Sr. QA/QC Mechanical Engineer with 8 years experience in power plant, oil and gas.
Industrial Project QA/QC Mechanical Head professional with 8 years of experience from the well-recognized organizations in the field of Industrial Inspection, Quality assurance, Quality control, Welding inspection and conformity Assessment of products and services.
Expertise in conducting receiving, in process and final inspection for achieving enhanced Quality. Having good working experience as a Third party inspector for SGS industrial services.
Distinctively been a Internal auditor for ISO 9001:2008 Quality management systems. Self-directed, team-oriented, enthusiastic & possessing solid organizational skills.
Coefficient of Thermal Expansion and their Importance.pptx
Sr. QA/QC Mechanical Engineer
1. Ahmed Hussien Abd Elazem
El wasta, Baniswif, Egypt.
Mobile : +97450189842
: +201010666300
E-mail : ahmed.abdelazim@pscqatar.com
: ahmed.hussien_sgs@yahoo.com
PERSONAL INFORMATION:
Date of Birth : 12/2/1984
Nationality : Egyptian
Gender : Male
Marital Status : Married
Graduation year : 2006
Military Service : Finished
Languages:
Arabic : Mother Tongue
English : Excellent
Objective and Resume Summary:
Industrial Project QA/QC Mechanical Head professional with 8 years of experience from the well-
recognized organizations in the field of Industrial Inspection, Quality assurance, Quality control,
Welding inspection and conformity Assessment of products and services.
Expertise in conducting receiving, in process and final inspection for achieving enhanced Quality.
Having good working experience as a Third party inspector for SGS industrial services.
Distinctively been a Internal auditor for ISO 9001:2008 Quality management systems. Self-directed,
team-oriented, enthusiastic & possessing solid organizational skills.
Skills:
QA QC, Welding inspection ,Quality management system, ISO 9001:2008 Internal auditor,Third
party Inspection.Engineering projects.
Education & Certifications:
Level of Education: B.Sc. in Industrial Engineering and Manufacturing (good Honors) , Ranked five
Fayoum University, Faculty of Engineering , Fayoum, Egypt
Graduation project grade: Excellent. (dissimilar welding )
• Bachelor of Engineering (Industrial Engineering)
• TUV Certified Intenal Auditor for ISO 9001-2008 Quality Management System
• ASNT-TC-1A for non destructive method Visual Testing (VT) Level ΙΙ Certificate
• ASNT-TC-1A for non destructive method Radiographic Testing (RT) Level ΙΙ Certificate
• ASNT-TC-1A for non destructive method Magnetic particles Testing (MT) Level ΙΙ Certificate
• ASNT-TC-1A for non destructive method liquid penetrant (PT) Level ΙΙ Certificate
• Safety Training Course(OHSAS)
• Computer Applications: Word, Excel, Power Point, Access.
2. EXPERIENCES:
Job title : Proiect QA/QC Mechanical Head .
From : July 2013 – till now.
Employer : Gulf Steel & Engineering. (Company specialized in Mechanical
/Industrial Construction, erection and Steel Design and Fabrication)
Current Project : Qatar (NATIONAL MUSEUM OF QATAR) work for the Main steel &
Secondary Steel Structure
(HYUNDAI Engineering & Construction & Hill International) Contractor.
Job title : Senior QA/QC Mechanical Engineer .
From : Sep 2012 – June 2013.
Employer : MEGA for construction and industries. (Company specialized
in Mechanical/Industrial Construction, erection and Steel
Design and Fabrication)
previous Project : Egypt (Giza North combined cycle power station plant 1500 MW) work
for the Balance of Plant - BoP (Piping, Pumps)
(Intiec energia & PGESCO) client.
project : Egypt (Banha combined cycle power station plant 750 MW) works for
the Main Equipments (Gas Turbine, Generator, Stack)
(Sepco III & PGESCO) client.
Job title : Quality Management Representative (QMR).
From : Mar 2012 – Sep 2012.
Employer : CTSA (Construction Technical Services Arabia) specialized
in inspection
Services and Welding Consultancy (approved contractor to Saudi
Aramco)
Project : Saudi Aribia (CTSA) Head office
Implementing ISO 9001:2008 QMS, Creates audit reports, Follows up on
audit corrective action.
Job title : Senior QA/QC Mechanical Engineer.
From : Aug 2011 – Mar 2012.
Employer : Suez steel company. (Company specialized in Steel making and rolling)
Project : Egypt (erection of mechanical works of Air Separation Unit Cold Box,
Tanks) SASPG International Contractor Co. & Suez Steel Co. Owner.
Job title : Senior QA/QC Mechanical Engineer.
From : Feb 2011 – Aug 2011.
Employer : MEGA for construction and industries. (Company specialized
in Mechanical/Industrial Construction, erection and Steel
Design and Fabrication)
Project : Egypt (Damietta simple cycle power station plant 4*125 MW) works for
the Main Equipments (Gas Turbine, Generator, Stack)
(Kharafi National & PGESCO) client.
Job title : Senior QA/QC Mechanical Engineer.
From : Nov 2009 - Feb 2011.
Employer : Projects service company (PSC). (Company specialized in
3. Mechanical/Industrial Construction, erection and Steel Design
and fabrication)
Project : Egypt (integrated solar combined cycle project power station 140 MW)
Gas Turbine, Heat Recovery Steam Generator Boiler, Steam Turbine
and Steam Condenser (IBERDROLA) client.
: Egypt (ALEX. Waste water treatment plant)
Tanks, Piping, Pumps, Valves), Final Clarifier Structures, Plate Work
(DEGREMONT) client.
Job title : QA/QC Mechanical Engineer
From : Jun 2007 - Nov 2009.
Employer : DSD Ferrometalco Company specialized in Mechanical /Industrial
heavy industrial construction projects, steel design and fabrication.
Project : Egypt (Eltbeen thermal power plant 2*350 MW)
Two unit of Utility Boiler in El-tbeen thermal power plant work in the site
for steel structure and prussure part with (Ansaldo Caldaie & PGESCo)
client.
: Egypt (Workshop fabrication of plate work, Piping and vessels)
Fabrication of plate work, Piping and vessels for many projects as
contractor with a big company in this filed like (Aramco,ALSTOM, NEM,
Uhde, ThyssenKrupp,…)
Job title : QA Engineer.
From : Nov 2006 - Jun 2007.
Employer : SGS Company specialized in inspection and certification
Project : Egypt (Outsourced from SGS to DSD Ferrometalco)
Implementing ISO 9001:2008 QMS, Creates audit reports, Follows up on
audit corrective action.
Job Responsibilities:
• Preparing and review to WPS, PQR and Welder qualification for a lot of projects.
• Developing & maintaining quality plans of designated project works.
• Reviewing work procedures for quality content.
• Reviewing & update project requisitions & other documents for correct quality contents.
• The full awareness of AWS,ASME, EN tests & other related standards of Welding / Testing
of material.
• Controlling third party NDT subcontractors.
• following the post weld heat treatment for different materials and preparing the required cycle
for each one.
• Visual Inspection of Welding / Fit-up.
• Dimension and final inspection of the fabricated items.
• Raising NCRs wherever necessary & ensures that these are actioned.
• Reviewing, registering & monitoring trends for all NCRs .
• Registering customer complaints, significant problems raised on site and report findings to
the Manager Quality
• Compiling quality records and identifying dates in the quality control plan for as- built
purposes.
• Participate and follow company HSE requirement as far as applicable to work activities.
• Managing incoming, in process and final inspection.
• Creating and monitoring Quality control circles, identifying facilitators for each circle.
4. • Implementing continuous improvement process like six sigma and 5S audit.
• Implementing statistical quality control methods.
• Initiating action to prevent the occurrence of any non-conformities relating to the product,
process and recommending solutions through designated channels.
• Controlling processing or delivery of non –conforming product until the deficiency or
unsatisfactory condition is corrected or eliminated.
• Quality policy and objective planning.
• Quality manual Preparation.
• Preparing work instructions, standard operating procedures.
• Organizing and conducting quality Awareness training for employees.
• Documenting Quality management system (ISO 9001:2008).
• Implementing and Audit for ISO 9001:2008 Quality management system.
• Material inspection - Review of Test certificates with respect to Standards.
• Witnessing Mechanical test in laboratories - Tensile, impact, hardness & bend test.
• Witnessing of Pressure testing of pipes, vessels & valves (Hydro/Pneumatic).
• Review and Approval of Quality Plan/Inspection test procedure.
• Review of heat treatment charts/PWHT procedures.