Stakeholder management
in a matrix environment
A Programme Management SIG webinar
www.apm.org.uk/progm
Welcome & housekeeping
 This webinar is being recorded
 Slides available for viewing on resources pages on APM
website and ProgM microsite
 Please use the questions box to ask questions
Programme Management SIG (ProgM)
 Vision: To be recognised internationally as the leading group for
programme management, supporting a world in which all projects
succeed.
 Workstreams:
 Physical Events
 Virtual Events
 Communications
 Higher Education
 Publications
 Corporate
ProgM
 Introduction to Programme Management Guide refresh underway
 Website: www.apm.org.uk/progm
 Twitter: @apmprogmsig
Upcoming events
 Validating Strategies for Programme Success
 ProgM Webinars
 ProgM Conference
 Events: www.apm.org.uk/events
Stakeholder management
in a matrix environment
Jake Holloway
A Programme Management SIG webinar
www.apm.org.uk/progm
Webinar: Stakeholder
Management in a Matrix
Organisation
Jake Holloway
Clarity for complex changewww.xceedgroup.com/shm
Introduction
Stakeholder Management is critical to project and programme
success. It separates good PMs from administrators.
In many organisations not all of the team members report to the
project manager.
This matrix of responsibility means more complex stakeholder
management. It causes a number of issues and tensions between
the project and functions, and also across multiple projects and
programmes.
The webinar looks at Stakeholder Management both generally and
within Matrix Organisations.
www.xceedgroup.com/shm
25/08/2
015
9
What the webinar will cover
 Stakeholder Management Basics
 Stakeholder Management process
 Building your stakeholder map
 Support v Influence Matrix
 Effective Stakeholder Communication
 Understanding Your Stakeholder’s Other Priorities
 Stakeholder Persuasion Techniques:- building stakeholder support
 Matrix Stakeholder Management
 Types of Matrix organisations and their PM/SHM issues
 Handling Matrix stakeholders and their issues
 Q&A
Stakeholder
Management basics
www.xceedgroup.com/shm
(1) Refine
stakeholder
catalogue
(2) Define
stakeholder
requirements
(3) Understand
stakeholder
opinion &
influence
(4) Create
stakeholder plan
(5) Prioritise &
Execute plan
(6)
Measure/Review
progress
Catalogue
Requirements
Understand
Plan
Do
Check
Stakeholder
management is
organised human
interaction
www.xceedgroup.com/shm
A tested back out
 What is a stakeholder?
 Not only the Sponsor(s)
 Not only the people who have project requirements
 Definition: stakeholders are individuals or groups who can impact
on the real or perceived success of a project or programme
 They are all the people who you need something from
 Sponsors and other interested Executives
 Project team members, including suppliers & contractors
 Internal and external customers (users, recipients, operations staff,
sales & marketing)
 Gatekeepers
 Matrix: Functional managers, resource owners
Rehearsals
Brand Protection
 The catalogue should cover
 All Individuals, groups, and sub-groups who have distinct inputs, needs,
opinions, and levels of authority
 Think as widely as possible – projects and programmes can fail simply
because the PM does not identify the most important stakeholders!
 Initial information should include
 What is your access to them?
 Where are they?
 What communication channels do they use?
 Who do key individuals report to?
 What professional and personal authority do they have? (e.g. on a scale 1
to 10)
 In order for the project/programme to be a success, and to be
perceived as one;
 What does the project/programme need from them?
 What do they want from the project/programme – in order for you to get
what you need?
 Include in what you need;
 Information, requirements & approvals
 Resource and work request execution
 Approval of process or methods used
 Approvals of deliverables, quality etc.
 Hard work, possibly above and beyond the call of duty
 Executive decisions
 Support and project/programme ‘promotion’ (or at least compliance /
agreement)
 Behaviour change, adoption of new practices
 Assess how important each stakeholder’s requirements are (e.g. on
a scale of 1 to 10)
www.xceedgroup.com/shm
Organisational
relationships Statements
of work
RACI
matrices
Personal
relationships
Favouritism
Rivalries
Shared
interests
“History”
Proximity Common
objectives
Language
and culture
Previous co-
operation
The influence iceberg
 The more positive the stakeholders the easier the
project/programme
 In a crisis, positive opinions and stakeholder support delivered via
their influence networks could save you!
 Negative stakeholders can kill it!
 What do you know of their attitude towards;
 The project/programme generally and the benefits to them
(professionally and personally) of it succeeding
 Fulfilling your requirements of them
 Will it mean a lot of work? A lot of change? What are their other priorities?
Are they very busy? Is this project/programme a distraction?
 You personally, and towards other key stakeholders
 Assess their support on a scale of 1 to 10
 Note that early on you may not know everything you need to know
Support
Influence
Stakeholder A
Stakeholder B
Stakeholder C
Stakeholder F
Stakeholder E
Stakeholder D
Low
High
High
Low
AMBER
Support
Influence
Low
High
High
Low
REDGREEN
GREEN
AMBER
 The stakeholder plan is a plan to obtain the
Stakeholder requirements, and to achieve
other stakeholder-related objectives
 It describes all organised interaction with them
 It is not just a plan to “communicate and engage”
with them, or “get their requirements”
 You must also understand them, persuade them
and change their behaviour
 Why?
 For example
 If an important Executive will have significant impact on the
programme being a success, but you know that they are inclined
against the programme
 Then your plan needs to either persuade them to change their mind – or to
work round the problem of their negativity
 Or if you require the QA Manager to carry out testing and quality audit
quickly and according to your schedule, and you know that that team is
overloaded by other projects/programmes
 Then you need a plan to somehow get ahead of the queue! Which means
persuading them to support your project
 The job of project/programme manager is all about influencing,
persuading, negotiating and changing attitudes and behaviour
 It’s about reality
 It’s not just Gantt charts, it’s social psychology too!
 With stakeholder groups - think like an
Advertiser
 Design messages to address feelings
 Use their channels to connect
(no more project newsletters)
 Measure reach, opinion, recall, level of
engagement, satisfaction, behaviours
 Ask yourself, what would a marketing
person do?
 If you don’t know, get one on your
programme!
www.xceedgroup.com/shm
 With individual stakeholders – think like a
Salesperson
 Focus on persuasion and changing behaviours, not
just ‘engagement’
 Use sales techniques to manage their decision-
making process
What do they want? What are their real objectives and
objections?
What are the benefits? What is their decision making
process? Can you influence it?
Close them on important decisions
 Use persuasion techniques to motivate and
negotiate with them
Social proof, scarcity, investment rationalisation,
comparisons, etc.
Support
Influence
Stakeholder A
Stakeholder B
Stakeholder C
Stakeholder F
Stakeholder E
Stakeholder D
Low
High
High
Low
Stakeholder E1
Stakeholder E2
Desired change
Stakeholder influences
Stakeholder objectives: support-influence map
www.xceedgroup.com/shm
Stakeholder Stakeholder
requirements
Example objectives Plan to include..
Sponsor A • Requirement
• Requirement
• Sustain high support
• Use +ive influence
Weekly meeting, personalised report
focussed on their high value outcomes
Power Users • Requirement
• Requirement
• Build enthusiasm
• User them to influence
general users
Fit early visibility around their
schedule, build identification with
project, open access to the team,
regular satisfaction/attitude survey
Sponsor B • Requirement
• Requirement
• Less antagonism Use Sponsor A to influence them, find
way to make them feel more
comfortable
Quality Team
Manager
• Requirement
• Requirement
• Get through their QA and test
process quickly
Understand the QA workload, build
bridges with competing PMs and try to
help QA schedule. Sell the project’s
true value
Project Team • Requirement
• Requirement
• Keep them focussed on
delivery
Create enjoyable working
environment, help with individual
career objectives
General
Users
• Requirement
• Requirement
• Adoption of new system Drinks/lunch sessions showing new
system, use their intranet for comms
about benefits to them
 Working with stakeholders could take up all of your time
 Prioritise based on how important they are to the success
of the project/programme
 Is the project/programme obtaining your stakeholder
requirements?
 Are you achieving your stakeholder objectives?
 If not, react
 change the plan
Matrix organisations
Functions
Projects
Co-ordination
project
Secondment
project
Functions
Projects
Hybrid
project
Functions
Projects
Weak
Co-ordination
project
Strong
Co-ordination
project
• Functional managers and resource owners
are key stakeholders
• Your project/programme is not their no. 1
priority
• Your success is dependent on them, and on
other projects/programmes within your
organisation
• So you need to understand what they want
from you
• Understand their workload and workload
management processes
• Strong or weak co-ordination?
• You may have to persuade them to
work with you
 Each functional team requires managing, and they
don’t co-ordinate between themselves
 Project portfolio management should help, but rarely does
 Functional managers;
 Are often busy, or unresponsive
 Control your timescales, not you (but you still get the
blame!)
 Break schedule/resource commitments
 Control quality, delivery
 Sometimes control cost
 Manage demand/backlog/work request processes
differently, or sometimes not at all
 And, they are human
 E.g. Functional managers sometimes favour specific projects
 Functional managers perspective
 You have to schedule work from multiple Projects, who
don’t co-ordinate
 Project managers keep changing their schedules &
requirements, with too little advanced notice
 Project managers don’t appreciate your problems &
priorities, they just demand work to be done without
seeing the bigger picture
 Some projects are just more interesting/strategic/easy
than others
 Good SHM means understanding their
perspective, and helping them understand yours
 Appreciating the real pressures on them
 It also means trying to change it!
 Team members perspective
 Most team members have two managers, who have different
objectives
 Organisation perspective
 It is hard to optimise all resources, functions, projects and
programmes effectively because of;
 Immature processes
 Inadequate PPM tools
 Lack of interdepartmental and interpersonal co-operation
All these become problems for the PM!
 Understand their work request and demand
management process
 Make sure you have clarity on how they do business
 Negotiate the conditions under which they will complete the work
for you
 Explain your issues to them, for example other dependencies and
other things that might mean you changing details of the work
request
 Understand their workload
 Specifically, which other projects/programmes may cause a
capacity/schedule issue for them (i.e. for you)
 You may need to include those PMs as stakeholders!
 Understand their real issues and what motivates
them
 Use this to sell to them!
Catalogue
Requirements
Understand
Plan
Do
Check
www.xceedgroup.com/shm
Include functional managers,
resource owners, other
project/programme managers
What are their issues &
pressures? How can you
make their role easier? What
is their request and workload
management process? Can
you help optimise the Matrix?
Clarify and document
exactly what you need from
them, be the most specific
and easy to satisfy
Link your schedule with
resource and work
requests, provide early
notice of change
Prioritise what you
need, and prioritise
what they need
Hold them to account
and if it’s not
happening, negotiate or
escalate
Stakeholder
management is
organised human
interaction
 Win one of Five free copies
of my book – take the Big
Change Survey
www.xceedgroup.com/shm
 Connect with me on
LinkedIn
https://uk.linkedin.com/in/jakeholloway
Questions?
www.apm.org.uk/progm
www.xceedgroup.com/shm

Contenu connexe

Tendances

Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisEndeavor Management
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder EngagementMark Ritchie
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder managementGeorge Stamos
 
Mentoring PowerPoint PPT Content Modern Sample
Mentoring PowerPoint PPT Content Modern SampleMentoring PowerPoint PPT Content Modern Sample
Mentoring PowerPoint PPT Content Modern SampleAndrew Schwartz
 
Practical Stakeholder Engagement
Practical Stakeholder EngagementPractical Stakeholder Engagement
Practical Stakeholder EngagementSABSA_Institute
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementAndre Knipe
 
Training module on stakeholder engagement
Training module on stakeholder engagementTraining module on stakeholder engagement
Training module on stakeholder engagementweADAPT
 
Stakeholder management - a short introduction
Stakeholder management - a short introduction Stakeholder management - a short introduction
Stakeholder management - a short introduction Vincenzo Capozzoli
 
6 best practices in stakeholder engagement
6 best practices in stakeholder engagement6 best practices in stakeholder engagement
6 best practices in stakeholder engagementWayne Dunn
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiNelson Mandela Anyomi
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder ManagementNur Al Fata
 
4 Steps for Improved Stakeholder Engagement
4 Steps for Improved Stakeholder Engagement4 Steps for Improved Stakeholder Engagement
4 Steps for Improved Stakeholder EngagementBrightWork
 

Tendances (20)

Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Stakeholder Engagement
Stakeholder EngagementStakeholder Engagement
Stakeholder Engagement
 
Tools and Techniques for Mentoring
Tools and Techniques for MentoringTools and Techniques for Mentoring
Tools and Techniques for Mentoring
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Mentoring PowerPoint PPT Content Modern Sample
Mentoring PowerPoint PPT Content Modern SampleMentoring PowerPoint PPT Content Modern Sample
Mentoring PowerPoint PPT Content Modern Sample
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Practical Stakeholder Engagement
Practical Stakeholder EngagementPractical Stakeholder Engagement
Practical Stakeholder Engagement
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Training module on stakeholder engagement
Training module on stakeholder engagementTraining module on stakeholder engagement
Training module on stakeholder engagement
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder management - a short introduction
Stakeholder management - a short introduction Stakeholder management - a short introduction
Stakeholder management - a short introduction
 
6 best practices in stakeholder engagement
6 best practices in stakeholder engagement6 best practices in stakeholder engagement
6 best practices in stakeholder engagement
 
Mentoring
MentoringMentoring
Mentoring
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela Anyomi
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
MENTORING POWERPOINT
MENTORING POWERPOINTMENTORING POWERPOINT
MENTORING POWERPOINT
 
4 Steps for Improved Stakeholder Engagement
4 Steps for Improved Stakeholder Engagement4 Steps for Improved Stakeholder Engagement
4 Steps for Improved Stakeholder Engagement
 
Mentoring
MentoringMentoring
Mentoring
 

En vedette

The Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and PortfoliosThe Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and PortfoliosDrew Jemilo
 
Surviving in a Matrix: Simple Techniques for Effective Project Management in ...
Surviving in a Matrix: Simple Techniques for Effective Project Management in ...Surviving in a Matrix: Simple Techniques for Effective Project Management in ...
Surviving in a Matrix: Simple Techniques for Effective Project Management in ...Dr. Thomas Juli
 
Matrix management
Matrix managementMatrix management
Matrix managementCraig Brown
 
Business communication 4 audience motivation
Business communication 4   audience motivationBusiness communication 4   audience motivation
Business communication 4 audience motivationShafqat Jilani
 
Croma, the creative organisation matrix
Croma, the creative organisation matrixCroma, the creative organisation matrix
Croma, the creative organisation matrixBEDENK
 
Quantas Classification Tracker for Oracle Projects
Quantas Classification Tracker for Oracle ProjectsQuantas Classification Tracker for Oracle Projects
Quantas Classification Tracker for Oracle ProjectsAndy Fry
 
Classification project
Classification projectClassification project
Classification projectDarren Hanson
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outlineTransnet Port Terminals
 
Managing the Restructure Aftermath: 4 Things You Must Do Right Away
Managing the Restructure Aftermath: 4 Things You Must Do Right AwayManaging the Restructure Aftermath: 4 Things You Must Do Right Away
Managing the Restructure Aftermath: 4 Things You Must Do Right AwayCathy Cassidy
 
5 aces stakeholder management presentation v6
5 aces   stakeholder management presentation v65 aces   stakeholder management presentation v6
5 aces stakeholder management presentation v6tycshih
 
Contemporary issues in marketing final
Contemporary issues in marketing finalContemporary issues in marketing final
Contemporary issues in marketing finalManish Parihar
 
11 e voting-proposal_it_project_management10may12
11 e voting-proposal_it_project_management10may1211 e voting-proposal_it_project_management10may12
11 e voting-proposal_it_project_management10may12Traitet Thepbandansuk
 
How can you influence your Board to adopt good governance of project / change...
How can you influence your Board to adopt good governance of project / change...How can you influence your Board to adopt good governance of project / change...
How can you influence your Board to adopt good governance of project / change...Association for Project Management
 
Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...Serdar Temiz
 
Project Management (Secret: You are all project managers!)
Project Management (Secret: You are all project managers!)Project Management (Secret: You are all project managers!)
Project Management (Secret: You are all project managers!)Raven Tools
 

En vedette (20)

The Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and PortfoliosThe Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
 
Surviving in a Matrix: Simple Techniques for Effective Project Management in ...
Surviving in a Matrix: Simple Techniques for Effective Project Management in ...Surviving in a Matrix: Simple Techniques for Effective Project Management in ...
Surviving in a Matrix: Simple Techniques for Effective Project Management in ...
 
Matrix management
Matrix managementMatrix management
Matrix management
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Making the business case: classic challenges and new horizons
Making the business case: classic challenges and new horizonsMaking the business case: classic challenges and new horizons
Making the business case: classic challenges and new horizons
 
Business communication 4 audience motivation
Business communication 4   audience motivationBusiness communication 4   audience motivation
Business communication 4 audience motivation
 
Croma, the creative organisation matrix
Croma, the creative organisation matrixCroma, the creative organisation matrix
Croma, the creative organisation matrix
 
Quantas Classification Tracker for Oracle Projects
Quantas Classification Tracker for Oracle ProjectsQuantas Classification Tracker for Oracle Projects
Quantas Classification Tracker for Oracle Projects
 
Classification project
Classification projectClassification project
Classification project
 
Building better business cases - Nick Wensley
Building better business cases - Nick WensleyBuilding better business cases - Nick Wensley
Building better business cases - Nick Wensley
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
 
Agile change programmes webinar 150915
Agile change programmes webinar 150915Agile change programmes webinar 150915
Agile change programmes webinar 150915
 
Managing the Restructure Aftermath: 4 Things You Must Do Right Away
Managing the Restructure Aftermath: 4 Things You Must Do Right AwayManaging the Restructure Aftermath: 4 Things You Must Do Right Away
Managing the Restructure Aftermath: 4 Things You Must Do Right Away
 
5 aces stakeholder management presentation v6
5 aces   stakeholder management presentation v65 aces   stakeholder management presentation v6
5 aces stakeholder management presentation v6
 
Contemporary issues in marketing final
Contemporary issues in marketing finalContemporary issues in marketing final
Contemporary issues in marketing final
 
11 e voting-proposal_it_project_management10may12
11 e voting-proposal_it_project_management10may1211 e voting-proposal_it_project_management10may12
11 e voting-proposal_it_project_management10may12
 
How can you influence your Board to adopt good governance of project / change...
How can you influence your Board to adopt good governance of project / change...How can you influence your Board to adopt good governance of project / change...
How can you influence your Board to adopt good governance of project / change...
 
Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...Organization Structure - stake holder -human resources management during proj...
Organization Structure - stake holder -human resources management during proj...
 
Project Management (Secret: You are all project managers!)
Project Management (Secret: You are all project managers!)Project Management (Secret: You are all project managers!)
Project Management (Secret: You are all project managers!)
 

Similaire à Stakeholder management in a matrix organisation - 25th August 2015

Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17Nick Wilson
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programmeMaven
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsAli Zeeshan
 
Project Management For Nonprofits
Project Management For NonprofitsProject Management For Nonprofits
Project Management For Nonprofitsguest257849
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysisStefan Csosz
 
Are You Really Agile?
Are You Really Agile?Are You Really Agile?
Are You Really Agile?mhambalek
 
APM Presents - Joining the dots - Programme Management in action
APM Presents - Joining the dots - Programme Management in actionAPM Presents - Joining the dots - Programme Management in action
APM Presents - Joining the dots - Programme Management in actionAssociation for Project Management
 
Program Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionProgram Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionManish Srivastava
 
Change Management 2004
Change Management 2004Change Management 2004
Change Management 2004jim
 
Product Management And Service Delivery Process - FlackVentures Example
Product Management And Service Delivery Process - FlackVentures ExampleProduct Management And Service Delivery Process - FlackVentures Example
Product Management And Service Delivery Process - FlackVentures ExampleKate Pynn
 
Social work: Crafting Goals and Objectives
Social work: Crafting Goals and ObjectivesSocial work: Crafting Goals and Objectives
Social work: Crafting Goals and Objectivesbernie3524
 
How to effectively cultivate change
How to effectively cultivate changeHow to effectively cultivate change
How to effectively cultivate changeNina Segura
 

Similaire à Stakeholder management in a matrix organisation - 25th August 2015 (20)

Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
 
Pm lecture
Pm lecturePm lecture
Pm lecture
 
PM_lecture.pdf
PM_lecture.pdfPM_lecture.pdf
PM_lecture.pdf
 
Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17
 
PgMP Panel Review (3/3)
PgMP Panel Review (3/3)PgMP Panel Review (3/3)
PgMP Panel Review (3/3)
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programme
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For Results
 
Project Management For Nonprofits
Project Management For NonprofitsProject Management For Nonprofits
Project Management For Nonprofits
 
Program management group2
Program management group2Program management group2
Program management group2
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Are You Really Agile?
Are You Really Agile?Are You Really Agile?
Are You Really Agile?
 
APM Presents - Joining the dots - Programme Management in action
APM Presents - Joining the dots - Programme Management in actionAPM Presents - Joining the dots - Programme Management in action
APM Presents - Joining the dots - Programme Management in action
 
Program Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionProgram Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer Satisfaction
 
Change Management 2004
Change Management 2004Change Management 2004
Change Management 2004
 
BTF Process
BTF Process BTF Process
BTF Process
 
Product Management And Service Delivery Process - FlackVentures Example
Product Management And Service Delivery Process - FlackVentures ExampleProduct Management And Service Delivery Process - FlackVentures Example
Product Management And Service Delivery Process - FlackVentures Example
 
Social work: Crafting Goals and Objectives
Social work: Crafting Goals and ObjectivesSocial work: Crafting Goals and Objectives
Social work: Crafting Goals and Objectives
 
How to effectively cultivate change
How to effectively cultivate changeHow to effectively cultivate change
How to effectively cultivate change
 
Project Management Skills
Project Management SkillsProject Management Skills
Project Management Skills
 

Plus de Association for Project Management

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Association for Project Management
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...Association for Project Management
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Association for Project Management
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...Association for Project Management
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Association for Project Management
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Association for Project Management
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Association for Project Management
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 

Plus de Association for Project Management (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 

Dernier

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Dernier (20)

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Stakeholder management in a matrix organisation - 25th August 2015

  • 1. Stakeholder management in a matrix environment A Programme Management SIG webinar www.apm.org.uk/progm
  • 2. Welcome & housekeeping  This webinar is being recorded  Slides available for viewing on resources pages on APM website and ProgM microsite  Please use the questions box to ask questions
  • 3. Programme Management SIG (ProgM)  Vision: To be recognised internationally as the leading group for programme management, supporting a world in which all projects succeed.  Workstreams:  Physical Events  Virtual Events  Communications  Higher Education  Publications  Corporate
  • 4. ProgM  Introduction to Programme Management Guide refresh underway  Website: www.apm.org.uk/progm  Twitter: @apmprogmsig
  • 5. Upcoming events  Validating Strategies for Programme Success  ProgM Webinars  ProgM Conference  Events: www.apm.org.uk/events
  • 6. Stakeholder management in a matrix environment Jake Holloway A Programme Management SIG webinar www.apm.org.uk/progm
  • 7. Webinar: Stakeholder Management in a Matrix Organisation Jake Holloway Clarity for complex changewww.xceedgroup.com/shm
  • 8. Introduction Stakeholder Management is critical to project and programme success. It separates good PMs from administrators. In many organisations not all of the team members report to the project manager. This matrix of responsibility means more complex stakeholder management. It causes a number of issues and tensions between the project and functions, and also across multiple projects and programmes. The webinar looks at Stakeholder Management both generally and within Matrix Organisations. www.xceedgroup.com/shm
  • 9. 25/08/2 015 9 What the webinar will cover  Stakeholder Management Basics  Stakeholder Management process  Building your stakeholder map  Support v Influence Matrix  Effective Stakeholder Communication  Understanding Your Stakeholder’s Other Priorities  Stakeholder Persuasion Techniques:- building stakeholder support  Matrix Stakeholder Management  Types of Matrix organisations and their PM/SHM issues  Handling Matrix stakeholders and their issues  Q&A
  • 11. www.xceedgroup.com/shm (1) Refine stakeholder catalogue (2) Define stakeholder requirements (3) Understand stakeholder opinion & influence (4) Create stakeholder plan (5) Prioritise & Execute plan (6) Measure/Review progress
  • 13. A tested back out  What is a stakeholder?  Not only the Sponsor(s)  Not only the people who have project requirements  Definition: stakeholders are individuals or groups who can impact on the real or perceived success of a project or programme  They are all the people who you need something from  Sponsors and other interested Executives  Project team members, including suppliers & contractors  Internal and external customers (users, recipients, operations staff, sales & marketing)  Gatekeepers  Matrix: Functional managers, resource owners Rehearsals Brand Protection
  • 14.  The catalogue should cover  All Individuals, groups, and sub-groups who have distinct inputs, needs, opinions, and levels of authority  Think as widely as possible – projects and programmes can fail simply because the PM does not identify the most important stakeholders!  Initial information should include  What is your access to them?  Where are they?  What communication channels do they use?  Who do key individuals report to?  What professional and personal authority do they have? (e.g. on a scale 1 to 10)
  • 15.  In order for the project/programme to be a success, and to be perceived as one;  What does the project/programme need from them?  What do they want from the project/programme – in order for you to get what you need?  Include in what you need;  Information, requirements & approvals  Resource and work request execution  Approval of process or methods used  Approvals of deliverables, quality etc.  Hard work, possibly above and beyond the call of duty  Executive decisions  Support and project/programme ‘promotion’ (or at least compliance / agreement)  Behaviour change, adoption of new practices  Assess how important each stakeholder’s requirements are (e.g. on a scale of 1 to 10)
  • 17.  The more positive the stakeholders the easier the project/programme  In a crisis, positive opinions and stakeholder support delivered via their influence networks could save you!  Negative stakeholders can kill it!  What do you know of their attitude towards;  The project/programme generally and the benefits to them (professionally and personally) of it succeeding  Fulfilling your requirements of them  Will it mean a lot of work? A lot of change? What are their other priorities? Are they very busy? Is this project/programme a distraction?  You personally, and towards other key stakeholders  Assess their support on a scale of 1 to 10  Note that early on you may not know everything you need to know
  • 18. Support Influence Stakeholder A Stakeholder B Stakeholder C Stakeholder F Stakeholder E Stakeholder D Low High High Low
  • 20.  The stakeholder plan is a plan to obtain the Stakeholder requirements, and to achieve other stakeholder-related objectives  It describes all organised interaction with them  It is not just a plan to “communicate and engage” with them, or “get their requirements”  You must also understand them, persuade them and change their behaviour  Why?
  • 21.  For example  If an important Executive will have significant impact on the programme being a success, but you know that they are inclined against the programme  Then your plan needs to either persuade them to change their mind – or to work round the problem of their negativity  Or if you require the QA Manager to carry out testing and quality audit quickly and according to your schedule, and you know that that team is overloaded by other projects/programmes  Then you need a plan to somehow get ahead of the queue! Which means persuading them to support your project  The job of project/programme manager is all about influencing, persuading, negotiating and changing attitudes and behaviour  It’s about reality  It’s not just Gantt charts, it’s social psychology too!
  • 22.  With stakeholder groups - think like an Advertiser  Design messages to address feelings  Use their channels to connect (no more project newsletters)  Measure reach, opinion, recall, level of engagement, satisfaction, behaviours  Ask yourself, what would a marketing person do?  If you don’t know, get one on your programme! www.xceedgroup.com/shm
  • 23.  With individual stakeholders – think like a Salesperson  Focus on persuasion and changing behaviours, not just ‘engagement’  Use sales techniques to manage their decision- making process What do they want? What are their real objectives and objections? What are the benefits? What is their decision making process? Can you influence it? Close them on important decisions  Use persuasion techniques to motivate and negotiate with them Social proof, scarcity, investment rationalisation, comparisons, etc.
  • 24. Support Influence Stakeholder A Stakeholder B Stakeholder C Stakeholder F Stakeholder E Stakeholder D Low High High Low Stakeholder E1 Stakeholder E2 Desired change Stakeholder influences Stakeholder objectives: support-influence map
  • 25. www.xceedgroup.com/shm Stakeholder Stakeholder requirements Example objectives Plan to include.. Sponsor A • Requirement • Requirement • Sustain high support • Use +ive influence Weekly meeting, personalised report focussed on their high value outcomes Power Users • Requirement • Requirement • Build enthusiasm • User them to influence general users Fit early visibility around their schedule, build identification with project, open access to the team, regular satisfaction/attitude survey Sponsor B • Requirement • Requirement • Less antagonism Use Sponsor A to influence them, find way to make them feel more comfortable Quality Team Manager • Requirement • Requirement • Get through their QA and test process quickly Understand the QA workload, build bridges with competing PMs and try to help QA schedule. Sell the project’s true value Project Team • Requirement • Requirement • Keep them focussed on delivery Create enjoyable working environment, help with individual career objectives General Users • Requirement • Requirement • Adoption of new system Drinks/lunch sessions showing new system, use their intranet for comms about benefits to them
  • 26.  Working with stakeholders could take up all of your time  Prioritise based on how important they are to the success of the project/programme  Is the project/programme obtaining your stakeholder requirements?  Are you achieving your stakeholder objectives?  If not, react  change the plan
  • 31. • Functional managers and resource owners are key stakeholders • Your project/programme is not their no. 1 priority • Your success is dependent on them, and on other projects/programmes within your organisation • So you need to understand what they want from you • Understand their workload and workload management processes • Strong or weak co-ordination? • You may have to persuade them to work with you
  • 32.  Each functional team requires managing, and they don’t co-ordinate between themselves  Project portfolio management should help, but rarely does  Functional managers;  Are often busy, or unresponsive  Control your timescales, not you (but you still get the blame!)  Break schedule/resource commitments  Control quality, delivery  Sometimes control cost  Manage demand/backlog/work request processes differently, or sometimes not at all  And, they are human  E.g. Functional managers sometimes favour specific projects
  • 33.  Functional managers perspective  You have to schedule work from multiple Projects, who don’t co-ordinate  Project managers keep changing their schedules & requirements, with too little advanced notice  Project managers don’t appreciate your problems & priorities, they just demand work to be done without seeing the bigger picture  Some projects are just more interesting/strategic/easy than others  Good SHM means understanding their perspective, and helping them understand yours  Appreciating the real pressures on them  It also means trying to change it!
  • 34.  Team members perspective  Most team members have two managers, who have different objectives  Organisation perspective  It is hard to optimise all resources, functions, projects and programmes effectively because of;  Immature processes  Inadequate PPM tools  Lack of interdepartmental and interpersonal co-operation All these become problems for the PM!
  • 35.  Understand their work request and demand management process  Make sure you have clarity on how they do business  Negotiate the conditions under which they will complete the work for you  Explain your issues to them, for example other dependencies and other things that might mean you changing details of the work request  Understand their workload  Specifically, which other projects/programmes may cause a capacity/schedule issue for them (i.e. for you)  You may need to include those PMs as stakeholders!  Understand their real issues and what motivates them  Use this to sell to them!
  • 36. Catalogue Requirements Understand Plan Do Check www.xceedgroup.com/shm Include functional managers, resource owners, other project/programme managers What are their issues & pressures? How can you make their role easier? What is their request and workload management process? Can you help optimise the Matrix? Clarify and document exactly what you need from them, be the most specific and easy to satisfy Link your schedule with resource and work requests, provide early notice of change Prioritise what you need, and prioritise what they need Hold them to account and if it’s not happening, negotiate or escalate Stakeholder management is organised human interaction
  • 37.  Win one of Five free copies of my book – take the Big Change Survey www.xceedgroup.com/shm  Connect with me on LinkedIn https://uk.linkedin.com/in/jakeholloway