Governance and Enabling
Change Specific Interest
Groups (SIG) Joint Event
14 October 2015
Agenda
 Introductions
 GovSIG objectives
 EC SIG objectives
 Relationship between the two SIGs
 Context and Principles of governance of Agile
Change
 Key (governance) behaviours to enable agile
change success
 Summary of findings / agreements
 Close
Governance SIG objectives
 Be the UK focus
 Advance understanding
 Contribute to good practice
 Influence national and international standard making
authorities
 Influence those operationally responsible
 Develop ambassadors and exemplars of excellence
3
….in the governance of project management (change)
Governance SIG prime activities
 Engagement – CxO level and APM
members
 Conferences and Seminars - sharing
 Publications
The silver bullet……?
 Project success
 Portfolio success
 Embedding change
5
Good
Governance
Of projects And change
Of project And change management
6
APM Research - Project Success
Factors
7
APM Research - Project Success
Factors
8
APM Research - Project Success
Factors
Directing Change
2nd edition 2011
9
Co-Directing Change
2007 (being updated)
Sponsoring Change
2009
Free to APM members at www.apm.org.uk/memberdownloads
GovSIG publications
New
Agile Governance
(being developed)
Enabling Change SIG – Key
Objectives
• Sharing information & knowledge
• Delivering events and communications
• Establishing effective links - other SIGs/Branches
• Collaborating to build the change community
• Developing Change Practitioner Groups
• Completing an APM-funded Research project
• Reviewing and updating the BoK and
Competencies for Enabling Change
Improve the change capability
of APM’s corporate
organisations, teams and
individuals
12
Free to APM members at https://www.apm.org.uk/news/enabling-
change-sig-capabilities-and-methods-pillar
EC SIG Resources
 Case studies
 Methods & Standards library
 Change management press and
publications reference guide
 Library of professional knowledge
Strategy
Projects
Operations
Change projects deliver strategy
13
Governance
SIG focuses
on the
people who
are directing
the change
Enabling Change
SIG focuses on all
aspects of change
– people,
processes,
technology and
systems
‘Shape’ of Agile Change
Change
Key Principles of Agile Change
Deliverables
Business
Epics
Features
User Stories
One or more assigned to a project
Several / many assigned to a programme
A set of assigned to a project, or,
A work package (e.g. Scrum)
Developed within a work package
e.g. Scrum
Combine to deliver
Business
Benefits
Combine to deliver
Combine to deliver
Good Governance principles
 The Board has overall responsibility and decides when independent scrutiny
is required
 The organisation differentiates between non-projects (run the business) and
projects (change)
 Roles and responsibilities for project work are clearly defined
 Every programme or stand-alone project has an appointed Sponsor or SRO
 There is strategic alignment of each project, programme or portfolio to the
enterprise strategic objectives
 All projects have an approved plan, authorisation points or stage gate
reviews
 Authorisation bodies have appropriate authority and competence
 Programme and Project business cases are supported by reliable and
realistic information
 There are clearly defined criteria for reporting status
 The organisation fosters a culture of improvement, frank internal disclosure
and transparency
 Stakeholders are engaged effectively
 Projects are closed when no longer justified.
From APM Directing Change
‘Additional’ Agile governance principles
Focus on the Business need
Value driven
Incremental Delivery
Time Box Delivery
Empowered teams and decision making
Collaboration
Simple Requirements
Constant striving for improvement
‘Fail fast’ (and often)
Demonstrate Control
Change Control
Good Change principles
 The Board has overall accountability and demonstrates Change leadership
 The key drivers for change (The Why?) - is clearly understood &
communicated
 The organisation recognises the importance of managing change as a key
component of managing projects
 Roles and responsibilities for change management are clearly defined
 Project/Programme plans are integrated with people change management
plan
 The organisation fosters a culture of feedback, improvement, frank internal
disclosure and transparency
 The key behavioural changes for adopting new ways of working have been
identified
 Communication, training and support mechanisms are designed and
implemented to effectively enable change
 Stakeholders are engaged and consulted as appropriate
‘Additional’ Agile change principles
Incremental change delivery
Empowered teams and decision making
Collaborative approach between project team
and stakeholders
Early end user engagement
Change leadership
Change methodologies integrated with agile
delivery
Business ‘owns’ the change and not just
project/change teams
Recognition that everything is evolving – plans,
products, outcomes
So what does this mean for
governance/change behaviours?
 Ambiguity re: final time and cost and traditional
‘control’?
 Stage gate reviews?
 Command and control vs. empowerment?
 Buy-in vs. resistance?
 Victims, survivors or navigators of change?
 Flexibility re: goals?
 Staff deployment?
In Groups (A and B)
Group A
 Put yourself in the shoes of a board
director / portfolio manager
Group B
 Put yourself in the shoes of a project
manager / change manager
Task
 What key behaviours / different emphasis
(for agile change) do you exhibit or expect?
 Create long list and then identify top 5
EC SIG - Upcoming Events & Activities
 22nd Oct – Social communities – fostering
communication for change (PMO SIG Conference)
 29th Oct - Process improvement and change
management (Reading)
 Feb 2016 – Joint full day event with PMC SIG
 Feb 2016 – Resistance to Change (Midland Branch)
 March 2016 – Change v Project Manager (Midland
Branch)
 APM funded research project
 Spark Collaboration tool
Summary and close
 Thanks for your contribution
 We will collate notes and do a blog shortly
 Please do sign up for either SIG by
becoming a member from their community
page – www.apm.org.uk/community

Contenu connexe

Tendances

6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015Association for Project Management
 
Mapping the future: the art and science of programme planning in a waterfall ...
Mapping the future: the art and science of programme planning in a waterfall ...Mapping the future: the art and science of programme planning in a waterfall ...
Mapping the future: the art and science of programme planning in a waterfall ...Association for Project Management
 
An introduction to portfolio management - the theory and in practice webinar,...
An introduction to portfolio management - the theory and in practice webinar,...An introduction to portfolio management - the theory and in practice webinar,...
An introduction to portfolio management - the theory and in practice webinar,...Association for Project Management
 
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Association for Project Management
 
3. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV0110153. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV011015Association for Project Management
 
Enterprise Architecture Program Management Challenges
Enterprise Architecture Program Management ChallengesEnterprise Architecture Program Management Challenges
Enterprise Architecture Program Management ChallengesNashreen Hofmeester
 
Introducing the UK Government’s Project Delivery Standard webinar, 25 October...
Introducing the UK Government’s Project Delivery Standard webinar, 25 October...Introducing the UK Government’s Project Delivery Standard webinar, 25 October...
Introducing the UK Government’s Project Delivery Standard webinar, 25 October...Association for Project Management
 
Projects programmes and portfolios, so what is the difference?
Projects programmes and portfolios, so what is the difference?Projects programmes and portfolios, so what is the difference?
Projects programmes and portfolios, so what is the difference?Catherine Bendell
 
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...Association for Project Management
 
An Assessment of Project Portfolio Management Techniques on Product and Servi...
An Assessment of Project Portfolio Management Techniques on Product and Servi...An Assessment of Project Portfolio Management Techniques on Product and Servi...
An Assessment of Project Portfolio Management Techniques on Product and Servi...iosrjce
 

Tendances (20)

Where did it go wrong?
Where did it go wrong?Where did it go wrong?
Where did it go wrong?
 
DIST portfolio management 1st Oct 2013
DIST portfolio management   1st Oct 2013 DIST portfolio management   1st Oct 2013
DIST portfolio management 1st Oct 2013
 
1. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV0110151. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV011015
 
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
 
Workshop B, Agile P3M benefits, by Steve Messenger
Workshop B, Agile P3M benefits, by Steve MessengerWorkshop B, Agile P3M benefits, by Steve Messenger
Workshop B, Agile P3M benefits, by Steve Messenger
 
1. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV0110151. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV011015
 
Risk balanced portfolios Jim Morrison
Risk balanced portfolios   Jim MorrisonRisk balanced portfolios   Jim Morrison
Risk balanced portfolios Jim Morrison
 
2. Amerjit Walia - delivering good governance for p3m GOV011015
2. Amerjit Walia - delivering good governance for p3m GOV0110152. Amerjit Walia - delivering good governance for p3m GOV011015
2. Amerjit Walia - delivering good governance for p3m GOV011015
 
Mapping the future: the art and science of programme planning in a waterfall ...
Mapping the future: the art and science of programme planning in a waterfall ...Mapping the future: the art and science of programme planning in a waterfall ...
Mapping the future: the art and science of programme planning in a waterfall ...
 
An introduction to portfolio management - the theory and in practice webinar,...
An introduction to portfolio management - the theory and in practice webinar,...An introduction to portfolio management - the theory and in practice webinar,...
An introduction to portfolio management - the theory and in practice webinar,...
 
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
 
Karl Riley PwC analysis from their 4th global PPM
Karl Riley PwC analysis from their 4th global PPMKarl Riley PwC analysis from their 4th global PPM
Karl Riley PwC analysis from their 4th global PPM
 
3. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV0110153. Adrian Pyne - good agile governance (including case studies) GOV011015
3. Adrian Pyne - good agile governance (including case studies) GOV011015
 
Enterprise Architecture Program Management Challenges
Enterprise Architecture Program Management ChallengesEnterprise Architecture Program Management Challenges
Enterprise Architecture Program Management Challenges
 
Changing your ways, APM Enabling Change SIG, 17th November 2015
Changing your ways, APM Enabling Change SIG, 17th November 2015Changing your ways, APM Enabling Change SIG, 17th November 2015
Changing your ways, APM Enabling Change SIG, 17th November 2015
 
Introducing the UK Government’s Project Delivery Standard webinar, 25 October...
Introducing the UK Government’s Project Delivery Standard webinar, 25 October...Introducing the UK Government’s Project Delivery Standard webinar, 25 October...
Introducing the UK Government’s Project Delivery Standard webinar, 25 October...
 
Projects programmes and portfolios, so what is the difference?
Projects programmes and portfolios, so what is the difference?Projects programmes and portfolios, so what is the difference?
Projects programmes and portfolios, so what is the difference?
 
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
Applying Risk Factors in the Strategic Selection of Portfolio Projects Case S...
 
The essence of successful programmes webinar
The essence of successful programmes webinarThe essence of successful programmes webinar
The essence of successful programmes webinar
 
An Assessment of Project Portfolio Management Techniques on Product and Servi...
An Assessment of Project Portfolio Management Techniques on Product and Servi...An Assessment of Project Portfolio Management Techniques on Product and Servi...
An Assessment of Project Portfolio Management Techniques on Product and Servi...
 

Similaire à Directing Agile Change, 14th October 2015, London

Austerity Implications for Project Management
Austerity Implications for Project ManagementAusterity Implications for Project Management
Austerity Implications for Project ManagementAndyMurray
 
The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...Association for Project Management
 
Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...Association for Project Management
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0Gavin Berry
 
Portfolio Management and how it can deliver organisations strategy and value
Portfolio Management and how it can deliver organisations strategy and valuePortfolio Management and how it can deliver organisations strategy and value
Portfolio Management and how it can deliver organisations strategy and valueAssociation for Project Management
 
Successful change - good culture and governance matter Conference - Adrian Py...
Successful change - good culture and governance matter Conference - Adrian Py...Successful change - good culture and governance matter Conference - Adrian Py...
Successful change - good culture and governance matter Conference - Adrian Py...Association for Project Management
 
Advanced project management ppts
Advanced project management pptsAdvanced project management ppts
Advanced project management pptsAli Ishaqi
 
Effective Implementation Of Strategic Initiatives Nov 2009
Effective Implementation Of Strategic Initiatives Nov 2009Effective Implementation Of Strategic Initiatives Nov 2009
Effective Implementation Of Strategic Initiatives Nov 2009giseke
 
PMP Exam Chapter Wise Q & A’s Project Management Frame Work - By SN Panigrahi
PMP Exam Chapter Wise  Q & A’s Project Management Frame Work - By SN PanigrahiPMP Exam Chapter Wise  Q & A’s Project Management Frame Work - By SN Panigrahi
PMP Exam Chapter Wise Q & A’s Project Management Frame Work - By SN PanigrahiSN Panigrahi, PMP
 
MBA Portfolio Management PPT.pptx
MBA Portfolio Management PPT.pptxMBA Portfolio Management PPT.pptx
MBA Portfolio Management PPT.pptxChhaviTyagi28
 
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-ITPMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-ITChief Innovation
 
Déployer le Lean lors d’un rachat d’entreprise
Déployer le Lean lors d’un rachat d’entrepriseDéployer le Lean lors d’un rachat d’entreprise
Déployer le Lean lors d’un rachat d’entrepriseOperae Partners
 
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...Thomas Walenta, PMI Fellow
 
PMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkPMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkSkillogic Solutions
 
Prosci Change Capability Webinar
Prosci Change Capability WebinarProsci Change Capability Webinar
Prosci Change Capability WebinarTim Creasey
 

Similaire à Directing Agile Change, 14th October 2015, London (20)

Governance of agile m samphire
Governance of agile   m samphireGovernance of agile   m samphire
Governance of agile m samphire
 
Good governance of the project portfolio
Good governance of the project portfolioGood governance of the project portfolio
Good governance of the project portfolio
 
Austerity Implications for Project Management
Austerity Implications for Project ManagementAusterity Implications for Project Management
Austerity Implications for Project Management
 
The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...
 
Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
Directing agile change - governance of project management
Directing agile change - governance of  project managementDirecting agile change - governance of  project management
Directing agile change - governance of project management
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0
 
Portfolio Management and how it can deliver organisations strategy and value
Portfolio Management and how it can deliver organisations strategy and valuePortfolio Management and how it can deliver organisations strategy and value
Portfolio Management and how it can deliver organisations strategy and value
 
Successful change - good culture and governance matter Conference - Adrian Py...
Successful change - good culture and governance matter Conference - Adrian Py...Successful change - good culture and governance matter Conference - Adrian Py...
Successful change - good culture and governance matter Conference - Adrian Py...
 
Advanced project management ppts
Advanced project management pptsAdvanced project management ppts
Advanced project management ppts
 
Ready for-change-2017 spoce event slides
Ready for-change-2017 spoce event slidesReady for-change-2017 spoce event slides
Ready for-change-2017 spoce event slides
 
Effective Implementation Of Strategic Initiatives Nov 2009
Effective Implementation Of Strategic Initiatives Nov 2009Effective Implementation Of Strategic Initiatives Nov 2009
Effective Implementation Of Strategic Initiatives Nov 2009
 
PMP Exam Chapter Wise Q & A’s Project Management Frame Work - By SN Panigrahi
PMP Exam Chapter Wise  Q & A’s Project Management Frame Work - By SN PanigrahiPMP Exam Chapter Wise  Q & A’s Project Management Frame Work - By SN Panigrahi
PMP Exam Chapter Wise Q & A’s Project Management Frame Work - By SN Panigrahi
 
MBA Portfolio Management PPT.pptx
MBA Portfolio Management PPT.pptxMBA Portfolio Management PPT.pptx
MBA Portfolio Management PPT.pptx
 
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-ITPMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
 
Déployer le Lean lors d’un rachat d’entreprise
Déployer le Lean lors d’un rachat d’entrepriseDéployer le Lean lors d’un rachat d’entreprise
Déployer le Lean lors d’un rachat d’entreprise
 
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
 
PMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkPMP Training Course - Project Management Framework
PMP Training Course - Project Management Framework
 
Prosci Change Capability Webinar
Prosci Change Capability WebinarProsci Change Capability Webinar
Prosci Change Capability Webinar
 

Plus de Association for Project Management

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 

Plus de Association for Project Management (20)

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 

Dernier

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 

Dernier (20)

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 

Directing Agile Change, 14th October 2015, London

  • 1. Governance and Enabling Change Specific Interest Groups (SIG) Joint Event 14 October 2015
  • 2. Agenda  Introductions  GovSIG objectives  EC SIG objectives  Relationship between the two SIGs  Context and Principles of governance of Agile Change  Key (governance) behaviours to enable agile change success  Summary of findings / agreements  Close
  • 3. Governance SIG objectives  Be the UK focus  Advance understanding  Contribute to good practice  Influence national and international standard making authorities  Influence those operationally responsible  Develop ambassadors and exemplars of excellence 3 ….in the governance of project management (change)
  • 4. Governance SIG prime activities  Engagement – CxO level and APM members  Conferences and Seminars - sharing  Publications
  • 5. The silver bullet……?  Project success  Portfolio success  Embedding change 5 Good Governance Of projects And change Of project And change management
  • 6. 6 APM Research - Project Success Factors
  • 7. 7 APM Research - Project Success Factors
  • 8. 8 APM Research - Project Success Factors
  • 9. Directing Change 2nd edition 2011 9 Co-Directing Change 2007 (being updated) Sponsoring Change 2009 Free to APM members at www.apm.org.uk/memberdownloads GovSIG publications New Agile Governance (being developed)
  • 10. Enabling Change SIG – Key Objectives • Sharing information & knowledge • Delivering events and communications • Establishing effective links - other SIGs/Branches • Collaborating to build the change community • Developing Change Practitioner Groups • Completing an APM-funded Research project • Reviewing and updating the BoK and Competencies for Enabling Change Improve the change capability of APM’s corporate organisations, teams and individuals
  • 11.
  • 12. 12 Free to APM members at https://www.apm.org.uk/news/enabling- change-sig-capabilities-and-methods-pillar EC SIG Resources  Case studies  Methods & Standards library  Change management press and publications reference guide  Library of professional knowledge
  • 13. Strategy Projects Operations Change projects deliver strategy 13 Governance SIG focuses on the people who are directing the change Enabling Change SIG focuses on all aspects of change – people, processes, technology and systems
  • 14. ‘Shape’ of Agile Change Change
  • 15. Key Principles of Agile Change
  • 16. Deliverables Business Epics Features User Stories One or more assigned to a project Several / many assigned to a programme A set of assigned to a project, or, A work package (e.g. Scrum) Developed within a work package e.g. Scrum Combine to deliver Business Benefits Combine to deliver Combine to deliver
  • 17. Good Governance principles  The Board has overall responsibility and decides when independent scrutiny is required  The organisation differentiates between non-projects (run the business) and projects (change)  Roles and responsibilities for project work are clearly defined  Every programme or stand-alone project has an appointed Sponsor or SRO  There is strategic alignment of each project, programme or portfolio to the enterprise strategic objectives  All projects have an approved plan, authorisation points or stage gate reviews  Authorisation bodies have appropriate authority and competence  Programme and Project business cases are supported by reliable and realistic information  There are clearly defined criteria for reporting status  The organisation fosters a culture of improvement, frank internal disclosure and transparency  Stakeholders are engaged effectively  Projects are closed when no longer justified. From APM Directing Change
  • 18. ‘Additional’ Agile governance principles Focus on the Business need Value driven Incremental Delivery Time Box Delivery Empowered teams and decision making Collaboration Simple Requirements Constant striving for improvement ‘Fail fast’ (and often) Demonstrate Control Change Control
  • 19. Good Change principles  The Board has overall accountability and demonstrates Change leadership  The key drivers for change (The Why?) - is clearly understood & communicated  The organisation recognises the importance of managing change as a key component of managing projects  Roles and responsibilities for change management are clearly defined  Project/Programme plans are integrated with people change management plan  The organisation fosters a culture of feedback, improvement, frank internal disclosure and transparency  The key behavioural changes for adopting new ways of working have been identified  Communication, training and support mechanisms are designed and implemented to effectively enable change  Stakeholders are engaged and consulted as appropriate
  • 20. ‘Additional’ Agile change principles Incremental change delivery Empowered teams and decision making Collaborative approach between project team and stakeholders Early end user engagement Change leadership Change methodologies integrated with agile delivery Business ‘owns’ the change and not just project/change teams Recognition that everything is evolving – plans, products, outcomes
  • 21. So what does this mean for governance/change behaviours?  Ambiguity re: final time and cost and traditional ‘control’?  Stage gate reviews?  Command and control vs. empowerment?  Buy-in vs. resistance?  Victims, survivors or navigators of change?  Flexibility re: goals?  Staff deployment?
  • 22. In Groups (A and B) Group A  Put yourself in the shoes of a board director / portfolio manager Group B  Put yourself in the shoes of a project manager / change manager Task  What key behaviours / different emphasis (for agile change) do you exhibit or expect?  Create long list and then identify top 5
  • 23. EC SIG - Upcoming Events & Activities  22nd Oct – Social communities – fostering communication for change (PMO SIG Conference)  29th Oct - Process improvement and change management (Reading)  Feb 2016 – Joint full day event with PMC SIG  Feb 2016 – Resistance to Change (Midland Branch)  March 2016 – Change v Project Manager (Midland Branch)  APM funded research project  Spark Collaboration tool
  • 24. Summary and close  Thanks for your contribution  We will collate notes and do a blog shortly  Please do sign up for either SIG by becoming a member from their community page – www.apm.org.uk/community