RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                                  MEASURES IN PLACE


           Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.


                                                                                            Team Leader

                                                                                                                             Assessment Date: 29/05/2012
Accommodation Assessed . Eccles college B12 Classroom                                       Assessor. Adam Robinson


                                                                                                                                   RISK (with controls)         Additional
                                    Who might be
          HAZARD                                                               PRECAUTIONS/CONTROLS                                                             Controls
                                    harmed and
      potential for harm                                           already in place to remove hazard, reduce risk level             L       S         R         Needed.
                                    how ?
                                                                                                                                                               Details Over
Trips, Slips and Falls                                             •    Make sure all wires are out of the way                      1       2         3
[ Workplace Regs ]                                                 •    Make sure there are no drinks or food near
                                                                        computers or electrical equipment
                                                                   •    Make sure there is carpet rather than any other type
                                                                        of flooring
Fire Hazards                                                       •    Fire Alarm call points located on exit routes               1       3         4
                                                                   •    Keep water and other liquids away from computers
                                                                        and other electrical equipment
Accident                                                           •    24 First Aiders on site                                     1       2         3
                                                                   •    First Aid box available in reception
                                                                   •    Local First Aider
                                                                   •    Contact Reception, 2400 if in any doubt.

The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)   LIKELIHOOD                                             (S)       SEVERITY OF HAZARD                          (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                        (LxS).
1. Hazard exists very infrequently; limited numbers           1.       Could cause minor injury only
exposed                                                       2.          Could cause major injury/3 day or more       Very high risks score 6 or 9
2. Likely to occur; hazard exists intermittently or occurs                absence                                      Moderate risks score 3 or 4
    occasionally                                              3.          Could cause fatality/severe injury           Low priority risks score       1 or 2
3.   Likely to occur soon; permanent hazard or occurs
     daily / repeatedly; many may be exposed            VERY HIGH RISKS NEED IMMEDIATE ACTION

Contenu connexe

Tendances

Incident Investigation “Working to Prevent Recurrence“
Incident Investigation “Working to Prevent Recurrence“Incident Investigation “Working to Prevent Recurrence“
Incident Investigation “Working to Prevent Recurrence“Mario Deshaies
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&SAhmed-Refat Refat
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templatetamz486
 
Painting risk assessment template
Painting   risk assessment template Painting   risk assessment template
Painting risk assessment template Dale Linehan
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Presentation risk assessment training
Presentation risk assessment trainingPresentation risk assessment training
Presentation risk assessment trainingBrian Larkin
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdfRafiullahKhan88
 
Manual handling
Manual handlingManual handling
Manual handlingdoogstone
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptxMoolRaj3
 
OHS Risk Assessment and Hierarchy of Control
OHS Risk Assessment and Hierarchy of ControlOHS Risk Assessment and Hierarchy of Control
OHS Risk Assessment and Hierarchy of ControlPECB
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazardslifecombo
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionProtection
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templatesDwarika Bhushan Sharma
 
Trenching and Excavation Safety
Trenching and Excavation SafetyTrenching and Excavation Safety
Trenching and Excavation SafetyProtection
 

Tendances (20)

Incident Investigation “Working to Prevent Recurrence“
Incident Investigation “Working to Prevent Recurrence“Incident Investigation “Working to Prevent Recurrence“
Incident Investigation “Working to Prevent Recurrence“
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&S
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Painting risk assessment template
Painting   risk assessment template Painting   risk assessment template
Painting risk assessment template
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
Plan de emergencia
Plan de emergenciaPlan de emergencia
Plan de emergencia
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
Presentation risk assessment training
Presentation risk assessment trainingPresentation risk assessment training
Presentation risk assessment training
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
Manual handling
Manual handlingManual handling
Manual handling
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
 
OHS Risk Assessment and Hierarchy of Control
OHS Risk Assessment and Hierarchy of ControlOHS Risk Assessment and Hierarchy of Control
OHS Risk Assessment and Hierarchy of Control
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in Construction
 
ZT Safety Systems 2015
ZT Safety Systems 2015ZT Safety Systems 2015
ZT Safety Systems 2015
 
Safety evaluation Best practices-04.11.10
Safety evaluation   Best practices-04.11.10Safety evaluation   Best practices-04.11.10
Safety evaluation Best practices-04.11.10
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates
 
Trenching and Excavation Safety
Trenching and Excavation SafetyTrenching and Excavation Safety
Trenching and Excavation Safety
 

En vedette

Classroom Instruction Risk Assessment
Classroom Instruction Risk AssessmentClassroom Instruction Risk Assessment
Classroom Instruction Risk AssessmentMintcho Mintchev
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment FormBrett Tinnion
 
Classroom Activity Our Risk Assessment
Classroom Activity Our Risk AssessmentClassroom Activity Our Risk Assessment
Classroom Activity Our Risk AssessmentPaula Owens
 
Choosing the right nursery parents england
Choosing the right nursery parents englandChoosing the right nursery parents england
Choosing the right nursery parents englandgulciny07
 
Risk Assessment Classrooms
Risk Assessment ClassroomsRisk Assessment Classrooms
Risk Assessment ClassroomsJoshuaGillypoop
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment formjamieboon
 
Manufacturing Design Change
Manufacturing Design ChangeManufacturing Design Change
Manufacturing Design ChangeRoy Lunsford
 
Psychological hazard
Psychological hazardPsychological hazard
Psychological hazardfazida76
 
1 events filming risk assessment form-1
1 events   filming risk assessment form-11 events   filming risk assessment form-1
1 events filming risk assessment form-110079613
 
Step by-step guide to risk management
Step by-step guide to risk managementStep by-step guide to risk management
Step by-step guide to risk managementzezawah
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formGraveney School
 

En vedette (14)

Classroom Instruction Risk Assessment
Classroom Instruction Risk AssessmentClassroom Instruction Risk Assessment
Classroom Instruction Risk Assessment
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
 
LO2 - Lesson 10 - Health & Safety
LO2 - Lesson 10 - Health & SafetyLO2 - Lesson 10 - Health & Safety
LO2 - Lesson 10 - Health & Safety
 
Risk assessment c19
Risk assessment c19Risk assessment c19
Risk assessment c19
 
Classroom Activity Our Risk Assessment
Classroom Activity Our Risk AssessmentClassroom Activity Our Risk Assessment
Classroom Activity Our Risk Assessment
 
Choosing the right nursery parents england
Choosing the right nursery parents englandChoosing the right nursery parents england
Choosing the right nursery parents england
 
Risk Assessment Classrooms
Risk Assessment ClassroomsRisk Assessment Classrooms
Risk Assessment Classrooms
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Manufacturing Design Change
Manufacturing Design ChangeManufacturing Design Change
Manufacturing Design Change
 
Psychological hazard
Psychological hazardPsychological hazard
Psychological hazard
 
1 events filming risk assessment form-1
1 events   filming risk assessment form-11 events   filming risk assessment form-1
1 events filming risk assessment form-1
 
Step by-step guide to risk management
Step by-step guide to risk managementStep by-step guide to risk management
Step by-step guide to risk management
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 

Similaire à Risk assessment classroom

Similaire à Risk assessment classroom (18)

Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Risk assessmentjosh
Risk assessmentjoshRisk assessmentjosh
Risk assessmentjosh
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Haccp training
Haccp trainingHaccp training
Haccp training
 
General mining and underground induction
General mining and underground inductionGeneral mining and underground induction
General mining and underground induction
 
Induction warwick revision
Induction warwick revisionInduction warwick revision
Induction warwick revision
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment Form
 
Train Station Risk Assessment
Train Station Risk AssessmentTrain Station Risk Assessment
Train Station Risk Assessment
 
Risk assessment troc
Risk assessment trocRisk assessment troc
Risk assessment troc
 

Plus de adamrobinsonmedia

Plus de adamrobinsonmedia (20)

Short film analasis original
Short film analasis originalShort film analasis original
Short film analasis original
 
Short film analasis original revisted
Short film analasis original revistedShort film analasis original revisted
Short film analasis original revisted
 
Research into hand washing
Research into hand washing Research into hand washing
Research into hand washing
 
Horror1
Horror1Horror1
Horror1
 
Lo3 captin america
Lo3 captin americaLo3 captin america
Lo3 captin america
 
Script for pitch
Script for pitchScript for pitch
Script for pitch
 
Wash your hands! powerpoint presentation
Wash your hands! powerpoint presentationWash your hands! powerpoint presentation
Wash your hands! powerpoint presentation
 
Production schedule
Production scheduleProduction schedule
Production schedule
 
Location reconnaissance town hall
Location reconnaissance town hallLocation reconnaissance town hall
Location reconnaissance town hall
 
Location reconnaissance college
Location reconnaissance collegeLocation reconnaissance college
Location reconnaissance college
 
Results for stop motion
Results for stop motionResults for stop motion
Results for stop motion
 
Adam vocreview
Adam vocreviewAdam vocreview
Adam vocreview
 
Production schedule
Production scheduleProduction schedule
Production schedule
 
Lo3 captin america
Lo3 captin americaLo3 captin america
Lo3 captin america
 
Same film diffrent time and place
Same film diffrent time and placeSame film diffrent time and place
Same film diffrent time and place
 
PR1 How We Analyse a Film
PR1 How We Analyse a FilmPR1 How We Analyse a Film
PR1 How We Analyse a Film
 
NHS Brief Wash Your Hands
NHS Brief Wash Your HandsNHS Brief Wash Your Hands
NHS Brief Wash Your Hands
 
IG5 NHS Brief, In Salford
IG5 NHS Brief, In SalfordIG5 NHS Brief, In Salford
IG5 NHS Brief, In Salford
 
Adam Robinson Evidence for Motion Graphics
Adam Robinson Evidence for Motion Graphics Adam Robinson Evidence for Motion Graphics
Adam Robinson Evidence for Motion Graphics
 
Adam Robinson Film Title Sequence Storyboards
Adam Robinson Film Title Sequence StoryboardsAdam Robinson Film Title Sequence Storyboards
Adam Robinson Film Title Sequence Storyboards
 

Risk assessment classroom

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Team Leader Assessment Date: 29/05/2012 Accommodation Assessed . Eccles college B12 Classroom Assessor. Adam Robinson RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Trips, Slips and Falls • Make sure all wires are out of the way 1 2 3 [ Workplace Regs ] • Make sure there are no drinks or food near computers or electrical equipment • Make sure there is carpet rather than any other type of flooring Fire Hazards • Fire Alarm call points located on exit routes 1 3 4 • Keep water and other liquids away from computers and other electrical equipment Accident • 24 First Aiders on site 1 2 3 • First Aid box available in reception • Local First Aider • Contact Reception, 2400 if in any doubt. The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2
  • 2. 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION