SlideShare une entreprise Scribd logo
1  sur  10
Digital Inputs & Outputs
Carlos Tangerino
December, 2010
Schneider Electric 2- Division - Name – Date
Basic concept
●By default, the outputs are always ON
●The control logic only turn outputs to OFF condition
●If one of the logics decides for turn the output OFF, the final state will
be OFF
●One output respect the logics priorities
●One or more outputs respect the priorities among them
●Loads with same priority must use round-robin scheduling
Schneider Electric 3- Division - Name – Date
Fixed Logic, variable Atributes
●The physical state of a control device (ex.: relay)
● Depends on the physical contacts connections or device model
● ON state means – The energy is available for this output
●Control atributes
● AUTO – Indicated if the state of an output is controlled by the system or by
the user. (0=MANUAL, 1=AUTO)
● FORCE – If AUTO mode is off, this flag indicates the forced state. (0=Force
OFF, 1=Force ON)
● DEMAND – Output state from the demand control logic. (0=OFF, 1=ON)
● TIMER – Output state from the time control logic (0=OFF, 1=ON)
● TOU – Output state from the time of use control logic. (0=OFF, 1=ON)
● INVERTION – Command to invert the output state (0=Not Inverted,
1=Inverted)
Schneider Electric 4- Division - Name – Date
Control Priorities
●One output may be controlled by more than one internal logic
●The decision for a such state follow the priority list as:
● Lowest priority
– Demand control
– Timer control
– TOU control
– Bypass
● Highest priority
Schneider Electric 5- Division - Name – Date
Control Logic
DEMAND
TIMER
TOU
AUTO
FORCE
INVERTION
OUTPUT
Schneider Electric 6- Division - Name – Date
Advanced Output
DirectDirect
TONTON
TOFFTOFF
Output same as input
Timer ON
Timer OFF
T
T
We can create many ways to control the output. Worth it?
Timers
Tempo mínimo OFF
Tempo mínimo ON
Tempo máximo OFF
Pausa após ON
Pausa após OFF
Schneider Electric 7- Division - Name – Date
Control Functions
SH
SL
POFF
PON
Demand
ON
OFF
Time
SH – Setpoint High
SL – Setpoint Low
POFF – pause after OFF
PON – Pause after ON
Output
Schneider Electric 8- Division - Name – Date
Digital Input Physical Interface
RAW
INPUT DEBOUNCE
FILTER
DIGITAL
INPUT
To Application
OPEN
CLOSE
T
Schneider Electric 9- Division - Name – Date
Digital Input Type
●Always open – Force condition
●Always close – Force condition
●Direct input – Same state as the input
●Inverted input – The state is inverted
●Count on close – Increment the counter value on close transition
●Count on open - Increment the counter value on open transition
●Count on change - Increment the counter value on any change
●Toggle – Change state on close
●The input type selection depend on the behavior of the connected
device
Schneider Electric 10- Division - Name – Date
Digital Inputs - Application
●The digital inputs can be used isolated or in group
●One isolated digital input may be used as:
● Event monitoring
● Alarm monitoring
● KYZ control (TOU, EOI)
●One or more digital inputs may be combined to interface pulse energy
meters. Ex:
● Input 1 – kWh pulse - received
● Input 2 – kVArh pulse - received
● Input 3 – kWh pulse – delivered
● Input 4 – kVArh pulse – delivered
● Input 5 – EOI pulse
● Input 6 – TOU pulse (off-peak)
●Mixed mode as pulse counter and trip detection at same input

Contenu connexe

Tendances

An Overview Study on Quad High Side Switch
An Overview Study on Quad High Side SwitchAn Overview Study on Quad High Side Switch
An Overview Study on Quad High Side SwitchPremier Farnell
 
Altistart 48 user manual
Altistart 48 user manualAltistart 48 user manual
Altistart 48 user manualToàn Huỳnh
 
Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...
Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...
Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...Dien Ha The
 
Interrupts for PIC18
Interrupts for PIC18Interrupts for PIC18
Interrupts for PIC18raosandy11
 
Ade(unit 4) Counters
Ade(unit 4) CountersAde(unit 4) Counters
Ade(unit 4) CountersANKITSURWADE
 
Advanced processor and controllers
Advanced processor and controllersAdvanced processor and controllers
Advanced processor and controllersPalak Ariwala
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADAIndira Kundu
 
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatPLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatJitender Singh Shekhawat
 
Rotary and Key Lock Switches
Rotary and Key Lock SwitchesRotary and Key Lock Switches
Rotary and Key Lock SwitchesPremier Farnell
 
An Introduction to very low power 16-bit Digital Signal Controllers
An Introduction to very low power 16-bit Digital Signal Controllers An Introduction to very low power 16-bit Digital Signal Controllers
An Introduction to very low power 16-bit Digital Signal Controllers Premier Farnell
 
PLC programming example - Paint Spray
PLC programming example - Paint SprayPLC programming example - Paint Spray
PLC programming example - Paint SprayACC Automation
 
Ls catalog thiet bi tu dong i s5_e_1105_dienhathe.vn
Ls catalog thiet bi tu dong i s5_e_1105_dienhathe.vnLs catalog thiet bi tu dong i s5_e_1105_dienhathe.vn
Ls catalog thiet bi tu dong i s5_e_1105_dienhathe.vnDien Ha The
 

Tendances (19)

An Overview Study on Quad High Side Switch
An Overview Study on Quad High Side SwitchAn Overview Study on Quad High Side Switch
An Overview Study on Quad High Side Switch
 
Omron ladder programming
Omron ladder programmingOmron ladder programming
Omron ladder programming
 
Altistart 48 user manual
Altistart 48 user manualAltistart 48 user manual
Altistart 48 user manual
 
Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...
Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...
Siemens s7 300-400-s7 graph for s7-300 400 programming sequential control sys...
 
Interrupts for PIC18
Interrupts for PIC18Interrupts for PIC18
Interrupts for PIC18
 
0 Sed2 Product Overview
0 Sed2 Product Overview0 Sed2 Product Overview
0 Sed2 Product Overview
 
PLC
PLCPLC
PLC
 
Ade(unit 4) Counters
Ade(unit 4) CountersAde(unit 4) Counters
Ade(unit 4) Counters
 
Advanced processor and controllers
Advanced processor and controllersAdvanced processor and controllers
Advanced processor and controllers
 
Pmc basic final
Pmc basic finalPmc basic final
Pmc basic final
 
Industrial automation
Industrial automationIndustrial automation
Industrial automation
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADA
 
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatPLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
 
Plc programming course1
Plc programming course1Plc programming course1
Plc programming course1
 
Rotary and Key Lock Switches
Rotary and Key Lock SwitchesRotary and Key Lock Switches
Rotary and Key Lock Switches
 
An Introduction to very low power 16-bit Digital Signal Controllers
An Introduction to very low power 16-bit Digital Signal Controllers An Introduction to very low power 16-bit Digital Signal Controllers
An Introduction to very low power 16-bit Digital Signal Controllers
 
PLC programming example - Paint Spray
PLC programming example - Paint SprayPLC programming example - Paint Spray
PLC programming example - Paint Spray
 
Ls catalog thiet bi tu dong i s5_e_1105_dienhathe.vn
Ls catalog thiet bi tu dong i s5_e_1105_dienhathe.vnLs catalog thiet bi tu dong i s5_e_1105_dienhathe.vn
Ls catalog thiet bi tu dong i s5_e_1105_dienhathe.vn
 
Omkar Electronics, Thane, Elevator Components
Omkar Electronics, Thane, Elevator ComponentsOmkar Electronics, Thane, Elevator Components
Omkar Electronics, Thane, Elevator Components
 

Similaire à Digitalinputsoutputs

ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.pptpouyan6
 
PLC, or Programmable Logic Controller, is a specialized industrial computer u...
PLC, or Programmable Logic Controller, is a specialized industrial computer u...PLC, or Programmable Logic Controller, is a specialized industrial computer u...
PLC, or Programmable Logic Controller, is a specialized industrial computer u...Govindarajv11
 
PLC (PROGRAMMABLE LOGIC CONTROLLER)
PLC (PROGRAMMABLE LOGIC CONTROLLER)PLC (PROGRAMMABLE LOGIC CONTROLLER)
PLC (PROGRAMMABLE LOGIC CONTROLLER)navalip331
 
PROGRAMMABLE LOGIC CONTROLLERS
PROGRAMMABLELOGIC CONTROLLERSPROGRAMMABLELOGIC CONTROLLERS
PROGRAMMABLE LOGIC CONTROLLERSDnr Creatives
 
classic control and PLC training report
classic control and PLC training reportclassic control and PLC training report
classic control and PLC training reportahmed abdelnasser
 
Plc (PROGRAMMABLE LOGIC CONTROLLER)
Plc (PROGRAMMABLE LOGIC CONTROLLER)Plc (PROGRAMMABLE LOGIC CONTROLLER)
Plc (PROGRAMMABLE LOGIC CONTROLLER)Urval Chotalia
 
Maxvu tech support lvl presentation na
Maxvu tech support lvl presentation na Maxvu tech support lvl presentation na
Maxvu tech support lvl presentation na West Control Solutions
 
MECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .ppt
MECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .pptMECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .ppt
MECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .pptCHANDRA KUMAR S
 
06 chapter06 binary_logic_systems_Rev02
06 chapter06 binary_logic_systems_Rev0206 chapter06 binary_logic_systems_Rev02
06 chapter06 binary_logic_systems_Rev02John Todora
 

Similaire à Digitalinputsoutputs (20)

ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.ppt
 
plc1.ppt
plc1.pptplc1.ppt
plc1.ppt
 
PLC Basics
PLC BasicsPLC Basics
PLC Basics
 
PLC PPT.ppt
PLC PPT.pptPLC PPT.ppt
PLC PPT.ppt
 
ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.ppt
 
ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.ppt
 
PLC.ppt
PLC.pptPLC.ppt
PLC.ppt
 
PLC good.ppt
PLC good.pptPLC good.ppt
PLC good.ppt
 
ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.ppt
 
ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.ppt
 
ie450pp10.ppt
ie450pp10.pptie450pp10.ppt
ie450pp10.ppt
 
PLC, or Programmable Logic Controller, is a specialized industrial computer u...
PLC, or Programmable Logic Controller, is a specialized industrial computer u...PLC, or Programmable Logic Controller, is a specialized industrial computer u...
PLC, or Programmable Logic Controller, is a specialized industrial computer u...
 
PLC (PROGRAMMABLE LOGIC CONTROLLER)
PLC (PROGRAMMABLE LOGIC CONTROLLER)PLC (PROGRAMMABLE LOGIC CONTROLLER)
PLC (PROGRAMMABLE LOGIC CONTROLLER)
 
PROGRAMMABLE LOGIC CONTROLLERS
PROGRAMMABLELOGIC CONTROLLERSPROGRAMMABLELOGIC CONTROLLERS
PROGRAMMABLE LOGIC CONTROLLERS
 
classic control and PLC training report
classic control and PLC training reportclassic control and PLC training report
classic control and PLC training report
 
PLCpptFeb222017.ppt
PLCpptFeb222017.pptPLCpptFeb222017.ppt
PLCpptFeb222017.ppt
 
Plc (PROGRAMMABLE LOGIC CONTROLLER)
Plc (PROGRAMMABLE LOGIC CONTROLLER)Plc (PROGRAMMABLE LOGIC CONTROLLER)
Plc (PROGRAMMABLE LOGIC CONTROLLER)
 
Maxvu tech support lvl presentation na
Maxvu tech support lvl presentation na Maxvu tech support lvl presentation na
Maxvu tech support lvl presentation na
 
MECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .ppt
MECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .pptMECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .ppt
MECHATRONICS-UNIT 4-PROGRAMMABLE LOGIC CONTROLLER .ppt
 
06 chapter06 binary_logic_systems_Rev02
06 chapter06 binary_logic_systems_Rev0206 chapter06 binary_logic_systems_Rev02
06 chapter06 binary_logic_systems_Rev02
 

Dernier

The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 

Dernier (20)

The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 

Digitalinputsoutputs

  • 1. Digital Inputs & Outputs Carlos Tangerino December, 2010
  • 2. Schneider Electric 2- Division - Name – Date Basic concept ●By default, the outputs are always ON ●The control logic only turn outputs to OFF condition ●If one of the logics decides for turn the output OFF, the final state will be OFF ●One output respect the logics priorities ●One or more outputs respect the priorities among them ●Loads with same priority must use round-robin scheduling
  • 3. Schneider Electric 3- Division - Name – Date Fixed Logic, variable Atributes ●The physical state of a control device (ex.: relay) ● Depends on the physical contacts connections or device model ● ON state means – The energy is available for this output ●Control atributes ● AUTO – Indicated if the state of an output is controlled by the system or by the user. (0=MANUAL, 1=AUTO) ● FORCE – If AUTO mode is off, this flag indicates the forced state. (0=Force OFF, 1=Force ON) ● DEMAND – Output state from the demand control logic. (0=OFF, 1=ON) ● TIMER – Output state from the time control logic (0=OFF, 1=ON) ● TOU – Output state from the time of use control logic. (0=OFF, 1=ON) ● INVERTION – Command to invert the output state (0=Not Inverted, 1=Inverted)
  • 4. Schneider Electric 4- Division - Name – Date Control Priorities ●One output may be controlled by more than one internal logic ●The decision for a such state follow the priority list as: ● Lowest priority – Demand control – Timer control – TOU control – Bypass ● Highest priority
  • 5. Schneider Electric 5- Division - Name – Date Control Logic DEMAND TIMER TOU AUTO FORCE INVERTION OUTPUT
  • 6. Schneider Electric 6- Division - Name – Date Advanced Output DirectDirect TONTON TOFFTOFF Output same as input Timer ON Timer OFF T T We can create many ways to control the output. Worth it? Timers Tempo mínimo OFF Tempo mínimo ON Tempo máximo OFF Pausa após ON Pausa após OFF
  • 7. Schneider Electric 7- Division - Name – Date Control Functions SH SL POFF PON Demand ON OFF Time SH – Setpoint High SL – Setpoint Low POFF – pause after OFF PON – Pause after ON Output
  • 8. Schneider Electric 8- Division - Name – Date Digital Input Physical Interface RAW INPUT DEBOUNCE FILTER DIGITAL INPUT To Application OPEN CLOSE T
  • 9. Schneider Electric 9- Division - Name – Date Digital Input Type ●Always open – Force condition ●Always close – Force condition ●Direct input – Same state as the input ●Inverted input – The state is inverted ●Count on close – Increment the counter value on close transition ●Count on open - Increment the counter value on open transition ●Count on change - Increment the counter value on any change ●Toggle – Change state on close ●The input type selection depend on the behavior of the connected device
  • 10. Schneider Electric 10- Division - Name – Date Digital Inputs - Application ●The digital inputs can be used isolated or in group ●One isolated digital input may be used as: ● Event monitoring ● Alarm monitoring ● KYZ control (TOU, EOI) ●One or more digital inputs may be combined to interface pulse energy meters. Ex: ● Input 1 – kWh pulse - received ● Input 2 – kVArh pulse - received ● Input 3 – kWh pulse – delivered ● Input 4 – kVArh pulse – delivered ● Input 5 – EOI pulse ● Input 6 – TOU pulse (off-peak) ●Mixed mode as pulse counter and trip detection at same input