3.4 Sequence For Striking And Erecting The Wall
Mounted On Working Platform is as follows:
Fig-3.4.1 Erection of Platform On 2nd Floor 22
Fig-3.4.2 Striking of formwork
23
Fig-3.4.3 Positioning of Platform
24
Chapter – 4
Comparison of Mivan
Formwork
Components with
Actual Sight Photos 25
4.0 Comparison of Mivan Formwork Components with Actual Sight
Photos:
4.1 Beam Components:
1) Beam Side Panel:- It forms the side of the beams. It is a rectangular structure and is
cut according to the size of the beam
FIG-4.1.1: BEAM SIDE PANEL 26
2) Prop Head for Soffit Beam:- It forms the soffit beam. It is a V-shaped head for
easy dislodging of the formwork.
FIG-4.1.2: PROP HEAD FOR SOFFIT BEAM
27
3) Beam Soffit Panel:- It supports the soffit beam. It is a plain rectangular structure of
aluminum
FIG-4.1.3: BEAM SOFFIT-PANEL
28
4) Beam Soffit Bulkhead:- It is the bulkhead for beam. It carries most of the bulk load.
Fig-4.1.4: Beam Soffit Bulkhead
29
4.2 Deck Component:
1) Deck Panel:- It forms the horizontal surface for casting of slabs. It is built for proper
safety of workers.
FIG-4.2.1: DECK PANEL 30
2) Deck Prop: - It forms a V-shaped prop head. It supports the deck and bears the load
coming on the deck panel.
FIG-4.2.2: DECK PROP
31
3) Prop Length: - It is the length of the prop. It depends upon the length of the slab.
FIG-4.2.3: DECK PROP LENGTH
32
4) Deck Mid – Beam: - It supports the middle portion of the beam. It holds the concrete
FIG-4.2.4: DECK MID-BEAM 33
5) Soffit Length: - It provides support to the edge of the deck panels at their perimeter
of the room.
FIG-4.2.5: SOFFIT LENGTH 34
6) Deck Beam Bar: It is the deck for the beam. This component supports the deck and
beam.
FIG-4.2.5: DECK BEAM BAR
35
4.3 Other Components:
1) Internal Soffit Corner:- It forms the vertical internal corner between the walls and
the beams, slabs, and the horizontal internal cornice between the walls and the beam
slabs and the beam soffit.
FIG-4.3.1: INTERNAL SOFFIT CORNERA
36
FIG-4.3.2: EXTERNAL SOFFIT CORNER
2) External Soffit Corner:- It forms the external corner between the components
37
3) External Corner: It forms the external corner of the formwork system.
FIG- 4.3.3: EXTENAL CORNER 38
4) Internal Corner: - It connects two pieces of vertical formwork pieces at
their exterior
FIG-4.3.4: INTERNAL CORNERS 39
4.4 Wall Components:
1) Wall Panel: It forms the face of the wall. It is an Aluminium sheet properly cut to fit
the exact size of the wall
Fig- 4.4.1: WALL PANEL 40
2) Rocker: It is a supporting component of wall. It is L-shaped panel having allotment
holes for stub pin.
Fig- 4.4.2: ROCKER 41
3) Kicker: It forms the wall face at the top of the panels and acts as a ledge to support
Fig-4.4.3: KICKER 42
4) Stub Pin: It helps in joining two wall panels. It helps in joining two joints
Fig-4.4.4: STUB PIN
43
Chapter – 5
Design,
Specification, &
Work Cycle
44
5.2 Specifications:
1) Aluminium thickness: 0.06 0.08 0.10 0.12 0.15 0.18 0.21 0.25 0.30 0.35 0.40 0.45
0.50mm
2) Panel thickness: 3, 4, 5mm
3) Standard size:-1220x2440x3mm
-1220x2440x4mm
-1220x2440x5mm
45
5.0 Design, Specification, and Speed of Construction (Work Cycle):
5.1 Design Aspects of Mivan:
5.1.1 Buildings are compared as:
i) Conventional RC columns, beams, and slab construction (RC moment resisting framed
structure)
ii) RC load-bearing walls and slabs.
5.3 Work cycle:
5.3.1 The system usually follows a four day cycle:
Day 1: The first activity consists of erection of vertical reinforcement bars and one side
of the vertical formwork for the entire floor or a part of one floor.
Day 2: The second activity involves erection of the second side of the vertical
formwork and formwork for the floor
Day 3: Fixing reinforcement bars for floor slabs and casting of walls and slabs.
Day 4: Removal of vertical form work panels after 24hours, leaving the props in place
for 7 days.
46
Fig-5.4.1: Building Finishes Due To Mivan Formwork
5.4 Quality Advantage of Mivan:
High quality Formwork panels ensure consistency of dimensions.
The high tolerance of the finish means that no further plastering is required.
5.5 The Advantages of Mivan Formwork system:
The MIVAN formwork is specifically designed to allow rapid construction of all types
of architectural layouts.
1) Cost effective.
2) It is more effective for mass housing to be done quickly.
3) Great construction speed.
4) High quality finish.
5) Erected using unskilled labor.
6) Panels can be reused up to 250 times.
48
5.6 Limitation of Mivan Formwork:
1) Because of small sizes finishing lines are seen on the concrete surfaces.
2) It requires uniform planning as well as uniform elevations to be cost effective.
3) Modifications are not possible as all members are caste in RCC.
4) Due to box-type construction shrinkage cracks are likely to appear.
5) Heat of Hydration is high due to shear walls.
49
Chapter – 6
Conventional
( Traditional )
Formwork system
50
6.0 Conventional ( Traditional ) Formwork system:
6.1 In concrete construction formwork is commonly provided for the
following structural members.
• Foundations
• Wall
• Column
• Slabs & Beams
• Stairs
51
6.1.1 Formwork for
foundation
Wall foundations
It consists of
- Plywood Sheeting
- Struts
Column Foundations
It consists of
- Side Supports
- Side Planks
- Cleats 52
Cleat
Side Planks
Side Support
Fig - 6.1.4 Formwork for wall 53
6.1.2 Formwork for Wall:
It consists of
•Timber sheeting
•Vertical posts
•Horizontal members
•Wedges
6.1.3 Formwork for Column :
Fig-6.1.6 Formwork for Column
•It consists of : Side & End Planks, Yokes, & Nut-Bolts
•Two end & two side planks are joined by the yokes and bolts.
• Yokes are the horizontal member which gives support to the side & end planks.
• Yokes are connected to each other by the help of nut & bolts.
54
6.1.4 Formwork for Slabs & beams
It consists of
• Sole plates
• Wedges
• Props
• Head tree
• Planks
• Batten
• Ledgers
• Beam formwork rests on head tree
• Slab form work rests on battens and joists
55
Fig-6.1.10 Formwork for Slab & Beam 56
6.1.5 Formwork for Stairs
It consists of
•Vertical & inclined posts
•Inclined members
•Wooden Planks or sheeting
•Stringer
•Riser Planks
57
6.2 Removal of formwork
Time of formwork removal depends on the following factors
1.Type of Cement
1.Rapid hardening cements require lesser time as compared to OPC (Ordinary
Portland Cement)
2.Ratio of concrete mix
1.Rich ratio concrete gain strength earlier as compared to weak ratio concrete.
3.Weather condition
1.Hydration process accelerates in hot weather conditions as compared to cold and
humid weather conditions
58
Fig- 6.2.1 Removal of Formwork 59
Sr.
No
Structural Member
OPC
(Ordinary Portland
Cement)
Rapid
Hardening
Cement
1 Beam sides, walls & Columns 2-3 Days 2 Days
2 Slab (Vertical Supports remains intact) 4 Days 3 Days
3 Slab (Complete Formwork removal) 10 Days 5 Days
4 Beams (Removal of Sheeting, Props
remains intact)
8 Days 5 Days
5 Beams & Arches (Complete
formwork removal) (up to 6 m span)
14 Days 5-8 Days
6 Beams & Arches (Complete
formwork removal) (more than 6 m span)
21 Days 8-10 Days
6.3 Time of Removal of formwork
60
Work on which would be carried out in next semester :
Applications and comparison among different types of formwork system with its merits
and demerits of one or two of following formwork system….
• Doka formwork system.
• Peri formwork system.
• Coffor formwork system.
• Tabla formwork system.
• Slip formwork system.
61
COFFOR Construction
Technology Pvt. Ltd 62
COFFOR INNOVATIVE
STAY-IN-PLACE
FORMWORK
 COFFOR is a patented structural stay in place formwork
system to build load bearing monolithic structures.
About COFFOR Technology
 It is composed of 2 filtering grids made of rib lathe
reinforced by vertical stiffeners.
About COFFOR Technology
• The grids are connected by articulated rebar loops and
connectors that fold for cost effective transportation.
Different Parts of
COFFOR Formwork
System
65
COFFOR Construction
Technology Pvt. Ltd 66
Part – 1: C-Profile
– This are vertical stiffeners,
– They are made up of 0.6 mm thick GP
sheet.
– Area of profile is 60.6 mm2 (i.e > 8 mm
tor bar)
COFFOR Construction
Technology Pvt. Ltd 67
Part – 2: Rebar
– Rebar's are horizontal stiffeners.
– They are 5 mm MS bars.
COFFOR Construction
Technology Pvt. Ltd 68
Part – 3: Connector
– They connects C profile & Rebar.
– They are made up of 1.6 thick CRCA plate.
COFFOR Construction
Technology Pvt. Ltd 69
Part – 4: Rib Mesh
– Rib meshes are filtering grids.
– They are made up of 0.42 mm thick GP
sheets
COFFOR Construction
Technology Pvt. Ltd
Pane
l
Type
T
(m
m)
A
(m
m)
B
(m
m)
W
(m
m)
H
(mm
)
C 10 100 200 100,
200 300,
500,
700,
900
,
1100
0.5 m
To
5 m
C 16 160 200 100,
200
C 20 200 200 100,
200
C 25 250 200 100,
200
T
H
A
W
T
B
COFFOR Construction
Technology Pvt. Ltd 71
Installation of COFFOR Panels
COFFOR Construction
Technology Pvt. Ltd 73
Individual Bungalow
Strip Footing for Coffor Panel
Installation
Panel Installation up to Plinth
COFFOR Construction
Technology Pvt. Ltd 74
Individual Bungalow
Support provided to the panels
Structure Post-Concreting
COFFOR Construction
Technology Pvt. Ltd 75
Individual Bungalow
Installation of wall panels up to
slab level
Easy insertion of electrical /
plumbing connections
COFFOR Construction
Technology Pvt. Ltd 76
Individual Bungalow
Support & Concrete pouring of
walls & slab at one go
Monolithic Structure
Applications of COFFOR
COFFOR Construction
Technology Pvt. Ltd 78
Individual Bungalow
Plastering is required
All kind of finishing is possible
COFFOR Construction
Technology Pvt. Ltd 79
P+4 Residential Apartment
COFFOR Construction
Technology Pvt. Ltd 80
P+4 Residential Apartment
www.cofforindia.com 81
P + 4 Apartment
Storm Water Drainage
www.cofforindia.com 82
Radius Architectural Designs
COFFOR Construction
Technology Pvt. Ltd 83
Various architectural designs can
be easily done with Coffor
Installation of panels for
underground storage tank
Radius Architectural Designs
COFFOR Construction
Technology Pvt. Ltd 84
Post concrete pouring
Storage tank for explosive material
in Vadodara, Gujarat
Utility Chambers
COFFOR Construction
Technology Pvt. Ltd 85
Utility Chambers
86
COFFOR Construction
Technology Pvt. Ltd 87
Shaped Wall
Various shapes/designs are
possible with Coffor for
door/windows openings
COFFOR Construction
Technology Pvt. Ltd 88
Compound Wall
Panel Installation in Nasik,
Maharashtra
Concrete pouring in progress
Inclined Roof
COFFOR Construction
Technology Pvt. Ltd 89
Slabs & Lintels
COFFOR Construction
Technology Pvt. Ltd 90
COFFOR Construction
Technology Pvt. Ltd 91
Swimming Pool
COFFOR Construction
Technology Pvt. Ltd 92
Water Purification Tank
COFFOR Construction
Technology Pvt. Ltd 93
Water Purification Tank
Water Tanks
COFFOR Construction
Technology Pvt. Ltd 94
•Less Volume Required
•No Shuttering Required
•No Crane Required
•Minimum Reinforcement
•Less allied accessories required
•Multiple Creative possibilities
•Semi-skilled labour’s required
•Less no of labour’s required
•No honey comb in concrete
•Easy installation of Electric and plumbing lines
•Rapid Concrete Shrinkage
•Over all reduction in construction time
•Higher Seismic Resistance
•All types of Finishing Possible
L & T DOKA FORMWORK
L&T – INDIA DOKA - AUSTRIA
TYPES OF FORMWORK SYSTEMS
 STAIR TOWER
 WALL & COLUMN FORMWORK
 CLIMBING FORMWORK
 FLEX SYSTEM
 HEAVY DUTY TOWER
 ACCESS SCAFFOLD
Kind of Formwork:
 SUBSTRUCTURE FORMWORK
 COLUMN FORWORK
 LIFTWALL FORMWORK
 BEAM FORMWORK
 SLAB FORMWORK
 STAIR CASE FORMWORK
SUBSTUCTURE FORMWORK
STUB COLUMN
STEEL WALERS & H 20
BEAM
SIDE SUPPORT,
PROP
FOUNDATION FORMWORK
1. FLOOR FORM 2. FORM CLIP
3. FLOOR FORM CORNER
3
2
1
4. PIPE WALER CLAMP 5. PIPE WALER
SIZE
3000,2000,1500
SIZES
1200,900,600
LAPPING PLATE
4
5
7. WALER CONNECTOR6. STEEL WALER
7
6
9. HEAD ADOPTER ASSEMBLY
8. CT PROP
TYPES
CT 250, CT 300, CT 340, CT 410
10. FOOT ADOPTER ASSEMBLY
8
9
10
COLUMN / WALL FORMWORK
1. H BEAM (H-16 / H – 20)
4. CT PROP
Types
CT 250, CT 300, CT 340, CT 410,
3. TOP SCAFFOLD
BRACKET 60
6. LIFTING BRACKET
1
2
2. STEEL WALER
3
4
6
5. FLANGE CLAW
ASSEMBLY
5
1
3
COLUMN
7.SPLICE PLATE 8.ANGLE PLATE
U
9. UNIVERSAL OUTSIDE
FIXING
10.UNIVERSAL INSIDE CORNER
10
8
9
7
CONNECTING PIN
11
12
11.HEAD ADOPTER ASSEMBLY
ANCHOR PLATE
12.FOOT ADOPTER ASSEMBLY
WING NUT
TIE ROD CONE PLUG (PVC)
PLUG TO GROUT THE PVC TUBE
TIE ROD TUBE (PVC)
EXPENDABLE TIE SLEEVE
FOR REUSABLE TIE ROD 18 MM
TIE ROD CONE
TO ENSURE THE PROPER
FIXING OF PVC TUBES AT TIE
ROD LOCATION AND TO
PREVENT THE SLURRY LOSS
ADJUSTABLE WALING EXTN.
.65 m, 1.20 m
COLUMN FORMWORK
STEEL SHUTTER PLATES
18 MM PLY INSIDE , STEEL
WALERS, H 20 BEAMS
LIFTWALL FORMWORK
PLATFORM FOR
CONCRETING
CT PROP 300
ALIGNMENT
PROP
SLAB FORMWORK
SECONDARY
BEAM
PRIMARY BEAM
BEAM FORMING
HEAD
CT PROP
FLEX SYSTEM FOR RCC SLAB (Upto 4.5m Height)
FOUR WAY
HEAD
FLEX SYSTEM
2.CT PROP
Types
CT 250, CT 300, CT 340, CT 410
4.FOLDING TRIPOD
I
1. H BEAM (H-16 / H – 20)
3.FOUR WAY HEAD
1
2
3
4
SUPPORTING HEAD
ASSEMBLY WEDGE CLAMP
BEAM FORMING HEAD
BEAM FORMING
SUPPORT
3. ADJUSTABLE BEAM SIDE EXTN.
1. BEAM FORMING SUPPORT
2. BEAM FORMING SUPPORT EXTN.
AVAILABILITY
600,800, 1000,1200
1
2
BEAM SIDE SUPPORTS
FLEX TABLE SYSTEM
18 MM PLY
WOOD
STAIRCASE FORMWORK
WORKING PLATFORM AT HEIGHT
HEAVY DUTY
TOWERS
(EACH HDT TOWER CARRIES
25 T LOAD)
Sizes
0.90,1.20,1.50,1.80 M
1. BASIC FRAME 2. HORIZONTAL BRACING AND DIAGONAL
BRACING
4. U-HEAD
1
2 3
4
3. FOOT PLATE
SPRING LOCKED CONNECTING PIN
5.TOWER SPINDLE WITH LEVER
NUT
LOAD BEARING MEMBER FOR
BEAM
TO ADJUST THE HEIGHT OF TOWER
7.SHORT PROP
IT IS USED IN SLAB AND BEAM
FORMWORK FOR TRANSFERRING
THE SLAB LOAD TO THE BEARING
TOWERS THROUGH STANDARD
WALERS
8.LTS-WHEEL B
TO BE FIXED WITH
BOTTOM FRAME OF STAIR
TOWER / HDT TO SHIFT ONE
PLACE TO ANOTHER PLACE
5
6
7
8
HD COUPLER
BEAM SPAN 1525
6.BEAM SPAN 2230
STAIR TOWER / ACCESS SCAFFOLD
STAIR TOWER /
ACCESS
SCAFFOLD
ADVANTAGES
● HIGH LABOR PRODUCTIVITY (APPROX 8 TO 10 SQ.M
PER MAN-DAY)
● SIMPLE DESHUTTERING OPERATION
● MINIMIZES MAKING / ASSEMBLY TIME AND COST AT
SITE
● ENTIRE ASSEMBLY CAN BE LIFTED WITH CRANE
● SYSTEM IS RIGID AND STABLE
● CLEAN ACCURATE AND SMOOTH CONCRETE FINISH
It is a German base Company
Now a days it is used in our city
Ahmedabad at two places
1. BRTS Bus Stop
2. Savvy Swaraj Sports City
Peri form materials are available in
1.Plywood as well as in
2. Steel
Basic Components of Peri
Formwork
Cup-lock
Threaded Anchor Plate
Wing Nut
Steel Waller
Steel
Tension
Rod
Tripod
Tripod is the main
basic component of
the system.
It needs hard and
good resting surface.
All the loads
coming through the
slab, beam and
column is transferred
to the Tripod through
the CT Props.
CT-Prop
Height
should be
adjust by
this jacking
system
through
threads.
Column
Panels
Four Way
Head CT-
Prop
Slab Formwork
Distance
between 2 ct -
props are 30 cms
Trio
Secondary
Girder
Main
Girder
Plywood
Sheet
supported on
Secondary
Beam which
is supported
on Primary
Beam which
rests on Four-
head CT
Props
VT-20
Girder
Plates
supported
on CT
Props
Two VT-
20 Girders
are joined
through
the Steel
Rod and
Threaded
anchor
plate
GT-24 Girder
Main Props
Intermediate Props
Photo of
VT-20
Girders
from the
Top Slab
Level
Peri Sky Deck
Alluminium Forms
Cover strip
(Required when
Drop head is
used)
Wall Formwork
Wall
Panel
Arrangement
of Wall
Panels Before
Concreting
Two
Adjacent
Wall
Panel
Two
Panels
are
joined
through
Cup-lock
Two
Parallel
wall
panels are
joined
through
the Steel
Tension
Rod
Steel
Waller to
Join Two
Column
Panels
Joining of
four panels
through
Cup - lock,
Steel Rod,
and Steel
Waller
Column Formwork
Column
Panel
Supports
Beam Formwork
Cross Head
CT Prop
Beam Head
Locker
Tripod
Stacking of different
types of forms
on Site
Finishing Work
Some Site
Photographs
Comparison of different kinds
of Formworks used with in
Indian Construction Industry
207
BEST
GOOD
MEDIUM
In comparison we have given the
score as per below colour code
209
Factors Affecting Conventional Mivan Coffor Peri Doka
Initial Cost
Weight
Re-use
Maintenance cost
Scrap Value
Construction speed
Volume of Required
material
Seismic Resistance
Formwork Material
Pilferage
Formwork Material
Shrinkage
Possibility of Damage
Handling of Equipment
210
Factors Affecting Conventional Mivan Coffor Peri Doka
Finishing
No. of labour’s required
Reinforcement
Requirement
Monolithic Structure
Allied Accessories
Supply & Availability of
Formwork
During Concreting Quality
Check
On site assembly of
formwork
Labour Skill set required
No of post concrete
procedures
BEST GOOD MEDIUM
Conclusion of the
Project
• Summary:
The structural form of the building is one of the critical factors to
determine the choice of formwork
System products contribute much in the success of formwork
application
The choice and arrangement of utilizing formwork is highly depended
on individual site/project environment
More collaboration between client, design teams and contractor can
help in the effective use of more advance formwork systems
Thank you SIR

Contenu connexe

Tendances

Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction purvi golecha
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionJenilPatel22
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential buildingK.MAHESH KUMAR
 
Steel building design worked example
Steel building design worked exampleSteel building design worked example
Steel building design worked exampleMd. Shahadat Hossain
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Introduction
IntroductionIntroduction
Introductionsky hawk
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C BeamAr. Aakansha
 
50727481 checklist-for-site-works
50727481 checklist-for-site-works50727481 checklist-for-site-works
50727481 checklist-for-site-worksimaduddin91
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formworkchaitanyakrsk
 
Precast structure
Precast structurePrecast structure
Precast structurepiyush9392
 
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...Bala Balaji
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingTarun kumar
 

Tendances (20)

Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential building
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
 
Steel building design worked example
Steel building design worked exampleSteel building design worked example
Steel building design worked example
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Mivan tech
Mivan techMivan tech
Mivan tech
 
Introduction
IntroductionIntroduction
Introduction
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Lecture 8 raft foundation
Lecture 8 raft foundationLecture 8 raft foundation
Lecture 8 raft foundation
 
ibs 304
ibs 304ibs 304
ibs 304
 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
 
50727481 checklist-for-site-works
50727481 checklist-for-site-works50727481 checklist-for-site-works
50727481 checklist-for-site-works
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
Precast structure
Precast structurePrecast structure
Precast structure
 
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied building
 

En vedette

Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineeringFazal-E- Jalal
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awarenessedale07
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 

En vedette (6)

Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Formwork
FormworkFormwork
Formwork
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 

Similaire à Different Types of Formwork Syetem Used within Indian Construction Industry

Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1chongyih2
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniquekvijay31
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology IOng Shi Hui
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”IRJET Journal
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
civil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasancivil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasanEngr Mirza S Hasan
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
industrial training report
industrial training reportindustrial training report
industrial training reportdavid minja
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated ColumnAnees Khan
 
Seismic Analysis of Braced Frame with Different Base Condition
Seismic Analysis of Braced Frame with Different Base ConditionSeismic Analysis of Braced Frame with Different Base Condition
Seismic Analysis of Braced Frame with Different Base ConditionIRJET Journal
 
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET Journal
 
Summer training report
Summer training reportSummer training report
Summer training reportaki8872233
 
Progressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresProgressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresIRJET Journal
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...IRJET Journal
 

Similaire à Different Types of Formwork Syetem Used within Indian Construction Industry (20)

Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Site visit report
Site visit reportSite visit report
Site visit report
 
civil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasancivil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasan
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
industrial training report
industrial training reportindustrial training report
industrial training report
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
Seismic Analysis of Braced Frame with Different Base Condition
Seismic Analysis of Braced Frame with Different Base ConditionSeismic Analysis of Braced Frame with Different Base Condition
Seismic Analysis of Braced Frame with Different Base Condition
 
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Progressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresProgressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC Structures
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
 

Plus de Abhishek Shah

STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...Abhishek Shah
 
Mechanical Compaction of Concrete
Mechanical Compaction of Concrete Mechanical Compaction of Concrete
Mechanical Compaction of Concrete Abhishek Shah
 
Standard test on fresh concrete
Standard test on fresh concreteStandard test on fresh concrete
Standard test on fresh concreteAbhishek Shah
 
Application & Comparison of different Formwork System used within Ind...
Application  &  Comparison  of  different  Formwork System  used  within  Ind...Application  &  Comparison  of  different  Formwork System  used  within  Ind...
Application & Comparison of different Formwork System used within Ind...Abhishek Shah
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 
Ready Mix Concrete: Economic and Qualitative Growth for Construction Industry
Ready Mix Concrete: Economic and Qualitative Growth for Construction IndustryReady Mix Concrete: Economic and Qualitative Growth for Construction Industry
Ready Mix Concrete: Economic and Qualitative Growth for Construction IndustryAbhishek Shah
 
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons..."Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...Abhishek Shah
 

Plus de Abhishek Shah (8)

STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
 
Mechanical Compaction of Concrete
Mechanical Compaction of Concrete Mechanical Compaction of Concrete
Mechanical Compaction of Concrete
 
Ready Mix Concrete
Ready Mix ConcreteReady Mix Concrete
Ready Mix Concrete
 
Standard test on fresh concrete
Standard test on fresh concreteStandard test on fresh concrete
Standard test on fresh concrete
 
Application & Comparison of different Formwork System used within Ind...
Application  &  Comparison  of  different  Formwork System  used  within  Ind...Application  &  Comparison  of  different  Formwork System  used  within  Ind...
Application & Comparison of different Formwork System used within Ind...
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
Ready Mix Concrete: Economic and Qualitative Growth for Construction Industry
Ready Mix Concrete: Economic and Qualitative Growth for Construction IndustryReady Mix Concrete: Economic and Qualitative Growth for Construction Industry
Ready Mix Concrete: Economic and Qualitative Growth for Construction Industry
 
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons..."Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
 

Dernier

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Dernier (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Different Types of Formwork Syetem Used within Indian Construction Industry

  • 1. Application & Comparison of different Formwork System used within Indian Construction Industry A Project Report Submitted by: ABHISHEK SHAH 090670106002 ABHISHEK ASNANI 100673106003 RUDRADATTSINH CHUDASAMA 090670106049 MANISH VALAND 090670106043 1
  • 2. SAL INSTITUTE OF TECHNOLOGY AND ENGINEERING RESEARCH AHMEDABAD Gujarat Technological University December 2012 In fulfillment for the award of the degree Of BACHELOR OF ENGINEERING In CIVIL ENGINEERING DEPARTMENT 2
  • 3. About the project site: Name of the project site: Mondeal Square, HN Safal Location: Near Karnavati Club, S. G. Highway, Ahmedabad. About the project site: • Premium business landmark of Ahmedabad. • Exclusively designed for business persons. • No of floors is Ground+11 floors • Designed by the German Architecture Blocher & Blocher. • Structure Consultant is Mr. N.K.Shah • Project Manager is Mr. Akshay Desai. 3
  • 5. 1. Introduction: 1.1 Definition of Formwork: When concrete is placed, it is in plastic state. It requires to be supported by temporary supports and castings of desired shape till it becomes sufficiently strong to support its own weight. This temporary casing is known as the formwork or forms or shuttering. 1.2 General Introduction: • Formwork plays a key role in concrete construction. • Forms are the moulds & dies of concrete construction. • They mould the concrete to the desired size & shape & control its alignment & position. • Formwork also carries the weight of freshly placed concrete and itself besides live load due to materials, equipment and workmen 5
  • 6. 1.3 Importance of Formwork: •In the Construction of any building concreting and reinforcement binding is the main activity after that to hold them in their position Formwork is most important • Formwork constitutes 20% of the standard cost and 60% of the time in concrete construction. • Thus a good formwork system helps in achieving speed, quality, economy and safety in reinforced concrete construction 6
  • 7. 1.4 Requirement of Formwork: • To obtain the required shape, size, finish, position and alignment of concrete members. • To have enough load carrying, or transferring capacity to take pressure or weight of fresh concrete and any other loads, without distortion, deflection, leakage, failure or danger to workmen. • To have design for quick erection and removal. • To handle easily using available equipment or manpower. • Joints between formwork must be tight enough to prevent leakage of grout.
  • 8. 1.5 Based on material Various Types of Formwork are :  Plywood (Fig-1.1)  Bamboo (Fig-1.2)  Steel (Fig-1.3)  Aluminium (Fig-1.4)  Plastic (Fig-1.5) 8
  • 14. Chapter – 2 Mivan Formwork System 14
  • 15. 15
  • 16. The technology has been used extensively in other countries such as Europe, Gulf Countries, Asia and all other parts of the world. MIVAN technology is suitable for constructing large number of houses within short time using room size forms to construct walls and slabs in one continuous pour on concrete. Early removal of forms can be achieved by hot air curing / curing compounds. This facilitates fast construction, say two flats per day. All the activities are planned in assembly line manner and hence result into more accurate, well – controlled and high quality production at optimum cost and in shortest possible time. 16
  • 17. Fig-2.1 Wall Assembly Details 2.3 Mivan Formwork Assembly: MIVAN aims in using modern construction techniques and equipment in all its projects. On leaving the MIVAN factory all panels are clearly labeled to ensure that they are easily identifiable on site and can be smoothly fitted together using the formwork modulation drawings. All formwork begins at a corner and proceeds from there. 17
  • 18. Chapter - 3 Procedure For Using Mivan Formwork 18
  • 19. 3.0 Procedure For Using Mivan Formwork: 3.1 PRE – CONCRETE ACTIVITIES: a) Receipt of Equipment on Site – The equipments is received in the site as ordered. b) Level Surveys – Level checking are made to maintain horizontal level check. c) Setting Out – The setting out of the formwork is done. d) Control / Correction of Deviation – Deviation or any correction are carried out. e) Erect Formwork – The formwork is erected on site. f) Erect Deck Formwork – Deck is erected for labours to work. g) Setting Kickers – kickers are provided over the beam. 19
  • 20. i. Dislodging of pins/wedges due to vibration. ii. Beam/deck props adjacent to drop areas slipping due to vibration. iii. Ensure all bracing at special areas slipping due to vibration. iv. Overspill of concrete at window opening etc. 3.2 ON CONCRETE ACTIVITIES: 20
  • 21. A) CLEANING: • All components should be cleaned with scrapers and wire brushes as soon as they are struck. Wire brush is to be used on side rails only. B) TRANSPORTING: • The heaviest and the longest, which is a full height of wall panel, can be carried up the nearest stairway. Passes through void areas. C) STRIKING: • Once cleaned and transported to the next point of erection, panels should be stacked at right place and in right order. •D. Erecting of Formwork: • After that formwork is erect again on the next floor. 3.3 POST – CONCRETE ACTIVITIES: 21
  • 22. 3.4 Sequence For Striking And Erecting The Wall Mounted On Working Platform is as follows: Fig-3.4.1 Erection of Platform On 2nd Floor 22
  • 23. Fig-3.4.2 Striking of formwork 23
  • 25. Chapter – 4 Comparison of Mivan Formwork Components with Actual Sight Photos 25
  • 26. 4.0 Comparison of Mivan Formwork Components with Actual Sight Photos: 4.1 Beam Components: 1) Beam Side Panel:- It forms the side of the beams. It is a rectangular structure and is cut according to the size of the beam FIG-4.1.1: BEAM SIDE PANEL 26
  • 27. 2) Prop Head for Soffit Beam:- It forms the soffit beam. It is a V-shaped head for easy dislodging of the formwork. FIG-4.1.2: PROP HEAD FOR SOFFIT BEAM 27
  • 28. 3) Beam Soffit Panel:- It supports the soffit beam. It is a plain rectangular structure of aluminum FIG-4.1.3: BEAM SOFFIT-PANEL 28
  • 29. 4) Beam Soffit Bulkhead:- It is the bulkhead for beam. It carries most of the bulk load. Fig-4.1.4: Beam Soffit Bulkhead 29
  • 30. 4.2 Deck Component: 1) Deck Panel:- It forms the horizontal surface for casting of slabs. It is built for proper safety of workers. FIG-4.2.1: DECK PANEL 30
  • 31. 2) Deck Prop: - It forms a V-shaped prop head. It supports the deck and bears the load coming on the deck panel. FIG-4.2.2: DECK PROP 31
  • 32. 3) Prop Length: - It is the length of the prop. It depends upon the length of the slab. FIG-4.2.3: DECK PROP LENGTH 32
  • 33. 4) Deck Mid – Beam: - It supports the middle portion of the beam. It holds the concrete FIG-4.2.4: DECK MID-BEAM 33
  • 34. 5) Soffit Length: - It provides support to the edge of the deck panels at their perimeter of the room. FIG-4.2.5: SOFFIT LENGTH 34
  • 35. 6) Deck Beam Bar: It is the deck for the beam. This component supports the deck and beam. FIG-4.2.5: DECK BEAM BAR 35
  • 36. 4.3 Other Components: 1) Internal Soffit Corner:- It forms the vertical internal corner between the walls and the beams, slabs, and the horizontal internal cornice between the walls and the beam slabs and the beam soffit. FIG-4.3.1: INTERNAL SOFFIT CORNERA 36
  • 37. FIG-4.3.2: EXTERNAL SOFFIT CORNER 2) External Soffit Corner:- It forms the external corner between the components 37
  • 38. 3) External Corner: It forms the external corner of the formwork system. FIG- 4.3.3: EXTENAL CORNER 38
  • 39. 4) Internal Corner: - It connects two pieces of vertical formwork pieces at their exterior FIG-4.3.4: INTERNAL CORNERS 39
  • 40. 4.4 Wall Components: 1) Wall Panel: It forms the face of the wall. It is an Aluminium sheet properly cut to fit the exact size of the wall Fig- 4.4.1: WALL PANEL 40
  • 41. 2) Rocker: It is a supporting component of wall. It is L-shaped panel having allotment holes for stub pin. Fig- 4.4.2: ROCKER 41
  • 42. 3) Kicker: It forms the wall face at the top of the panels and acts as a ledge to support Fig-4.4.3: KICKER 42
  • 43. 4) Stub Pin: It helps in joining two wall panels. It helps in joining two joints Fig-4.4.4: STUB PIN 43
  • 45. 5.2 Specifications: 1) Aluminium thickness: 0.06 0.08 0.10 0.12 0.15 0.18 0.21 0.25 0.30 0.35 0.40 0.45 0.50mm 2) Panel thickness: 3, 4, 5mm 3) Standard size:-1220x2440x3mm -1220x2440x4mm -1220x2440x5mm 45 5.0 Design, Specification, and Speed of Construction (Work Cycle): 5.1 Design Aspects of Mivan: 5.1.1 Buildings are compared as: i) Conventional RC columns, beams, and slab construction (RC moment resisting framed structure) ii) RC load-bearing walls and slabs.
  • 46. 5.3 Work cycle: 5.3.1 The system usually follows a four day cycle: Day 1: The first activity consists of erection of vertical reinforcement bars and one side of the vertical formwork for the entire floor or a part of one floor. Day 2: The second activity involves erection of the second side of the vertical formwork and formwork for the floor Day 3: Fixing reinforcement bars for floor slabs and casting of walls and slabs. Day 4: Removal of vertical form work panels after 24hours, leaving the props in place for 7 days. 46
  • 47. Fig-5.4.1: Building Finishes Due To Mivan Formwork 5.4 Quality Advantage of Mivan: High quality Formwork panels ensure consistency of dimensions. The high tolerance of the finish means that no further plastering is required.
  • 48. 5.5 The Advantages of Mivan Formwork system: The MIVAN formwork is specifically designed to allow rapid construction of all types of architectural layouts. 1) Cost effective. 2) It is more effective for mass housing to be done quickly. 3) Great construction speed. 4) High quality finish. 5) Erected using unskilled labor. 6) Panels can be reused up to 250 times. 48
  • 49. 5.6 Limitation of Mivan Formwork: 1) Because of small sizes finishing lines are seen on the concrete surfaces. 2) It requires uniform planning as well as uniform elevations to be cost effective. 3) Modifications are not possible as all members are caste in RCC. 4) Due to box-type construction shrinkage cracks are likely to appear. 5) Heat of Hydration is high due to shear walls. 49
  • 50. Chapter – 6 Conventional ( Traditional ) Formwork system 50
  • 51. 6.0 Conventional ( Traditional ) Formwork system: 6.1 In concrete construction formwork is commonly provided for the following structural members. • Foundations • Wall • Column • Slabs & Beams • Stairs 51
  • 52. 6.1.1 Formwork for foundation Wall foundations It consists of - Plywood Sheeting - Struts Column Foundations It consists of - Side Supports - Side Planks - Cleats 52 Cleat Side Planks Side Support
  • 53. Fig - 6.1.4 Formwork for wall 53 6.1.2 Formwork for Wall: It consists of •Timber sheeting •Vertical posts •Horizontal members •Wedges
  • 54. 6.1.3 Formwork for Column : Fig-6.1.6 Formwork for Column •It consists of : Side & End Planks, Yokes, & Nut-Bolts •Two end & two side planks are joined by the yokes and bolts. • Yokes are the horizontal member which gives support to the side & end planks. • Yokes are connected to each other by the help of nut & bolts. 54
  • 55. 6.1.4 Formwork for Slabs & beams It consists of • Sole plates • Wedges • Props • Head tree • Planks • Batten • Ledgers • Beam formwork rests on head tree • Slab form work rests on battens and joists 55
  • 56. Fig-6.1.10 Formwork for Slab & Beam 56
  • 57. 6.1.5 Formwork for Stairs It consists of •Vertical & inclined posts •Inclined members •Wooden Planks or sheeting •Stringer •Riser Planks 57
  • 58. 6.2 Removal of formwork Time of formwork removal depends on the following factors 1.Type of Cement 1.Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 2.Ratio of concrete mix 1.Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 3.Weather condition 1.Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions 58
  • 59. Fig- 6.2.1 Removal of Formwork 59
  • 60. Sr. No Structural Member OPC (Ordinary Portland Cement) Rapid Hardening Cement 1 Beam sides, walls & Columns 2-3 Days 2 Days 2 Slab (Vertical Supports remains intact) 4 Days 3 Days 3 Slab (Complete Formwork removal) 10 Days 5 Days 4 Beams (Removal of Sheeting, Props remains intact) 8 Days 5 Days 5 Beams & Arches (Complete formwork removal) (up to 6 m span) 14 Days 5-8 Days 6 Beams & Arches (Complete formwork removal) (more than 6 m span) 21 Days 8-10 Days 6.3 Time of Removal of formwork 60
  • 61. Work on which would be carried out in next semester : Applications and comparison among different types of formwork system with its merits and demerits of one or two of following formwork system…. • Doka formwork system. • Peri formwork system. • Coffor formwork system. • Tabla formwork system. • Slip formwork system. 61
  • 62. COFFOR Construction Technology Pvt. Ltd 62 COFFOR INNOVATIVE STAY-IN-PLACE FORMWORK
  • 63.  COFFOR is a patented structural stay in place formwork system to build load bearing monolithic structures. About COFFOR Technology
  • 64.  It is composed of 2 filtering grids made of rib lathe reinforced by vertical stiffeners. About COFFOR Technology • The grids are connected by articulated rebar loops and connectors that fold for cost effective transportation.
  • 65. Different Parts of COFFOR Formwork System 65
  • 66. COFFOR Construction Technology Pvt. Ltd 66 Part – 1: C-Profile – This are vertical stiffeners, – They are made up of 0.6 mm thick GP sheet. – Area of profile is 60.6 mm2 (i.e > 8 mm tor bar)
  • 67. COFFOR Construction Technology Pvt. Ltd 67 Part – 2: Rebar – Rebar's are horizontal stiffeners. – They are 5 mm MS bars.
  • 68. COFFOR Construction Technology Pvt. Ltd 68 Part – 3: Connector – They connects C profile & Rebar. – They are made up of 1.6 thick CRCA plate.
  • 69. COFFOR Construction Technology Pvt. Ltd 69 Part – 4: Rib Mesh – Rib meshes are filtering grids. – They are made up of 0.42 mm thick GP sheets
  • 70. COFFOR Construction Technology Pvt. Ltd Pane l Type T (m m) A (m m) B (m m) W (m m) H (mm ) C 10 100 200 100, 200 300, 500, 700, 900 , 1100 0.5 m To 5 m C 16 160 200 100, 200 C 20 200 200 100, 200 C 25 250 200 100, 200 T H A W T B
  • 73. COFFOR Construction Technology Pvt. Ltd 73 Individual Bungalow Strip Footing for Coffor Panel Installation Panel Installation up to Plinth
  • 74. COFFOR Construction Technology Pvt. Ltd 74 Individual Bungalow Support provided to the panels Structure Post-Concreting
  • 75. COFFOR Construction Technology Pvt. Ltd 75 Individual Bungalow Installation of wall panels up to slab level Easy insertion of electrical / plumbing connections
  • 76. COFFOR Construction Technology Pvt. Ltd 76 Individual Bungalow Support & Concrete pouring of walls & slab at one go Monolithic Structure
  • 78. COFFOR Construction Technology Pvt. Ltd 78 Individual Bungalow Plastering is required All kind of finishing is possible
  • 79. COFFOR Construction Technology Pvt. Ltd 79 P+4 Residential Apartment
  • 80. COFFOR Construction Technology Pvt. Ltd 80 P+4 Residential Apartment
  • 83. Radius Architectural Designs COFFOR Construction Technology Pvt. Ltd 83 Various architectural designs can be easily done with Coffor Installation of panels for underground storage tank
  • 84. Radius Architectural Designs COFFOR Construction Technology Pvt. Ltd 84 Post concrete pouring Storage tank for explosive material in Vadodara, Gujarat
  • 87. COFFOR Construction Technology Pvt. Ltd 87 Shaped Wall Various shapes/designs are possible with Coffor for door/windows openings
  • 88. COFFOR Construction Technology Pvt. Ltd 88 Compound Wall Panel Installation in Nasik, Maharashtra Concrete pouring in progress
  • 90. Slabs & Lintels COFFOR Construction Technology Pvt. Ltd 90
  • 91. COFFOR Construction Technology Pvt. Ltd 91 Swimming Pool
  • 92. COFFOR Construction Technology Pvt. Ltd 92 Water Purification Tank
  • 93. COFFOR Construction Technology Pvt. Ltd 93 Water Purification Tank
  • 95. •Less Volume Required •No Shuttering Required •No Crane Required •Minimum Reinforcement •Less allied accessories required
  • 96. •Multiple Creative possibilities •Semi-skilled labour’s required •Less no of labour’s required •No honey comb in concrete •Easy installation of Electric and plumbing lines •Rapid Concrete Shrinkage
  • 97. •Over all reduction in construction time •Higher Seismic Resistance •All types of Finishing Possible
  • 98. L & T DOKA FORMWORK L&T – INDIA DOKA - AUSTRIA
  • 99. TYPES OF FORMWORK SYSTEMS  STAIR TOWER  WALL & COLUMN FORMWORK  CLIMBING FORMWORK  FLEX SYSTEM  HEAVY DUTY TOWER  ACCESS SCAFFOLD
  • 100. Kind of Formwork:  SUBSTRUCTURE FORMWORK  COLUMN FORWORK  LIFTWALL FORMWORK  BEAM FORMWORK  SLAB FORMWORK  STAIR CASE FORMWORK
  • 101. SUBSTUCTURE FORMWORK STUB COLUMN STEEL WALERS & H 20 BEAM SIDE SUPPORT, PROP
  • 103. 1. FLOOR FORM 2. FORM CLIP 3. FLOOR FORM CORNER 3 2 1
  • 104. 4. PIPE WALER CLAMP 5. PIPE WALER SIZE 3000,2000,1500 SIZES 1200,900,600 LAPPING PLATE 4 5
  • 105. 7. WALER CONNECTOR6. STEEL WALER 7 6
  • 106. 9. HEAD ADOPTER ASSEMBLY 8. CT PROP TYPES CT 250, CT 300, CT 340, CT 410 10. FOOT ADOPTER ASSEMBLY 8 9 10
  • 107. COLUMN / WALL FORMWORK
  • 108. 1. H BEAM (H-16 / H – 20) 4. CT PROP Types CT 250, CT 300, CT 340, CT 410, 3. TOP SCAFFOLD BRACKET 60 6. LIFTING BRACKET 1 2 2. STEEL WALER 3 4 6 5. FLANGE CLAW ASSEMBLY 5 1 3
  • 109. COLUMN 7.SPLICE PLATE 8.ANGLE PLATE U 9. UNIVERSAL OUTSIDE FIXING 10.UNIVERSAL INSIDE CORNER 10 8 9 7
  • 110. CONNECTING PIN 11 12 11.HEAD ADOPTER ASSEMBLY ANCHOR PLATE 12.FOOT ADOPTER ASSEMBLY WING NUT
  • 111. TIE ROD CONE PLUG (PVC) PLUG TO GROUT THE PVC TUBE TIE ROD TUBE (PVC) EXPENDABLE TIE SLEEVE FOR REUSABLE TIE ROD 18 MM TIE ROD CONE TO ENSURE THE PROPER FIXING OF PVC TUBES AT TIE ROD LOCATION AND TO PREVENT THE SLURRY LOSS ADJUSTABLE WALING EXTN. .65 m, 1.20 m
  • 112. COLUMN FORMWORK STEEL SHUTTER PLATES 18 MM PLY INSIDE , STEEL WALERS, H 20 BEAMS
  • 113.
  • 115.
  • 118.
  • 119. FLEX SYSTEM FOR RCC SLAB (Upto 4.5m Height) FOUR WAY HEAD
  • 121. 2.CT PROP Types CT 250, CT 300, CT 340, CT 410 4.FOLDING TRIPOD I 1. H BEAM (H-16 / H – 20) 3.FOUR WAY HEAD 1 2 3 4
  • 122. SUPPORTING HEAD ASSEMBLY WEDGE CLAMP BEAM FORMING HEAD
  • 124. 3. ADJUSTABLE BEAM SIDE EXTN. 1. BEAM FORMING SUPPORT 2. BEAM FORMING SUPPORT EXTN. AVAILABILITY 600,800, 1000,1200 1 2
  • 127.
  • 130.
  • 131.
  • 132. WORKING PLATFORM AT HEIGHT HEAVY DUTY TOWERS (EACH HDT TOWER CARRIES 25 T LOAD)
  • 133. Sizes 0.90,1.20,1.50,1.80 M 1. BASIC FRAME 2. HORIZONTAL BRACING AND DIAGONAL BRACING 4. U-HEAD 1 2 3 4 3. FOOT PLATE SPRING LOCKED CONNECTING PIN
  • 134. 5.TOWER SPINDLE WITH LEVER NUT LOAD BEARING MEMBER FOR BEAM TO ADJUST THE HEIGHT OF TOWER 7.SHORT PROP IT IS USED IN SLAB AND BEAM FORMWORK FOR TRANSFERRING THE SLAB LOAD TO THE BEARING TOWERS THROUGH STANDARD WALERS 8.LTS-WHEEL B TO BE FIXED WITH BOTTOM FRAME OF STAIR TOWER / HDT TO SHIFT ONE PLACE TO ANOTHER PLACE 5 6 7 8 HD COUPLER BEAM SPAN 1525 6.BEAM SPAN 2230
  • 135.
  • 136. STAIR TOWER / ACCESS SCAFFOLD STAIR TOWER / ACCESS SCAFFOLD
  • 137. ADVANTAGES ● HIGH LABOR PRODUCTIVITY (APPROX 8 TO 10 SQ.M PER MAN-DAY) ● SIMPLE DESHUTTERING OPERATION ● MINIMIZES MAKING / ASSEMBLY TIME AND COST AT SITE ● ENTIRE ASSEMBLY CAN BE LIFTED WITH CRANE ● SYSTEM IS RIGID AND STABLE ● CLEAN ACCURATE AND SMOOTH CONCRETE FINISH
  • 138.
  • 139. It is a German base Company Now a days it is used in our city Ahmedabad at two places 1. BRTS Bus Stop 2. Savvy Swaraj Sports City
  • 140. Peri form materials are available in 1.Plywood as well as in 2. Steel
  • 141. Basic Components of Peri Formwork
  • 144. Tripod
  • 145. Tripod is the main basic component of the system. It needs hard and good resting surface. All the loads coming through the slab, beam and column is transferred to the Tripod through the CT Props.
  • 147. Height should be adjust by this jacking system through threads.
  • 151.
  • 152.
  • 153.
  • 154.
  • 155.
  • 156. Distance between 2 ct - props are 30 cms
  • 158.
  • 159. Plywood Sheet supported on Secondary Beam which is supported on Primary Beam which rests on Four- head CT Props
  • 161. Two VT- 20 Girders are joined through the Steel Rod and Threaded anchor plate
  • 162.
  • 163.
  • 167.
  • 168.
  • 170.
  • 171.
  • 172.
  • 173.
  • 181. Joining of four panels through Cup - lock, Steel Rod, and Steel Waller
  • 184.
  • 185.
  • 186.
  • 188. Cross Head CT Prop Beam Head Locker Tripod
  • 189.
  • 190.
  • 191.
  • 192. Stacking of different types of forms on Site
  • 193.
  • 194.
  • 195.
  • 197.
  • 198.
  • 199.
  • 201.
  • 202.
  • 203.
  • 204.
  • 205.
  • 206.
  • 207. Comparison of different kinds of Formworks used with in Indian Construction Industry 207
  • 208. BEST GOOD MEDIUM In comparison we have given the score as per below colour code
  • 209. 209 Factors Affecting Conventional Mivan Coffor Peri Doka Initial Cost Weight Re-use Maintenance cost Scrap Value Construction speed Volume of Required material Seismic Resistance Formwork Material Pilferage Formwork Material Shrinkage Possibility of Damage Handling of Equipment
  • 210. 210 Factors Affecting Conventional Mivan Coffor Peri Doka Finishing No. of labour’s required Reinforcement Requirement Monolithic Structure Allied Accessories Supply & Availability of Formwork During Concreting Quality Check On site assembly of formwork Labour Skill set required No of post concrete procedures BEST GOOD MEDIUM
  • 212. • Summary: The structural form of the building is one of the critical factors to determine the choice of formwork System products contribute much in the success of formwork application The choice and arrangement of utilizing formwork is highly depended on individual site/project environment More collaboration between client, design teams and contractor can help in the effective use of more advance formwork systems