SlideShare une entreprise Scribd logo
1  sur  4
Present Address : 176/C, Shyama Prasad Mukherjee
Road
Kolkata-700026
Email ID : aditya070694@gmail.com
Contact Nos. : 7278824870, 9038125969
ADITYA BARIK
OBJECTIVE:
Seeking a career in a reputed organization that will provide me with opportunities to utilise
my skills so that I can contribute towards the betterment of the organization.
EDUCATIONAL QUALIFICATIONS:
Examination Institute Board/University Year of
Passing
Percentage
B. Tech
(Electrical and
Electronics Engineering)
Pailan College of
Management And
Technology
West Bengal
University of
Technology
July 2016 Sem SGPA
1st
8.30
2nd
7.72
3rd
7.41
4th
8.21
5th
8
6th
7.96
Exam
Board Year of
Appearing
Exam
School
Percentage
of Marks
Class XII
(Higher
Secondary)
West Bengal
Council of Higher
Secondary
Education
2012
National High School For Boys
72.25
Class X
(Madhyamik)
West Bengal
Board of
Secondary
Education
2010 South Point High School 69.3
PROJECTS UNDERTAKEN:
1. Completed a Vocational Training at Metro Railway of Kolkata.
2. Completed a course in Industrial Automation using PLC at SLIEM at Salt Lake which is
Affiliated by NSDC (National Skill Development Centre) .
3. Managed Electro a program of our college and participated and went to final round in
technical quiz and gaming in antimatter also a program of our college.
4. Completed a project On Traffic Control Signal using PLC .
PERSONAL DETAILS:
Date of Birth : 25th
February 1994
Gender : Male
Nationality : Indian
Religion : Hinduism
Marital Status : Single
Languages Known : English, Bengali, Hindi and Odia.
Father’s Name : Pitambar Barik
Mother’s Name : Ahalya Barik
Extra-Curricular Activities : 1.Was a member of Electo ( A seminar based on electrical
and electronics project of our college )
2. Have completed an art course from Chitrangsu (Institute
of Art and Craft)
3. Completed a course in Autocad from Srimati Techno
Institute
Hobbies : Drawing and painting, watching movies and cartoons and
cooking.
Skills- Auto cad , C programming , Management Skills, PLC Automation.
Traffic Control:
Traffic Control using 3 Lights
From the Simulations Menu at the top of the screen, select the Traffic Light Simulation
Using my knowledge of cascading timers, I am developing a ladder logic program which will sequence
a set of green, amber and red lights in the following manner:
Sequence of Operation:
1. Light O:2/00 (Red) = 12 seconds ON
2. Light O:2/02 (Green) = 8 seconds ON
3. Light O:2/01 (Amber) = 4 seconds ON
4. The sequence now repeats with Red = ON.
PROJECT REPORT
Summary
Nowadays, most of the control system operation in industries used PLC as a
controller to control the process. It contain in the process control, transportation,
domestic appliances, production lines and so on.
Using the PLC to control traffic light can reduce the used of hard-wired relays
and other external components. PLC has an internal function such as timer and counter
making it become sophisticated but simple in used. It also provides flexibility of control
that based on the programming and can execute simple logic instruction which being
used in ladder diagram.
An Intelligent Traffic Light that used the PLC to control a cross-junction has
been successfully developed. The PLC program (ladder logic diagram) for implement
the three mode of traffic light operation; Normal Mode, emergency Mode and Night
Mode, have been designed completely and can be operated effectively together with the
model of emergency sensor (switch) for the
Emergency mode and the IR sensor circuit that has been developed especially for the Night mode..
All the testing of the response to incoming emergency vehicle, instant green
light during the night and the normal mode of operation has been done successfully. It
was repeatedly tested to operate for continuously long time. In past period, the system
had been performing well without any error. As such, it can be concluded that the
system performance is reliable to response to change on time regarding on traffic
volume and approaching emergency vehicle as wished-for. The change from one mode
to another is achieved automatically.
In summary, the aim of this project, which are to minimize the waiting time cars
at intersection when the traffic volume are significantly low and to prevent the
emergency car stuck at the cross-junction, are totally achieved including the objectives of project have
been accomplish successfully
cv1aditya

Contenu connexe

Tendances (18)

Resume
ResumeResume
Resume
 
Mohammad Al-Baba CV
Mohammad Al-Baba CVMohammad Al-Baba CV
Mohammad Al-Baba CV
 
Abdulraheem CV
Abdulraheem CVAbdulraheem CV
Abdulraheem CV
 
Final cv
Final cvFinal cv
Final cv
 
Muhammad Atiq
Muhammad AtiqMuhammad Atiq
Muhammad Atiq
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple results
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
 
Long Distance Teleoperation for Trucking
Long Distance Teleoperation for TruckingLong Distance Teleoperation for Trucking
Long Distance Teleoperation for Trucking
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
 
mohamed mostfa
mohamed mostfamohamed mostfa
mohamed mostfa
 
Gaurav Mishra
Gaurav MishraGaurav Mishra
Gaurav Mishra
 
Presentation1
Presentation1Presentation1
Presentation1
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013
 
ME CIM Scheme
ME CIM SchemeME CIM Scheme
ME CIM Scheme
 
I Yr B.Tech (R07) Supplementary Results Dec-2015
I Yr B.Tech (R07) Supplementary Results Dec-2015I Yr B.Tech (R07) Supplementary Results Dec-2015
I Yr B.Tech (R07) Supplementary Results Dec-2015
 
III B.Tech I sem(R07)supple exams june 2014 results
III B.Tech I sem(R07)supple exams june 2014 resultsIII B.Tech I sem(R07)supple exams june 2014 results
III B.Tech I sem(R07)supple exams june 2014 results
 
Mechatriks Automation Profile
Mechatriks Automation ProfileMechatriks Automation Profile
Mechatriks Automation Profile
 

En vedette

Ppt on impact of celebrity endorsement on consumer buying decision
Ppt on impact of celebrity endorsement on consumer buying decisionPpt on impact of celebrity endorsement on consumer buying decision
Ppt on impact of celebrity endorsement on consumer buying decision
molisca
 
Celebrity endorsements finally ppt
Celebrity endorsements finally pptCelebrity endorsements finally ppt
Celebrity endorsements finally ppt
Mariyam Khan Baloch
 
CELEBRITY ENDORSEMENT
CELEBRITY ENDORSEMENTCELEBRITY ENDORSEMENT
CELEBRITY ENDORSEMENT
KHYATI89
 
La pobreza en méxico
La pobreza en méxicoLa pobreza en méxico
La pobreza en méxico
Daan Romeero
 

En vedette (14)

вода
водавода
вода
 
Blue edge ppt
Blue edge pptBlue edge ppt
Blue edge ppt
 
презентация эгхб викторина
презентация эгхб викторинапрезентация эгхб викторина
презентация эгхб викторина
 
150504 platica ´Gerencia de Proyectos UANL
150504 platica ´Gerencia de Proyectos UANL150504 platica ´Gerencia de Proyectos UANL
150504 platica ´Gerencia de Proyectos UANL
 
Data Mining Techniques using WEKA (Ankit Pandey-10BM60012)
Data Mining Techniques using WEKA (Ankit Pandey-10BM60012)Data Mining Techniques using WEKA (Ankit Pandey-10BM60012)
Data Mining Techniques using WEKA (Ankit Pandey-10BM60012)
 
вода
водавода
вода
 
Kako da prodate svoj proizvod ili uslugu preko interneta
Kako da prodate svoj proizvod ili uslugu preko internetaKako da prodate svoj proizvod ili uslugu preko interneta
Kako da prodate svoj proizvod ili uslugu preko interneta
 
Android App Development - 14 location, media and notifications
Android App Development - 14 location, media and notificationsAndroid App Development - 14 location, media and notifications
Android App Development - 14 location, media and notifications
 
Celebrity Endorsements (consumer perception)
Celebrity Endorsements (consumer perception)Celebrity Endorsements (consumer perception)
Celebrity Endorsements (consumer perception)
 
Ppt on impact of celebrity endorsement on consumer buying decision
Ppt on impact of celebrity endorsement on consumer buying decisionPpt on impact of celebrity endorsement on consumer buying decision
Ppt on impact of celebrity endorsement on consumer buying decision
 
Celebrity endorsements finally ppt
Celebrity endorsements finally pptCelebrity endorsements finally ppt
Celebrity endorsements finally ppt
 
CELEBRITY ENDORSEMENT
CELEBRITY ENDORSEMENTCELEBRITY ENDORSEMENT
CELEBRITY ENDORSEMENT
 
"A Project Report on The Impact of Celebrity Endorsement on Brand Personality...
"A Project Report on The Impact of Celebrity Endorsement on Brand Personality..."A Project Report on The Impact of Celebrity Endorsement on Brand Personality...
"A Project Report on The Impact of Celebrity Endorsement on Brand Personality...
 
La pobreza en méxico
La pobreza en méxicoLa pobreza en méxico
La pobreza en méxico
 

Similaire à cv1aditya

aman_resume_finally.PDF
aman_resume_finally.PDFaman_resume_finally.PDF
aman_resume_finally.PDF
Aman Goyal
 
RESUME-NAMRATA ASHOK SHINDE
RESUME-NAMRATA ASHOK SHINDERESUME-NAMRATA ASHOK SHINDE
RESUME-NAMRATA ASHOK SHINDE
namrata shinde
 
shuja's cv for Instrumentation, DCS and Power plant.
shuja's cv for Instrumentation, DCS and Power plant.shuja's cv for Instrumentation, DCS and Power plant.
shuja's cv for Instrumentation, DCS and Power plant.
Shuja Khalid
 
Pratik Dhadiwal HW Engineer CV 2016
Pratik Dhadiwal HW Engineer CV 2016Pratik Dhadiwal HW Engineer CV 2016
Pratik Dhadiwal HW Engineer CV 2016
Pratik Dhadiwal
 
FLSmidth Report final
FLSmidth Report finalFLSmidth Report final
FLSmidth Report final
Shahid Faizee
 
Sample of project synopsis (2)
Sample of project synopsis (2)Sample of project synopsis (2)
Sample of project synopsis (2)
TH8B
 

Similaire à cv1aditya (20)

Resume
ResumeResume
Resume
 
Resume Embedded
Resume EmbeddedResume Embedded
Resume Embedded
 
Vikas_Agrawal_Resume
Vikas_Agrawal_ResumeVikas_Agrawal_Resume
Vikas_Agrawal_Resume
 
sanket new 1
sanket new 1sanket new 1
sanket new 1
 
aman_resume_finally.PDF
aman_resume_finally.PDFaman_resume_finally.PDF
aman_resume_finally.PDF
 
Soumen resume
Soumen resumeSoumen resume
Soumen resume
 
RESUME-NAMRATA ASHOK SHINDE
RESUME-NAMRATA ASHOK SHINDERESUME-NAMRATA ASHOK SHINDE
RESUME-NAMRATA ASHOK SHINDE
 
Gore
GoreGore
Gore
 
Automation
AutomationAutomation
Automation
 
IRJET- Advanced Vehicle Parking using PLC
IRJET- Advanced Vehicle Parking using PLCIRJET- Advanced Vehicle Parking using PLC
IRJET- Advanced Vehicle Parking using PLC
 
New ppt seminor.pptx
New ppt seminor.pptxNew ppt seminor.pptx
New ppt seminor.pptx
 
Group project dld assignement
Group project dld assignementGroup project dld assignement
Group project dld assignement
 
shuja's cv for Instrumentation, DCS and Power plant.
shuja's cv for Instrumentation, DCS and Power plant.shuja's cv for Instrumentation, DCS and Power plant.
shuja's cv for Instrumentation, DCS and Power plant.
 
Omar Salih
Omar SalihOmar Salih
Omar Salih
 
RESUME 3(2) (1)
RESUME 3(2) (1)RESUME 3(2) (1)
RESUME 3(2) (1)
 
Resume
ResumeResume
Resume
 
Pratik Dhadiwal HW Engineer CV 2016
Pratik Dhadiwal HW Engineer CV 2016Pratik Dhadiwal HW Engineer CV 2016
Pratik Dhadiwal HW Engineer CV 2016
 
FLSmidth Report final
FLSmidth Report finalFLSmidth Report final
FLSmidth Report final
 
Density Based Traffic signal system using microcontroller
Density Based Traffic signal system using microcontrollerDensity Based Traffic signal system using microcontroller
Density Based Traffic signal system using microcontroller
 
Sample of project synopsis (2)
Sample of project synopsis (2)Sample of project synopsis (2)
Sample of project synopsis (2)
 

cv1aditya

  • 1. Present Address : 176/C, Shyama Prasad Mukherjee Road Kolkata-700026 Email ID : aditya070694@gmail.com Contact Nos. : 7278824870, 9038125969 ADITYA BARIK OBJECTIVE: Seeking a career in a reputed organization that will provide me with opportunities to utilise my skills so that I can contribute towards the betterment of the organization. EDUCATIONAL QUALIFICATIONS: Examination Institute Board/University Year of Passing Percentage B. Tech (Electrical and Electronics Engineering) Pailan College of Management And Technology West Bengal University of Technology July 2016 Sem SGPA 1st 8.30 2nd 7.72 3rd 7.41 4th 8.21 5th 8 6th 7.96 Exam Board Year of Appearing Exam School Percentage of Marks Class XII (Higher Secondary) West Bengal Council of Higher Secondary Education 2012 National High School For Boys 72.25 Class X (Madhyamik) West Bengal Board of Secondary Education 2010 South Point High School 69.3 PROJECTS UNDERTAKEN:
  • 2. 1. Completed a Vocational Training at Metro Railway of Kolkata. 2. Completed a course in Industrial Automation using PLC at SLIEM at Salt Lake which is Affiliated by NSDC (National Skill Development Centre) . 3. Managed Electro a program of our college and participated and went to final round in technical quiz and gaming in antimatter also a program of our college. 4. Completed a project On Traffic Control Signal using PLC . PERSONAL DETAILS: Date of Birth : 25th February 1994 Gender : Male Nationality : Indian Religion : Hinduism Marital Status : Single Languages Known : English, Bengali, Hindi and Odia. Father’s Name : Pitambar Barik Mother’s Name : Ahalya Barik Extra-Curricular Activities : 1.Was a member of Electo ( A seminar based on electrical and electronics project of our college ) 2. Have completed an art course from Chitrangsu (Institute of Art and Craft) 3. Completed a course in Autocad from Srimati Techno Institute Hobbies : Drawing and painting, watching movies and cartoons and cooking. Skills- Auto cad , C programming , Management Skills, PLC Automation. Traffic Control:
  • 3. Traffic Control using 3 Lights From the Simulations Menu at the top of the screen, select the Traffic Light Simulation Using my knowledge of cascading timers, I am developing a ladder logic program which will sequence a set of green, amber and red lights in the following manner: Sequence of Operation: 1. Light O:2/00 (Red) = 12 seconds ON 2. Light O:2/02 (Green) = 8 seconds ON 3. Light O:2/01 (Amber) = 4 seconds ON 4. The sequence now repeats with Red = ON. PROJECT REPORT Summary Nowadays, most of the control system operation in industries used PLC as a controller to control the process. It contain in the process control, transportation, domestic appliances, production lines and so on. Using the PLC to control traffic light can reduce the used of hard-wired relays and other external components. PLC has an internal function such as timer and counter making it become sophisticated but simple in used. It also provides flexibility of control that based on the programming and can execute simple logic instruction which being used in ladder diagram. An Intelligent Traffic Light that used the PLC to control a cross-junction has been successfully developed. The PLC program (ladder logic diagram) for implement the three mode of traffic light operation; Normal Mode, emergency Mode and Night Mode, have been designed completely and can be operated effectively together with the model of emergency sensor (switch) for the Emergency mode and the IR sensor circuit that has been developed especially for the Night mode.. All the testing of the response to incoming emergency vehicle, instant green light during the night and the normal mode of operation has been done successfully. It was repeatedly tested to operate for continuously long time. In past period, the system had been performing well without any error. As such, it can be concluded that the system performance is reliable to response to change on time regarding on traffic volume and approaching emergency vehicle as wished-for. The change from one mode to another is achieved automatically. In summary, the aim of this project, which are to minimize the waiting time cars at intersection when the traffic volume are significantly low and to prevent the emergency car stuck at the cross-junction, are totally achieved including the objectives of project have been accomplish successfully