SlideShare une entreprise Scribd logo
1  sur  7
Télécharger pour lire hors ligne
Statuary Publication: This document is the sole publication of the Author. Any misuse and the mis-interpretation by anyone, author does not take the responsibilty for the same. Amit Pokhrel FEASIBILITY REPORT 
A feasibility report is prepared to present an in-depth techno-commercial analysis carried out on the project idea for consideration of the financial institutions and other authorities empowered to take the investment decision. According to the guidelines published by the Planning Commission from the world, a feasibility report should include: 1. Raw material survey 2. Demand study 3. Technical study -Product pattern -Process selection -Plant size -Raw material selection 4. Location study 5. Project capital cost estimates and source of finance
6. Profitability and cash flow analysis 7. Cost benefit analysis Detail study of the above theory 1. Raw material survey The raw material may belongs to any of the following categories a. Available in natural form as deposits, either on the surface or underground, in one part or different parts of the country. Necessary arrangements in that case are to be made for extracting the same from the main raw material body and transport it to the processing centre. Studies would look into not only the quality of the raw material to assess its suitability for the manufacturing process, but also the quantity to decide on the size and life of the plant it would support. The study would also take into consideration the quantity of the material already committed for different plants in operation in the pipeline. A new investigation to establish availability of raw materials is normally needed, but in cases where there is considerable delay in establishing the projects, it may be necessary to obtain re-confirmation of the availability from the companies supplying or producing them. b. Demand study A demand study normally would establish the following: =Demand =Supply =Distribution
=Prices Most of the information is available from published literature. In special cases, however, an independent survey may be needed. Some of the documents that are usually referred to for this purpose as follows: + Plan documents + Guidelines to industries published by the department of Industrial Development, Ministry of Industry. + Economic survey published by the Ministry of Finance, Central bank + Annual survey of industries published by the Central Statistical organization + Import and export statistics published by the Ministry of Commerce + Monthly bulletin of Rastra bank (central bank of Nepal) + Survey reports of various institutions: publication of the Industrial development, Various market research agencies are available which can analyze the published information and also carry out field surveys to collect realistic information regarding demand, supply and prices. Normally, a field survey is carried out to confirm some of the conclusions of the desk study. Such studies are usually referred to as sample surveys. Accuracy and dependability of such surveys depends upon a number of factors not excluding the capability of the surveyor and willingness of the respondents to part with authentic information. Long-range sales forecasts or projections over the possible life-span of the plant are essential to work out the sales revenue for the project. These forecasts may prove to be wrong due to various external factors, assuming that in the first instance, the forecasts were competently made. Thus, it may become necessary to take another look at these forecasts in case there has been a long time gap between the completion of feasibility study and the effective starting date of the project. Since
demand study is a time-consuming affair, a re-study is avoided unless there has been an abnormal change in the environment. c. Technical study _Product pattern The demand survey projects an estimate of potential sales and the raw material survey confirms its adequate material will be available to support the project. These two data and the consideration of the economy of scale should be sufficient to select the plant capacity. But a final decision in this regard can be made only after the financial resources required and the available alternative technologies are also evaluated. In this case of process plant, the selected process would also determine the various co- products and by-products that are possible. In such cases, quantities of all such products have to be established. Besides market and technology, there are other factors which may affect the decision regarding plant capacity. Technology may dictate the minimum scale of operation, but economy of scale and resource management may sway the decision from one capacity level to another. Also, if the technology is likely to change very fast, as it is in the case of electronics, the choice may fall on a smaller plant capacity. Governmental controls in terms of prices, tax, reliefs, import and export may also determine the plant capacity and the product pattern. It is unlikely that the optimum of plant capacity selected during the feasibility study will change by the time the projects reach the zero date. If, however, the time elapsed is very large, a re-study may be required to establish all over again the product pattern and optimal plant capacity _Process selection
The product pattern so selected and the raw material availability will govern the selection of the processing scheme. But detailed evaluation including the economics of operation of alternative processing schemes is necessary for selecting an optimum process. Usually a processing scheme is developed by an operating company through its own R & D efforts and is protected by patents. The company is then said to possess know-how. If the company agrees to share this know-how with others, it may be done through a technology license agreement. The mode of technology transfer will depend on the capability of the receiving party. Unless the company possessing the know-how also engineering projects, the same may be passed on to a project engineering company will then convert the know-how into a technological package and market it. A complete technology package is not available, nor is it required for evaluation of alternative processing schemes. During the feasibility study period, the investigation is made regarding the source of know-how and contact is established with them for obtaining the data necessary for the evaluation of alternative processing schemes and establishment of capital cost estimate. From this contact only limited information is likely to be available. The various factors that could result in a meaningful evaluation are: * Indigenous vs. foreign know-how * Type of process and stage of development * Raw material requirements * Utilities requirements * Indigenous and foreign component requirements * Flexibility in product pattern and compliance with market requirements * Operating cost and installed capital cost * Economic analysis
* Organizational ability of process licensor * Success of the process in the country of origin and in other countries where it has been licensed. d. Location study To meet their targets relating to time and costs, it is necessary that the site has been properly selected and possession taken of before the zero date. Normally, the financial institutions will depute a team of experts to inspect the site before they sanction any loan. Uncertainties associated with the site and particularly that of sub-soil conditions must also be removed before the zero date. If the plant site has to be relocated at a later date, not only will the targets be missed but even the viability of the project may also be lost. Project sites are selected on several considerations. The basic consideration is: = Availability of land, soil characteristics and cost of the land = Approach to site = Source of raw material and transportation requirement = Transportation and marketing of finished product = Source and availability of water = Availability of power and source = Availabilities of skill manpower or human resource = Social amenities in the area
= Availabilities of tax incentives, if any = Facilities for drainage and effluent disposal = Availability of engineering and maintenance facilities = Acceptance of the project by the local bodies. e, f,g represents financing arrangements which a project needs for any work of the project from formulation to the execution phase. Financing arrangements includes Capital costs, Working capital and Operating costs

Contenu connexe

Similaire à Feasibility report

Techno Economic Feasibility Report I Gaurav Singh Rajput
Techno Economic Feasibility Report I Gaurav Singh RajputTechno Economic Feasibility Report I Gaurav Singh Rajput
Techno Economic Feasibility Report I Gaurav Singh RajputGaurav Singh Rajput
 
Entrepreneurship : project
Entrepreneurship : projectEntrepreneurship : project
Entrepreneurship : projectshweta saxena
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project managementDevendra Kachhi
 
Feasibility study ppt
Feasibility study pptFeasibility study ppt
Feasibility study pptkunal kishore
 
[Journal] a feasibility study to buy metal plate press machine in pt. x
[Journal] a feasibility study to buy metal plate press machine in pt. x[Journal] a feasibility study to buy metal plate press machine in pt. x
[Journal] a feasibility study to buy metal plate press machine in pt. xWilliam Budiharsono
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxbettymakuve1
 
Article On Green Field Project
Article On Green Field ProjectArticle On Green Field Project
Article On Green Field Projectmkg2803
 
prefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdfprefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdfJanPan7
 
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptxPROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptxPawanMishra226835
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...BBAsourashtracollege
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimatesnagashree123
 
Project Management Notes 1
Project Management Notes 1Project Management Notes 1
Project Management Notes 1Golam Bitonsir
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project reporttaruian
 
Project proposal to start a new enterprise
Project proposal to start a new enterpriseProject proposal to start a new enterprise
Project proposal to start a new enterpriseSamaira Mujeeb
 

Similaire à Feasibility report (20)

Techno Economic Feasibility Report I Gaurav Singh Rajput
Techno Economic Feasibility Report I Gaurav Singh RajputTechno Economic Feasibility Report I Gaurav Singh Rajput
Techno Economic Feasibility Report I Gaurav Singh Rajput
 
Entrepreneurship : project
Entrepreneurship : projectEntrepreneurship : project
Entrepreneurship : project
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
 
Project formulation (1)
Project formulation (1)Project formulation (1)
Project formulation (1)
 
Feasibility study ppt
Feasibility study pptFeasibility study ppt
Feasibility study ppt
 
Feasibility Study.pptx
Feasibility Study.pptxFeasibility Study.pptx
Feasibility Study.pptx
 
project management
project managementproject management
project management
 
[Journal] a feasibility study to buy metal plate press machine in pt. x
[Journal] a feasibility study to buy metal plate press machine in pt. x[Journal] a feasibility study to buy metal plate press machine in pt. x
[Journal] a feasibility study to buy metal plate press machine in pt. x
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptx
 
Article On Green Field Project
Article On Green Field ProjectArticle On Green Field Project
Article On Green Field Project
 
prefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdfprefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdf
 
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptxPROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
 
Pm chapter 2...
Pm chapter 2...Pm chapter 2...
Pm chapter 2...
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Pm chapter 2
Pm chapter 2Pm chapter 2
Pm chapter 2
 
Project Management Notes 1
Project Management Notes 1Project Management Notes 1
Project Management Notes 1
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project report
 
Unit v operations mgt
Unit v operations mgtUnit v operations mgt
Unit v operations mgt
 
Project proposal to start a new enterprise
Project proposal to start a new enterpriseProject proposal to start a new enterprise
Project proposal to start a new enterprise
 

Plus de Amit Pokharel

Certificate educating staff development program early childhood development f...
Certificate educating staff development program early childhood development f...Certificate educating staff development program early childhood development f...
Certificate educating staff development program early childhood development f...Amit Pokharel
 
Becoming a confident trainer
Becoming a confident trainerBecoming a confident trainer
Becoming a confident trainerAmit Pokharel
 
Major problems of urban environments and development in nepal
Major problems of urban environments and development in nepalMajor problems of urban environments and development in nepal
Major problems of urban environments and development in nepalAmit Pokharel
 
Communication management in project management
Communication management in project managementCommunication management in project management
Communication management in project managementAmit Pokharel
 
What is corporate finance
What is corporate financeWhat is corporate finance
What is corporate financeAmit Pokharel
 
Paper on real state development
Paper on real state developmentPaper on real state development
Paper on real state developmentAmit Pokharel
 
Ghandruk village profile, a study of culture resource management
Ghandruk village profile, a study of culture resource managementGhandruk village profile, a study of culture resource management
Ghandruk village profile, a study of culture resource managementAmit Pokharel
 
Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepalAmit Pokharel
 
Design studio proposal
Design studio proposalDesign studio proposal
Design studio proposalAmit Pokharel
 
Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepalAmit Pokharel
 
Remedies for traffic conditions in kathmandu valley
Remedies for traffic conditions in kathmandu valleyRemedies for traffic conditions in kathmandu valley
Remedies for traffic conditions in kathmandu valleyAmit Pokharel
 
Major problems of urban environments and development in nepal
Major problems of urban environments and development in nepalMajor problems of urban environments and development in nepal
Major problems of urban environments and development in nepalAmit Pokharel
 
Final report(conservation)
Final report(conservation)Final report(conservation)
Final report(conservation)Amit Pokharel
 
Project proposal for traditional residential dwelling design studio
Project proposal for traditional residential dwelling design studioProject proposal for traditional residential dwelling design studio
Project proposal for traditional residential dwelling design studioAmit Pokharel
 
What wrongs with the inequality
What wrongs with the inequalityWhat wrongs with the inequality
What wrongs with the inequalityAmit Pokharel
 
Urbanization in nepal final
Urbanization in nepal finalUrbanization in nepal final
Urbanization in nepal finalAmit Pokharel
 
Proposal of conservation power point version-conservation studio
Proposal of conservation power point version-conservation studioProposal of conservation power point version-conservation studio
Proposal of conservation power point version-conservation studioAmit Pokharel
 
Patterns of neighbourhood structure in history -final
Patterns of neighbourhood structure in history -finalPatterns of neighbourhood structure in history -final
Patterns of neighbourhood structure in history -finalAmit Pokharel
 

Plus de Amit Pokharel (20)

Certificate educating staff development program early childhood development f...
Certificate educating staff development program early childhood development f...Certificate educating staff development program early childhood development f...
Certificate educating staff development program early childhood development f...
 
Becoming a confident trainer
Becoming a confident trainerBecoming a confident trainer
Becoming a confident trainer
 
Major problems of urban environments and development in nepal
Major problems of urban environments and development in nepalMajor problems of urban environments and development in nepal
Major problems of urban environments and development in nepal
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
Communication management in project management
Communication management in project managementCommunication management in project management
Communication management in project management
 
What is corporate finance
What is corporate financeWhat is corporate finance
What is corporate finance
 
Paper on real state development
Paper on real state developmentPaper on real state development
Paper on real state development
 
Ghandruk village profile, a study of culture resource management
Ghandruk village profile, a study of culture resource managementGhandruk village profile, a study of culture resource management
Ghandruk village profile, a study of culture resource management
 
Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepal
 
Design studio proposal
Design studio proposalDesign studio proposal
Design studio proposal
 
Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepal
 
Remedies for traffic conditions in kathmandu valley
Remedies for traffic conditions in kathmandu valleyRemedies for traffic conditions in kathmandu valley
Remedies for traffic conditions in kathmandu valley
 
Major problems of urban environments and development in nepal
Major problems of urban environments and development in nepalMajor problems of urban environments and development in nepal
Major problems of urban environments and development in nepal
 
Final report(conservation)
Final report(conservation)Final report(conservation)
Final report(conservation)
 
Project proposal for traditional residential dwelling design studio
Project proposal for traditional residential dwelling design studioProject proposal for traditional residential dwelling design studio
Project proposal for traditional residential dwelling design studio
 
What wrongs with the inequality
What wrongs with the inequalityWhat wrongs with the inequality
What wrongs with the inequality
 
Urbanization in nepal final
Urbanization in nepal finalUrbanization in nepal final
Urbanization in nepal final
 
Proposal of conservation power point version-conservation studio
Proposal of conservation power point version-conservation studioProposal of conservation power point version-conservation studio
Proposal of conservation power point version-conservation studio
 
Patterns of neighbourhood structure in history -final
Patterns of neighbourhood structure in history -finalPatterns of neighbourhood structure in history -final
Patterns of neighbourhood structure in history -final
 
Malla houses
Malla housesMalla houses
Malla houses
 

Dernier

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Feasibility report

  • 1. Statuary Publication: This document is the sole publication of the Author. Any misuse and the mis-interpretation by anyone, author does not take the responsibilty for the same. Amit Pokhrel FEASIBILITY REPORT A feasibility report is prepared to present an in-depth techno-commercial analysis carried out on the project idea for consideration of the financial institutions and other authorities empowered to take the investment decision. According to the guidelines published by the Planning Commission from the world, a feasibility report should include: 1. Raw material survey 2. Demand study 3. Technical study -Product pattern -Process selection -Plant size -Raw material selection 4. Location study 5. Project capital cost estimates and source of finance
  • 2. 6. Profitability and cash flow analysis 7. Cost benefit analysis Detail study of the above theory 1. Raw material survey The raw material may belongs to any of the following categories a. Available in natural form as deposits, either on the surface or underground, in one part or different parts of the country. Necessary arrangements in that case are to be made for extracting the same from the main raw material body and transport it to the processing centre. Studies would look into not only the quality of the raw material to assess its suitability for the manufacturing process, but also the quantity to decide on the size and life of the plant it would support. The study would also take into consideration the quantity of the material already committed for different plants in operation in the pipeline. A new investigation to establish availability of raw materials is normally needed, but in cases where there is considerable delay in establishing the projects, it may be necessary to obtain re-confirmation of the availability from the companies supplying or producing them. b. Demand study A demand study normally would establish the following: =Demand =Supply =Distribution
  • 3. =Prices Most of the information is available from published literature. In special cases, however, an independent survey may be needed. Some of the documents that are usually referred to for this purpose as follows: + Plan documents + Guidelines to industries published by the department of Industrial Development, Ministry of Industry. + Economic survey published by the Ministry of Finance, Central bank + Annual survey of industries published by the Central Statistical organization + Import and export statistics published by the Ministry of Commerce + Monthly bulletin of Rastra bank (central bank of Nepal) + Survey reports of various institutions: publication of the Industrial development, Various market research agencies are available which can analyze the published information and also carry out field surveys to collect realistic information regarding demand, supply and prices. Normally, a field survey is carried out to confirm some of the conclusions of the desk study. Such studies are usually referred to as sample surveys. Accuracy and dependability of such surveys depends upon a number of factors not excluding the capability of the surveyor and willingness of the respondents to part with authentic information. Long-range sales forecasts or projections over the possible life-span of the plant are essential to work out the sales revenue for the project. These forecasts may prove to be wrong due to various external factors, assuming that in the first instance, the forecasts were competently made. Thus, it may become necessary to take another look at these forecasts in case there has been a long time gap between the completion of feasibility study and the effective starting date of the project. Since
  • 4. demand study is a time-consuming affair, a re-study is avoided unless there has been an abnormal change in the environment. c. Technical study _Product pattern The demand survey projects an estimate of potential sales and the raw material survey confirms its adequate material will be available to support the project. These two data and the consideration of the economy of scale should be sufficient to select the plant capacity. But a final decision in this regard can be made only after the financial resources required and the available alternative technologies are also evaluated. In this case of process plant, the selected process would also determine the various co- products and by-products that are possible. In such cases, quantities of all such products have to be established. Besides market and technology, there are other factors which may affect the decision regarding plant capacity. Technology may dictate the minimum scale of operation, but economy of scale and resource management may sway the decision from one capacity level to another. Also, if the technology is likely to change very fast, as it is in the case of electronics, the choice may fall on a smaller plant capacity. Governmental controls in terms of prices, tax, reliefs, import and export may also determine the plant capacity and the product pattern. It is unlikely that the optimum of plant capacity selected during the feasibility study will change by the time the projects reach the zero date. If, however, the time elapsed is very large, a re-study may be required to establish all over again the product pattern and optimal plant capacity _Process selection
  • 5. The product pattern so selected and the raw material availability will govern the selection of the processing scheme. But detailed evaluation including the economics of operation of alternative processing schemes is necessary for selecting an optimum process. Usually a processing scheme is developed by an operating company through its own R & D efforts and is protected by patents. The company is then said to possess know-how. If the company agrees to share this know-how with others, it may be done through a technology license agreement. The mode of technology transfer will depend on the capability of the receiving party. Unless the company possessing the know-how also engineering projects, the same may be passed on to a project engineering company will then convert the know-how into a technological package and market it. A complete technology package is not available, nor is it required for evaluation of alternative processing schemes. During the feasibility study period, the investigation is made regarding the source of know-how and contact is established with them for obtaining the data necessary for the evaluation of alternative processing schemes and establishment of capital cost estimate. From this contact only limited information is likely to be available. The various factors that could result in a meaningful evaluation are: * Indigenous vs. foreign know-how * Type of process and stage of development * Raw material requirements * Utilities requirements * Indigenous and foreign component requirements * Flexibility in product pattern and compliance with market requirements * Operating cost and installed capital cost * Economic analysis
  • 6. * Organizational ability of process licensor * Success of the process in the country of origin and in other countries where it has been licensed. d. Location study To meet their targets relating to time and costs, it is necessary that the site has been properly selected and possession taken of before the zero date. Normally, the financial institutions will depute a team of experts to inspect the site before they sanction any loan. Uncertainties associated with the site and particularly that of sub-soil conditions must also be removed before the zero date. If the plant site has to be relocated at a later date, not only will the targets be missed but even the viability of the project may also be lost. Project sites are selected on several considerations. The basic consideration is: = Availability of land, soil characteristics and cost of the land = Approach to site = Source of raw material and transportation requirement = Transportation and marketing of finished product = Source and availability of water = Availability of power and source = Availabilities of skill manpower or human resource = Social amenities in the area
  • 7. = Availabilities of tax incentives, if any = Facilities for drainage and effluent disposal = Availability of engineering and maintenance facilities = Acceptance of the project by the local bodies. e, f,g represents financing arrangements which a project needs for any work of the project from formulation to the execution phase. Financing arrangements includes Capital costs, Working capital and Operating costs