SlideShare une entreprise Scribd logo
1  sur  57
REPAIRS, REHABILITATION
AND
RETROFITTING OF
STRUCTURES
Prepared By:
Assistant Professor Ankit Patel
REPAIR, RESTORATION AND RETROFITTING
Repair: To bring back the position of the structure to its previous
condition so it gives performance same as previously.
It doesn’t cover the strength aspect of the structures.
Some examples of repair…….
Decoration of structure,Painting,White Washing
 Checking the wiring of building
 Replastering of any wall if required
 Repairing of damaged flooring
 Repair of door and window
 Checking or repairing of pipe line connections, gas line connections
and plumbing serveries.
 Relaying disturbed roof tiles
BITS Edu Campusprof. Ankit Patel
2
REPAIR, RESTORATION AND RETROFITTING
Rehabilitation: Rehabilitation of a building means returning a
building or a structure to a useful state by means of repair,
modification, or alteration.
It is related to the strength aspect of structures.
To Bring back the position and condition of the structure by
considering the strength aspect.
Some of the examples of Rehabilitation…..
 To fill the wide cracks using some suitable material
 Injecting epoxy like material in to cracks in walls,columns,beams,
etc.
 Removal of damaged portion of masonry and reconstructing it
using rich mortar mix.
 Addition of reinforcing mesh on both sides of the wall
BITS Edu Campusprof. Ankit Patel
3
REPAIR, RESTORATION AND RETROFITTING
Retrofitting:
Earthquake creates great devastation in terms of life, money and
failures of structures.
Earthquake Mitigation is an important field of study from a long time
now.
Seismic Retrofitting is a collection mitigation techniques for
Earthquake Engineering.
It is of utmost importance for historic monuments, areas prone to
severe earthquakes and tall or expensive structures
It is the modification of existing structures to make them more
resistant to seismic activity, ground motion, or soil failure due to
earthquakes.
The retrofit techniques are also applicable for other natural hazards
such as tropical cyclones, tornadoes, and severe winds from
thunderstorms. BITS Edu Campusprof. Ankit Patel
4
REPAIR, RESTORATION AND RETROFITTING
When is Seismic Retrofitting Needed ?
The two circumstances are:-
Earthquake damaged buildings, and Earthquake-vulnerable
buildings(with no exposure to severe earthquakes)
Some examples of retrofitting ………
 Increasing the lateral strength in one or both directions, by
reinforcement or by increasing wall areas or the numbers of walls
and columns
 Giving unity to the structure by providing a proper connection
between resisting elements.
 Eliminating features that are sources of weakness, asymmetrical
plan distribution of resisting members, abrupt changes of stiffness
from one floor to the other.
 Avoiding the possibility of brittle modes of failure by proper
reinforcement and connection of resisting members. BITS Edu Campusprof. Ankit Patel
5
REPAIR METHODOLOGY
 Evaluation
 Relating observation to causes
 Selecting methods and materials
 Preparation of drawings and specifications
 Selection of a contractor
 Execution of the work
 Quality Control
BITS Edu Campusprof. Ankit Patel
6
MATERIALS FOR CRACK REPAIR
The various materials used for repairs of cracks are:
 Cement Slurry
 Cement Mortar
 Epoxy resin
 Polymer Modified Cementitious Products
BITS Edu Campusprof. Ankit Patel
7
CRACK REPAIR TECHNIQUES
 Epoxy-injection Grouting
 Routing and Sealing
 Flexible Sealing
 Stitching
 Providing additional Reinforcement
 Drilling and plugging
 Prestressing steel
 Grouting
 Dry packing
 Surface Coatings
BITS Edu Campusprof. Ankit Patel
8
CRACK REPAIR TECHNIQUES
 Epoxy-injection Grouting
Cracks as narrow as 0.002 in. (0.05 mm) can be bonded by the
injection of epoxy. The technique generally consists of establishing
entry and venting ports at close intervals along the cracks, sealing the
crack on exposed surfaces, and injecting the epoxy under pressure.
Epoxy injection has been successfully used in the repair of cracks in
buildings, bridges, dams, and other types of concrete structures.
However, unless the cause of the cracking has been corrected, it will
probably recur near the original crack.
The general procedure are given below.
BITS Edu Campusprof. Ankit Patel
9
CRACK REPAIR TECHNIQUES
Clean the cracks: The first step is to clean the cracks that have been
contaminated; to the extent this is possible and practical. Contaminants
such as oil, grease, dirt, or fine particles of concrete prevent epoxy
penetration and bonding, and reduce the effectiveness of repairs.
Preferably, contamination should be removed by vacuuming or
flushing with water or other specially effective cleaning solutions.
Seal the surfaces: Surface cracks should be sealed to keep the epoxy
from leaking out before it has gelled. A surface can be sealed by
applying an epoxy, polyester, or other appropriate sealing material to
the surface of the crack and allowing it to harden. If a permanent
glossy appearance along the crack is objectionable and if high
injection pressure is not required, a strippable plastic surface sealer
may be applied along the face of the crack.
BITS Edu Campusprof. Ankit Patel
10
CRACK REPAIR TECHNIQUES
When the job is completed, the surface sealer can be stripped away to
expose the gloss-free surface. Cementitious seals can also be used
where appearance of the completed work is important. If extremely
high injection pressures are needed, the crack can be cut out to a depth
of 1/2 in. (13 mm) and width of about 3/4 in. (20 mm) in a V-shape,
filled with an epoxy, and struck off flush with the surface.
Install the entry and venting ports. Two methods are in general use:
Fittings inserted into drilled holes: This method was the first to be
used, and is often used in conjunction with V-grooving of the cracks.
The method entails drilling a hole into the crack, approximately 3/4 in.
(20 mm) in diameter and 1/2 to 1 in. (13 to 25 mm) below the apex of
the V grooved section.
BITS Edu Campusprof. Ankit Patel
11
CRACK REPAIR TECHNIQUES
Bonded flush fitting: When the cracks are not V grooved , a
method frequently used to provide an entry port is to bond a
fitting flush with the concrete face over the crack. The flush
fitting has an opening at the top for the adhesive to enter and a
flange at the bottom that is bonded to the concrete.
BITS Edu Campusprof. Ankit Patel
12
CRACK REPAIR TECHNIQUES
Mix the epoxy: This is done either by batch or continuous methods. In
batch mixing, the adhesive components are premixed according to the
manufacturers instructions, usually with the use of a mechanical
stirrer, like a paint mixing paddle. Care must be taken to mix only the
amount of adhesive that can be used prior to commencement of gelling
of the material.
Inject the epoxy: Hydraulic pumps, paint pressure pots, or air-
actuated caulking guns may be used. The pressure used for injection
must be selected carefully. Increased pressure often does little to
accelerate the rate of injection. If the crack is vertical or inclined, the
injection process should begin by pumping epoxy into the entry port at
the lowest elevation until the epoxy level reaches the entry port above.
For horizontal cracks, the injection should proceed from one end of
the crack to the other in the same manner. The crack is full if the
pressure can be maintained. If the pressure can not be maintained, the
epoxy is still flowing into unfilled portions or leaking out of the crack.
BITS Edu Campusprof. Ankit Patel
13
CRACK REPAIR TECHNIQUES
Remove the surface seal: After the injected epoxy has cured,
the surface seal should be removed by grinding or other means
as appropriate.
BITS Edu Campusprof. Ankit Patel
14
CRACK REPAIR TECHNIQUES
BITS Edu Campusprof. Ankit Patel
15
BITS Edu Campusprof. Ankit Patel
16
BITS Edu Campusprof. Ankit Patel
17
BITS Edu Campusprof. Ankit Patel
18
BITS Edu Campusprof. Ankit Patel
19
REPAIR BY ROUTING AND SEALING
BITS Edu Campusprof. Ankit Patel
20
BITS Edu Campusprof. Ankit Patel
21
BITS Edu Campusprof. Ankit Patel
22
BITS Edu Campusprof. Ankit Patel
23
BITS Edu Campusprof. Ankit Patel
24
BITS Edu Campusprof. Ankit Patel
25
BITS Edu Campusprof. Ankit Patel
26
BITS Edu Campusprof. Ankit Patel
27
REPAIR BY PROVIDING EXTRA
REINFORCEMENT
BITS Edu Campusprof. Ankit Patel
28
BITS Edu Campusprof. Ankit Patel
29
BITS Edu Campusprof. Ankit Patel
30
BITS Edu Campusprof. Ankit Patel
31
BITS Edu Campusprof. Ankit Patel
32
REPAIR BY POST TENSIONING
BITS Edu Campusprof. Ankit Patel
33
BITS Edu Campusprof. Ankit Patel
34
GROUTING
Grouting is a process of injecting mixture of cement, sand water at
high pressure in the cracks, joints, voids etc.
Purpose of grouting:
 To strengthen the porous Concrete
 To prevent the seepage in dam and water retaining structures
 To reduce uplift pressure below dam
 To fill the cracks in concrete structure
BITS Edu Campusprof. Ankit Patel
35
GROUTING
Procedure for grouting:
Drilling of Grouting holes
For drilling grouting holes, equipment's like jack hammer, diamond
drill, shot drill etc are used. The choice of type of drilling equipment
depends upon the type of stone, size of hole and depth of hole.
Arrangement of grout pipes
Grout pipes of 4 to 5 cm dia and 45 to 90 cm length are inserted in the
grout holes. The space surrounding the pipe is filled with cement
mortar. The top end of the pipe is connected to the pump.
Cleaning of cracks
Before injecting grout mixture in the cracks, it is necessary to clean
the cracks.
Inserting grout in holes
Normally grout is inserted in the holes at a pressure 0.65kg/cm2 per m
depth hole BITS Edu Campusprof. Ankit Patel
36
GROUTING
Types of grouting:
1. Consolidation Grouting:
This type of grouting is used for shallow depth grouting holes.
Normally pressure below 3 kg/cm2 is known as low pressure grouting.
2. Stage grouting:
When thick layers are to be grouted the total thickness of layer is
divided into stages of 1m each and grouting of each layer is carried out
one by one. Grouting of upper layer is started only after the grout in
the lower layer had properly set.
3. Curtain Grouting:
This type of grouting is done to prevent the seepage of water below
foundation of dam. Grouting holes are drilled in the upstream side of
dam in the bed rock and impermeable grout wall is created.it will
prevent seepage of water through dam foundation.
BITS Edu Campusprof. Ankit Patel
37
BITS Edu Campusprof. Ankit Patel
38
BITS Edu Campusprof. Ankit Patel
39
BITS Edu Campusprof. Ankit Patel
40
BITS Edu Campusprof. Ankit Patel
41
BITS Edu Campusprof. Ankit Patel
42
BITS Edu Campusprof. Ankit Patel
43
BITS Edu Campusprof. Ankit Patel
44
BITS Edu Campusprof. Ankit Patel
45
BITS Edu Campusprof. Ankit Patel
46
BITS Edu Campusprof. Ankit Patel
47
BITS Edu Campusprof. Ankit Patel
48
BITS Edu Campusprof. Ankit Patel
49
`
BITS Edu Campusprof. Ankit Patel
50
CAUSES OF DAMAGE IN MASONRY
BUILDING
 Heavy Weight and very stiff buildings, attracting large seismic
inertia forces.
 Very low tensile strength particularly with poor mortars
 Low shear strength
 Brittle behavior in tension as well as in compression
 Weak connection between wall and wall
 Weak connection between roof and wall
 Stress connection at corners of doors and windows
 Overall unsymmetry in plan and elevation of buildings
BITS Edu Campusprof. Ankit Patel
51
UNDERWATER REPAIRS
INTRODUCTION
Many of the techniques available for above water
repair can be used underwater with only minor
modifications. The materials specified for use in
air, however, are often completely unsuitable for
underwater use.
The major effects that underwater working has
on repair operations are summarized as follows:
The cost & difficulty of underwater working
requires that operations to be carried out at
the repair site be minimized & made as simple
as possible. The method of repair must be
tailored to suit the available methods of
access.
BITS Edu Campus prof. Ankit Patel 53
BITS Edu Campus prof. Ankit Patel 54
INTRODUCTION
Preparation of the damaged area requires
specially adapted techniques. Care must be
taken to ensure that the area is not
contaminated prior to application of the repair
material.
The material selected for the repair must be
compatible with underwater use both during
placing & curing. Many resin-based repair
materials are not suitable for use underwater;
cementitious systems are however in an ideal
medium.
Placement methods & formwork must be adopted
that minimize mixing between repair material &
water.
BITS Edu Campus prof. Ankit Patel 55
INTRODUCTION
Checking during the repair operation and regular
inspection on completion is difficult and costly to
achieve underwater.
The cost of underwater repair is far greater than
for similar repairs carried out in the dry. The cost
of failed repairs is also therefore high. Hence it is
important that laboratory trials on both repair
methods and materials be carried out to identify
possible problem areas and ensure smooth site
operations.
BITS Edu Campus prof. Ankit Patel 56
UNDERWATER REPAIR
 Preparation of damaged area: The preparation of damaged area
require removal of cracked concrete and cutting of corroded
reinforcement. The damaged concrete can be removed by high
pressure water jetting. Wherein hydraulic expanding cylinder are
inserted in to pre-drilled holes and pressurized until splitting of
concrete occurs.
BITS Edu Campusprof. Ankit Patel
57

Contenu connexe

Tendances

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteUdisha15
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structureshlok patel
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
HIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPTHIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPTabdul raheem
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATIONaframawal
 
High strength concrete
High strength concreteHigh strength concrete
High strength concreteDr K M SONI
 
Advantages and types of prestressing
Advantages and types of prestressingAdvantages and types of prestressing
Advantages and types of prestressingSaurav Chaudhary
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESbrijlata sharma
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting TechniquesAritra Banerjee
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.Satyaki Sikdar
 
Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....SJMIT,now NMAMIT NITTE
 

Tendances (20)

GUNITING
GUNITINGGUNITING
GUNITING
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Jacketing
JacketingJacketing
Jacketing
 
HIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPTHIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPT
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
 
Fibre Reinforced Concrete
Fibre Reinforced ConcreteFibre Reinforced Concrete
Fibre Reinforced Concrete
 
Advantages and types of prestressing
Advantages and types of prestressingAdvantages and types of prestressing
Advantages and types of prestressing
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Materials and Techniques For Repair
Materials and Techniques For RepairMaterials and Techniques For Repair
Materials and Techniques For Repair
 
Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....Rebound Hammer Test-priciple,procedure,cons&pros.....
Rebound Hammer Test-priciple,procedure,cons&pros.....
 

En vedette

Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationShuvam Sarkar
 
Textiles in earthquake prevention
Textiles in earthquake preventionTextiles in earthquake prevention
Textiles in earthquake preventionSuvin
 
enhancement of seismic resistance of structures
enhancement of seismic resistance of structuresenhancement of seismic resistance of structures
enhancement of seismic resistance of structuresBharath Reddy Bhimavarapu
 
Analysis of 3+ story building in staad pro
Analysis of 3+ story building in staad proAnalysis of 3+ story building in staad pro
Analysis of 3+ story building in staad proCADmantra Technologies
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGAnjneya Srivastava
 
Midas gen advanced tutorial
Midas gen advanced tutorialMidas gen advanced tutorial
Midas gen advanced tutorialTaegwang Jung
 
Seismic retrofit of building structures
Seismic retrofit of building structuresSeismic retrofit of building structures
Seismic retrofit of building structuresgopi1991
 
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGESMETHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGESUmer Farooq
 
residential buliding by stadd pro
residential buliding by stadd proresidential buliding by stadd pro
residential buliding by stadd proila vamsi krishna
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Dhaval Jadhav
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersFawad Najam
 

En vedette (18)

Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitation
 
Tabs ppt
Tabs pptTabs ppt
Tabs ppt
 
Textiles in earthquake prevention
Textiles in earthquake preventionTextiles in earthquake prevention
Textiles in earthquake prevention
 
enhancement of seismic resistance of structures
enhancement of seismic resistance of structuresenhancement of seismic resistance of structures
enhancement of seismic resistance of structures
 
Analysis of 3+ story building in staad pro
Analysis of 3+ story building in staad proAnalysis of 3+ story building in staad pro
Analysis of 3+ story building in staad pro
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
Etabs 2015 sesion 2
Etabs 2015 sesion 2Etabs 2015 sesion 2
Etabs 2015 sesion 2
 
Etabs 2015 sesion 3 parte 1
Etabs 2015 sesion 3 parte 1Etabs 2015 sesion 3 parte 1
Etabs 2015 sesion 3 parte 1
 
Etabs 2015 sesion 1
Etabs 2015 sesion 1Etabs 2015 sesion 1
Etabs 2015 sesion 1
 
Midas gen advanced tutorial
Midas gen advanced tutorialMidas gen advanced tutorial
Midas gen advanced tutorial
 
Etabs 2015 sesion 4 parte 2
Etabs 2015 sesion 4 parte 2Etabs 2015 sesion 4 parte 2
Etabs 2015 sesion 4 parte 2
 
Seismic retrofit of building structures
Seismic retrofit of building structuresSeismic retrofit of building structures
Seismic retrofit of building structures
 
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGESMETHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
 
residential buliding by stadd pro
residential buliding by stadd proresidential buliding by stadd pro
residential buliding by stadd pro
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC Members
 

Similaire à Chapter 4 repair, rehabilitation & retrofiiting

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresShahrukh Niaz
 
Methodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in BuildingMethodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in BuildingGRD Journals
 
type of Cracks in building and its repair
type of Cracks in building and its repairtype of Cracks in building and its repair
type of Cracks in building and its repairbasilesho2
 
Litterature study on building failures
Litterature study on building failures Litterature study on building failures
Litterature study on building failures Ar v chiru
 
Retrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structureRetrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structureKumarS250747
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketingAditya Sanyal
 
presentation on retro fit and repair methods
presentation on retro fit and repair methodspresentation on retro fit and repair methods
presentation on retro fit and repair methodsKumarS250747
 
Various methods for repair and rehabilitation for concrete structure failure
Various methods for repair and rehabilitation for concrete structure failureVarious methods for repair and rehabilitation for concrete structure failure
Various methods for repair and rehabilitation for concrete structure failureConstrofacilitator
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS jay Rathod
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207sharad_kadbhane
 
Manoj bk (water proofing)
Manoj bk (water proofing)Manoj bk (water proofing)
Manoj bk (water proofing)Manojkarader
 
Types of crack-Amit Payal
Types of crack-Amit PayalTypes of crack-Amit Payal
Types of crack-Amit PayalAMIT PAYAL
 
REPAIR REHABILITATION & RETROFITTING OF STRUCTURES.pptx
REPAIR REHABILITATION  & RETROFITTING OF STRUCTURES.pptxREPAIR REHABILITATION  & RETROFITTING OF STRUCTURES.pptx
REPAIR REHABILITATION & RETROFITTING OF STRUCTURES.pptxBasineniUdaykumar
 
Repair of concrete members
Repair of concrete membersRepair of concrete members
Repair of concrete membersDivyang Rathod
 
MAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptx
MAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptxMAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptx
MAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptxNamanGhevariya
 

Similaire à Chapter 4 repair, rehabilitation & retrofiiting (20)

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
Methodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in BuildingMethodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in Building
 
type of Cracks in building and its repair
type of Cracks in building and its repairtype of Cracks in building and its repair
type of Cracks in building and its repair
 
Litterature study on building failures
Litterature study on building failures Litterature study on building failures
Litterature study on building failures
 
Retrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structureRetrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structure
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
 
presentation on retro fit and repair methods
presentation on retro fit and repair methodspresentation on retro fit and repair methods
presentation on retro fit and repair methods
 
Various methods for repair and rehabilitation for concrete structure failure
Various methods for repair and rehabilitation for concrete structure failureVarious methods for repair and rehabilitation for concrete structure failure
Various methods for repair and rehabilitation for concrete structure failure
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
 
Manoj bk (water proofing)
Manoj bk (water proofing)Manoj bk (water proofing)
Manoj bk (water proofing)
 
Types of crack-Amit Payal
Types of crack-Amit PayalTypes of crack-Amit Payal
Types of crack-Amit Payal
 
cracks.pptx
cracks.pptxcracks.pptx
cracks.pptx
 
12161463.ppt
12161463.ppt12161463.ppt
12161463.ppt
 
Methodes of reparing cracks
Methodes of reparing cracksMethodes of reparing cracks
Methodes of reparing cracks
 
REPAIR REHABILITATION & RETROFITTING OF STRUCTURES.pptx
REPAIR REHABILITATION  & RETROFITTING OF STRUCTURES.pptxREPAIR REHABILITATION  & RETROFITTING OF STRUCTURES.pptx
REPAIR REHABILITATION & RETROFITTING OF STRUCTURES.pptx
 
Repair of concrete members
Repair of concrete membersRepair of concrete members
Repair of concrete members
 
MAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptx
MAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptxMAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptx
MAINTENANCE OF CIVIL ENGINEERING STRCTURES.pptx
 

Plus de Ankit Patel

Module 2 ch-2 ground water
Module 2 ch-2 ground waterModule 2 ch-2 ground water
Module 2 ch-2 ground waterAnkit Patel
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisAnkit Patel
 
Module 1 introduction
Module 1 introductionModule 1 introduction
Module 1 introductionAnkit Patel
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic charactersticsAnkit Patel
 
Ch 5 demolition of structures
Ch 5 demolition of structuresCh 5 demolition of structures
Ch 5 demolition of structuresAnkit Patel
 
Chapter 2 seviceability and durability
Chapter 2 seviceability and durabilityChapter 2 seviceability and durability
Chapter 2 seviceability and durabilityAnkit Patel
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergiesAnkit Patel
 

Plus de Ankit Patel (8)

Module 2 ch-2 ground water
Module 2 ch-2 ground waterModule 2 ch-2 ground water
Module 2 ch-2 ground water
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysis
 
Module 1 introduction
Module 1 introductionModule 1 introduction
Module 1 introduction
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic characterstics
 
Ch 5 demolition of structures
Ch 5 demolition of structuresCh 5 demolition of structures
Ch 5 demolition of structures
 
Chapter 2 seviceability and durability
Chapter 2 seviceability and durabilityChapter 2 seviceability and durability
Chapter 2 seviceability and durability
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergies
 

Dernier

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Dernier (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

Chapter 4 repair, rehabilitation & retrofiiting

  • 2. REPAIR, RESTORATION AND RETROFITTING Repair: To bring back the position of the structure to its previous condition so it gives performance same as previously. It doesn’t cover the strength aspect of the structures. Some examples of repair……. Decoration of structure,Painting,White Washing  Checking the wiring of building  Replastering of any wall if required  Repairing of damaged flooring  Repair of door and window  Checking or repairing of pipe line connections, gas line connections and plumbing serveries.  Relaying disturbed roof tiles BITS Edu Campusprof. Ankit Patel 2
  • 3. REPAIR, RESTORATION AND RETROFITTING Rehabilitation: Rehabilitation of a building means returning a building or a structure to a useful state by means of repair, modification, or alteration. It is related to the strength aspect of structures. To Bring back the position and condition of the structure by considering the strength aspect. Some of the examples of Rehabilitation…..  To fill the wide cracks using some suitable material  Injecting epoxy like material in to cracks in walls,columns,beams, etc.  Removal of damaged portion of masonry and reconstructing it using rich mortar mix.  Addition of reinforcing mesh on both sides of the wall BITS Edu Campusprof. Ankit Patel 3
  • 4. REPAIR, RESTORATION AND RETROFITTING Retrofitting: Earthquake creates great devastation in terms of life, money and failures of structures. Earthquake Mitigation is an important field of study from a long time now. Seismic Retrofitting is a collection mitigation techniques for Earthquake Engineering. It is of utmost importance for historic monuments, areas prone to severe earthquakes and tall or expensive structures It is the modification of existing structures to make them more resistant to seismic activity, ground motion, or soil failure due to earthquakes. The retrofit techniques are also applicable for other natural hazards such as tropical cyclones, tornadoes, and severe winds from thunderstorms. BITS Edu Campusprof. Ankit Patel 4
  • 5. REPAIR, RESTORATION AND RETROFITTING When is Seismic Retrofitting Needed ? The two circumstances are:- Earthquake damaged buildings, and Earthquake-vulnerable buildings(with no exposure to severe earthquakes) Some examples of retrofitting ………  Increasing the lateral strength in one or both directions, by reinforcement or by increasing wall areas or the numbers of walls and columns  Giving unity to the structure by providing a proper connection between resisting elements.  Eliminating features that are sources of weakness, asymmetrical plan distribution of resisting members, abrupt changes of stiffness from one floor to the other.  Avoiding the possibility of brittle modes of failure by proper reinforcement and connection of resisting members. BITS Edu Campusprof. Ankit Patel 5
  • 6. REPAIR METHODOLOGY  Evaluation  Relating observation to causes  Selecting methods and materials  Preparation of drawings and specifications  Selection of a contractor  Execution of the work  Quality Control BITS Edu Campusprof. Ankit Patel 6
  • 7. MATERIALS FOR CRACK REPAIR The various materials used for repairs of cracks are:  Cement Slurry  Cement Mortar  Epoxy resin  Polymer Modified Cementitious Products BITS Edu Campusprof. Ankit Patel 7
  • 8. CRACK REPAIR TECHNIQUES  Epoxy-injection Grouting  Routing and Sealing  Flexible Sealing  Stitching  Providing additional Reinforcement  Drilling and plugging  Prestressing steel  Grouting  Dry packing  Surface Coatings BITS Edu Campusprof. Ankit Patel 8
  • 9. CRACK REPAIR TECHNIQUES  Epoxy-injection Grouting Cracks as narrow as 0.002 in. (0.05 mm) can be bonded by the injection of epoxy. The technique generally consists of establishing entry and venting ports at close intervals along the cracks, sealing the crack on exposed surfaces, and injecting the epoxy under pressure. Epoxy injection has been successfully used in the repair of cracks in buildings, bridges, dams, and other types of concrete structures. However, unless the cause of the cracking has been corrected, it will probably recur near the original crack. The general procedure are given below. BITS Edu Campusprof. Ankit Patel 9
  • 10. CRACK REPAIR TECHNIQUES Clean the cracks: The first step is to clean the cracks that have been contaminated; to the extent this is possible and practical. Contaminants such as oil, grease, dirt, or fine particles of concrete prevent epoxy penetration and bonding, and reduce the effectiveness of repairs. Preferably, contamination should be removed by vacuuming or flushing with water or other specially effective cleaning solutions. Seal the surfaces: Surface cracks should be sealed to keep the epoxy from leaking out before it has gelled. A surface can be sealed by applying an epoxy, polyester, or other appropriate sealing material to the surface of the crack and allowing it to harden. If a permanent glossy appearance along the crack is objectionable and if high injection pressure is not required, a strippable plastic surface sealer may be applied along the face of the crack. BITS Edu Campusprof. Ankit Patel 10
  • 11. CRACK REPAIR TECHNIQUES When the job is completed, the surface sealer can be stripped away to expose the gloss-free surface. Cementitious seals can also be used where appearance of the completed work is important. If extremely high injection pressures are needed, the crack can be cut out to a depth of 1/2 in. (13 mm) and width of about 3/4 in. (20 mm) in a V-shape, filled with an epoxy, and struck off flush with the surface. Install the entry and venting ports. Two methods are in general use: Fittings inserted into drilled holes: This method was the first to be used, and is often used in conjunction with V-grooving of the cracks. The method entails drilling a hole into the crack, approximately 3/4 in. (20 mm) in diameter and 1/2 to 1 in. (13 to 25 mm) below the apex of the V grooved section. BITS Edu Campusprof. Ankit Patel 11
  • 12. CRACK REPAIR TECHNIQUES Bonded flush fitting: When the cracks are not V grooved , a method frequently used to provide an entry port is to bond a fitting flush with the concrete face over the crack. The flush fitting has an opening at the top for the adhesive to enter and a flange at the bottom that is bonded to the concrete. BITS Edu Campusprof. Ankit Patel 12
  • 13. CRACK REPAIR TECHNIQUES Mix the epoxy: This is done either by batch or continuous methods. In batch mixing, the adhesive components are premixed according to the manufacturers instructions, usually with the use of a mechanical stirrer, like a paint mixing paddle. Care must be taken to mix only the amount of adhesive that can be used prior to commencement of gelling of the material. Inject the epoxy: Hydraulic pumps, paint pressure pots, or air- actuated caulking guns may be used. The pressure used for injection must be selected carefully. Increased pressure often does little to accelerate the rate of injection. If the crack is vertical or inclined, the injection process should begin by pumping epoxy into the entry port at the lowest elevation until the epoxy level reaches the entry port above. For horizontal cracks, the injection should proceed from one end of the crack to the other in the same manner. The crack is full if the pressure can be maintained. If the pressure can not be maintained, the epoxy is still flowing into unfilled portions or leaking out of the crack. BITS Edu Campusprof. Ankit Patel 13
  • 14. CRACK REPAIR TECHNIQUES Remove the surface seal: After the injected epoxy has cured, the surface seal should be removed by grinding or other means as appropriate. BITS Edu Campusprof. Ankit Patel 14
  • 15. CRACK REPAIR TECHNIQUES BITS Edu Campusprof. Ankit Patel 15
  • 16. BITS Edu Campusprof. Ankit Patel 16
  • 17. BITS Edu Campusprof. Ankit Patel 17
  • 18. BITS Edu Campusprof. Ankit Patel 18
  • 19. BITS Edu Campusprof. Ankit Patel 19
  • 20. REPAIR BY ROUTING AND SEALING BITS Edu Campusprof. Ankit Patel 20
  • 21. BITS Edu Campusprof. Ankit Patel 21
  • 22. BITS Edu Campusprof. Ankit Patel 22
  • 23. BITS Edu Campusprof. Ankit Patel 23
  • 24. BITS Edu Campusprof. Ankit Patel 24
  • 25. BITS Edu Campusprof. Ankit Patel 25
  • 26. BITS Edu Campusprof. Ankit Patel 26
  • 27. BITS Edu Campusprof. Ankit Patel 27
  • 28. REPAIR BY PROVIDING EXTRA REINFORCEMENT BITS Edu Campusprof. Ankit Patel 28
  • 29. BITS Edu Campusprof. Ankit Patel 29
  • 30. BITS Edu Campusprof. Ankit Patel 30
  • 31. BITS Edu Campusprof. Ankit Patel 31
  • 32. BITS Edu Campusprof. Ankit Patel 32
  • 33. REPAIR BY POST TENSIONING BITS Edu Campusprof. Ankit Patel 33
  • 34. BITS Edu Campusprof. Ankit Patel 34
  • 35. GROUTING Grouting is a process of injecting mixture of cement, sand water at high pressure in the cracks, joints, voids etc. Purpose of grouting:  To strengthen the porous Concrete  To prevent the seepage in dam and water retaining structures  To reduce uplift pressure below dam  To fill the cracks in concrete structure BITS Edu Campusprof. Ankit Patel 35
  • 36. GROUTING Procedure for grouting: Drilling of Grouting holes For drilling grouting holes, equipment's like jack hammer, diamond drill, shot drill etc are used. The choice of type of drilling equipment depends upon the type of stone, size of hole and depth of hole. Arrangement of grout pipes Grout pipes of 4 to 5 cm dia and 45 to 90 cm length are inserted in the grout holes. The space surrounding the pipe is filled with cement mortar. The top end of the pipe is connected to the pump. Cleaning of cracks Before injecting grout mixture in the cracks, it is necessary to clean the cracks. Inserting grout in holes Normally grout is inserted in the holes at a pressure 0.65kg/cm2 per m depth hole BITS Edu Campusprof. Ankit Patel 36
  • 37. GROUTING Types of grouting: 1. Consolidation Grouting: This type of grouting is used for shallow depth grouting holes. Normally pressure below 3 kg/cm2 is known as low pressure grouting. 2. Stage grouting: When thick layers are to be grouted the total thickness of layer is divided into stages of 1m each and grouting of each layer is carried out one by one. Grouting of upper layer is started only after the grout in the lower layer had properly set. 3. Curtain Grouting: This type of grouting is done to prevent the seepage of water below foundation of dam. Grouting holes are drilled in the upstream side of dam in the bed rock and impermeable grout wall is created.it will prevent seepage of water through dam foundation. BITS Edu Campusprof. Ankit Patel 37
  • 38. BITS Edu Campusprof. Ankit Patel 38
  • 39. BITS Edu Campusprof. Ankit Patel 39
  • 40. BITS Edu Campusprof. Ankit Patel 40
  • 41. BITS Edu Campusprof. Ankit Patel 41
  • 42. BITS Edu Campusprof. Ankit Patel 42
  • 43. BITS Edu Campusprof. Ankit Patel 43
  • 44. BITS Edu Campusprof. Ankit Patel 44
  • 45. BITS Edu Campusprof. Ankit Patel 45
  • 46. BITS Edu Campusprof. Ankit Patel 46
  • 47. BITS Edu Campusprof. Ankit Patel 47
  • 48. BITS Edu Campusprof. Ankit Patel 48
  • 49. BITS Edu Campusprof. Ankit Patel 49
  • 50. ` BITS Edu Campusprof. Ankit Patel 50
  • 51. CAUSES OF DAMAGE IN MASONRY BUILDING  Heavy Weight and very stiff buildings, attracting large seismic inertia forces.  Very low tensile strength particularly with poor mortars  Low shear strength  Brittle behavior in tension as well as in compression  Weak connection between wall and wall  Weak connection between roof and wall  Stress connection at corners of doors and windows  Overall unsymmetry in plan and elevation of buildings BITS Edu Campusprof. Ankit Patel 51
  • 53. INTRODUCTION Many of the techniques available for above water repair can be used underwater with only minor modifications. The materials specified for use in air, however, are often completely unsuitable for underwater use. The major effects that underwater working has on repair operations are summarized as follows: The cost & difficulty of underwater working requires that operations to be carried out at the repair site be minimized & made as simple as possible. The method of repair must be tailored to suit the available methods of access. BITS Edu Campus prof. Ankit Patel 53
  • 54. BITS Edu Campus prof. Ankit Patel 54
  • 55. INTRODUCTION Preparation of the damaged area requires specially adapted techniques. Care must be taken to ensure that the area is not contaminated prior to application of the repair material. The material selected for the repair must be compatible with underwater use both during placing & curing. Many resin-based repair materials are not suitable for use underwater; cementitious systems are however in an ideal medium. Placement methods & formwork must be adopted that minimize mixing between repair material & water. BITS Edu Campus prof. Ankit Patel 55
  • 56. INTRODUCTION Checking during the repair operation and regular inspection on completion is difficult and costly to achieve underwater. The cost of underwater repair is far greater than for similar repairs carried out in the dry. The cost of failed repairs is also therefore high. Hence it is important that laboratory trials on both repair methods and materials be carried out to identify possible problem areas and ensure smooth site operations. BITS Edu Campus prof. Ankit Patel 56
  • 57. UNDERWATER REPAIR  Preparation of damaged area: The preparation of damaged area require removal of cracked concrete and cutting of corroded reinforcement. The damaged concrete can be removed by high pressure water jetting. Wherein hydraulic expanding cylinder are inserted in to pre-drilled holes and pressurized until splitting of concrete occurs. BITS Edu Campusprof. Ankit Patel 57