SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
Monthly Status
Briefing
September 2011




                 1
Project Background

 The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely
  destroy 523 tons of chemical agent in rockets and artillery projectiles stored
  at the Blue Grass Army Depot in Richmond, Ky.

 The technology selected by the Department of Defense to destroy the Blue
  Grass chemical weapons stockpile is neutralization followed by supercritical
  water oxidation (SCWO).

 The Assembled Chemical Weapons Alternatives (ACWA) Program,
  headquartered at Aberdeen Proving Ground, Maryland, is responsible for
  managing all aspects of the safe and environmentally sound destruction of
  the chemical weapons stockpiles in both Kentucky and Colorado.

 The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National,
  Inc., and Parsons Infrastructure and Technology Group, along with teaming
  partners URS Corporation, Battelle Memorial Institute, General Atomics and
  General Physics, is the systems contractor selected to design, build,
  systemize, pilot test, operate and close the BGCAPP.




                                                                              2
Destruction Technology




                         Neutralization followed by
                         supercritical water
                         oxidation will be used to
                         destroy the Kentucky
                         stockpile.




                                               3
Safety


          Continued progress toward OSHA
          Voluntary Protection Program Star Status
          Lost-time injury rate 93 percent lower
          and recordable injury rate 67 percent
          lower than industry average
          As of August 31, 2011, the project has
          completed 818,348 hours and
          175 days without a lost-time accident




               (12-month rolling rate)
               Accidents per 200,000 job hours




                                                     4
Current Project Staffing


 Total project
 employment―888
 Richmond, Ky.―741
  •   Nonmanual―388
  •   Craft―353
  •   Local hires―58 percent
 Other locations―147
  •   Pasco, WA
  •   San Diego, CA
  •   Columbus, OH
  •   Frederick, MD


                               More than half of the BGCAPP project
                               workforce are hired from the local area.


                                                                          5
Economic Impact



 Acquisitions to date
  •   $74.8 million spent with Kentucky companies
  •   $44.6 million spent in Madison and surrounding counties
 Payroll to date
  •   $201 million of local payroll paid
  •   $426 million more to be paid during the remainder of project




                                                                     6
Construction Work in Progress

                                    5                               4




                                                                              3

                        1                                     2




1
   Control and Support Building (CSB)                2 Munitions Demilitarization Building (MDB)
                                                       
    • Metal wall studs and sheet rock                     • First and second lift concrete placements

    • Electrical, piping and fire detection systems       • Structural steel and wall paneling

    • Heating, ventilation and air conditioning (HVAC)    • Electrical and piping systems

3
   Utility Building                                      • Vessels and tanks
    • Electrical, piping and HVAC systems             4 Supercritical Water Oxidation (SCWO) Building
                                                       
    • Exterior tanks                                     (not visible in photo)
                                                          • Pipe rack steel and equipment tanks

                                                      5 Laboratory Building
                                                       
                                                     (not visible in photo)
                                                      •   Concrete foundation placements

                                                                                            7
Control and Support
Building (CSB)




BGCAPP craft workers (above left) safely fasten sheetrock to metal wall studs inside the CSB.
Outside the CSB, craft workers (above right) erect support steel for external piping systems.
Once complete, the CSB will house the control room and integrated control system used to
operate BGCAPP.




                                                                                          8
Munitions Demilitarization
Building (MDB)




BGCAPP construction craft workers (above left) continue erecting structural steel and preparing
for more elevated concrete placements. Meanwhile, at a fabrication shop in Pasco, Wash.,
assembly of the Rocket Cutter (above, right, top) and Shear (above, right, bottom) machines
continued. This Blue Grass Specific Equipment is designed to separate rocket motors from the
portions containing agent and cut rockets into pieces and drain the agent. The MDB is where the
chemical weapons will be disassembled, explosives removed and the agent neutralized.




                                                                                         9
Supercritical Water Oxidation
(SCWO) Building




A SCWO emergency relief tank (above) has been placed atop the building’s foundation.
The tank is specially designed for a safe and controlled release of liquid or gas pressure if
ever needed during plant operations. The SCWO Building will house the reactors where
agent and energetic hydrolysates, byproducts of the neutralization process, will be subjected
to very high temperatures and pressures to destroy the hydrolysates’ organic content.




                                                                                         10
Laboratory Building




At the Laboratory Building, BGCAPP team members (above left) completed the building’s final
concrete foundation placement. Meanwhile, at a fabrication facility in Elkhart, Ind., workers
have been fabricating and assembling the Laboratory Building’s 20 modular components (above
right) which will later be set atop the completed foundation. The Laboratory will handle and
analyze low concentrations of chemical agent when BGCAPP operations begin.




                                                                                       11
Utility Building (UB)




Inside the fully enclosed UB (above left), BGCAPP craft workers continue installing piping and
equipment systems. Outside the UB, two large compressed air tanks (above right) have been
placed. Once complete, the UB will house equipment to produce steam, compressed air, chilled
water and hot water for operations.




                                                                                         12
Blue Grass Chemical
Agent-Destruction Pilot Plant




                                13

Contenu connexe

Tendances

Tendances (11)

August 2012 BGCAPP Monthly Status Briefing
August 2012 BGCAPP Monthly Status BriefingAugust 2012 BGCAPP Monthly Status Briefing
August 2012 BGCAPP Monthly Status Briefing
 
December 2012 BGCAPP Monthly Status Briefing
December 2012 BGCAPP Monthly Status BriefingDecember 2012 BGCAPP Monthly Status Briefing
December 2012 BGCAPP Monthly Status Briefing
 
January 2013 BGCAPP Monthly Status Briefing
January 2013 BGCAPP Monthly Status BriefingJanuary 2013 BGCAPP Monthly Status Briefing
January 2013 BGCAPP Monthly Status Briefing
 
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
 
September 2012 BGCAPP Monthly Status Briefing
September 2012 BGCAPP Monthly Status BriefingSeptember 2012 BGCAPP Monthly Status Briefing
September 2012 BGCAPP Monthly Status Briefing
 
February 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status BriefingFebruary 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status Briefing
 
October 2012 BGCAPP Monthly Status Briefing
October 2012 BGCAPP Monthly Status BriefingOctober 2012 BGCAPP Monthly Status Briefing
October 2012 BGCAPP Monthly Status Briefing
 
February 2013 PCAPP Monthly Status Briefing
February 2013 PCAPP Monthly Status BriefingFebruary 2013 PCAPP Monthly Status Briefing
February 2013 PCAPP Monthly Status Briefing
 
December 2012 PCAPP Monthly Status Briefing
December 2012 PCAPP Monthly Status BriefingDecember 2012 PCAPP Monthly Status Briefing
December 2012 PCAPP Monthly Status Briefing
 
January 2013 PCAPP Monthly Status Briefing
January 2013 PCAPP Monthly Status BriefingJanuary 2013 PCAPP Monthly Status Briefing
January 2013 PCAPP Monthly Status Briefing
 
November 2012 BGCAPP Monthly Status Briefing
November 2012 BGCAPP Monthly Status BriefingNovember 2012 BGCAPP Monthly Status Briefing
November 2012 BGCAPP Monthly Status Briefing
 

Similaire à BGCAPP Monthly Status Briefing - September 2011

Reactor Building Integration_ Final Presentation_ Spring 2014 pfp
Reactor Building Integration_ Final Presentation_ Spring 2014 pfpReactor Building Integration_ Final Presentation_ Spring 2014 pfp
Reactor Building Integration_ Final Presentation_ Spring 2014 pfp
Huu Duy Nguyen
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
Maria Archana
 
Brian Beekley Poster Final
Brian Beekley Poster FinalBrian Beekley Poster Final
Brian Beekley Poster Final
Brian Beekley
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
ssuser8685dc
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
Dan Caouette
 

Similaire à BGCAPP Monthly Status Briefing - September 2011 (19)

BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...
 
Reactor Building Integration_ Final Presentation_ Spring 2014 pfp
Reactor Building Integration_ Final Presentation_ Spring 2014 pfpReactor Building Integration_ Final Presentation_ Spring 2014 pfp
Reactor Building Integration_ Final Presentation_ Spring 2014 pfp
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
4 Projects
4 Projects4 Projects
4 Projects
 
8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 
Brian Beekley Poster Final
Brian Beekley Poster FinalBrian Beekley Poster Final
Brian Beekley Poster Final
 
Biotech Facility Modular Construction
Biotech Facility Modular ConstructionBiotech Facility Modular Construction
Biotech Facility Modular Construction
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Article_Proof
Article_ProofArticle_Proof
Article_Proof
 
Clo2 system l stn 001
Clo2 system l stn 001  Clo2 system l stn 001
Clo2 system l stn 001
 
Pueblo Chemical Agent-Destruction Pilot Plant Explosive Destruction System (...
Pueblo Chemical Agent-Destruction Pilot Plant Explosive Destruction System (...Pueblo Chemical Agent-Destruction Pilot Plant Explosive Destruction System (...
Pueblo Chemical Agent-Destruction Pilot Plant Explosive Destruction System (...
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
Introduction to PCB Design (Eagle)
Introduction to PCB Design (Eagle)Introduction to PCB Design (Eagle)
Introduction to PCB Design (Eagle)
 
CV_AKSHAY RAJPUT
CV_AKSHAY RAJPUTCV_AKSHAY RAJPUT
CV_AKSHAY RAJPUT
 

Plus de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

Plus de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013
 
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 
Economic Development Working Group Update
Economic Development Working Group UpdateEconomic Development Working Group Update
Economic Development Working Group Update
 
Blue Grass Chemical Activity Update 12 September 2012
Blue Grass Chemical Activity Update 12 September 2012Blue Grass Chemical Activity Update 12 September 2012
Blue Grass Chemical Activity Update 12 September 2012
 
Explosive Destruction Technologies Summary 23 October 2013
Explosive Destruction Technologies Summary 23 October 2013Explosive Destruction Technologies Summary 23 October 2013
Explosive Destruction Technologies Summary 23 October 2013
 

Dernier

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Dernier (20)

Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 

BGCAPP Monthly Status Briefing - September 2011

  • 2. Project Background  The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.  The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).  The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.  The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close the BGCAPP. 2
  • 3. Destruction Technology Neutralization followed by supercritical water oxidation will be used to destroy the Kentucky stockpile. 3
  • 4. Safety  Continued progress toward OSHA Voluntary Protection Program Star Status  Lost-time injury rate 93 percent lower and recordable injury rate 67 percent lower than industry average  As of August 31, 2011, the project has completed 818,348 hours and 175 days without a lost-time accident (12-month rolling rate) Accidents per 200,000 job hours 4
  • 5. Current Project Staffing  Total project employment―888  Richmond, Ky.―741 • Nonmanual―388 • Craft―353 • Local hires―58 percent  Other locations―147 • Pasco, WA • San Diego, CA • Columbus, OH • Frederick, MD More than half of the BGCAPP project workforce are hired from the local area. 5
  • 6. Economic Impact  Acquisitions to date • $74.8 million spent with Kentucky companies • $44.6 million spent in Madison and surrounding counties  Payroll to date • $201 million of local payroll paid • $426 million more to be paid during the remainder of project 6
  • 7. Construction Work in Progress 5 4 3 1 2 1  Control and Support Building (CSB) 2 Munitions Demilitarization Building (MDB)  • Metal wall studs and sheet rock • First and second lift concrete placements • Electrical, piping and fire detection systems • Structural steel and wall paneling • Heating, ventilation and air conditioning (HVAC) • Electrical and piping systems 3  Utility Building • Vessels and tanks • Electrical, piping and HVAC systems 4 Supercritical Water Oxidation (SCWO) Building  • Exterior tanks (not visible in photo) • Pipe rack steel and equipment tanks 5 Laboratory Building  (not visible in photo) • Concrete foundation placements 7
  • 8. Control and Support Building (CSB) BGCAPP craft workers (above left) safely fasten sheetrock to metal wall studs inside the CSB. Outside the CSB, craft workers (above right) erect support steel for external piping systems. Once complete, the CSB will house the control room and integrated control system used to operate BGCAPP. 8
  • 9. Munitions Demilitarization Building (MDB) BGCAPP construction craft workers (above left) continue erecting structural steel and preparing for more elevated concrete placements. Meanwhile, at a fabrication shop in Pasco, Wash., assembly of the Rocket Cutter (above, right, top) and Shear (above, right, bottom) machines continued. This Blue Grass Specific Equipment is designed to separate rocket motors from the portions containing agent and cut rockets into pieces and drain the agent. The MDB is where the chemical weapons will be disassembled, explosives removed and the agent neutralized. 9
  • 10. Supercritical Water Oxidation (SCWO) Building A SCWO emergency relief tank (above) has been placed atop the building’s foundation. The tank is specially designed for a safe and controlled release of liquid or gas pressure if ever needed during plant operations. The SCWO Building will house the reactors where agent and energetic hydrolysates, byproducts of the neutralization process, will be subjected to very high temperatures and pressures to destroy the hydrolysates’ organic content. 10
  • 11. Laboratory Building At the Laboratory Building, BGCAPP team members (above left) completed the building’s final concrete foundation placement. Meanwhile, at a fabrication facility in Elkhart, Ind., workers have been fabricating and assembling the Laboratory Building’s 20 modular components (above right) which will later be set atop the completed foundation. The Laboratory will handle and analyze low concentrations of chemical agent when BGCAPP operations begin. 11
  • 12. Utility Building (UB) Inside the fully enclosed UB (above left), BGCAPP craft workers continue installing piping and equipment systems. Outside the UB, two large compressed air tanks (above right) have been placed. Once complete, the UB will house equipment to produce steam, compressed air, chilled water and hot water for operations. 12