Monthly Status
Briefing
April 2012
Project Background

   The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely
    destroy 2,611 tons of mustard agent in mortar rounds and artillery
    projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).

   Neutralization followed by biotreatment is the technology selected by the
    Department of Defense to destroy the Pueblo chemical weapons stockpile.

   The Program Manager, Assembled Chemical Weapons Alternatives (ACWA),
    headquartered at Aberdeen Proving Ground, Maryland, is responsible for
    managing all aspects of the safe and environmentally sound destruction of
    the chemical weapons stockpiles in Colorado and Kentucky.

   The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc.,
    URS, Parsons, and Battelle Memorial Institute. The BPT functions as the
    systems contractor selected to design, build, systemize, pilot test, operate,
    and close the PCAPP.



                                                                               2
     OPSEC Completed 12 April 2012
Bechtel Pueblo Team

                                         Systems Contractor

 Project management                                           Design/engineering
 Business services                                            Procurement/subcontracting
 Safety and quality                                           Construction



                                        Teaming Subcontractors




   Systemization                     Process design              Environmental permitting
   Pilot testing                     Process equipment            and compliance
   Operations                         fabrication                 Laboratory management
   Closure                           Support to systemization    Pilot testing
                                       and operations


                                                                                             3
     OPSEC Completed 12 April 2012
Staffing


 Bechtel Pueblo Team
  non-manual: 562
     –   Pueblo: 557 (172 local hires)

     – Other locations: 5


 Construction Workers: 571
     – Bechtel direct-hire craft
       workers: 408
     – Subcontractor
       personnel: 163




                                         4
    OPSEC Completed 12 April 2012
Employment Opportunities


             Hotline

     (719)549-4003

            Website

http://pueblo.bechtel.com




                                     5
     OPSEC Completed 12 April 2012
Safety


                           As of March 31, 2012,
                      PCAPP Project staff accomplished:

                                   395 Safe Work Days

                                   2,691,387 Safe Work Hours




                                                                6
  OPSEC Completed 12 April 2012
Destruction Technology




                                  7
  OPSEC Completed 12 April 2012
Pueblo Chemical Agent-Destruction
Pilot Plant—Site Plan




                                    8
  OPSEC Completed 12 April 2012
PCAPP Site Overview


                                            4                                                     3
                                                       5                                                             7
                                                                           2

                                                  1




                                                  6




                                                                                      8

                                          Northwestern Corner - Observation Point

                    1      Enhanced Reconfiguration Building         5    Agent Filtration Area
                    2      Automated Guided Vehicle Corridor         6    Munitions Service Magazine
                    3      Agent Processing Building                 7    Control and Support Building (not shown)
                    4      Biotreatment Area                         8    Munitions Service Magazine corridor

                                                                                                                         9
  OPSEC Completed 12 April 2012
Construction Status – In Progress

   Enhanced Reconfiguration Building– Installation of Load Center 12 has been
    completed and is in process of being turned over to Systemization. Remaining critical
    systems for energetics is the Projectile Mortar Disassembly discharge system
    equipment setting (95%) and 26 minicams (including three monitoring houses).
   Agent Processing Building– electrical conduit, cable and wire pulling (65%), piping
    (58%) and mechanical equipment setting at 98% complete.
   Multi-Purpose Building – Final facility turnover for Beneficial Occupancy* has been
    accepted by systemization for care, custody and control.
   Balance of Facilities– Final piping system pressure testing activities are underway for
    Yard areas and Utility Building.
   Immobilized Cell Bioreactors— Final piping pressure testing is 80% complete. Poly
    Urea specialty coating application is scheduled to start in April.
   Brine Reduction System—Installation of vendor-supplied piping, supports and
    instrumentation at 70% complete.
   Medical Facility—Decontamination room
    mechanical and electrical work, 60% complete.
   Filter Press Building— electrical and piping
    commodities at 85% complete.
                    *”Beneficial Occupancy” is that stage of construction of a facility, before final completion,
                     when it can be occupied for its intended purpose.


                                                                                                                    10
      OPSEC Completed 12 April 2012
Systemization

As the project transitions from construction to systemization, the
following systems have been turned over to the start-up group to begin
the systemization process:
                                                                    Two ERB Critical Power Panels
   Utility Building 480V Substation
                                                                    HVAC Hot Water Distribution to APB
   Agent Processing Building (APB) 480V substation
                                                                    APB supply air handlers chilled water
   APB essential motor control center power
                                                                    Potable Water—Water Utility Drops
   Agent Filtration Area (AFA) instrument air
                                                                    Potable Water—Bulk Chemical Storage Area
   AFA plant air
                                                                    Medical Building
   Biotreatment Area (BTA) Essential motor
    control center

   13.2 kV Switchgear

   HVAC exhaust filter units 07 thru 16, common
    ductwork, and stack

   Agent Filtration Area

   Plant Air System—Enhanced Reconfiguration
    Building (ERB) Distribution

   Standby diesel generator 1A and 1B

   ERB 480V Substation
                                          To learn more about Systemization, watch the video at
                                     http://www.pmacwa.army.mil/info/video/systemization_yt.html

                                                                                                                11
     OPSEC Completed 12 April 2012
Systemization (cont.)
    APB Uninterruptible Power Supply                              Maintenance Building (maintenance area of CSB)

    Instrument Air—IA Compressors, Dryers, Main                   HVAC hot water- ERB distribution
     Air Receiver and Yard Distribution Piping
                                                                   HVAC chilled water – ERB distribution
    Biotreatment Electrical Building Utilities
     Redundant Facility Control System (FCS)                       Multipurpose Building (MPB)*
     Controller                                                    Laundry Area (Located in the MPB)*
    ERB Redundant FCS Controller                                  Two ERB critical power panels*
    Plant Air Compressors, Dryers, Main Air
     Receiver and Yard Distribution Piping

    Utility Building Redundant FCS Controller

    APB Redundant FCS Controller

    Control and Support Building (CSB) Control
     Room Equipment and CSB Redundant FCS
     Controller

    AFA Redundant FCS Controller

    Potable water – BTA distribution

    Four APB critical power panels

    Instrument Air ERB distribution

    Control and Support Building (CSB)


                                            To learn more about Systemization, watch the video at           *Newly added
                                       http://www.pmacwa.army.mil/info/video/systemization_yt.html

                                                                                                                 12
       OPSEC Completed 12 April 2012
Enhanced Reconfiguration Building




                  Munitions Monitoring Enclosures (MME’s) monitor reconfigured munitions for
                  agent contamination before exiting the Explosion Containment Rooms.

                                                                                           13
   OPSEC Completed 12 April 2012
Agent Processing Building




                This is the paint residual removal system, located at the end of the Munitions
                Treatment Unit. The system will remove loose paint from the munition bodies
                while they are still hot. The vacuum then drops the paint into a drum.

                                                                                             14
  OPSEC Completed 12 April 2012
Biotreatment Area (BTA)




              Much progress has been made on the BTA, where the byproduct of neutralized
              mustard agent will be further broken down. Here, Brine Concentrator Feed tanks
              are shown in the background (right), with the Brine Reduction System on the left.
              The tall spikes are lightening protection which surround the BTA.

                                                                                           15
  OPSEC Completed 12 April 2012
Black Hills Energy Tour




                Chris Burke, vice-president of operations for Black Hills Energy, gets
                a tour of the PCAPP plant by Bruce Huenefeld, PCAPP site project
                manager. Officials from the local utility company visited the site on
                March 22 to learn more about the project.

                                                                                         16
  OPSEC Completed 12 April 2012
Contact Information


    Pueblo Chemical                      U.S. Army
Stockpile Outreach Office          Pueblo Chemical Depot
        104 West B Street            45825 Highway 96 East
          719-546-0400                   719-549-4135

           Tom Schultz                 Chuck Sprague
            PCAPP                      Public Affairs Officer
   Public Affairs Specialist
                                          Ken Roque
        Bob Kennemer               Deputy Public Affairs Officer
    Community Outreach
        Manager

        Sandy Romero
  Bechtel Communications
          Manager


                                                                17
   OPSEC Completed 12 April 2012

Contenu connexe

Tendances

DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
Gerard B. Hawkins
 
petrock patricia resume final
petrock patricia resume finalpetrock patricia resume final
petrock patricia resume final
Patricia petrock
 
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
Gerard B. Hawkins
 

Tendances (20)

Study 6: Project Close-out /Post Start-up Review
Study 6: Project Close-out /Post Start-up ReviewStudy 6: Project Close-out /Post Start-up Review
Study 6: Project Close-out /Post Start-up Review
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
Hazard Study Process Glossary
Hazard Study Process GlossaryHazard Study Process Glossary
Hazard Study Process Glossary
 
Fraser Uniquip
Fraser UniquipFraser Uniquip
Fraser Uniquip
 
VULCAN Series A2ST Advanced Alumina Support Technology
VULCAN Series A2ST Advanced Alumina Support TechnologyVULCAN Series A2ST Advanced Alumina Support Technology
VULCAN Series A2ST Advanced Alumina Support Technology
 
Study 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project DefinitionStudy 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project Definition
 
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
 
Fugitive Emissions
Fugitive EmissionsFugitive Emissions
Fugitive Emissions
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit Revamp
 
Reactor Modeling Tools - An Overview
Reactor Modeling Tools - An OverviewReactor Modeling Tools - An Overview
Reactor Modeling Tools - An Overview
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Bhaskar Jha CV
Bhaskar Jha CVBhaskar Jha CV
Bhaskar Jha CV
 
Examination of Critical Centrifugal Fans and Blowers
Examination of Critical Centrifugal Fans and BlowersExamination of Critical Centrifugal Fans and Blowers
Examination of Critical Centrifugal Fans and Blowers
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
 
Shortcut Methods of Distillation Design
Shortcut Methods of Distillation DesignShortcut Methods of Distillation Design
Shortcut Methods of Distillation Design
 
petrock patricia resume final
petrock patricia resume finalpetrock patricia resume final
petrock patricia resume final
 
Catalytic Reforming Technology - Infographics
Catalytic Reforming Technology - InfographicsCatalytic Reforming Technology - Infographics
Catalytic Reforming Technology - Infographics
 
My CV
My CVMy CV
My CV
 
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
 
RPA Excel Templates (Industrial equipment performance test, base on ASME PTCs)
RPA Excel Templates (Industrial equipment performance test, base on ASME PTCs)RPA Excel Templates (Industrial equipment performance test, base on ASME PTCs)
RPA Excel Templates (Industrial equipment performance test, base on ASME PTCs)
 

Similaire à April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Briefing

Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
Yizhe Liu
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Anas Momen
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
Bhupat Kanani
 
Ingenious ProRPM overview
Ingenious ProRPM overviewIngenious ProRPM overview
Ingenious ProRPM overview
ingeniousinc
 
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
Royal Mail
 

Similaire à April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Briefing (20)

May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...
May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...
May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...
 
July 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brie...
July 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brie...July 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brie...
July 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brie...
 
December 2012 PCAPP Monthly Status Briefing
December 2012 PCAPP Monthly Status BriefingDecember 2012 PCAPP Monthly Status Briefing
December 2012 PCAPP Monthly Status Briefing
 
November 2012 BGCAPP Monthly Status Briefing
November 2012 BGCAPP Monthly Status BriefingNovember 2012 BGCAPP Monthly Status Briefing
November 2012 BGCAPP Monthly Status Briefing
 
January 2013 PCAPP Monthly Status Briefing
January 2013 PCAPP Monthly Status BriefingJanuary 2013 PCAPP Monthly Status Briefing
January 2013 PCAPP Monthly Status Briefing
 
February 2013 PCAPP Monthly Status Briefing
February 2013 PCAPP Monthly Status BriefingFebruary 2013 PCAPP Monthly Status Briefing
February 2013 PCAPP Monthly Status Briefing
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves Energy
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
 
September 2012 BGCAPP Monthly Status Briefing
September 2012 BGCAPP Monthly Status BriefingSeptember 2012 BGCAPP Monthly Status Briefing
September 2012 BGCAPP Monthly Status Briefing
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
InduSoft and Genesis RTS - Evolution of Real-Time Operations in the Energy Se...
InduSoft and Genesis RTS - Evolution of Real-Time Operations in the Energy Se...InduSoft and Genesis RTS - Evolution of Real-Time Operations in the Energy Se...
InduSoft and Genesis RTS - Evolution of Real-Time Operations in the Energy Se...
 
Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
October 2012 BGCAPP Monthly Status Briefing
October 2012 BGCAPP Monthly Status BriefingOctober 2012 BGCAPP Monthly Status Briefing
October 2012 BGCAPP Monthly Status Briefing
 
Ingenious ProRPM overview
Ingenious ProRPM overviewIngenious ProRPM overview
Ingenious ProRPM overview
 
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
 
Embedded Service Oriented Monitoring for the Energy Aware Factory
Embedded Service Oriented Monitoring for the Energy Aware Factory Embedded Service Oriented Monitoring for the Energy Aware Factory
Embedded Service Oriented Monitoring for the Energy Aware Factory
 
Oilfield Modeling and Optimization of a Mature Field using Integrated Product...
Oilfield Modeling and Optimization of a Mature Field using Integrated Product...Oilfield Modeling and Optimization of a Mature Field using Integrated Product...
Oilfield Modeling and Optimization of a Mature Field using Integrated Product...
 

Plus de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

Plus de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013
 
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 

Dernier

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Dernier (20)

EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 

April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Briefing

  • 2. Project Background  The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely destroy 2,611 tons of mustard agent in mortar rounds and artillery projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).  Neutralization followed by biotreatment is the technology selected by the Department of Defense to destroy the Pueblo chemical weapons stockpile.  The Program Manager, Assembled Chemical Weapons Alternatives (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in Colorado and Kentucky.  The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc., URS, Parsons, and Battelle Memorial Institute. The BPT functions as the systems contractor selected to design, build, systemize, pilot test, operate, and close the PCAPP. 2 OPSEC Completed 12 April 2012
  • 3. Bechtel Pueblo Team Systems Contractor  Project management  Design/engineering  Business services  Procurement/subcontracting  Safety and quality  Construction Teaming Subcontractors  Systemization  Process design  Environmental permitting  Pilot testing  Process equipment and compliance  Operations fabrication  Laboratory management  Closure  Support to systemization  Pilot testing and operations 3 OPSEC Completed 12 April 2012
  • 4. Staffing  Bechtel Pueblo Team non-manual: 562 – Pueblo: 557 (172 local hires) – Other locations: 5  Construction Workers: 571 – Bechtel direct-hire craft workers: 408 – Subcontractor personnel: 163 4 OPSEC Completed 12 April 2012
  • 5. Employment Opportunities Hotline (719)549-4003 Website http://pueblo.bechtel.com 5 OPSEC Completed 12 April 2012
  • 6. Safety As of March 31, 2012, PCAPP Project staff accomplished:  395 Safe Work Days  2,691,387 Safe Work Hours 6 OPSEC Completed 12 April 2012
  • 7. Destruction Technology 7 OPSEC Completed 12 April 2012
  • 8. Pueblo Chemical Agent-Destruction Pilot Plant—Site Plan 8 OPSEC Completed 12 April 2012
  • 9. PCAPP Site Overview 4 3 5 7 2 1 6 8 Northwestern Corner - Observation Point 1 Enhanced Reconfiguration Building 5 Agent Filtration Area 2 Automated Guided Vehicle Corridor 6 Munitions Service Magazine 3 Agent Processing Building 7 Control and Support Building (not shown) 4 Biotreatment Area 8 Munitions Service Magazine corridor 9 OPSEC Completed 12 April 2012
  • 10. Construction Status – In Progress  Enhanced Reconfiguration Building– Installation of Load Center 12 has been completed and is in process of being turned over to Systemization. Remaining critical systems for energetics is the Projectile Mortar Disassembly discharge system equipment setting (95%) and 26 minicams (including three monitoring houses).  Agent Processing Building– electrical conduit, cable and wire pulling (65%), piping (58%) and mechanical equipment setting at 98% complete.  Multi-Purpose Building – Final facility turnover for Beneficial Occupancy* has been accepted by systemization for care, custody and control.  Balance of Facilities– Final piping system pressure testing activities are underway for Yard areas and Utility Building.  Immobilized Cell Bioreactors— Final piping pressure testing is 80% complete. Poly Urea specialty coating application is scheduled to start in April.  Brine Reduction System—Installation of vendor-supplied piping, supports and instrumentation at 70% complete.  Medical Facility—Decontamination room mechanical and electrical work, 60% complete.  Filter Press Building— electrical and piping commodities at 85% complete. *”Beneficial Occupancy” is that stage of construction of a facility, before final completion, when it can be occupied for its intended purpose. 10 OPSEC Completed 12 April 2012
  • 11. Systemization As the project transitions from construction to systemization, the following systems have been turned over to the start-up group to begin the systemization process:  Two ERB Critical Power Panels  Utility Building 480V Substation  HVAC Hot Water Distribution to APB  Agent Processing Building (APB) 480V substation  APB supply air handlers chilled water  APB essential motor control center power  Potable Water—Water Utility Drops  Agent Filtration Area (AFA) instrument air  Potable Water—Bulk Chemical Storage Area  AFA plant air  Medical Building  Biotreatment Area (BTA) Essential motor control center  13.2 kV Switchgear  HVAC exhaust filter units 07 thru 16, common ductwork, and stack  Agent Filtration Area  Plant Air System—Enhanced Reconfiguration Building (ERB) Distribution  Standby diesel generator 1A and 1B  ERB 480V Substation To learn more about Systemization, watch the video at http://www.pmacwa.army.mil/info/video/systemization_yt.html 11 OPSEC Completed 12 April 2012
  • 12. Systemization (cont.)  APB Uninterruptible Power Supply  Maintenance Building (maintenance area of CSB)  Instrument Air—IA Compressors, Dryers, Main  HVAC hot water- ERB distribution Air Receiver and Yard Distribution Piping  HVAC chilled water – ERB distribution  Biotreatment Electrical Building Utilities Redundant Facility Control System (FCS)  Multipurpose Building (MPB)* Controller  Laundry Area (Located in the MPB)*  ERB Redundant FCS Controller  Two ERB critical power panels*  Plant Air Compressors, Dryers, Main Air Receiver and Yard Distribution Piping  Utility Building Redundant FCS Controller  APB Redundant FCS Controller  Control and Support Building (CSB) Control Room Equipment and CSB Redundant FCS Controller  AFA Redundant FCS Controller  Potable water – BTA distribution  Four APB critical power panels  Instrument Air ERB distribution  Control and Support Building (CSB) To learn more about Systemization, watch the video at *Newly added http://www.pmacwa.army.mil/info/video/systemization_yt.html 12 OPSEC Completed 12 April 2012
  • 13. Enhanced Reconfiguration Building Munitions Monitoring Enclosures (MME’s) monitor reconfigured munitions for agent contamination before exiting the Explosion Containment Rooms. 13 OPSEC Completed 12 April 2012
  • 14. Agent Processing Building This is the paint residual removal system, located at the end of the Munitions Treatment Unit. The system will remove loose paint from the munition bodies while they are still hot. The vacuum then drops the paint into a drum. 14 OPSEC Completed 12 April 2012
  • 15. Biotreatment Area (BTA) Much progress has been made on the BTA, where the byproduct of neutralized mustard agent will be further broken down. Here, Brine Concentrator Feed tanks are shown in the background (right), with the Brine Reduction System on the left. The tall spikes are lightening protection which surround the BTA. 15 OPSEC Completed 12 April 2012
  • 16. Black Hills Energy Tour Chris Burke, vice-president of operations for Black Hills Energy, gets a tour of the PCAPP plant by Bruce Huenefeld, PCAPP site project manager. Officials from the local utility company visited the site on March 22 to learn more about the project. 16 OPSEC Completed 12 April 2012
  • 17. Contact Information Pueblo Chemical U.S. Army Stockpile Outreach Office Pueblo Chemical Depot 104 West B Street 45825 Highway 96 East 719-546-0400 719-549-4135 Tom Schultz Chuck Sprague PCAPP Public Affairs Officer Public Affairs Specialist Ken Roque Bob Kennemer Deputy Public Affairs Officer Community Outreach Manager Sandy Romero Bechtel Communications Manager 17 OPSEC Completed 12 April 2012