   The first demonstration of electric light in Calcutta
    was conducted on 24 July 1879 by P W Floury &
    Co. Mumbai saw electric lighting demonstration
    for the first time in 1882 at Crawford Market, and
    Bombay Electric Supply & Tramways Company
    (B.E.S.T.) set up a generating station in 1905 to
    provide electricity for the tramway. The first
    hydroelectric installation in India was installed
    near a tea estate at Sidrapong for the Darjeeling
    Municipality in 1897.The first electric train ran
    between Bombay's Victoria Terminus and Kurla
    along the Harbour Line, in 1925. In
    1931, electrification of the meter gauge track
    between Madras Beach and Tambaram was
    started.
Power development in India was first started in
1897 in Darjeeling, followed by commissioning of a
hydropower station at Sivasamudram in
Karnataka during 1902.

Since 1990, India has been one of the fastest
growing markets for new electricity generation
capacity.

The country's annual electricity generation
capacity has increased in last 20 years by about 120
GW, from about 66 GW in 1991to over 100 GW in
2001,to over 185 GW in 2011.
State-owned and privately owned companies are
significant players generating electricity in India.


As of August 2011, the states and union territories
of India with power surplus were Himachal
Pradesh, Sikkim, Tripura, Gujarat,
Delhi and Dadra and Nagar Haveli.


 India's central government and state
governments jointly regulate electricity sector in
India.
The table below presents the electricity generation
capacity, as well as availability to India's end user
and their demand

ITEM              VALUE    DATE
                           REPORTED
Total installed
                  201.64   April 2012
capacity (GW)
Available base
load supply       837374   May 2011
(MU)
Available peak
load supply       118.7    May 2011
(GW)
Demand base
                  933741   May 2011
load (MU)
Demand peak
                  136.2    May 2011
load (GW)
MAIN SOURCES

o    Thermal power

    Thermal power plants convert energy rich fuel into
    electricity and heat. Possible fuels include coal, natural gas,
    petroleum products, agricultural waste and domestic trash
    waste.

     India expects that its projected rapid growth in electricity
    generation over the next couple of decades is expected to be
    largely met by thermal power plants.
o   HYDRO POWER

    -It is a renewable energy resource.
    -2700 twh is generated every year.
    -5th rank.
    -contributes 21.5%.

    The power plants at Darjeeling and Shimsha
    were established in 1898 and 1902 respectively
    are first in Asia
o    NUCLEAR POWER

    -Indigenous Nuclear Power Program.
    -Nuclear Non Proliferation Treaty.
    -Thorium reserves.
    -Nuclear Power supplies.
    -Reactor years.
    -Shortage of fossil fuels drive the nuclear investment.
      India aims to supply 9% of it electricity needs with
      nuclear power by 2032. India's largest nuclear power
      plant project under implementation is at
      Jaitapur, Maharashtra in partnership
      with Areva, France.
o   SOLAR POWER

o   WIND POWER

o   BIOMASS POWER

o   GEOTHERMAL ENERGY

o   TIDAL WAVE ENERGY
Thar Desert project.
Solar Power Reception.
Average Solar Energy incident over India.
             GUJRAT
Leader in Solar Power Generation.
Asia’s biggest Solar park.
Park generates 214 MW Solar Power.
Awarded for being ecofriendly.
Development of Wind Power increased.
India ranks 5th.
Total installed capacity 16078 MW.
Generates 1.6% of the country’s power.
                  GUJRAT
Rise in the capacity to generate power.
Total wind power generation in Gujrat is 2884 MW.
   Suited for rural areas.
   Helps in efficient utilization of renewable biological
    sources.
   Low cost Resource.
   Ability to have small kw. Scale Power production as
    low as 20 KW.
   Good potential of producing 10600 MW power.
   Not yet Exploited.
   Ecofriendly means of power generation.
   Total potential 9000MW
   Gulf of Cambay & Gulf of Kutch.
   Ganges Delta in Sundarban In west Bengal.
   Gujrat government’s approval for the Gulf of
     Kutch.
   Urea Global Ltd. In association with U.S based
    company Ocean Energy Industries.
   Of the 1.4 billion people of the world who have no
    access to electricity in the world, India accounts for
    over 300 million.

    800 million Indians use traditional fuels –
    fuelwood, agricultural waste and biomass cakes –
    for cooking and general heating needs

   The five states with largest power demand and
    availability, as of May 2011, were Maharashtra,
    Andhra pradesh ,Tamil nadu, Uttar pradesh and
    gujarat
   According to a sample of 97,882 households in
    2002, electricity was the main source of lighting for
    53% of rural households compared to 36% in 1993

   India currently suffers from a major shortage of
    electricity generation capacity, even though it is
    the world's fourth largest energy consumer after
    United States, China and Russia.The International
    Energy Agency estimates India needs an
    investment of at least $135 billion to provide
    universal access of electricity to its population.
   Gujarat was declared a power surplus
    state, with about 2–3 GW more power available
    than its internal demand
   Over 2010–11, India's industrial demand
    accounted for 35% of electrical power
    requirement, domestic household use
    accounted for 28%, agriculture
    21%, commercial 9%, public lighting and other
    miscellaneous applications accounted for the
    rest.
    India's demand for electricity may cross 300
     GW, earlier than most estimates
      REASONS
1)   India's manufacturing sector is likely to grow
     faster than in the past
2)   Domestic demand will increase more rapidly
     as the quality of life for more Indians improve
3)   About 125,000 villages are likely to get
     connected to India's electricity grid
1)   Government giveaways such as free electricity
     for farmers, partly to curry political
     favour, have depleted the cash reserves of
     state-run electricity-distribution system.

2) Shortages of fuel: despite abundant reserves of
   coal, India is facing a severe shortage of coal.
   The country isn't producing enough to feed its
   power plants. Some plants do not have reserve
   coal supplies to last a day of operations.
   3) The giant new offshore natural gas field has
    delivered less fuel than projected

   4) hydroelectric power projects in India's
    mountainous north and northeast regions have
    been slowed down by ecological, environmental
    and rehabilitation controversies, coupled with
    public interest litigations.

   5) The July 2012 blackout, affecting the north of the
    country, was the largest power grid failure in
    history by number of people affected.
6)   In 2010, electricity losses in India during
     transmission and distribution were about
     24%, while losses because of consumer theft or
     billing deficiencies added another 10–15%
7)   Power cuts are common throughout India and the
     consequent failure to satisfy the demand for
     electricity has adversely effected India's economic
     growth.
8)   Over 300 million Indian citizens had no access to
     electricity. Over one third of India's rural
     population lacked electricity, as did 6% of the
     urban population
   India's Ministry of Power launched Rajiv
    Gandhi Grameen Vidyutikaran Yojana as one
    of its flagship programme in March 2005 with
    the objective of electrifying over one lakh un-
    electrified villages and to provide free
    electricity connections to 2.34 crore rural
    households

   This free electricity program promises energy
    access to India's rural areas, but is in part
    creating problems for India's electricity sector
   A Ministry of Renewal and New Energy
    announcement claims State Renewable Energy
    Agencies are being supported to organize
    short-term training programmes for
    installation, operation and maintenance and
    repair of renewable energy systems in such
    places where intensive RE programme are
    being implemented

    Renewable Energy Chairs have been
    established in IIT Roorkee and IIT Kharagpur.
Electricity and power consumption in india (1)

Contenu connexe

Tendances

Renewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaRenewable energy & its furure prospects in india
Renewable energy & its furure prospects in india
Surabhi Pal
 
Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in india
SHAMSHAD AHAMAD
 

Tendances (20)

Electricity ppt
Electricity pptElectricity ppt
Electricity ppt
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integration
 
Future of the Indian power sector
Future of the Indian power sectorFuture of the Indian power sector
Future of the Indian power sector
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
Energy project report on hydropower
Energy project report on hydropowerEnergy project report on hydropower
Energy project report on hydropower
 
impact of renewable energy sources on power system opeartion
impact of renewable energy sources on power system opeartionimpact of renewable energy sources on power system opeartion
impact of renewable energy sources on power system opeartion
 
Wind Power in India
Wind Power in IndiaWind Power in India
Wind Power in India
 
Potential of Solar energy in India
Potential of Solar energy in IndiaPotential of Solar energy in India
Potential of Solar energy in India
 
Renewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaRenewable energy & its furure prospects in india
Renewable energy & its furure prospects in india
 
Hydroelectric Power Plant
Hydroelectric Power PlantHydroelectric Power Plant
Hydroelectric Power Plant
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in India
 
Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in india
 
Hydro Power in India
Hydro Power in IndiaHydro Power in India
Hydro Power in India
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in india
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Renewable energy : POTENTIAL and UTILIZATION IN INDIA
Renewable energy : POTENTIAL and UTILIZATION IN INDIARenewable energy : POTENTIAL and UTILIZATION IN INDIA
Renewable energy : POTENTIAL and UTILIZATION IN INDIA
 
Renewable energy - India- future
Renewable energy - India- futureRenewable energy - India- future
Renewable energy - India- future
 
Project Report Hydraulic Power Plant
Project Report Hydraulic Power PlantProject Report Hydraulic Power Plant
Project Report Hydraulic Power Plant
 
Indian Energy Sector
Indian Energy SectorIndian Energy Sector
Indian Energy Sector
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 

Similaire à Electricity and power consumption in india (1)

power sector in india
power sector in india power sector in india
power sector in india
Kumar Gaurav
 
Electricity in india
Electricity in indiaElectricity in india
Electricity in india
Dev Garg
 
Renewable energy potential for india
Renewable energy potential for indiaRenewable energy potential for india
Renewable energy potential for india
Rajkumar Viral
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
Ankur Mahajan
 

Similaire à Electricity and power consumption in india (1) (20)

Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Power scenario of india
Power scenario of indiaPower scenario of india
Power scenario of india
 
DATA ON ENERGY PRODUCTION.pptx
DATA ON ENERGY PRODUCTION.pptxDATA ON ENERGY PRODUCTION.pptx
DATA ON ENERGY PRODUCTION.pptx
 
Vamshi tech ppt
Vamshi tech pptVamshi tech ppt
Vamshi tech ppt
 
power sector in india
power sector in india power sector in india
power sector in india
 
Electrical consumtion in india
Electrical consumtion in indiaElectrical consumtion in india
Electrical consumtion in india
 
Unit 1(res)
Unit  1(res)Unit  1(res)
Unit 1(res)
 
power for all reality or myth
power for all reality or myth power for all reality or myth
power for all reality or myth
 
Module-1_renewable energy sources introduction.pptx
Module-1_renewable energy sources introduction.pptxModule-1_renewable energy sources introduction.pptx
Module-1_renewable energy sources introduction.pptx
 
Indian energy scenario (2)
Indian energy scenario (2)Indian energy scenario (2)
Indian energy scenario (2)
 
Electricity in india
Electricity in indiaElectricity in india
Electricity in india
 
Renewable energy engineering (ala)
Renewable energy engineering (ala)Renewable energy engineering (ala)
Renewable energy engineering (ala)
 
Resources of Renewable Energy in India
Resources of Renewable Energy in IndiaResources of Renewable Energy in India
Resources of Renewable Energy in India
 
Renewable energy potential for india
Renewable energy potential for indiaRenewable energy potential for india
Renewable energy potential for india
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTOR
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Future Scope of Wind Energy in India
Future Scope of Wind Energy in IndiaFuture Scope of Wind Energy in India
Future Scope of Wind Energy in India
 
M010127983
M010127983M010127983
M010127983
 
Ijesdmv4n3 18
Ijesdmv4n3 18Ijesdmv4n3 18
Ijesdmv4n3 18
 
Ijesdmv4n3 18
Ijesdmv4n3 18Ijesdmv4n3 18
Ijesdmv4n3 18
 

Electricity and power consumption in india (1)

  • 1. PRESENTED BY: ANIRUDH SHARMA(12148) PALKIN SHAH(12142) RUSHABH SHAH (12143) SUBMITTED TO :DR SHARIFF MENON
  • 2. The first demonstration of electric light in Calcutta was conducted on 24 July 1879 by P W Floury & Co. Mumbai saw electric lighting demonstration for the first time in 1882 at Crawford Market, and Bombay Electric Supply & Tramways Company (B.E.S.T.) set up a generating station in 1905 to provide electricity for the tramway. The first hydroelectric installation in India was installed near a tea estate at Sidrapong for the Darjeeling Municipality in 1897.The first electric train ran between Bombay's Victoria Terminus and Kurla along the Harbour Line, in 1925. In 1931, electrification of the meter gauge track between Madras Beach and Tambaram was started.
  • 3. Power development in India was first started in 1897 in Darjeeling, followed by commissioning of a hydropower station at Sivasamudram in Karnataka during 1902. Since 1990, India has been one of the fastest growing markets for new electricity generation capacity. The country's annual electricity generation capacity has increased in last 20 years by about 120 GW, from about 66 GW in 1991to over 100 GW in 2001,to over 185 GW in 2011.
  • 4. State-owned and privately owned companies are significant players generating electricity in India. As of August 2011, the states and union territories of India with power surplus were Himachal Pradesh, Sikkim, Tripura, Gujarat, Delhi and Dadra and Nagar Haveli. India's central government and state governments jointly regulate electricity sector in India.
  • 5. The table below presents the electricity generation capacity, as well as availability to India's end user and their demand ITEM VALUE DATE REPORTED Total installed 201.64 April 2012 capacity (GW) Available base load supply 837374 May 2011 (MU) Available peak load supply 118.7 May 2011 (GW) Demand base 933741 May 2011 load (MU) Demand peak 136.2 May 2011 load (GW)
  • 6. MAIN SOURCES o Thermal power Thermal power plants convert energy rich fuel into electricity and heat. Possible fuels include coal, natural gas, petroleum products, agricultural waste and domestic trash waste. India expects that its projected rapid growth in electricity generation over the next couple of decades is expected to be largely met by thermal power plants.
  • 7. o HYDRO POWER -It is a renewable energy resource. -2700 twh is generated every year. -5th rank. -contributes 21.5%. The power plants at Darjeeling and Shimsha were established in 1898 and 1902 respectively are first in Asia
  • 8. o NUCLEAR POWER -Indigenous Nuclear Power Program. -Nuclear Non Proliferation Treaty. -Thorium reserves. -Nuclear Power supplies. -Reactor years. -Shortage of fossil fuels drive the nuclear investment. India aims to supply 9% of it electricity needs with nuclear power by 2032. India's largest nuclear power plant project under implementation is at Jaitapur, Maharashtra in partnership with Areva, France.
  • 9. o SOLAR POWER o WIND POWER o BIOMASS POWER o GEOTHERMAL ENERGY o TIDAL WAVE ENERGY
  • 10. Thar Desert project. Solar Power Reception. Average Solar Energy incident over India. GUJRAT Leader in Solar Power Generation. Asia’s biggest Solar park. Park generates 214 MW Solar Power. Awarded for being ecofriendly.
  • 11. Development of Wind Power increased. India ranks 5th. Total installed capacity 16078 MW. Generates 1.6% of the country’s power. GUJRAT Rise in the capacity to generate power. Total wind power generation in Gujrat is 2884 MW.
  • 12. Suited for rural areas.  Helps in efficient utilization of renewable biological  sources.  Low cost Resource.  Ability to have small kw. Scale Power production as  low as 20 KW.
  • 13. Good potential of producing 10600 MW power.  Not yet Exploited.  Ecofriendly means of power generation.
  • 14. Total potential 9000MW  Gulf of Cambay & Gulf of Kutch.  Ganges Delta in Sundarban In west Bengal.  Gujrat government’s approval for the Gulf of  Kutch.  Urea Global Ltd. In association with U.S based  company Ocean Energy Industries.
  • 15. Of the 1.4 billion people of the world who have no access to electricity in the world, India accounts for over 300 million.  800 million Indians use traditional fuels – fuelwood, agricultural waste and biomass cakes – for cooking and general heating needs  The five states with largest power demand and availability, as of May 2011, were Maharashtra, Andhra pradesh ,Tamil nadu, Uttar pradesh and gujarat
  • 16. According to a sample of 97,882 households in 2002, electricity was the main source of lighting for 53% of rural households compared to 36% in 1993  India currently suffers from a major shortage of electricity generation capacity, even though it is the world's fourth largest energy consumer after United States, China and Russia.The International Energy Agency estimates India needs an investment of at least $135 billion to provide universal access of electricity to its population.
  • 17. Gujarat was declared a power surplus state, with about 2–3 GW more power available than its internal demand  Over 2010–11, India's industrial demand accounted for 35% of electrical power requirement, domestic household use accounted for 28%, agriculture 21%, commercial 9%, public lighting and other miscellaneous applications accounted for the rest.
  • 18. India's demand for electricity may cross 300 GW, earlier than most estimates  REASONS 1) India's manufacturing sector is likely to grow faster than in the past 2) Domestic demand will increase more rapidly as the quality of life for more Indians improve 3) About 125,000 villages are likely to get connected to India's electricity grid
  • 19. 1) Government giveaways such as free electricity for farmers, partly to curry political favour, have depleted the cash reserves of state-run electricity-distribution system. 2) Shortages of fuel: despite abundant reserves of coal, India is facing a severe shortage of coal. The country isn't producing enough to feed its power plants. Some plants do not have reserve coal supplies to last a day of operations.
  • 20. 3) The giant new offshore natural gas field has delivered less fuel than projected  4) hydroelectric power projects in India's mountainous north and northeast regions have been slowed down by ecological, environmental and rehabilitation controversies, coupled with public interest litigations.  5) The July 2012 blackout, affecting the north of the country, was the largest power grid failure in history by number of people affected.
  • 21. 6) In 2010, electricity losses in India during transmission and distribution were about 24%, while losses because of consumer theft or billing deficiencies added another 10–15% 7) Power cuts are common throughout India and the consequent failure to satisfy the demand for electricity has adversely effected India's economic growth. 8) Over 300 million Indian citizens had no access to electricity. Over one third of India's rural population lacked electricity, as did 6% of the urban population
  • 22. India's Ministry of Power launched Rajiv Gandhi Grameen Vidyutikaran Yojana as one of its flagship programme in March 2005 with the objective of electrifying over one lakh un- electrified villages and to provide free electricity connections to 2.34 crore rural households  This free electricity program promises energy access to India's rural areas, but is in part creating problems for India's electricity sector
  • 23. A Ministry of Renewal and New Energy announcement claims State Renewable Energy Agencies are being supported to organize short-term training programmes for installation, operation and maintenance and repair of renewable energy systems in such places where intensive RE programme are being implemented  Renewable Energy Chairs have been established in IIT Roorkee and IIT Kharagpur.