RA-01 Risk assessment 2-2 - logistic.docx
- 1. FRM-RA-01-REV 0
Telecom co
Risk Assessment Recording Form HRM & Logistic dept.
S = Severity P = Probability of occurrence R = Risk level = (S x L)
1 Low Simple defects in service / restart / acceptance override 1 Low Repeat the event of (1 - 2) once a year 1-2 Lower (Control measures)
2 Medium
large defects / Second Degree (Repeat customer
complaint) 2 Medium Repeat the event of (1 - 2) once a month 3-4 Medium (Control measures)
3 High The inability to meet the specific requirements (loss of
customers)
3 High Repeat the event of (1 - 2) once a week 5-9 Substantial (Critical Point)
2
/
2
Management team leader
#
Process stages
Risk Source Risk Results
Coefficient the
risk Risk Control
Remaining risk
Main Process stages and
equipment used
S P RL S P RL
R
1 الموارد مع االدارات عمل تسيهل
والتنسيق والمشتريات والمالية البشرية
بينهم فيما
تطبيق
بي ار االي نظام الفعالية زيادة 1 1 1 Apply ERP 1
2 للموظفين المالية المستحقات في التأخر
الطر اخالء او
ف
السيارات تسليم او
واالجراءات المالية القدرة الوظيفي الرضا نقص 1 1 1 1
3 اعمال تاخر
والتركيبات المشاريع دوائر
لعد
م
مواد وجود
المستودعات في
الموردين مستحقات بدفع التأخر مالي خصم 1 1 1 1
4 تكلفة ارتفاع
ال
صيانة اعمال من المساندة خدمات
للمب
اني
ولالجهزة
المعلومات لنظم الدعم وشركات
العمالة تكاليف زيادة مالية خسارة 3 1 3 العمالة عدد تخفيض 1
5 قد مما النسب وتحقيق للمهن التوطين قرارات
وتوقف للموظفين االقامات تجديد يوقف
انتاجيتهم
والقوانيين االنظمة الكافبة العمالة توفر عدم
بسبب التكلفة وزيادة
الجديدة التعيينات
2 2 4 عدد يادةزو ن ر
السعوديي ر
غي عدد تخفيض
ن ر
السعوديي
1
6 والتأخر الشركة إحتياجات في المستمر النقص
توفيرها في
وعدم الموردين سوق في الثقة انعدام
جدد موردين لتوفير اإلمكانية
االعمال انجاز عدم 2 2 4 الالزمة السيولة ر
توفي 1
7 المعرفة المعرفة نقل الخبرات قلة
خروج
الكفاءات ذو الموظفين
1 1 1
8 التنظيمي االداء االجرءات االداء ضعف 1 1 1
9 الفريق بروح العمل التنظيمية الثقافة االداء ضعف 1 1 1
Date: 1.2.2021 Administration HRM and logistic
departments
Responsible Risk assessment Responsible