SlideShare une entreprise Scribd logo
1  sur  10
Aircraft Landing Gear
DASSAULT FALCON 7X
Presented By:
AMINE
LAKHDARI
The Falcon 7X features:
- Two main Landing Gears,
- One nose Landing Gear
Landing gears are:
- Electrically controlled,
- Hydraulically actuated
CONTROLS
Crew control of landing
gear system is performed
via:
- Normal operation Landing
Gear Handle,
- Three landing gear free
fall extension handles (also
referred to as emergency
operation
gear handles).
Each main landing gear has the
following characteristics:
- Inboard retracting
configuration,
- Doors are operating in
sequence with the gear,
- Twin wheels,
- Each main gear and doors are
fitted with double set of
proximity switches providing:
o Signal of gears and doors
position to LGSCU,
o Signal of WOW (Weight On
Wheels) to transmit to all
systems:
Either directly from one relay,
Or through consolidated WOW
signal based on a combination
of relays.
NOSE LANDING GEAR
The nose landing gear has the
following characteristics:
- Forward retracting
configuration,
- Doors are mechanically
actuated by gear movements,
- It is fitted with an oleo-
pneumatic shock absorber
including two cams centring the
nose
wheels when nose landing gear is
completely extended,
- The nose landing gear
incorporates the nose wheel
steering hydraulic module,
- Provides shimmy damping
NORMAL LANDING GEAR EXTENSION
The extension sequence of landing gears and doors
during normal operation is the
following:
- 1. Main doors open,
- 2. Main and nose landing gears extend,
- 3. Main doors close.
As previously mentioned nose landing gear doors
are mechanically open by the nose
landing gear and remain open while the nose
landing gear is extended.
LANDING GEAR RETRACTION
Before landing gear retraction sequence is allowed:
- The airplane must be in air mode (WOW proximity
switches),
- The nose wheel must be centred.
The sequencing is the same as for extension:
- 1. Main doors open,
- 2. Main and nose landing gears retract,
- 3. Main doors close.
During retraction sequence, brake pressure is
applied by the braking system to stop main
NORMAL BRAKING OPERATION
During normal operation, control of the
braking system is performed:
- By the dual channel Brake Control Unit,
- Which commands hydraulic power to be
provided through brake shut off valves,
- To the brake control valves.
Hydraulic pressure is modulated according to:
- Brake pedal position,
- Anti skid protection.
Hydraulic A is used by brake system 1, while
hydraulic B is used by brake system 2.
In case of dual hydraulic system failure, the
braking action on pedals remains possible with
antiskid using only pressure of park /
emergency brake accumulator. Braking action
is
limited to park / emergency brake
accumulator capacity.
Crew control of braking system is
performed via:
- Park / emergency brake handle at
parking,
- Pedals for normal wheel braking,
-Park / emergency Brake handle
when normal braking is lost.
Pedals are not mechanically linked
for braking action.
There is one pedal position
transducer for each left and right
seat pedals
Aircraft  landing  gear FALCON 7X

Contenu connexe

Tendances

AIRCRAFT WHEEL AND BEARING DEFECT
AIRCRAFT WHEEL AND BEARING DEFECTAIRCRAFT WHEEL AND BEARING DEFECT
AIRCRAFT WHEEL AND BEARING DEFECTLe Ven
 
01. boeing 727 ata 22 - autoflight
01. boeing 727   ata 22 - autoflight01. boeing 727   ata 22 - autoflight
01. boeing 727 ata 22 - autoflightDiegoRuddyArcaineZeg
 
B737NG Aircraft general
B737NG Aircraft generalB737NG Aircraft general
B737NG Aircraft generaltheoryce
 
Basic aircraft structure
Basic aircraft structureBasic aircraft structure
Basic aircraft structurenyinyilay
 
01. boeing 727 ata 27 - flight controls
01. boeing 727   ata 27 - flight controls01. boeing 727   ata 27 - flight controls
01. boeing 727 ata 27 - flight controlsDiegoRuddyArcaineZeg
 
EFIS on Airbus A320 / A330
EFIS on Airbus A320 / A330EFIS on Airbus A320 / A330
EFIS on Airbus A320 / A330careaviaitonhk
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systemstheoryce
 
B737 NG Fuel System.
B737 NG Fuel System.B737 NG Fuel System.
B737 NG Fuel System.theoryce
 
B737 NG Landing gear
B737 NG Landing gearB737 NG Landing gear
B737 NG Landing geartheoryce
 
Aircraft Systems and Instruments
Aircraft Systems and InstrumentsAircraft Systems and Instruments
Aircraft Systems and InstrumentsVarun Karthikeyan
 
Fc744 Flightcontrol
Fc744 FlightcontrolFc744 Flightcontrol
Fc744 Flightcontroltheoryce
 
Aircraft Hydraulic System
Aircraft Hydraulic SystemAircraft Hydraulic System
Aircraft Hydraulic SystemEkant Shah
 
Aircraft landing gear system
Aircraft landing gear systemAircraft landing gear system
Aircraft landing gear systemKrishikesh Singh
 
Landing gear system of the Airbus A 380
Landing gear system of the Airbus A 380 Landing gear system of the Airbus A 380
Landing gear system of the Airbus A 380 Homayoon Fattahi
 

Tendances (20)

AIRCRAFT WHEEL AND BEARING DEFECT
AIRCRAFT WHEEL AND BEARING DEFECTAIRCRAFT WHEEL AND BEARING DEFECT
AIRCRAFT WHEEL AND BEARING DEFECT
 
Landing Gear
Landing GearLanding Gear
Landing Gear
 
01. boeing 727 ata 22 - autoflight
01. boeing 727   ata 22 - autoflight01. boeing 727   ata 22 - autoflight
01. boeing 727 ata 22 - autoflight
 
Landing gear
Landing gear Landing gear
Landing gear
 
B737NG Aircraft general
B737NG Aircraft generalB737NG Aircraft general
B737NG Aircraft general
 
Basic aircraft structure
Basic aircraft structureBasic aircraft structure
Basic aircraft structure
 
01. boeing 727 ata 27 - flight controls
01. boeing 727   ata 27 - flight controls01. boeing 727   ata 27 - flight controls
01. boeing 727 ata 27 - flight controls
 
EFIS on Airbus A320 / A330
EFIS on Airbus A320 / A330EFIS on Airbus A320 / A330
EFIS on Airbus A320 / A330
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systems
 
B737 NG Fuel System.
B737 NG Fuel System.B737 NG Fuel System.
B737 NG Fuel System.
 
B737 NG Landing gear
B737 NG Landing gearB737 NG Landing gear
B737 NG Landing gear
 
Aircraft Systems and Instruments
Aircraft Systems and InstrumentsAircraft Systems and Instruments
Aircraft Systems and Instruments
 
Landing gear
Landing gearLanding gear
Landing gear
 
Fc744 Flightcontrol
Fc744 FlightcontrolFc744 Flightcontrol
Fc744 Flightcontrol
 
Aircraft Hydraulic System
Aircraft Hydraulic SystemAircraft Hydraulic System
Aircraft Hydraulic System
 
Aircraft landing gear system
Aircraft landing gear systemAircraft landing gear system
Aircraft landing gear system
 
B737mrg exterior inspection
B737mrg exterior inspectionB737mrg exterior inspection
B737mrg exterior inspection
 
01. boeing 727 ata 28 - fuel
01. boeing 727   ata 28 - fuel01. boeing 727   ata 28 - fuel
01. boeing 727 ata 28 - fuel
 
Landing gear system of the Airbus A 380
Landing gear system of the Airbus A 380 Landing gear system of the Airbus A 380
Landing gear system of the Airbus A 380
 
Flight Basics
Flight BasicsFlight Basics
Flight Basics
 

Similaire à Aircraft landing gear FALCON 7X

B737 NG Flight controls
B737 NG Flight controlsB737 NG Flight controls
B737 NG Flight controlstheoryce
 
Lab pactice on pneumatic control systems
Lab pactice on pneumatic control systemsLab pactice on pneumatic control systems
Lab pactice on pneumatic control systemsEphremZemedkun
 
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control system
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control systemAUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control system
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control systemGherghescu Gabriel
 
Volvo Wheel Loader L120d Service Manual
 Volvo Wheel Loader L120d Service Manual  Volvo Wheel Loader L120d Service Manual
Volvo Wheel Loader L120d Service Manual SantySingh5
 
N426YP DA-42NG Overview
N426YP DA-42NG OverviewN426YP DA-42NG Overview
N426YP DA-42NG OverviewJoeyNewton2
 
Air Brakes Safety
Air Brakes SafetyAir Brakes Safety
Air Brakes SafetyK Wilson
 
EMERGENCY BRAKING SYSTEM.pptx
EMERGENCY BRAKING SYSTEM.pptxEMERGENCY BRAKING SYSTEM.pptx
EMERGENCY BRAKING SYSTEM.pptxGokul740367
 
rafs_requirements_specification
rafs_requirements_specificationrafs_requirements_specification
rafs_requirements_specificationPedro Pablo Plazas
 
3 a. industrial pneumatic circuit basic
3 a. industrial pneumatic circuit   basic3 a. industrial pneumatic circuit   basic
3 a. industrial pneumatic circuit basicDr.R. SELVAM
 
New 1 - Air Brakes.pptx
New 1 - Air Brakes.pptxNew 1 - Air Brakes.pptx
New 1 - Air Brakes.pptxJimsonOgbejele
 
01. boeing 727 ata 32 - landing gear
01. boeing 727   ata 32 - landing gear01. boeing 727   ata 32 - landing gear
01. boeing 727 ata 32 - landing gearDiegoRuddyArcaineZeg
 
2000 oldsmobile bravada service repair manual
2000 oldsmobile bravada service repair manual2000 oldsmobile bravada service repair manual
2000 oldsmobile bravada service repair manualfjskkedmmem
 
Halderman ch095 lecture
Halderman ch095 lectureHalderman ch095 lecture
Halderman ch095 lecturemcfalltj
 
Hydraulic Circuit Contents..pptx
Hydraulic Circuit Contents..pptxHydraulic Circuit Contents..pptx
Hydraulic Circuit Contents..pptxAhmdSbhy
 

Similaire à Aircraft landing gear FALCON 7X (20)

Turning Table.pptx
Turning Table.pptxTurning Table.pptx
Turning Table.pptx
 
Hst ppt
Hst pptHst ppt
Hst ppt
 
B737 NG Flight controls
B737 NG Flight controlsB737 NG Flight controls
B737 NG Flight controls
 
H60
H60H60
H60
 
Lab pactice on pneumatic control systems
Lab pactice on pneumatic control systemsLab pactice on pneumatic control systems
Lab pactice on pneumatic control systems
 
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control system
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control systemAUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control system
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 27 48 cruise control system
 
Volvo Wheel Loader L120d Service Manual
 Volvo Wheel Loader L120d Service Manual  Volvo Wheel Loader L120d Service Manual
Volvo Wheel Loader L120d Service Manual
 
N426YP DA-42NG Overview
N426YP DA-42NG OverviewN426YP DA-42NG Overview
N426YP DA-42NG Overview
 
Air Brakes Safety
Air Brakes SafetyAir Brakes Safety
Air Brakes Safety
 
EMERGENCY BRAKING SYSTEM.pptx
EMERGENCY BRAKING SYSTEM.pptxEMERGENCY BRAKING SYSTEM.pptx
EMERGENCY BRAKING SYSTEM.pptx
 
Sistemas
SistemasSistemas
Sistemas
 
Antilock brakes
Antilock brakesAntilock brakes
Antilock brakes
 
rafs_requirements_specification
rafs_requirements_specificationrafs_requirements_specification
rafs_requirements_specification
 
3 a. industrial pneumatic circuit basic
3 a. industrial pneumatic circuit   basic3 a. industrial pneumatic circuit   basic
3 a. industrial pneumatic circuit basic
 
New 1 - Air Brakes.pptx
New 1 - Air Brakes.pptxNew 1 - Air Brakes.pptx
New 1 - Air Brakes.pptx
 
01. boeing 727 ata 32 - landing gear
01. boeing 727   ata 32 - landing gear01. boeing 727   ata 32 - landing gear
01. boeing 727 ata 32 - landing gear
 
2000 oldsmobile bravada service repair manual
2000 oldsmobile bravada service repair manual2000 oldsmobile bravada service repair manual
2000 oldsmobile bravada service repair manual
 
Halderman ch095 lecture
Halderman ch095 lectureHalderman ch095 lecture
Halderman ch095 lecture
 
SISTEMA DE AIRE FRENOS 793D
SISTEMA DE AIRE FRENOS 793DSISTEMA DE AIRE FRENOS 793D
SISTEMA DE AIRE FRENOS 793D
 
Hydraulic Circuit Contents..pptx
Hydraulic Circuit Contents..pptxHydraulic Circuit Contents..pptx
Hydraulic Circuit Contents..pptx
 

Plus de amineshinobie

Iggnition and starting system
Iggnition and starting systemIggnition and starting system
Iggnition and starting systemamineshinobie
 
Aircraft fuel system
Aircraft fuel systemAircraft fuel system
Aircraft fuel systemamineshinobie
 
Aircraft flap system
Aircraft flap systemAircraft flap system
Aircraft flap systemamineshinobie
 
P&w r2800 piston engine
P&w r2800 piston engineP&w r2800 piston engine
P&w r2800 piston engineamineshinobie
 
Boeing Company Presentation
Boeing Company PresentationBoeing Company Presentation
Boeing Company Presentationamineshinobie
 

Plus de amineshinobie (6)

CFM56
CFM56CFM56
CFM56
 
Iggnition and starting system
Iggnition and starting systemIggnition and starting system
Iggnition and starting system
 
Aircraft fuel system
Aircraft fuel systemAircraft fuel system
Aircraft fuel system
 
Aircraft flap system
Aircraft flap systemAircraft flap system
Aircraft flap system
 
P&w r2800 piston engine
P&w r2800 piston engineP&w r2800 piston engine
P&w r2800 piston engine
 
Boeing Company Presentation
Boeing Company PresentationBoeing Company Presentation
Boeing Company Presentation
 

Dernier

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Aircraft landing gear FALCON 7X

  • 1. Aircraft Landing Gear DASSAULT FALCON 7X Presented By: AMINE LAKHDARI
  • 2. The Falcon 7X features: - Two main Landing Gears, - One nose Landing Gear Landing gears are: - Electrically controlled, - Hydraulically actuated
  • 3.
  • 4. CONTROLS Crew control of landing gear system is performed via: - Normal operation Landing Gear Handle, - Three landing gear free fall extension handles (also referred to as emergency operation gear handles).
  • 5. Each main landing gear has the following characteristics: - Inboard retracting configuration, - Doors are operating in sequence with the gear, - Twin wheels, - Each main gear and doors are fitted with double set of proximity switches providing: o Signal of gears and doors position to LGSCU, o Signal of WOW (Weight On Wheels) to transmit to all systems: Either directly from one relay, Or through consolidated WOW signal based on a combination of relays.
  • 6. NOSE LANDING GEAR The nose landing gear has the following characteristics: - Forward retracting configuration, - Doors are mechanically actuated by gear movements, - It is fitted with an oleo- pneumatic shock absorber including two cams centring the nose wheels when nose landing gear is completely extended, - The nose landing gear incorporates the nose wheel steering hydraulic module, - Provides shimmy damping
  • 7. NORMAL LANDING GEAR EXTENSION The extension sequence of landing gears and doors during normal operation is the following: - 1. Main doors open, - 2. Main and nose landing gears extend, - 3. Main doors close. As previously mentioned nose landing gear doors are mechanically open by the nose landing gear and remain open while the nose landing gear is extended. LANDING GEAR RETRACTION Before landing gear retraction sequence is allowed: - The airplane must be in air mode (WOW proximity switches), - The nose wheel must be centred. The sequencing is the same as for extension: - 1. Main doors open, - 2. Main and nose landing gears retract, - 3. Main doors close. During retraction sequence, brake pressure is applied by the braking system to stop main
  • 8. NORMAL BRAKING OPERATION During normal operation, control of the braking system is performed: - By the dual channel Brake Control Unit, - Which commands hydraulic power to be provided through brake shut off valves, - To the brake control valves. Hydraulic pressure is modulated according to: - Brake pedal position, - Anti skid protection. Hydraulic A is used by brake system 1, while hydraulic B is used by brake system 2. In case of dual hydraulic system failure, the braking action on pedals remains possible with antiskid using only pressure of park / emergency brake accumulator. Braking action is limited to park / emergency brake accumulator capacity.
  • 9. Crew control of braking system is performed via: - Park / emergency brake handle at parking, - Pedals for normal wheel braking, -Park / emergency Brake handle when normal braking is lost. Pedals are not mechanically linked for braking action. There is one pedal position transducer for each left and right seat pedals

Notes de l'éditeur

  1. The Falcon 7X features: - Two main Landing Gears, - One nose Landing Gear Landing gears are: - Electrically controlled, - Hydraulically actuated
  2. CONTROLS Crew control of landing gear system is performed via: - Normal operation Landing Gear Handle, - Three landing gear free fall extension handles (also referred to as emergency operation gear handles).
  3. Each main landing gear has the following characteristics: - Inboard retracting configuration, - Doors are operating in sequence with the gear, - Twin wheels, - Each main gear and doors are fitted with double set of proximity switches providing: o Signal of gears and doors position to LGSCU, o Signal of WOW (Weight On Wheels) to transmit to all systems: Either directly from one relay, Or through consolidated WOW signal based on a combination of relays.
  4. NOSE LANDING GEAR The nose landing gear has the following characteristics: - Forward retracting configuration, - Doors are mechanically actuated by gear movements, - It is fitted with an oleo-pneumatic shock absorber including two cams centring the nose wheels when nose landing gear is completely extended, - The nose landing gear incorporates the nose wheel steering hydraulic module, - Provides shimmy damping
  5. NORMAL LANDING GEAR EXTENSION The extension sequence of landing gears and doors during normal operation is the following: - 1. Main doors open, - 2. Main and nose landing gears extend, - 3. Main doors close. As previously mentioned nose landing gear doors are mechanically open by the nose landing gear and remain open while the nose landing gear is extended. LANDING GEAR RETRACTION Before landing gear retraction sequence is allowed: - The airplane must be in air mode (WOW proximity switches), - The nose wheel must be centred. The sequencing is the same as for extension: - 1. Main doors open, - 2. Main and nose landing gears retract, - 3. Main doors close. During retraction sequence, brake pressure is applied by the braking system to stop main
  6. NORMAL BRAKING OPERATION During normal operation, control of the braking system is performed: - By the dual channel Brake Control Unit, - Which commands hydraulic power to be provided through brake shut off valves, - To the brake control valves. Hydraulic pressure is modulated according to: - Brake pedal position, - Anti skid protection. Hydraulic A is used by brake system 1, while hydraulic B is used by brake system 2. In case of dual hydraulic system failure, the braking action on pedals remains possible with antiskid using only pressure of park / emergency brake accumulator. Braking action is limited to park / emergency brake accumulator capacity.
  7. Crew control of braking system is performed via: - Park / emergency brake handle at parking, - Pedals for normal wheel braking, Park / emergency Brake handle when normal braking is lost. Pedals are not mechanically linked for braking action. There is one pedal position transducer for each left and right seat pedals