Benefits Management
Specific Interest Group (SIG)
Project Data Analytics - How do we leverage
experience of project delivery? webinar
Questions and Answers
Tuesday 20 March 2018
Martin Paver
established London Project Data and Analytics Meetup
Webinar speaker
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
1. What are your thoughts on whether this is cultural change or change in processes to
getting to the end result you are trying to achieve?
It’s definitely a cultural challenge. The first step is to 'ignite the professional imagination' on the art of
the possible and build out from there. Processes can follow to formalise whatever successes have
been achieved. I'd recommend an agile based methodology with pilots. But work towards a bold and
transformative vision.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
2. How do we stop organisations from forcing their rally drivers to go too fast / with the wrong
approach despite their professional opinion and advice?
There is a point when speed becomes reckless. If project managers are proven to be reckless then
there should be consequences. As an engineer, if I cut corners and my product costs my client a lot
of money then there are implications. We need to change the culture (and probably pay people more
as a consequence).
In time, machine learning should be able to provide early warnings. This should drive the agenda for
the project board and also help to shape coaching & assurance interventions.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
3. Connected data - what is that picture telling us - what insight can you gain?
The connected data picture illustrates that there are connections in the data that we can explore
further or query. For example, understanding the connectivity between risks, how they evolve and
snowball, how the risks relate to lessons and impact. In essence it’s the ability to extract insights from
the connections in the data.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
4. This feels time consuming and complex - i.e. resource heavy. Is that right? and how do you
justify the time collating this information and investing in the tools to mine that?
I don't believe it is. Organisations already collect schedule, risk, lesson, issue, cost, data, etc. It’s a
matter of extracting this against a series of use cases to solve specific problems. Some of the tools
are free, its matter of how they are integrated and supported in the 'stack'. In terms of justification, it’s
a conventional cost benefit analysis. I wouldn't recommend approaching this by promising a big bang
vision of a beautiful future, but to set that vision within the context of implementation sprints, with
gates to measure progress and build momentum.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
5. Can you explain more about what is machine learning?
There is a lot of material on the internet. I would recommend Andrew Ng's videos such as
https://www.youtube.com/watch?v=UzxYlbK2c7E . The Udacity videos are a bit easier to understand
see https://www.youtube.com/watch?v=ICKBWIkfeJ8
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
6. Were the original budgets realistic based on reference based estimating or were the
budgets politically influenced?
There is a large body of work on this. I would recommend Bent Flyvbjerg's work. It depends on the
project. Some projects suffer from 'strategic misrepresentation', http://bit.ly/2IKj0xV i.e. the business
case is oversold. But this isn't the only reason for the cost misalignment. Bias is a major factor. It also
depends whether there is something to reference against - if it is a once in a lifetime, complex and
innovative project then the point of reference will require a greater level of abstraction.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
7. If someone is looking to start a career in this sector, what kind of roles can the person apply
for?
It’s a very emergent industry. The P3M market isn't quite ready for this yet, but I expect this to change
by the end of this year. I'd recommend finding roles that enable you to delve into the detail, whilst
doing some of the Coursera or Udacity nano degrees.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
8. You have already touched on the fact that PMs are, more often than not, pushed for time
and are, therefore, reactive. This, in my experience leads to pushing on to the next
stage/sprint without properly (if at all) recording lessons learnt. What's your recommendation
for approaching this problem? And how can we best promote the recording of meaningful
lessons?
The lessons are rarely useful to them so they try and fill in the forms and get on with their job. The
turning point will be when they understand the intrinsic value in the data and what it can do for them
and their organisation. When the Board understand the potential then I would envisage that it will
become a key part of any organisation's data to day work.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
9. Does the data take account of the increased import costs for materials resulting from
weakened pound?
There are lessons associated with currency and commodity risks. The lessons could be to contract in
GBP or hedge forward.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
10. Is data analytics compatible with BIM?
Yes. BIM is subset of project data. But it also extends beyond project 'delivery data' into virtual
models and a range of other attributes. They are complementary and there is an overlap.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
11. Do you think that one of the problems that we face is that we don't have qualified people in
project management positions? I know for my industry, many individuals with Engineering
skills/experience are advanced into project management positions...
Partly. It depends on the sector. I've worked with some highly qualified and experienced PMs. I've
also worked with some who have fallen into it. A data centric approach will really help those with less
experience because it should provide checklists, prompts and insights. But we have to be careful
because intellectual ownership must reside with the individual. It would be a dangerous future if
projects failed because the 'computer told me to do it'. Less experienced PMs should also seek wise
counsel from others when they approach a difficult part of the rally track.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
12. Is there a standard form of software, or a standard body where the data can be
collaboratively shared?
Not yet. Government currently have a reluctance to open up data. But we are falling behind other
countries (see itdashboard.gov). In my opinion if the UK wants to be a leader in this then we need
data. Government has most of it and have an obligation to share it. If you believe this then campaign
to open it up and we'll get there.
I'm working with the Major Projects Association to try and pool data, but it is very early days. There
are a lot of issues to consider to ensure that it is used in a mature way, isn't compromised and is
appropriately anonymised.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
13. Whilst part of the problem is a personal lack of application of knowledge, how much is
also to do with organisational culture and commitment?
The culture is the main barrier. Please see my earlier answer. But culture can't be changed overnight.
Questions and Answers
Please note that the answers given here are the opinions of the people concerned,
who are experienced practitioners and they do not necessarily reflect the guidance
in the APM BoK or other text books.
14. With reference to what we are seeing in the news today, and bearing in mind GDPR, how
easy will it really be to 'pool data'?
GDPR is about personal data. This challenge relates to project data. I've already seen in some of the
data sets that names are redacted, but we don't need names or personal data for 99% of the use
cases. This may differ inside of an organisation if there is a decision to use personal delivery
performance to inform machine learning, e.g.' Tony always skips over front end loading and this
results in problems in design; we need to provide more guidance to Tony and ensure that we provide
appropriate coaching and oversight‘.
Thank you for your
engagement with this
webinar and
this QandA session.
These questions were raised
during a presentation delivered at
an APM webinar
To find out more about
upcoming webinars please visit
our website
www.apm.org.uk/events

Contenu connexe

Plus de Association for Project Management

Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Association for Project Management
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Association for Project Management
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 

Plus de Association for Project Management (20)

Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 

Dernier

Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Dernier (20)

Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Project Data Analytics - How do we leverage experience of project delivery? webinar, Question responses, 20 March 2018

  • 1. Benefits Management Specific Interest Group (SIG) Project Data Analytics - How do we leverage experience of project delivery? webinar Questions and Answers Tuesday 20 March 2018 Martin Paver established London Project Data and Analytics Meetup Webinar speaker
  • 2. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 1. What are your thoughts on whether this is cultural change or change in processes to getting to the end result you are trying to achieve? It’s definitely a cultural challenge. The first step is to 'ignite the professional imagination' on the art of the possible and build out from there. Processes can follow to formalise whatever successes have been achieved. I'd recommend an agile based methodology with pilots. But work towards a bold and transformative vision.
  • 3. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 2. How do we stop organisations from forcing their rally drivers to go too fast / with the wrong approach despite their professional opinion and advice? There is a point when speed becomes reckless. If project managers are proven to be reckless then there should be consequences. As an engineer, if I cut corners and my product costs my client a lot of money then there are implications. We need to change the culture (and probably pay people more as a consequence). In time, machine learning should be able to provide early warnings. This should drive the agenda for the project board and also help to shape coaching & assurance interventions.
  • 4. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 3. Connected data - what is that picture telling us - what insight can you gain? The connected data picture illustrates that there are connections in the data that we can explore further or query. For example, understanding the connectivity between risks, how they evolve and snowball, how the risks relate to lessons and impact. In essence it’s the ability to extract insights from the connections in the data.
  • 5. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 4. This feels time consuming and complex - i.e. resource heavy. Is that right? and how do you justify the time collating this information and investing in the tools to mine that? I don't believe it is. Organisations already collect schedule, risk, lesson, issue, cost, data, etc. It’s a matter of extracting this against a series of use cases to solve specific problems. Some of the tools are free, its matter of how they are integrated and supported in the 'stack'. In terms of justification, it’s a conventional cost benefit analysis. I wouldn't recommend approaching this by promising a big bang vision of a beautiful future, but to set that vision within the context of implementation sprints, with gates to measure progress and build momentum.
  • 6. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 5. Can you explain more about what is machine learning? There is a lot of material on the internet. I would recommend Andrew Ng's videos such as https://www.youtube.com/watch?v=UzxYlbK2c7E . The Udacity videos are a bit easier to understand see https://www.youtube.com/watch?v=ICKBWIkfeJ8
  • 7. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 6. Were the original budgets realistic based on reference based estimating or were the budgets politically influenced? There is a large body of work on this. I would recommend Bent Flyvbjerg's work. It depends on the project. Some projects suffer from 'strategic misrepresentation', http://bit.ly/2IKj0xV i.e. the business case is oversold. But this isn't the only reason for the cost misalignment. Bias is a major factor. It also depends whether there is something to reference against - if it is a once in a lifetime, complex and innovative project then the point of reference will require a greater level of abstraction.
  • 8. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 7. If someone is looking to start a career in this sector, what kind of roles can the person apply for? It’s a very emergent industry. The P3M market isn't quite ready for this yet, but I expect this to change by the end of this year. I'd recommend finding roles that enable you to delve into the detail, whilst doing some of the Coursera or Udacity nano degrees.
  • 9. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 8. You have already touched on the fact that PMs are, more often than not, pushed for time and are, therefore, reactive. This, in my experience leads to pushing on to the next stage/sprint without properly (if at all) recording lessons learnt. What's your recommendation for approaching this problem? And how can we best promote the recording of meaningful lessons? The lessons are rarely useful to them so they try and fill in the forms and get on with their job. The turning point will be when they understand the intrinsic value in the data and what it can do for them and their organisation. When the Board understand the potential then I would envisage that it will become a key part of any organisation's data to day work.
  • 10. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 9. Does the data take account of the increased import costs for materials resulting from weakened pound? There are lessons associated with currency and commodity risks. The lessons could be to contract in GBP or hedge forward.
  • 11. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 10. Is data analytics compatible with BIM? Yes. BIM is subset of project data. But it also extends beyond project 'delivery data' into virtual models and a range of other attributes. They are complementary and there is an overlap.
  • 12. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 11. Do you think that one of the problems that we face is that we don't have qualified people in project management positions? I know for my industry, many individuals with Engineering skills/experience are advanced into project management positions... Partly. It depends on the sector. I've worked with some highly qualified and experienced PMs. I've also worked with some who have fallen into it. A data centric approach will really help those with less experience because it should provide checklists, prompts and insights. But we have to be careful because intellectual ownership must reside with the individual. It would be a dangerous future if projects failed because the 'computer told me to do it'. Less experienced PMs should also seek wise counsel from others when they approach a difficult part of the rally track.
  • 13. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 12. Is there a standard form of software, or a standard body where the data can be collaboratively shared? Not yet. Government currently have a reluctance to open up data. But we are falling behind other countries (see itdashboard.gov). In my opinion if the UK wants to be a leader in this then we need data. Government has most of it and have an obligation to share it. If you believe this then campaign to open it up and we'll get there. I'm working with the Major Projects Association to try and pool data, but it is very early days. There are a lot of issues to consider to ensure that it is used in a mature way, isn't compromised and is appropriately anonymised.
  • 14. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 13. Whilst part of the problem is a personal lack of application of knowledge, how much is also to do with organisational culture and commitment? The culture is the main barrier. Please see my earlier answer. But culture can't be changed overnight.
  • 15. Questions and Answers Please note that the answers given here are the opinions of the people concerned, who are experienced practitioners and they do not necessarily reflect the guidance in the APM BoK or other text books. 14. With reference to what we are seeing in the news today, and bearing in mind GDPR, how easy will it really be to 'pool data'? GDPR is about personal data. This challenge relates to project data. I've already seen in some of the data sets that names are redacted, but we don't need names or personal data for 99% of the use cases. This may differ inside of an organisation if there is a decision to use personal delivery performance to inform machine learning, e.g.' Tony always skips over front end loading and this results in problems in design; we need to provide more guidance to Tony and ensure that we provide appropriate coaching and oversight‘.
  • 16. Thank you for your engagement with this webinar and this QandA session.
  • 17. These questions were raised during a presentation delivered at an APM webinar To find out more about upcoming webinars please visit our website www.apm.org.uk/events