Smart home assembly tutorial
202107015 V1.0
http://www.zhiyi.ltd/
2/19
Assembly tutorial
Step 1: Use the 4XM3*30 screws and 8XM3 nuts in the "AB screw package" to fix the smart home kit wood board A as shown in the figure:
Use two M3
nuts to fix
Note: When using screws to fix,
carefully look at the direction
of the front and back of the
board A
http://www.zhiyi.ltd/
3/19
Step 2: Use 2X M2*16 round head screws and 2X M2 nuts to fix the G90 servo as shown in the figure:
http://www.zhiyi.ltd/
4/19
Step 3: Fix the steering gear rotating bracket and B gear as shown in the figure:
http://www.zhiyi.ltd/
5/19
Step 4: Use 4X M3 nuts to fix the smart home window board B according to the normal rotation of the gear as shown in the figure:
The wiring of the
steering gear goes
through here
Warm reminder: When using the steering gear
and the window gear, please refer to the tutorial
item 14 for wiring first, and use the infrared
remote control to debug the normal rotation of
the window gear.
http://www.zhiyi.ltd/
6/19
Step 5: Use 4X M3*12 flat head screws to fix the LED module.
Here you need to lock
four nuts first
http://www.zhiyi.ltd/
7/19
Step 6: 2 X M2*10 round head screws; 2 X M2 nuts to fix the touch module, as shown in the figure:
http://www.zhiyi.ltd/
8/19
Step 7: Use 2 x M3*12 flat-head screws and 2 X M3 nuts in the "C screw package" to fix the LED module.
Warm reminder: When using screws to fix
the LED module, pay attention to the front
and back of the board.
http://www.zhiyi.ltd/
9/19
Step 8: Fix the RGB module and the relay module with 6 x M3*12 flat head screws; 6 x nuts respectively. Use 2 X M2*10 round head screws and 2 X M2 nuts to fix
the buzzer module as shown in the figure:
Warm reminder: When using
screws to fix, pay attention to
the front and back of the board.
http://www.zhiyi.ltd/
10/19
Step 9: Use the "DE screw pack" 4 X M3*10 flat head screws and 4 X M3 nuts; fix the small hinge with the wood board E and wood board D; as shown in the figure:
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
11/19
Step 10: Use the "DE screw pack" 2X M2*16 round head screws and 2X M2 screws to fix the G90 servo; at the same time use 2X M3*10+6 single-pass hexagonal
copper pillars and 2 X M3*8 round head screws, 2 X M3 nut fixes the RFID module; as shown in the figure:
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
12/19
Step 11: Use the "F screw pack" 4 X M3*12 flat head screws and 4 X M3 nuts to fix the LCD 1602 display module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
13/19
Step 12: Use 2X M2*10 round head screws and 2X M2 nuts to fix the DHT11 temperature and humidity module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
14/19
Step 13: Use the "G screw pack" 5X M3*10+6 single-pass hexagonal copper column and 5 X M3 nuts and M3*8 round head screws to fix the raindrop sensor
module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
15/19
Step 14: Use "H screw pack" 4 X M3*10+6 single-way hexagonal copper posts and M3*10 screws, 4 X M3 nuts to fix the MQ-2 gas sensor module; 2 X M2*10 round
head screws, 2 X M2 nut installs and fixes the infrared receiver module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
16/19
Step 15: Use 4 X M3*12 round head screws and 4 X M3 nuts to install and fix the fan module.
http://www.zhiyi.ltd/
17/19
Step 16: Use the "L screw pack" 4 X M3*12 flat head screws, 4 X M3 nuts to fix the battery box; at the same time, use 4 X M3*10+6 single-pass hexagonal copper
posts, 4 X M3*8 screws, 4 X M3 nut fixes the arduino nano expansion board.
Step 17: Wiring according to the following circuit diagram.
Expansion board G means GND; expansion board V means VCC; expansion board S means the pin number corresponding to arduino. (Note: the V corresponding to
the red line node connection represents the VCC corresponding to the connection pin number; the black line node connection corresponding to the G represents
the GND corresponding to the connection pin number)
http://www.zhiyi.ltd/
18/19
http://www.zhiyi.ltd/
19/19
Step 18: Use wooden bolts to assemble ABCDEFGHL boards.(Note: It can be completely fixed if assembled; the wooden bolt can also be used without it)

Contenu connexe

Similaire à Project 17 Smart Home Assembly Tutorial.pdf

Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1Franck Lecluse
 
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdfA8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdfCristian A. Tissera
 
DrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfDrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfUsmanBhatti46
 
430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdf430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdfirina686209
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Solar
 
COOL
COOLCOOL
COOL2in1
 
Toughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsToughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsGlenda Hernandez
 
A8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdfA8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdfCristian A. Tissera
 
How to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong TableHow to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong TableBrixton Johansson
 
CoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation InstructionsCoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation InstructionsCoastal Joinery Hardware
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guidejaydeedee
 
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000Gherghescu Gabriel
 
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMANSAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMANAlisa Axtman
 

Similaire à Project 17 Smart Home Assembly Tutorial.pdf (19)

Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1
 
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdfA8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
 
DrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfDrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdf
 
EVANNEX EcoHitch for Tesla Model S Install Guide Final
EVANNEX EcoHitch for Tesla Model S Install Guide FinalEVANNEX EcoHitch for Tesla Model S Install Guide Final
EVANNEX EcoHitch for Tesla Model S Install Guide Final
 
430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdf430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdf
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
 
Mobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation InstructionsMobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation Instructions
 
COOL
COOLCOOL
COOL
 
Toughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsToughbox-Assembly-Instructions
Toughbox-Assembly-Instructions
 
MSB manual
MSB manualMSB manual
MSB manual
 
A8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdfA8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdf
 
How to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong TableHow to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong Table
 
Vxl itona tc61yy
Vxl itona tc61yyVxl itona tc61yy
Vxl itona tc61yy
 
Doc 1010
Doc 1010Doc 1010
Doc 1010
 
Parabody gs4-user-manual
Parabody gs4-user-manualParabody gs4-user-manual
Parabody gs4-user-manual
 
CoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation InstructionsCoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation Instructions
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
 
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMANSAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
 

Dernier

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 

Dernier (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

Project 17 Smart Home Assembly Tutorial.pdf

  • 2. http://www.zhiyi.ltd/ 2/19 Assembly tutorial Step 1: Use the 4XM3*30 screws and 8XM3 nuts in the "AB screw package" to fix the smart home kit wood board A as shown in the figure: Use two M3 nuts to fix Note: When using screws to fix, carefully look at the direction of the front and back of the board A
  • 3. http://www.zhiyi.ltd/ 3/19 Step 2: Use 2X M2*16 round head screws and 2X M2 nuts to fix the G90 servo as shown in the figure:
  • 4. http://www.zhiyi.ltd/ 4/19 Step 3: Fix the steering gear rotating bracket and B gear as shown in the figure:
  • 5. http://www.zhiyi.ltd/ 5/19 Step 4: Use 4X M3 nuts to fix the smart home window board B according to the normal rotation of the gear as shown in the figure: The wiring of the steering gear goes through here Warm reminder: When using the steering gear and the window gear, please refer to the tutorial item 14 for wiring first, and use the infrared remote control to debug the normal rotation of the window gear.
  • 6. http://www.zhiyi.ltd/ 6/19 Step 5: Use 4X M3*12 flat head screws to fix the LED module. Here you need to lock four nuts first
  • 7. http://www.zhiyi.ltd/ 7/19 Step 6: 2 X M2*10 round head screws; 2 X M2 nuts to fix the touch module, as shown in the figure:
  • 8. http://www.zhiyi.ltd/ 8/19 Step 7: Use 2 x M3*12 flat-head screws and 2 X M3 nuts in the "C screw package" to fix the LED module. Warm reminder: When using screws to fix the LED module, pay attention to the front and back of the board.
  • 9. http://www.zhiyi.ltd/ 9/19 Step 8: Fix the RGB module and the relay module with 6 x M3*12 flat head screws; 6 x nuts respectively. Use 2 X M2*10 round head screws and 2 X M2 nuts to fix the buzzer module as shown in the figure: Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 10. http://www.zhiyi.ltd/ 10/19 Step 9: Use the "DE screw pack" 4 X M3*10 flat head screws and 4 X M3 nuts; fix the small hinge with the wood board E and wood board D; as shown in the figure: Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 11. http://www.zhiyi.ltd/ 11/19 Step 10: Use the "DE screw pack" 2X M2*16 round head screws and 2X M2 screws to fix the G90 servo; at the same time use 2X M3*10+6 single-pass hexagonal copper pillars and 2 X M3*8 round head screws, 2 X M3 nut fixes the RFID module; as shown in the figure: Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 12. http://www.zhiyi.ltd/ 12/19 Step 11: Use the "F screw pack" 4 X M3*12 flat head screws and 4 X M3 nuts to fix the LCD 1602 display module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 13. http://www.zhiyi.ltd/ 13/19 Step 12: Use 2X M2*10 round head screws and 2X M2 nuts to fix the DHT11 temperature and humidity module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 14. http://www.zhiyi.ltd/ 14/19 Step 13: Use the "G screw pack" 5X M3*10+6 single-pass hexagonal copper column and 5 X M3 nuts and M3*8 round head screws to fix the raindrop sensor module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 15. http://www.zhiyi.ltd/ 15/19 Step 14: Use "H screw pack" 4 X M3*10+6 single-way hexagonal copper posts and M3*10 screws, 4 X M3 nuts to fix the MQ-2 gas sensor module; 2 X M2*10 round head screws, 2 X M2 nut installs and fixes the infrared receiver module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 16. http://www.zhiyi.ltd/ 16/19 Step 15: Use 4 X M3*12 round head screws and 4 X M3 nuts to install and fix the fan module.
  • 17. http://www.zhiyi.ltd/ 17/19 Step 16: Use the "L screw pack" 4 X M3*12 flat head screws, 4 X M3 nuts to fix the battery box; at the same time, use 4 X M3*10+6 single-pass hexagonal copper posts, 4 X M3*8 screws, 4 X M3 nut fixes the arduino nano expansion board. Step 17: Wiring according to the following circuit diagram. Expansion board G means GND; expansion board V means VCC; expansion board S means the pin number corresponding to arduino. (Note: the V corresponding to the red line node connection represents the VCC corresponding to the connection pin number; the black line node connection corresponding to the G represents the GND corresponding to the connection pin number)
  • 19. http://www.zhiyi.ltd/ 19/19 Step 18: Use wooden bolts to assemble ABCDEFGHL boards.(Note: It can be completely fixed if assembled; the wooden bolt can also be used without it)