Beck Technology is a 100 year old company that provides BIM services and patented software called DProfiler. DProfiler allows users to create a simple 3D model and conduct real-time cost, energy, and site analysis. It also provides proforma and real estate dashboards. DProfiler can be used early in conceptual design to analyze design options and their impacts. Examples shown include using DProfiler for a healthcare campus master plan, a hospital project, and renovation feasibility studies. DProfiler allows analyzing designs across various project types from the conceptual through construction phases.
9. TIME EFFECT PD SD DD CD PR CA OP EFFORT Original Graphics: Patrick MacLeamy AIA/HOK The Solution Ability to impact project cost Cost associated with change Traditional Design Process Greatest ability to make changes at the lowest cost Preferred Design Process
19. Healthcare Example Detailed Room Quantity Take-off with “Match Properties” -Define Room Types -Types represent major cost groupings for equipment and finishes OR Classification Item Number Qty. Formula Floor Welded Sheet Vinyl Flooring Area S.F. Sheet Vinyl Integral Cove Perimeter L.F. Ceiling Gypsum Board Ceilings Area S.F. Paint Drywall Ceilings Area S.F. Walls 1 Layer of 5/8" Type "X" Gyp Board WallArea S.F. Lead Lined Gypsum Board 0 S.F. Tape & Bed WallArea S.F. Paint Drywall Partitions - Epoxy Paint Perimeter*9 S.F. Interior Door/Frame/Hardware - 6/0x7/0 w/ vision panels Each Opng. Paint Door & Frame Each Ea. Specialties Wall Protection, Corner Guards, stainless steel, 16 ga, 3-1/2" leg 4 L.F. R/F Sheilding (Braden Shielding or similar) WallArea/4 S.F. Other Uni-strut Medical Equipment Support Allowance Each All In-Wall Blocking - Upper Cabinets Perimeter/2 L.F. In-Wall Blocking - Base Cabinets Perimeter/2 L.F. In-Wall Blocking - Miscellaneous Perimeter/2 L.F. Solid Surface Vanity Top Perimeter/2 L.F. Cabinets, wall cabinets Perimeter/2 L.F. Cabinets, base cabinets, not including counter Perimeter/2 L.F.
30. Why? Conceptual Phase Schematic Phase Design Development Construction Documents Construction Phase Bid Phase Decisions without contractor involvement Value Engineering True Value Engineering, not just cost reduction Resulting Rework
35. Thanks. Andy O’Nan (214) 303-6254 Direct [email_address] www.beck-technology.com
Notes de l'éditeur
We represent Beck Technology, a member of the Beck Group of companies You may have heard of the Beck Group, they are an almost 100 year old ENR top 50 GC based in Dallas TX Beck Technology was formed in the mid 1990’s and selling DProfiler the software we are here to show you today since late 2006 DProfiler is an integrated modeling and cost estimating tool aimed at the earliest phases of a project enabling its users to make smarter, better, more informed decisions prior to an owner go/no go decision We currently have around 20% of ENR companies using our technology
Add target store image
Add target store image
Explain phases to non-Architects
Rather frequently as a team, we must begin working together with this level of information. A level of information that is wrought with unknowns, assumption, and variables that will affect the outcome of the project.
The red and blue coloring represents the phasing plan associated with the construction of the master plan.
Our initial challenge was to define the multiple bldg types represented in the project. Dormitories, classroom bldgs, office/administrative bldgs. Etc. We used these project data sheets to capture high level assumptions with respect to each bldg type and the characteristics that we would find common across similar bldg types. Information such as interior partition ratios, finish types, foundation types, structural types, et.c
MRNA Group – evaluates different sites Rather frequently as a team, we must begin working together with this level of information. A level of information that is wrought with unknowns, assumption, and variables that will affect the outcome of the project.