Your Organisation
• What triggers your organisation to perform an RCA?
• Easy… These typically cause significant production losses
• Shutdown Extensions
• Explosions or other event that may cause injury
• What triggers your organisation to perform an RCM study?
• Typically smaller losses that add up or Reliability issues on
bottleneck assets
• Poor Maintenance Strategy
• Poor Spares Management and/or Resource Levelling
• How often does your organisation review its’ maintenance
strategies?
• Answers I’ve heard in the past…
• Never
• Every 24 months
www.armsreliability.com
Why Use Process Reliability
• The Weibull process reliability techniques help define a
strategic course of action for making improvements.
• The look down technique provides opportunities for
developing a strategy to solve problems.
• The method tells the nature of
problems and quantifying the
losses.
www.armsreliability.com
Analysing a PR Chart
The reliability of the process is defined at
the point where the trend line, in the
upper reaches of the production, began
their losses at a cusp.
A portion of the losses appear as cutbacks.
Another portion of the losses appear as
very severe problems characterized by a
zone labeled crash and burn---both zones
are associated with reliability problems.
www.armsreliability.com
Process Reliability Chart
www.armsreliability.com
Nameplate Values
• NAMEPLATE Eta
– The maximum plant capacity under assumed ideal operating and control conditions. This
value can be however obtained by taking an average of the best 15 production results.
• NAMEPLATE Beta
– Manually set to 75 (or other pre-determined value). Beta of 100 is seen to be “world class”
production, achieving highly consistent results.
– Improvement in Nameplate Values will occur as the consistency of throughput is increased
as a result of focussing on both Production and Reliability losses
www.armsreliability.com
Production Values
• PRODUCTION Eta
– Production Line tonnes are based on the Weibull analysis performed using the daily production data,
returning a value where the production data line (best of fit) intersects with the Eta estimator (63.2% of
production results are below)
• PRODUCTION Beta
– The Characteristic Shape, or slope of the Weibull Distribution.
In Process analysis, this represents the consistency in the plant’s outputs. The lower the number, the
lower the consistency or increase in variability within the process.
– Production Losses are typically related to;
• Utilisation
• Efficiency
• Process variability
• Equipment Operating Characteristics
• Systemic issues
www.armsreliability.com
Reliability Losses
• Total Reliability & Loss
– Reliability point is where there is a cusp in the production points plotted on the Weibull chart. This
represents the point where production becomes inconsistent or unreliable. The loss value is the
difference between demonstrated capacity and are the points at which the production values lie to
the left of that capacity line
– The cusp for the point of reliability represents probability the capacity (tonnes) is likely to be
achieved or greater.
– i.e at this point a 90.34% probability of achieving 382.3 tonnes or greater
– Losses here equate to “Given” tonnes lost per day through reliability plant issues
such as breakdowns
– Reliability losses should be targeted with a formailised RCA Defect Elimination Process with
defined trigger points to reduce variability in plant throughput. This will result in higher eta and
beta Production values which represents increased throughput consistency
www.armsreliability.com
12 Month Analysis Profile
Profile
Production
Losses
Reliability
Losses 1
Dec 11 Jan 12 Feb Mar Apr May Jun Jul Aug Sep
Month
0
25
50
75
100
125
150
175
200
225
LostCapacitytonnes
www.armsreliability.com
How To Improve?
• What is the issue?
• Reliability or Process?
• How to deal with those issues?
• Do those issues change over time?
• How to quantify improvements?
www.armsreliability.com
Using a Reliability Block Diagram (RBD)
to Help Make Decisions
• An RBD is a logic diagram that describes a system behaviour
and easily allows different scenarios to be analysed.
1.1
Prim ary Crushing
System
(97.45)%
1.2
40,000tonneLive
Coars eOrePile
System
(95.46)%
1.3
Sec ondary
Crus herFeed
Conveyor
621-CVR-0-02
M TTF=100.6
M TTR=0.92
100%
1.4
Sec ondary
Crus hingSystem
(99.71)%
1.5
Coars eScreen
FeedConveyor
622-CRV-0-03
M TTF=144.2
M TTR=1.65
100%
1.7
HRGRFeed
Conveyor
623-CVR-0-04
M TTF=173.5
M TTR=1.15
100%
1.8
HPGRSy stem
(87.63)%
1.2.1
Coars eOrePile
TTE=96
TFL=12
100%
1.11
FineSc reening
andBallMill
System 1
(24.48)%
1.12
FineSc reening
andBallMill
System 2
(24.45)%
1.13
FineSc reening
andBallMill
System 3
(24.52)%
1.14
FineSc reening
andBallMill
System 4
(24.44)%
1.26
Coars eScreen
Feeder
623-FDV-1-01
M TTF=64.8
M TTR=0.45
35%
1.27
Coars eScreen
623-SCR-1-01
35%
1.28
Coars eScreen
Feeder
623-FDV-2-01
M TTF=64.8
M TTR=0.45
35%
1.29
Coars eScreen
623-SCR-2-01
35%
1.30
Coars eScreen
Feeder
623-FDV-3-01
M TTF=64.8
M TTR=0.45
35%
1.31
Coars eScreen
623-SCR-3-01
35%
1.32
Coars eScreen
Feeder
623-FDV-4-01
M TTF=64.8
M TTR=0.45
35%
1.33
Coars eScreen
623-SCR-4-01
35%
1.34
12WShutdown
TTF=1000000
M TTR=0
100%
1.35
1YRShutdown
TTF=1000000
M TTR=0
100%
1.36
6WShutdown
TTF=1000000
M TTR=0
100%
Copy Of1.8.17
FineOreBin
625-BIN
TTE=2.27
TFL=1.19
100%
Example of a crushing circuit
www.armsreliability.com
Which System is the Bottleneck?
www.armsreliability.com
Is there something in that system we can
target?
• Lets take a look at the problem system in detail
Example of the Secondary Crushing System
BN-003
Secondary Screen
Feed Bin 1
FE-002
Secondary Screen
Belt Feeder 1
BN-004
Secondary Screen
Feed Bin 2
FE-003
Secondary Screen
Belt Feeder 2
SC-002
Secondary Screen
1
SC-003
Secondary Screen
2
CV-003
Conveyor CV03
BN-006
Secondary
Crusher Feed Bin
1
BN-007
Secondary
Crusher Feed Bin
2
FE-005
Secondary
Crusher Feeder 1
FE-006
Secondary
Crusher Feeder 2
CV-004
Conveyor CV04
CR-002
Secondary
Crusher 1
CR-003
Secondary
Crusher 2
PP-004
Dust Scrubber
Slurry Pump
PP-010
Sump Pump
PP-011
Sump Pump
DC-003
Secondary
Screening Dust
Scrubber
AU10-PPP-CRU-BLDNG-BD002
BUILDING,
SECONDARY
SCREENING
AU10-PPP-CRU-BLDNG-BD003
BUILDING,
SECONDARY
CRUSHING
F-004.1
No Capacity
Consequence
Sub-system F-004
www.armsreliability.com
What to do in the Problem System to
Improve Production?
In this example CV04 and CV03 have the biggest impact on production.
0 200 400 600 800 1000 1200 1400 1600 1800
Conveyor CV04
Conveyor CV03
Secondary Crusher 1
Secondary Crusher 2
Secondary Screening Dust Scrubber
Secondary Crusher Feeder 1
Secondary Crusher Feeder 2
Contribution to Capacity Loss (Thousand $)
Component
Contribution to Capacity Loss over 10 YRS
www.armsreliability.com
Implementing The Strategy
• Reliability Block Diagrams (RBD)
– Utilise an Availability Simulation to predict production
increases with different scenarios.
How does a redundancy
scenario change production?
www.armsreliability.com
Implementing Your Strategy
• Reliability Block Diagrams (RBD)
– Utilise an Availability Simulation to predict production
increases with different scenarios.
What predicted impact will a
RCM have on our production?
MTTF goes from 8760
to 4860 through RCM
www.armsreliability.com
What is the Best Solution?
www.armsreliability.com
Comparing Results
www.armsreliability.com
Conclusions
• Step One
– Identify room for improvement
• Step Two
– Identify the best improvement that can be made.
• Step Three
– Quantify the cost benefit in the options available for
improvement through statistical methods.
• Step Four
– Analyse the data to see what impact decisions have on the
business.
www.armsreliability.com
Weylon Malek
ARMS Reliability
wmalek@armsreliability.com

Contenu connexe

Tendances

Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metricskaskerrigan
 
seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)Jayesh Gupta
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Top 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMSTop 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMSeMaint Enterprises
 
Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...ASQ Reliability Division
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputOH!Manufacturing
 
Implementing a Successful CMMS
Implementing a Successful CMMSImplementing a Successful CMMS
Implementing a Successful CMMSRandall C. Smith
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layouthakimizaki
 
8 Ingredients for a High-Performing CMMS
8 Ingredients for a High-Performing CMMS8 Ingredients for a High-Performing CMMS
8 Ingredients for a High-Performing CMMS24/7 Software
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
Preventative maintenance strategy with CMMS
Preventative maintenance strategy with CMMSPreventative maintenance strategy with CMMS
Preventative maintenance strategy with CMMSAndriy Popov
 
Etm551 lecture10
Etm551 lecture10Etm551 lecture10
Etm551 lecture10Alex Chuê
 

Tendances (17)

Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metrics
 
Jit
JitJit
Jit
 
seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)
 
Df Maint Tutorial
Df Maint TutorialDf Maint Tutorial
Df Maint Tutorial
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Top 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMSTop 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMS
 
Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
 
Implementing a Successful CMMS
Implementing a Successful CMMSImplementing a Successful CMMS
Implementing a Successful CMMS
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
8 Ingredients for a High-Performing CMMS
8 Ingredients for a High-Performing CMMS8 Ingredients for a High-Performing CMMS
8 Ingredients for a High-Performing CMMS
 
Design for X
Design for XDesign for X
Design for X
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Cell_sample
Cell_sampleCell_sample
Cell_sample
 
Preventative maintenance strategy with CMMS
Preventative maintenance strategy with CMMSPreventative maintenance strategy with CMMS
Preventative maintenance strategy with CMMS
 
Quality presentation
Quality presentationQuality presentation
Quality presentation
 
Etm551 lecture10
Etm551 lecture10Etm551 lecture10
Etm551 lecture10
 

Similaire à Weylon Malek AMPEAK 2014 Presentation - Process Reliability

Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLCReliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLCCarl Byington
 
Leveraging SAP to Support Reliability Analytics
Leveraging SAP to Support Reliability AnalyticsLeveraging SAP to Support Reliability Analytics
Leveraging SAP to Support Reliability AnalyticsMike Poland, CMRP
 
DFR Conference, March 2019
DFR  Conference, March 2019DFR  Conference, March 2019
DFR Conference, March 2019OptimalPlus
 
Lecture 10 Reliability.ppt
Lecture 10 Reliability.pptLecture 10 Reliability.ppt
Lecture 10 Reliability.ppttinymoley
 
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...Tonatiuh Lozada Duarte
 
Designing apps for resiliency
Designing apps for resiliencyDesigning apps for resiliency
Designing apps for resiliencyMasashi Narumoto
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007jrd9234
 
Renaissance Repair And Supply Overview
Renaissance Repair And Supply OverviewRenaissance Repair And Supply Overview
Renaissance Repair And Supply Overviewlenanderson
 
Renaissance Repair And Supply Overview
Renaissance Repair And Supply OverviewRenaissance Repair And Supply Overview
Renaissance Repair And Supply Overviewlenanderson
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisCharlton Inao
 
Six sigma project (chihaoshen)
Six sigma project (chihaoshen)Six sigma project (chihaoshen)
Six sigma project (chihaoshen)CH §Shen
 
150213 apics houston waging war on complexity in supply chains vf
150213 apics houston   waging war on complexity in supply chains vf150213 apics houston   waging war on complexity in supply chains vf
150213 apics houston waging war on complexity in supply chains vfWilson Perumal and Company
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them AllVibra
 
Driving semiconductor-manufacturing-business-performance-through-analytics (1)
Driving semiconductor-manufacturing-business-performance-through-analytics (1)Driving semiconductor-manufacturing-business-performance-through-analytics (1)
Driving semiconductor-manufacturing-business-performance-through-analytics (1)Suneetha Mathukumalli
 

Similaire à Weylon Malek AMPEAK 2014 Presentation - Process Reliability (20)

Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLCReliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
 
Leveraging SAP to Support Reliability Analytics
Leveraging SAP to Support Reliability AnalyticsLeveraging SAP to Support Reliability Analytics
Leveraging SAP to Support Reliability Analytics
 
FMEA_Guide-Q1.ppt
FMEA_Guide-Q1.pptFMEA_Guide-Q1.ppt
FMEA_Guide-Q1.ppt
 
DFR Conference, March 2019
DFR  Conference, March 2019DFR  Conference, March 2019
DFR Conference, March 2019
 
Lecture 10 Reliability.ppt
Lecture 10 Reliability.pptLecture 10 Reliability.ppt
Lecture 10 Reliability.ppt
 
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
 
Designing apps for resiliency
Designing apps for resiliencyDesigning apps for resiliency
Designing apps for resiliency
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
Process fmea work_instructions
Process fmea work_instructionsProcess fmea work_instructions
Process fmea work_instructions
 
Renaissance Repair And Supply Overview
Renaissance Repair And Supply OverviewRenaissance Repair And Supply Overview
Renaissance Repair And Supply Overview
 
Renaissance Repair And Supply Overview
Renaissance Repair And Supply OverviewRenaissance Repair And Supply Overview
Renaissance Repair And Supply Overview
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysis
 
Six sigma project (chihaoshen)
Six sigma project (chihaoshen)Six sigma project (chihaoshen)
Six sigma project (chihaoshen)
 
150213 apics houston waging war on complexity in supply chains vf
150213 apics houston   waging war on complexity in supply chains vf150213 apics houston   waging war on complexity in supply chains vf
150213 apics houston waging war on complexity in supply chains vf
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
VIB Analysis
VIB AnalysisVIB Analysis
VIB Analysis
 
Driving semiconductor-manufacturing-business-performance-through-analytics (1)
Driving semiconductor-manufacturing-business-performance-through-analytics (1)Driving semiconductor-manufacturing-business-performance-through-analytics (1)
Driving semiconductor-manufacturing-business-performance-through-analytics (1)
 
Understand SPC Fundamentals
Understand SPC FundamentalsUnderstand SPC Fundamentals
Understand SPC Fundamentals
 

Plus de ARMS Reliability

How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"ARMS Reliability
 
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...ARMS Reliability
 
Vulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) OverviewVulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) OverviewARMS Reliability
 
Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?ARMS Reliability
 
Using RCM to Justify Maintenance Strategies
Using RCM to Justify Maintenance Strategies Using RCM to Justify Maintenance Strategies
Using RCM to Justify Maintenance Strategies ARMS Reliability
 
ARMS Reliability Capability Statement
ARMS Reliability Capability StatementARMS Reliability Capability Statement
ARMS Reliability Capability StatementARMS Reliability
 
ARMS Reliability Corporate Brochure
ARMS Reliability Corporate BrochureARMS Reliability Corporate Brochure
ARMS Reliability Corporate BrochureARMS Reliability
 
Estimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability AnalysisEstimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability AnalysisARMS Reliability
 

Plus de ARMS Reliability (9)

How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
 
Vulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) OverviewVulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) Overview
 
Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?
 
Using RCM to Justify Maintenance Strategies
Using RCM to Justify Maintenance Strategies Using RCM to Justify Maintenance Strategies
Using RCM to Justify Maintenance Strategies
 
RAMS for new projects
RAMS for new projectsRAMS for new projects
RAMS for new projects
 
ARMS Reliability Capability Statement
ARMS Reliability Capability StatementARMS Reliability Capability Statement
ARMS Reliability Capability Statement
 
ARMS Reliability Corporate Brochure
ARMS Reliability Corporate BrochureARMS Reliability Corporate Brochure
ARMS Reliability Corporate Brochure
 
Estimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability AnalysisEstimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability Analysis
 

Dernier

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Dernier (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Weylon Malek AMPEAK 2014 Presentation - Process Reliability

  • 2. www.armsreliability.com Your Organisation • What triggers your organisation to perform an RCA? • Easy… These typically cause significant production losses • Shutdown Extensions • Explosions or other event that may cause injury • What triggers your organisation to perform an RCM study? • Typically smaller losses that add up or Reliability issues on bottleneck assets • Poor Maintenance Strategy • Poor Spares Management and/or Resource Levelling • How often does your organisation review its’ maintenance strategies? • Answers I’ve heard in the past… • Never • Every 24 months
  • 3. www.armsreliability.com Why Use Process Reliability • The Weibull process reliability techniques help define a strategic course of action for making improvements. • The look down technique provides opportunities for developing a strategy to solve problems. • The method tells the nature of problems and quantifying the losses.
  • 4. www.armsreliability.com Analysing a PR Chart The reliability of the process is defined at the point where the trend line, in the upper reaches of the production, began their losses at a cusp. A portion of the losses appear as cutbacks. Another portion of the losses appear as very severe problems characterized by a zone labeled crash and burn---both zones are associated with reliability problems.
  • 6. www.armsreliability.com Nameplate Values • NAMEPLATE Eta – The maximum plant capacity under assumed ideal operating and control conditions. This value can be however obtained by taking an average of the best 15 production results. • NAMEPLATE Beta – Manually set to 75 (or other pre-determined value). Beta of 100 is seen to be “world class” production, achieving highly consistent results. – Improvement in Nameplate Values will occur as the consistency of throughput is increased as a result of focussing on both Production and Reliability losses
  • 7. www.armsreliability.com Production Values • PRODUCTION Eta – Production Line tonnes are based on the Weibull analysis performed using the daily production data, returning a value where the production data line (best of fit) intersects with the Eta estimator (63.2% of production results are below) • PRODUCTION Beta – The Characteristic Shape, or slope of the Weibull Distribution. In Process analysis, this represents the consistency in the plant’s outputs. The lower the number, the lower the consistency or increase in variability within the process. – Production Losses are typically related to; • Utilisation • Efficiency • Process variability • Equipment Operating Characteristics • Systemic issues
  • 8. www.armsreliability.com Reliability Losses • Total Reliability & Loss – Reliability point is where there is a cusp in the production points plotted on the Weibull chart. This represents the point where production becomes inconsistent or unreliable. The loss value is the difference between demonstrated capacity and are the points at which the production values lie to the left of that capacity line – The cusp for the point of reliability represents probability the capacity (tonnes) is likely to be achieved or greater. – i.e at this point a 90.34% probability of achieving 382.3 tonnes or greater – Losses here equate to “Given” tonnes lost per day through reliability plant issues such as breakdowns – Reliability losses should be targeted with a formailised RCA Defect Elimination Process with defined trigger points to reduce variability in plant throughput. This will result in higher eta and beta Production values which represents increased throughput consistency
  • 9. www.armsreliability.com 12 Month Analysis Profile Profile Production Losses Reliability Losses 1 Dec 11 Jan 12 Feb Mar Apr May Jun Jul Aug Sep Month 0 25 50 75 100 125 150 175 200 225 LostCapacitytonnes
  • 10. www.armsreliability.com How To Improve? • What is the issue? • Reliability or Process? • How to deal with those issues? • Do those issues change over time? • How to quantify improvements?
  • 11. www.armsreliability.com Using a Reliability Block Diagram (RBD) to Help Make Decisions • An RBD is a logic diagram that describes a system behaviour and easily allows different scenarios to be analysed. 1.1 Prim ary Crushing System (97.45)% 1.2 40,000tonneLive Coars eOrePile System (95.46)% 1.3 Sec ondary Crus herFeed Conveyor 621-CVR-0-02 M TTF=100.6 M TTR=0.92 100% 1.4 Sec ondary Crus hingSystem (99.71)% 1.5 Coars eScreen FeedConveyor 622-CRV-0-03 M TTF=144.2 M TTR=1.65 100% 1.7 HRGRFeed Conveyor 623-CVR-0-04 M TTF=173.5 M TTR=1.15 100% 1.8 HPGRSy stem (87.63)% 1.2.1 Coars eOrePile TTE=96 TFL=12 100% 1.11 FineSc reening andBallMill System 1 (24.48)% 1.12 FineSc reening andBallMill System 2 (24.45)% 1.13 FineSc reening andBallMill System 3 (24.52)% 1.14 FineSc reening andBallMill System 4 (24.44)% 1.26 Coars eScreen Feeder 623-FDV-1-01 M TTF=64.8 M TTR=0.45 35% 1.27 Coars eScreen 623-SCR-1-01 35% 1.28 Coars eScreen Feeder 623-FDV-2-01 M TTF=64.8 M TTR=0.45 35% 1.29 Coars eScreen 623-SCR-2-01 35% 1.30 Coars eScreen Feeder 623-FDV-3-01 M TTF=64.8 M TTR=0.45 35% 1.31 Coars eScreen 623-SCR-3-01 35% 1.32 Coars eScreen Feeder 623-FDV-4-01 M TTF=64.8 M TTR=0.45 35% 1.33 Coars eScreen 623-SCR-4-01 35% 1.34 12WShutdown TTF=1000000 M TTR=0 100% 1.35 1YRShutdown TTF=1000000 M TTR=0 100% 1.36 6WShutdown TTF=1000000 M TTR=0 100% Copy Of1.8.17 FineOreBin 625-BIN TTE=2.27 TFL=1.19 100% Example of a crushing circuit
  • 13. www.armsreliability.com Is there something in that system we can target? • Lets take a look at the problem system in detail Example of the Secondary Crushing System BN-003 Secondary Screen Feed Bin 1 FE-002 Secondary Screen Belt Feeder 1 BN-004 Secondary Screen Feed Bin 2 FE-003 Secondary Screen Belt Feeder 2 SC-002 Secondary Screen 1 SC-003 Secondary Screen 2 CV-003 Conveyor CV03 BN-006 Secondary Crusher Feed Bin 1 BN-007 Secondary Crusher Feed Bin 2 FE-005 Secondary Crusher Feeder 1 FE-006 Secondary Crusher Feeder 2 CV-004 Conveyor CV04 CR-002 Secondary Crusher 1 CR-003 Secondary Crusher 2 PP-004 Dust Scrubber Slurry Pump PP-010 Sump Pump PP-011 Sump Pump DC-003 Secondary Screening Dust Scrubber AU10-PPP-CRU-BLDNG-BD002 BUILDING, SECONDARY SCREENING AU10-PPP-CRU-BLDNG-BD003 BUILDING, SECONDARY CRUSHING F-004.1 No Capacity Consequence Sub-system F-004
  • 14. www.armsreliability.com What to do in the Problem System to Improve Production? In this example CV04 and CV03 have the biggest impact on production. 0 200 400 600 800 1000 1200 1400 1600 1800 Conveyor CV04 Conveyor CV03 Secondary Crusher 1 Secondary Crusher 2 Secondary Screening Dust Scrubber Secondary Crusher Feeder 1 Secondary Crusher Feeder 2 Contribution to Capacity Loss (Thousand $) Component Contribution to Capacity Loss over 10 YRS
  • 15. www.armsreliability.com Implementing The Strategy • Reliability Block Diagrams (RBD) – Utilise an Availability Simulation to predict production increases with different scenarios. How does a redundancy scenario change production?
  • 16. www.armsreliability.com Implementing Your Strategy • Reliability Block Diagrams (RBD) – Utilise an Availability Simulation to predict production increases with different scenarios. What predicted impact will a RCM have on our production? MTTF goes from 8760 to 4860 through RCM
  • 19. www.armsreliability.com Conclusions • Step One – Identify room for improvement • Step Two – Identify the best improvement that can be made. • Step Three – Quantify the cost benefit in the options available for improvement through statistical methods. • Step Four – Analyse the data to see what impact decisions have on the business.