/06.02.12 1
Keeping collaborative delivery
arrangements in focus and on course
…a case of LBSR
Boris Lucic EMBA CEng MICE RPP
Programme Engineering Manager
London Bridge Station Redevelopment
/06.02.12 2
“The reality is that true collaboration
is difficult. It requires subordinating
individual goals to collective
achievement.”
Have you ever been
accused of not being
collaborative?
/6-Oct-16 3
This story is based on true events…
Strategy
Development
Strategy
Execution
Project
Review and
Interventions
Where we are
today
/06.02.12
Thameslink - achievements and challenges
4
 Transformational Change
 Scale
 Complexity
 People
 Communication
London Bridge Station
/06.02.12
Thameslink - achievements and challenges
5
 Super critical milestones
 Operational requirements take
precedent
 Cumulative complexity
 Constrained site
 Limited resources and supply chain
pool
Constraints
/06.02.12 6
Success Criteria
Safety
Schedule Performance
Cost Performance
Quality
Stakeholder Impact
Operational Performance
/06.02.12 7
Strategy in 2008
 Early Works Contractor
 Main Works Delivery Contractor
 Detailed Design and Build
 Early Contractor Involvement
 Early Sub-contractor Involvement
 Target Cost
 Co-located organisation
 One project identity-common brand
 Minimise man ‘man-marking’
 Collaborative, non-confrontational style
 Risk approach to quality assurance
 Multiple detailed design control points
 Co-ordination and stakeholder management
 Common IT platforms
 Common document management system
 One Schedule, one system
ORGANISATION & BEHAVIOURS SYSTEMS
PROCESSES PROCUREMENT
/06.02.12 8
Strategy Execution
/06.02.12 9
2011 2012 2013 2014 2015 2016 2017 2018
GRIP 4 ( OUTLINE DESIGN)
GRIP 5 (DETAILED DESIGN)
GRIP 6 – 8 (CONSTRUCTION - HANDBACK)
Feb 2012
Main Works
Contract Signature
Target Cost
Agreed
Mar. Stage 1 Completion
Early Works Contractor
Sept.. Stage 1a Completion
Jan. Stage 1 b Completion
May. Stage CC Completion
Jan. Stage2 Completion
July. Stage 2A (2A#) Completion
Apr.. Stage 3 Completion
Sept. Stage 4 Compl.
Strategy Execution
/06.02.12 10
Commercial Model
60% / 40%
£100.0M
£0.0M
Variable
Fee
Gainshare
Target
Cost
Saving
Total
Cost
TC + Fee
£100.0M
£40.0M
/Date 00.00.00 Create your footer by changing copy in the Header and Footer section 11
/
Everything with people in mind
6-Oct-16 12
/06.02.12 13
Project Review
Jan 2015
/06.02.12 14
2011 2012 2013 2014 2015 2016 2017 2018
GRIP 4 ( OUTLINE DESIGN)
GRIP 5 (DETAILED DESIGN)
GRIP 6 – 8 (CONSTRUCTION - HANDBACK)
Feb 2012
Contract Signature
Supplemental
Agreeement
Project Review
and Restructuring
Mar. Stage 1 Completion
Enabling Works Contract
Sept.. Stage 1a Completion
Jan. Stage 1 b Completion
May. Stage CC Completion
Jan. Stage2 Completion
July. Stage 2A (2A#) Completion
Apr.. Stage 3 Completion
Sept. Stage 4 Compl.
Schedule Performance
/06.02.12 15
Commercial Performance
60% / 40%
£100.0M
£0.0M
Variable
Fee
Gainshare
Target
Cost
Saving
Total
Cost
TC + Fee
£100.0M
£40.0M
/6-Oct-16 16
UNDER
ASSESSMENT OF
COMPLEXITY
POORLY DEFINED
REFERENCE
DESIGN, TOO
SHORT TIME FOR
DETAILED DESIGN
COMPLEXITY
POOR
EFFICIENCY
Pressure to
Design to
Budget
Poorly defined
Reference
Design or late
design decisions
triggers cost
growth
The complexity
of Major Projects
is often
intangible and
not estimated
Optimum bias
about
completion dates
leads to minimal
estimate of
Prolongation
CostGrowth
Time constraints impacts Procurement & Construction quality inc
Temporary Services & Finishes
ESTIMATING DETAILED DESIGN CONSTRUCTION PROLONGATION FOR COMPLETION &
QUALITY
Optimism Bias
Political Pressure
Design & Construction
Overlap
Fixed
Milestones
Hand
Back
Drivers of tension in a constrained commercial
model
/Date 00.00.00 Create your footer by changing copy in the Header and Footer section 17
/Date 00.00.00 Create your footer by changing copy in the Header and Footer section 18
Team Behaviours
 No conflict
 Commitment to project schedule delivery
 More compromise than collaboration
 Lack of challenge
 Reporting with insufficient clarity to support
effective management decisions
 Light touch governance
/
What it means to collaborate?
6-Oct-16 19
/08.06.15 20
Project Dynamics
/08.06.15 21
RISKLow High
Existing Incentivised
Target Cost
Guaranteed
Maximum Price
Commercial Model
• No threat to balance
sheet
• Driving defensive
behaviours
• Upward pressure on
target cost
• Threat to balance
sheet
• Limited negotiating
leverage
• Potential increase in
cost or fee due to risk
transfer
/
25% / 75%
60% / 40%
50% / 50%
40% / 60%
£31.8M
Target Cost £0.0M
New Incentivisation Model
Infrastructure Projects: Thameslink Programme
22
Employers
Discretionary
Gainshare
Gainshare
Target
Cost
Saving
Total
Cost
TC + Fee
£31.8M
KRA Fee
Lump
Sum Fee
Milestone Fee
£5.0M
£15.0M
£25.0M
Limited grounds
for Target Cost
adjustment
No fee on Total
Cost above
Target Cost
£0.0M
6-Oct-16
/
Take Aways
Infrastructure Projects: Thameslink Programme
Commercial Model aligns NR & Costain to achieve
lowest cost delivery (business objective)
Creates the environment required to achieve lowest
cost delivery
6-Oct-16 23
Control Collaboration
Capacity Capability
• Deliver within agreed CP5 funding
• Supply chain performance
• Stable borrowing
• VfM
• Maintain a net cash balance at an appropriate level
• Supply chain performance
• Deliver shareholder value (adjusted profit before tax
and dividend per share pence)
Costain PLC Commercial Results IP Commercial Result
• Reputation
• Customer Satisfaction
• Advocacy
Joint Results
• VfM
/
Thameslink Staff Briefing 18th September 2015 24
 London Bridge Management Board –
Executive Level
 London Bridge Project Board
 Programme Manager – project controls
 Behavioural Specialist
 Supply Chain Integration
 Recognise strategic role of design
management
Leadership Review
/
Thameslink Staff Briefing 18th September 2015 25
 Construction Management team
 Stakeholder and Operational interface
manager
 GRIP 6-8 Design and Engineering Team
 Independent Project Controls Manager
 Strengthen NR Contract Administration
 Design Management Design team
Organisation Review
/
Thameslink Staff Briefing 18th September 2015 26
Behaviours Review
 Independent consultant behavioural review
across the project
 Senior management behaviours review
 Joint management behavioural workshop
 Project wide briefings
 Ongoing behavioural change support
/
Thameslink Staff Briefing 18th September 2015 27
Design Management
NR Design Programme Manager
MD level engagement within the design joint venture.
Design summit to agree plan for process
improvements and the determination of the overall
long term design strategy.
Control of amendment/revision of design has been
enhanced.
/
Thameslink Staff Briefing 18th September 2015 28Thameslink Staff Briefing 18th September 2015 28
Project Controls
 Independent Project Controls Manager
 Restructuring of reporting requirements
 Robust risk management
 Accountability for budget management process
 EWN process reinvigorated
 Change Impact Assessment
 Visualisation Room
/06.02.12
Thameslink - achievements and challenges
29
Where we are today
Areas Strengthened
 Safety - 5 million man hours
without major injuries
 Design management - 860/901 PDS
Requirements already evidenced
 Cost performance – Stable contract
value
 Schedule performance – All
milestones met
 KPI Performance embedded
 Behaviours – improved
 Stakeholders Relationships -
positive
Opportunities for improvement
 Independent project controls c
be more effective
 Change management could be
more efficient
 Commercial returns under pre
/06.02.12 30
 Risk profile dictates our options
 Commercial model is central to
collaboration
 Take collaboration seriously – good
intentions are not enough
/06.02.12 31
Risk profile changes during the
lifecycle of a project; therefore
the commercial model needs to
match this flux if effective
collaborative arrangement is to
be maintained.
This presentation was delivered
at an APM event
To find out more about
upcoming events please visit our
website www.apm.org.uk/events

More Related Content

What's hot

Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_Gas
Mircea Tomescu
 
Project Control Basics
Project Control BasicsProject Control Basics
Project Control Basics
projectcompany
 

What's hot (20)

Advanced project scheduling: proper practices for integrated project schedules
Advanced project scheduling: proper practices for integrated project schedulesAdvanced project scheduling: proper practices for integrated project schedules
Advanced project scheduling: proper practices for integrated project schedules
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
 
Project Delivery Method Selection Tool
Project Delivery Method Selection ToolProject Delivery Method Selection Tool
Project Delivery Method Selection Tool
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_Gas
 
Organizational Transformation Best Practices (Project-Driven Businesses)
Organizational Transformation Best Practices (Project-Driven Businesses)Organizational Transformation Best Practices (Project-Driven Businesses)
Organizational Transformation Best Practices (Project-Driven Businesses)
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014
 
How to Manage the Transition from Small, Simple to Large Complex Projects
How to Manage the Transition from Small, Simple to Large Complex ProjectsHow to Manage the Transition from Small, Simple to Large Complex Projects
How to Manage the Transition from Small, Simple to Large Complex Projects
 
How Governance Makes or Breaks a Project
How Governance Makes or Breaks a ProjectHow Governance Makes or Breaks a Project
How Governance Makes or Breaks a Project
 
Swwe branch event 14th july 2016
Swwe branch event 14th july 2016Swwe branch event 14th july 2016
Swwe branch event 14th july 2016
 
DESIGN & BUILD
DESIGN & BUILDDESIGN & BUILD
DESIGN & BUILD
 
Project Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsProject Value Delivery methodology and interventions
Project Value Delivery methodology and interventions
 
Program management in the ICT sector
Program management in the ICT sectorProgram management in the ICT sector
Program management in the ICT sector
 
Large Complex Projects (PMI-MY presentation Sept 2012)
Large Complex Projects (PMI-MY presentation Sept 2012)Large Complex Projects (PMI-MY presentation Sept 2012)
Large Complex Projects (PMI-MY presentation Sept 2012)
 
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
 
Session B2 - Project Cost Control
Session B2 - Project Cost ControlSession B2 - Project Cost Control
Session B2 - Project Cost Control
 
LI, GUANGYA
LI,  GUANGYALI,  GUANGYA
LI, GUANGYA
 
Third Party Solar Financing
Third Party Solar FinancingThird Party Solar Financing
Third Party Solar Financing
 
Project Control Basics
Project Control BasicsProject Control Basics
Project Control Basics
 
Establishing a-pmo-in-the-nhs-15-03-26
Establishing a-pmo-in-the-nhs-15-03-26Establishing a-pmo-in-the-nhs-15-03-26
Establishing a-pmo-in-the-nhs-15-03-26
 
Client cases by industry
Client cases by industryClient cases by industry
Client cases by industry
 

Viewers also liked

Perkembanganemosi 120602013421-phpapp01
Perkembanganemosi 120602013421-phpapp01Perkembanganemosi 120602013421-phpapp01
Perkembanganemosi 120602013421-phpapp01
Serly Amalia
 
4.1.3 properties of coals
4.1.3 properties of coals4.1.3 properties of coals
4.1.3 properties of coals
rajdeepjain
 

Viewers also liked (20)

Closing the gap - women in the professions - Peter Cheese
Closing the gap - women in the professions - Peter CheeseClosing the gap - women in the professions - Peter Cheese
Closing the gap - women in the professions - Peter Cheese
 
Perkembanganemosi 120602013421-phpapp01
Perkembanganemosi 120602013421-phpapp01Perkembanganemosi 120602013421-phpapp01
Perkembanganemosi 120602013421-phpapp01
 
It takes two to tango pbk (nd) 160916
It takes two to tango pbk (nd) 160916It takes two to tango pbk (nd) 160916
It takes two to tango pbk (nd) 160916
 
Exploring work-life balance (and how to improve it) - Sue Pritchard
Exploring work-life balance (and how to improve it) - Sue PritchardExploring work-life balance (and how to improve it) - Sue Pritchard
Exploring work-life balance (and how to improve it) - Sue Pritchard
 
Diversity in change projects - How to plan to minimise impact on people and r...
Diversity in change projects - How to plan to minimise impact on people and r...Diversity in change projects - How to plan to minimise impact on people and r...
Diversity in change projects - How to plan to minimise impact on people and r...
 
Successful change - good culture and governance matter Conference - Melanie F...
Successful change - good culture and governance matter Conference - Melanie F...Successful change - good culture and governance matter Conference - Melanie F...
Successful change - good culture and governance matter Conference - Melanie F...
 
Strategic Change Management in Large Organisations - Brian Martin
Strategic Change Management in Large Organisations - Brian MartinStrategic Change Management in Large Organisations - Brian Martin
Strategic Change Management in Large Organisations - Brian Martin
 
Successful change - good culture and governance matter Conference - Ivor Benn...
Successful change - good culture and governance matter Conference - Ivor Benn...Successful change - good culture and governance matter Conference - Ivor Benn...
Successful change - good culture and governance matter Conference - Ivor Benn...
 
How far away is innovation in design and delivery
How far away is innovation in design and delivery How far away is innovation in design and delivery
How far away is innovation in design and delivery
 
4.1.3 properties of coals
4.1.3 properties of coals4.1.3 properties of coals
4.1.3 properties of coals
 
How to successfully deliver business change
How to successfully deliver business changeHow to successfully deliver business change
How to successfully deliver business change
 
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
 
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
 
The synergy between benefits management and change management, workshop 2, Ne...
The synergy between benefits management and change management, workshop 2, Ne...The synergy between benefits management and change management, workshop 2, Ne...
The synergy between benefits management and change management, workshop 2, Ne...
 
B1
B1B1
B1
 
PMO and Value Conference - Ruth Saunders, London, 25 October 2016
PMO and Value Conference - Ruth Saunders, London, 25 October 2016PMO and Value Conference - Ruth Saunders, London, 25 October 2016
PMO and Value Conference - Ruth Saunders, London, 25 October 2016
 
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
 
MATEMATIKA Operasi hitung bilangan bulat
MATEMATIKA Operasi hitung bilangan bulatMATEMATIKA Operasi hitung bilangan bulat
MATEMATIKA Operasi hitung bilangan bulat
 
IPA DASAR - ALAT PERNAFASAN MANUSIA dan HEWAN
IPA DASAR - ALAT PERNAFASAN MANUSIA dan HEWANIPA DASAR - ALAT PERNAFASAN MANUSIA dan HEWAN
IPA DASAR - ALAT PERNAFASAN MANUSIA dan HEWAN
 
La révolution mobile & tablette : êtes-vous prêt ?
La révolution mobile & tablette : êtes-vous prêt ?La révolution mobile & tablette : êtes-vous prêt ?
La révolution mobile & tablette : êtes-vous prêt ?
 

Similar to Successful change - good culture and governance matter Conference - Boris Lucic, London, 06 Oct 16

3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public
Richard B. Petch
 
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
JiWoon Yi
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
Webinar Critical Chain Project Management - Marris Consulting - June 2020
Webinar Critical Chain Project Management  - Marris Consulting - June 2020Webinar Critical Chain Project Management  - Marris Consulting - June 2020
Webinar Critical Chain Project Management - Marris Consulting - June 2020
MARRIS Consulting
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
Nada Sallam
 

Similar to Successful change - good culture and governance matter Conference - Boris Lucic, London, 06 Oct 16 (20)

Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)
Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)
Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)
 
The Real Reason That Projects Fail and How to Fix it - An Introduction to Cri...
The Real Reason That Projects Fail and How to Fix it - An Introduction to Cri...The Real Reason That Projects Fail and How to Fix it - An Introduction to Cri...
The Real Reason That Projects Fail and How to Fix it - An Introduction to Cri...
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public
 
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Management
 
Best Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit CrunchBest Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit Crunch
 
Fbe procurement event 23rd July 2015
Fbe procurement event 23rd July 2015Fbe procurement event 23rd July 2015
Fbe procurement event 23rd July 2015
 
FINLAY_A_KEITH_CV
FINLAY_A_KEITH_CVFINLAY_A_KEITH_CV
FINLAY_A_KEITH_CV
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
BBC - Better Business Cases - Foundation
BBC - Better Business Cases - FoundationBBC - Better Business Cases - Foundation
BBC - Better Business Cases - Foundation
 
Webinar Critical Chain Project Management - Marris Consulting - June 2020
Webinar Critical Chain Project Management  - Marris Consulting - June 2020Webinar Critical Chain Project Management  - Marris Consulting - June 2020
Webinar Critical Chain Project Management - Marris Consulting - June 2020
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
 
ned-presentation-project-management.pdf
ned-presentation-project-management.pdfned-presentation-project-management.pdf
ned-presentation-project-management.pdf
 
Alan Watt - APM Assurance SIG Conference 2018
Alan Watt - APM Assurance SIG Conference 2018Alan Watt - APM Assurance SIG Conference 2018
Alan Watt - APM Assurance SIG Conference 2018
 
S10 Organisations Software and Methodologies
S10 Organisations Software and MethodologiesS10 Organisations Software and Methodologies
S10 Organisations Software and Methodologies
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
 
david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...
 
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
The PMO Value - Emma-Ruth Arnaz-Pemberton | Project Challenge March 2018
 
ABB - Sustainable Procurement by Philip Juneau at GIB Summit
ABB - Sustainable Procurement by Philip Juneau at GIB SummitABB - Sustainable Procurement by Philip Juneau at GIB Summit
ABB - Sustainable Procurement by Philip Juneau at GIB Summit
 

More from Association for Project Management

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Association for Project Management
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
Association for Project Management
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Association for Project Management
 

More from Association for Project Management (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 

Recently uploaded

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 

Successful change - good culture and governance matter Conference - Boris Lucic, London, 06 Oct 16

  • 1. /06.02.12 1 Keeping collaborative delivery arrangements in focus and on course …a case of LBSR Boris Lucic EMBA CEng MICE RPP Programme Engineering Manager London Bridge Station Redevelopment
  • 2. /06.02.12 2 “The reality is that true collaboration is difficult. It requires subordinating individual goals to collective achievement.” Have you ever been accused of not being collaborative?
  • 3. /6-Oct-16 3 This story is based on true events… Strategy Development Strategy Execution Project Review and Interventions Where we are today
  • 4. /06.02.12 Thameslink - achievements and challenges 4  Transformational Change  Scale  Complexity  People  Communication London Bridge Station
  • 5. /06.02.12 Thameslink - achievements and challenges 5  Super critical milestones  Operational requirements take precedent  Cumulative complexity  Constrained site  Limited resources and supply chain pool Constraints
  • 6. /06.02.12 6 Success Criteria Safety Schedule Performance Cost Performance Quality Stakeholder Impact Operational Performance
  • 7. /06.02.12 7 Strategy in 2008  Early Works Contractor  Main Works Delivery Contractor  Detailed Design and Build  Early Contractor Involvement  Early Sub-contractor Involvement  Target Cost  Co-located organisation  One project identity-common brand  Minimise man ‘man-marking’  Collaborative, non-confrontational style  Risk approach to quality assurance  Multiple detailed design control points  Co-ordination and stakeholder management  Common IT platforms  Common document management system  One Schedule, one system ORGANISATION & BEHAVIOURS SYSTEMS PROCESSES PROCUREMENT
  • 9. /06.02.12 9 2011 2012 2013 2014 2015 2016 2017 2018 GRIP 4 ( OUTLINE DESIGN) GRIP 5 (DETAILED DESIGN) GRIP 6 – 8 (CONSTRUCTION - HANDBACK) Feb 2012 Main Works Contract Signature Target Cost Agreed Mar. Stage 1 Completion Early Works Contractor Sept.. Stage 1a Completion Jan. Stage 1 b Completion May. Stage CC Completion Jan. Stage2 Completion July. Stage 2A (2A#) Completion Apr.. Stage 3 Completion Sept. Stage 4 Compl. Strategy Execution
  • 10. /06.02.12 10 Commercial Model 60% / 40% £100.0M £0.0M Variable Fee Gainshare Target Cost Saving Total Cost TC + Fee £100.0M £40.0M
  • 11. /Date 00.00.00 Create your footer by changing copy in the Header and Footer section 11
  • 12. / Everything with people in mind 6-Oct-16 12
  • 14. /06.02.12 14 2011 2012 2013 2014 2015 2016 2017 2018 GRIP 4 ( OUTLINE DESIGN) GRIP 5 (DETAILED DESIGN) GRIP 6 – 8 (CONSTRUCTION - HANDBACK) Feb 2012 Contract Signature Supplemental Agreeement Project Review and Restructuring Mar. Stage 1 Completion Enabling Works Contract Sept.. Stage 1a Completion Jan. Stage 1 b Completion May. Stage CC Completion Jan. Stage2 Completion July. Stage 2A (2A#) Completion Apr.. Stage 3 Completion Sept. Stage 4 Compl. Schedule Performance
  • 15. /06.02.12 15 Commercial Performance 60% / 40% £100.0M £0.0M Variable Fee Gainshare Target Cost Saving Total Cost TC + Fee £100.0M £40.0M
  • 16. /6-Oct-16 16 UNDER ASSESSMENT OF COMPLEXITY POORLY DEFINED REFERENCE DESIGN, TOO SHORT TIME FOR DETAILED DESIGN COMPLEXITY POOR EFFICIENCY Pressure to Design to Budget Poorly defined Reference Design or late design decisions triggers cost growth The complexity of Major Projects is often intangible and not estimated Optimum bias about completion dates leads to minimal estimate of Prolongation CostGrowth Time constraints impacts Procurement & Construction quality inc Temporary Services & Finishes ESTIMATING DETAILED DESIGN CONSTRUCTION PROLONGATION FOR COMPLETION & QUALITY Optimism Bias Political Pressure Design & Construction Overlap Fixed Milestones Hand Back Drivers of tension in a constrained commercial model
  • 17. /Date 00.00.00 Create your footer by changing copy in the Header and Footer section 17
  • 18. /Date 00.00.00 Create your footer by changing copy in the Header and Footer section 18 Team Behaviours  No conflict  Commitment to project schedule delivery  More compromise than collaboration  Lack of challenge  Reporting with insufficient clarity to support effective management decisions  Light touch governance
  • 19. / What it means to collaborate? 6-Oct-16 19
  • 21. /08.06.15 21 RISKLow High Existing Incentivised Target Cost Guaranteed Maximum Price Commercial Model • No threat to balance sheet • Driving defensive behaviours • Upward pressure on target cost • Threat to balance sheet • Limited negotiating leverage • Potential increase in cost or fee due to risk transfer
  • 22. / 25% / 75% 60% / 40% 50% / 50% 40% / 60% £31.8M Target Cost £0.0M New Incentivisation Model Infrastructure Projects: Thameslink Programme 22 Employers Discretionary Gainshare Gainshare Target Cost Saving Total Cost TC + Fee £31.8M KRA Fee Lump Sum Fee Milestone Fee £5.0M £15.0M £25.0M Limited grounds for Target Cost adjustment No fee on Total Cost above Target Cost £0.0M 6-Oct-16
  • 23. / Take Aways Infrastructure Projects: Thameslink Programme Commercial Model aligns NR & Costain to achieve lowest cost delivery (business objective) Creates the environment required to achieve lowest cost delivery 6-Oct-16 23 Control Collaboration Capacity Capability • Deliver within agreed CP5 funding • Supply chain performance • Stable borrowing • VfM • Maintain a net cash balance at an appropriate level • Supply chain performance • Deliver shareholder value (adjusted profit before tax and dividend per share pence) Costain PLC Commercial Results IP Commercial Result • Reputation • Customer Satisfaction • Advocacy Joint Results • VfM
  • 24. / Thameslink Staff Briefing 18th September 2015 24  London Bridge Management Board – Executive Level  London Bridge Project Board  Programme Manager – project controls  Behavioural Specialist  Supply Chain Integration  Recognise strategic role of design management Leadership Review
  • 25. / Thameslink Staff Briefing 18th September 2015 25  Construction Management team  Stakeholder and Operational interface manager  GRIP 6-8 Design and Engineering Team  Independent Project Controls Manager  Strengthen NR Contract Administration  Design Management Design team Organisation Review
  • 26. / Thameslink Staff Briefing 18th September 2015 26 Behaviours Review  Independent consultant behavioural review across the project  Senior management behaviours review  Joint management behavioural workshop  Project wide briefings  Ongoing behavioural change support
  • 27. / Thameslink Staff Briefing 18th September 2015 27 Design Management NR Design Programme Manager MD level engagement within the design joint venture. Design summit to agree plan for process improvements and the determination of the overall long term design strategy. Control of amendment/revision of design has been enhanced.
  • 28. / Thameslink Staff Briefing 18th September 2015 28Thameslink Staff Briefing 18th September 2015 28 Project Controls  Independent Project Controls Manager  Restructuring of reporting requirements  Robust risk management  Accountability for budget management process  EWN process reinvigorated  Change Impact Assessment  Visualisation Room
  • 29. /06.02.12 Thameslink - achievements and challenges 29 Where we are today Areas Strengthened  Safety - 5 million man hours without major injuries  Design management - 860/901 PDS Requirements already evidenced  Cost performance – Stable contract value  Schedule performance – All milestones met  KPI Performance embedded  Behaviours – improved  Stakeholders Relationships - positive Opportunities for improvement  Independent project controls c be more effective  Change management could be more efficient  Commercial returns under pre
  • 30. /06.02.12 30  Risk profile dictates our options  Commercial model is central to collaboration  Take collaboration seriously – good intentions are not enough
  • 31. /06.02.12 31 Risk profile changes during the lifecycle of a project; therefore the commercial model needs to match this flux if effective collaborative arrangement is to be maintained.
  • 32. This presentation was delivered at an APM event To find out more about upcoming events please visit our website www.apm.org.uk/events