SlideShare une entreprise Scribd logo
1  sur  50
C&ESS DEPARTMENT CONTRACT WORKS EFP-I
S No Name of Work
Estimated
Cost
Press
Advertisem
ent date
Date of
Opening
Work Done by Parties Target
Completion
Date Present StatusAFE Cost Lowest Cost
1
CONSTRUCTION OF
FOUNDATION FOR
REBOILER,
CONDENSATE POTS
& SOFTENING
UNITS AT UCH#II,
Distt: DheraBugti.
1.773
Million
22.08.2013
At 1130 hrs 30 days
Work executed
departmentally.
Tender cancelled.
2
Construction of Pre-
Drilling Engineering
Works for Zin PAB-2
(Zin#06), Distt. Dera
Bughti, Balochistan
51.738
Millions
27.10.201
3 11.11.2013 90 Days
work is in
progress.
3
CONSTRUCTION OF
PRE DRILLING CIVIL
WORK AT LOTI DEEP
# 01. DISTRICT DERA
BUGHTI,
BALUCHISTAN.
59.624
Millions
04.02.201
4 21.02.2014 90 days
LOI issued.
Contract
agreement
execution stage
4
CONSTRUCTIONS
OF PRE DRILLING
CIVIL WORK AT
WELL LOCATION ZIN
SML #04. DISTRICT
DERA BUGTI
BALOCHISTAN
54.031
millions
31.05.201
4 16.06.2014 60 days
After retender. Bid
advertised &
opened on
16.06.2014.
S No Name of Work
Estimate
d Cost
Press
Advertise
ment
date
Date of
Opening
Work Done by
Parties
Target
Completion
Date Present StatusAFE Cost
Lowest
Cost
5
CONSTRUCTIONS OF
PRE DRILLING CIVIL
WORK AT LOTI WELL
#19. DISTRICT DERA
BUGHTI,
BALUCHISTAN.
41.798
millions 04.04.201421.04.2014 60 days
LOI issued on
03.06.2014 and
contract
agreement to be
executed.
6
CONSTRUCTIONS OF
PRE DRILLING CIVIL
WORK AT WELL
LOCATION PIRKO
DEEP #01. DISTRICT
DERA BUGTI
BALOCHISTAN.
54.406
millions
28.04.14 60 days
LOI issued on
03.06.2014 and
contract
agreement to be
executed.
7
CONSTRUCTIONS OF
PRE DRILLING CIVIL
WORK AT LOTI#20.
DISTRICT DERA
BUGT BALOCHISTAN
41.798
millions 31.05.201420.06.2014 60 days
After retender.
Bid advertised &
opened on
20.06.2014.
CONSTRUCTIONS OF
PRE DRILLING CIVIL
WORK AT WELL
LOCATION PIRKO
#54. DISTRICT DERA
BUGTI
44.762
millions
Press advertised
on
23.04.2014.open
ed on 7.5.14 and
is under
management
C&ESS DEPARTMENT CONTRACT WORKS EFP-II
S No Name of Work
Estimate
d Cost
Press
Advertise
ment
date
Date of
Opening
Work Done by
Parties Target
Completio
n Date Present StatusAFE Cost
Lowest
Cost
1
Engineering works
for Sohniwala Well #
1 at Tehsil
Ahmedpur Distt.
Jhang
Rs.16
million
23.03.201
3
07.04.20
13 30 day Completed
2
Construction of
Metalled Road,
Boundary Wall &
cement Concrete
Stone Paving-
additional works for
Annxe at Regional
Office Multan,
District:Muzzafar
Gahr. 2.64 M
03.09.201
3
2/10/20
13 30 days
Work
Completed.
3
CONSTRUCTION OF
PRE DRILLING CIVIL
WORK AT KUP-I
(KULCHAS
E.L).DISTT: DERA
BUGTI
BALOCHISTAN
55
Million
31.08.201
3
16.09.20
13 45 days
Work is in
Progress.
Watch Towers,
culverts and
cause under
progress.
C&ESS DEPARTMENT CONTRACT WORKS EFP-III
S No Name of Work
Estimated
Cost
Press
Advertisem
ent date
Date of
Opening
Work Done by
Parties Target
Completion Date Present StatusAFE Cost Lowest Cost
1
Engineering works
for Jand well # 1
Distt. Attock
Rs.20
millions 24.03.2013 09.04.2013 28.05.2013 Completed
2
Construction Of One
R.C.C Underground
Water Reservior At
Water Source Near
Mela #1 Water
Point.Distt:Kohat 3.742 M 21.08.2013
06-09-2013
At 1130 hrs 90 days Completed.
3
Construction of Pre
Drilling Engineering
Works At Rajian-8
District Chakwal
Punjab 27 M 15.07.2013 15.08.2013 45 days Completed.
4
Supply of Utility
Water (170,000
liters per day) to
Nashpa Oil Plant and
Camps including Rig
N-2 at Nashpa Field 14.10 M 27.07.2013 22.08.2013 365 days Work in progress
5
Construction of Pre
Drilling Engineering
Works AT NASHPA-5
District Karak KPK
Rs:116.65
millions
04.02.14 45 days Work in progress
S
No Name of Work
Estimat
ed Cost
Press
Advertis
ement
date
Date of
Opening
Work Done by
Parties
Target
Completion
Date Present StatusAFE Cost Lowest Cost
6
Construction of
internal road at
chanda plant,
Distt: Kohat KPK.
3.364
Millions
01.11.20
13
18.11.201
3 45 Days Work in progress
7
Modification in
new store shed at
Dakhni Plant Well.
1.948
Millions
02.09.20
13
26-09-
2013 60 days Completed
8
Construction of
Engineering Works
Required For
Workover Job At
Rajian#2 District.
20.193
Millions
03.09.20
13 16.09.13 30 Days Completed.
9
CONSTRUCTION
OF FOUNDATION
FOR
INSTALLATION OF
WEIGH BRIDGE
NASHPA OIL FIELD 0.931 M
30.08.20
13
19.09.201
3 45 days Completed.
REPAIR OF
(0.8KMS) ROAD AT
RATTA MOHRA
RAJIAN OIL FIELD,
DISTRICT 2.232 14.12.20 30.12.201
S
No Name of Work
Estimated
Cost
Press
Advertisem
ent date
Date of
Opening
Work Done by Parties
Target
Completion
Date Present StatusAFE Cost Lowest Cost
11
CONSTRACTION OF
RCC WALL (LENGTH
816.RM) AT NASHPA
PLANT. DISTT:KARAK
14.387
Million 23.11.2013
10.12.201
3 60 days
60 % Completed.
Suspended due
to land problem
12
CONSTRACTION OF
FOUNDATION FOR
INSTALLATION OF
WEIGH
BRIDGE AT RAJIAN
OIL FIELD.
DISTRICT ATTOCK.
1.5
MILLION 09.01.2014
27.01.201
4 45 days 80 % Completed.
13
CONSTRUCTION OF
DYKE WALL AND P.
C.C HARD STANDING
FOR MELA CRUDE
STORAGE TANK
DISST:KOHAT, KPK.
1.854
Million 13.11.2013
28.11.201
3 45 days
Work completed.
Final bill payment
is under process.
14
Construction of
Engineering Works
Required For
Workover Job At
Mela#1 District.Kohat
KPK
25
Million 05.12.2013
21.12.201
3 30 days
Well started
flowing and
tender was
annulled after
approval for
award of work.
Construction of
Permanent Wire
Woven Mesh Fencing
at Nashpa#1 2.18 07.04.201
Work order
issued on
15.05.14. work in
S
No Name of Work
Estimated
Cost
Press
Advertise
ment date
Date of
Opening
Work Done by Parties
Target
Completio
n Date Present StatusAFE Cost Lowest Cost
16
Construction of
Permanent Wire
Woven Mesh
Fencing at Nashpa
#4 Well.Distt:Karak
2.62
Million 22.03.20
14
07.04.2
014 30 days
Work order issued on
15.05.14. work in
progress.
17
CONSTRUCTION OF
ENGINEERING
WORKS REQUIRED
FOR WORKOVER JOB
AT CHAK NAURANG
SOUTH # 1.DISTRICT
CHAKWAL
12.23
Million
11.01.20
14
23.01.2
013 30 days Completed.
18
CONSTRUCTION OF
UNDER GROUND
WATER STORAGE
TANK AT CHANDA
PLANT DISST:KOHAT,
KPK.
6.988
Million
09.01.20
14
28.01.2
014 45 days
Tender will be
opened on 25-05-
2014 at EFP-III. Under
management
approval.
19
Construction of Pre
Drilling Engineering
Works at Nashpa -6
District: karak, KPK
Rs:30.12
millions
30 DAYS
Case for contractor
scope of work is
being initiated for
press advertisement
from management.
S
No Name of Work
Estimate
d Cost
Press
Advertisemen
t date
Date of
Opening
Work Done by
Parties
Target
Completion
Date Present StatusAFE Cost
Lowest
Cost
20
HIRING OF DOZERS
(D-8K/D-
8N/KOMATTSU 155,
MODEL 2000 &
ABOVE) FOR
NASHPA-6 WELL,
DISTRICT KARAK,
KPK.
Rs: 2.00
million 3 months
Case approved by
management and LOI
to be issued.
21
CONSTRUCTIONS OF
PRE DRILLING CIVIL
WORK AT DAKHNI
DEEP WELL NO. 5
DISTRICT ATTOCK.
40.00
millions 03.04.2014 18.04.2014 45 days
Work order issued on
25.05.2014. problem
in land acquisition.
22
CONSTRUCTION OF
R.C.C HARD
STANDING FOR
INSTALLATION OF
20000 BPD
CAPACITY NEW
SEPARATION
BATTERY AT
NASHPA District:
Karak, KPK
Rs:2.855
millions
05.04.2014 24.04.2014 45 days
Work order issued on
_______ and work is
under progress.
C&ESS DEPARTMENT CONTRACT WORKS EFP-IV
S No Name of Work
Estimated
Cost
Press
Advertise
ment
date
Date of
Opening
Work Done by
Parties Target
Completion
Date Present StatusAFE Cost
Lowest
Cost
1
Engineering works
for Qadirpur HRL
well # 7 Distt. Ghotki
Sindh
Rs.18.00
millions
02.04.201
3
18.04.20
13
240 days after
award Completed
2
Engineering works
for Maru East Well #
1 at Distt. Ghotki
Sindh
Rs.36.31
millions
30.04.201
3
15.05.20
13
45 days after
award Completed.
3
Engineering works
for Qadirpur Well #
50 at Distt. Ghotki
Sindh
Rs.34.66
millions
05.06.201
3
20.06.20
13 30 days Completed
4
Construction of Pre-
Drilling Engineering
Works at QP-51
District Ghotki,
Sindh. 30 Millions
07.09.201
3
30.09.20
13 30 days Completed
5
Construction of Pre-
Drilling Engineering
Works at HRL #08
District Ghotki,
Sindh. 25 Millions
27.10.201
3
12.11.20
13 30 days Completed
S
No Name of Work
Estimated
Cost
Press
Advertisem
ent date
Work Done by
Parties
Date of
Opening
Target
Completio
n Date Present StatusAFE Cost Lowest Cost
6
Construction of Pre-Drilling
Engineering Works at QP-52
District Ghotki, Sindh.
35.693
Millions 07.09.2013 07.10.2013 30 days Completed.
7
CONSTRUCTION OF CIVIL
SYSTEM AT ERW PLATFORM
(QP-42,43,44) FOR SCADA
SYSTEM. DISTRICT GHOTKI,
SINDH.
1.645
Million
17.11.2013 04.12.2013 30 days Completed
8
Construction of Pre Drilling
Engineering Works at Well
Location Sara West Well #
05.District Ghotk
Rs.63.153
millions
60 days
bids will be
opened on
13.06.2014 agaist
retendering.
9
Construction of Pre Drilling
Engineering Works at Well
Location, Reti # 02. District
Ghotki.
Rs.42.44
millions
08.03.2014 26.03.2014 45 days
LOI issued on
30.05.14.
10 Construction of Pre Drilling
Engineering Works at Qdir
Pur Well # 53.
. District Ghotki.
Rs.25.727
millions
03.04.2014 21.04.2014 30 days
Work order
issued on
30.05.2014 and
work in progress.
11
REPAIR / MAINTENANCE OF
QADIRPUR INTERNAL
ROAD.DISTRICT : GHOTKI,
SINDH
Rs 14.231
millions
24.05.2014 09.06.2014 90 DAYS
case sent on
10.06.2014 for
management
approval by EFP-
IV.
C&ESS DEPARTMENT CONTRACT WORKS EFP-V
S No Name of Work
Estimated
Cost
Press
Advertisem
ent date
Date of
Opening
Work Done by
Parties
Target
Completio
n Date Present StatusAFE Cost Lowest Cost
1
Engineering works for
Jakhro West Well # 1
at Distt. Sanghar Sindh
Rs.25.00
millions 20.04.2013
06.05.201
3 120 days Completed
2
CONSTRUCTION OF
PRE DRILLING CIVIL
WORKS AT WELL
KUNNAR
DEEP#09.Distt:
Hyderabad. 23.00 M 24.07.2013
13.08.201
3 45 days Complted.
3
CONSTRUCTION OF
PRE DRILLING CIVIL
WORK AT WELL CHAK
DIM5#3. 32.00 M 24.07.2013
13.08.201
3 30 days Completed
4
Construction of Pre
Drilling Engineering
Works AT CHAK 25C-
1, District Sanghar,
Sindh. 32 Millions 13.08.2013
30.08.201
3 30 Days Completed
5
Construction of Pre-
Drilling Engineering
works at Manna-1
(Tay X-2), Distt.
Hyderabad, Sindh. 24 Millions 29.08.2013
13.09.201
3 45 Days Completed
S No Name of Work
Estimated
Cost
Press
Advertisem
ent date
Date of
Opening
Work Done By Parties
Target
Completio
n Date Present StatusAFE Cost
Lowest
Cost
6
CONSTRUTION OF
550RFT LONG RCC
SLUB CULVERT OVER
BOBI & SINJORO
PLANTS PIPE LINES
DISTRICT SANGHAR
SINDH.
3.645
Million 45 Days
Tender cancelled
before Press
Advertisement
7
CONSTRUCTION OF
WORK OVER JOB CIVI
WORKS AT CHAK 66
NORTH EAST # 01,
DISTRICT SHANGHER.
12.124
million 07.12.203
23.12.201
3 30 days
Work order
issued ______.
90 % Completed.
Waiting for rig.
8
Construction of Pre
Drilling Engineering
Works at Goth Patafi
Well # 01 (Hanif
Siddiqui # 1 District
Hyderabad
Rs.22.270
millions
21.12.2013
07.01.201
4 30 days Completed
9
Construction of Pre
Drilling Engineering
Works at Pasaki Deep
Well # 04 District
Hyderabad
Rs.23.050
millions
21.12.2013
09.01.201
4 30 days Completed
S No Name of Work
Estimate
d Cost
Press
Advertise
ment date
Date of
Opening
Work Done By
Parties
Target
Completi
on Date Present StatusAFE Cost
Lowest
Cost
10
CONSTRUCTIONS
OF PRE DRILLING
CIVIL WORK AT
WELL LOCATION
SOUTH EAST X -01.
(Pali Deep # 1)
DISTRICT TANDO
ALAHYAR, SINDH.
42.913
millions
27.03.201
4
11.04.20
14 45 days
LOI issued on
02.06.2014.
11
CONSTRUCTION OF
PRE DRILLING CIVIL
WORK AT WELL
LOCATION, SAAND
#02 DISTT: TANDO
ALLAH YAR. 39.446
12.03.201
4 26.03.14 45 days.
Work order
issued on
_______ work in
progress.
12
CONSTRUCTION OF
PRE DRILLING CIVIL
WORK AT WELL
LOCATION,KUNNER
#09 DISTRICT :
HYDERABAD.,
SINDH RS.31.205
15.05.201
4
30.05.20
14 30 days
Bids opened on
30.05.2014 and
is under
management
approval.
C&ESS DEPARTMENT CONTRACT WORKS FGCP-I
S No Name of Work
Estimated
Cost
Press
Advertise
ment date
Date of
Opening
Work Done By
Parties
Target
Completion Date Present StatusAFE Cost
Lowest
Cost
1
Hiring Services for
Pipeline
Construction work
for Uch-II
Development
Project
Rs.68.826
millions
15.03.201
3
30.03.20
13
17.06.2013 (60
days) Completed
2
Civil & Mechanical
Works for
Installation of Well
Head Assembilies
and Flow Line for 09
wells at Uch Gas
Field, Near Dera
Murad Jamali, Distt.
Bughti, Balochistan.
160
Millions
19.08.201
3
04.09.20
13 180 Days
55% work
copmleted.
3
Electrical and
Instrumentation
Works for Well Head
Facilities for 15 wells
at Uch Gas Field,
Near Dera Murad
Jamali, Distt. Bughti,
Balochistan.
80
Millions
19.08.201
3
04.09.20
13 90 Days
Work order is to
be used.
C&ESS DEPARTMENT CONTRACT WORKS FGCP-I
S No Name of Work
Estimate
d Cost
Press
Advertis
ement
date Date of Opening
Work Done By Parties Target
Completion
Date Present StatusAFE Cost
Lowest
Cost
1
Hiring Services for
Pipeline Construction
work for Uch-II
Development Project
Rs.68.82
6
millions
15.03.20
13 30.03.2013
17.06.2013
(60 days) Completed
2
Civil & Mechanical
Works for Installation
of Well Head
Assembilies and Flow
Line for 09 wells at
Uch Gas Field, Near
Dera Murad Jamali,
Distt. Bughti,
Balochistan.
160
Millions
19.08.20
13 04.09.2013 180 Days
55% work
copmleted.
3
Electrical and
Instrumentation
Works for Well Head
Facilities for 15 wells
at Uch Gas Field, Near
Dera Murad Jamali,
Distt. Bughti,
Balochistan.
80
Millions
19.08.20
13 04.09.2013 90 Days
Work order is
to be used.
C&ESS DEPARTMENT CONTRACT WORKS HEAD OFFICE
S
No
Name of Work Estimate
d Cost
Press
Advertise
ment
date
Date of
Opening
Work Done By
Parties
Target
Completio
n Date
Present Status
AFE Cost
Lowest
Cost
1 Construction of
Admin building,
warehouses &
security office
building (Contract C-
1), near Kunnar Oil
Field Distt.
Hyderabad Sindh
Rs.66.70
millions
08.09.201
3
08.10.2013 240 days Management approval
accorded and LOI issued
by SCM department on
28.05.2014 .
2 Construction of
workshop offices,
MPE&I workshop,
safety & Firefighting
Building (Contract C-
2), Laboratory near
Kunnar Oil Field Distt.
Hyderabad Sindh
Rs.48.40
millions
08.09.201
3
08.10.2013 240 days Contract Agreement
Execution Stage.
3 Construction of
Officer's Houses (C-1)
at Sinjhoro Plant
Distt. Sanghar Sindh
Rs.89.61
9
millions
22.3.2014 26.03.2014 240 days Case deferred by
Procurement Committee.
Caravan as alternate
option suggested by PC.
4 Construction of
Assistant's Houses (C-
II) at Sinjhoro Plant
Distt. Sanghar Sindh
Rs.63.00
millions
11.05.201
3
27.06.2013 240 days Case deferred by
Procurement Committee.
Caravan as alternate
option suggested by PC.
S
No
Name of Work Estimated
Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Completion
Date
Present Status
AFE Cost
Lowest
Cost
5 Construction of
Officer's Houses (C-
1) at Uch Gas Field
for Uch-II
Rs.87.00
millions
08.09.2
013
09.10.20
13
365 days Annulled and Case for
Caravans to be processed
by Admin Deptt.
6 Construction of
Boundary wall at Jhal
Magsi Distt. Mera
Murad Jamali
Rs.28.00
millions
08.08.2
013
10.09.20
13
120 days Word order issued on
08.04.2014 and
contractor is to mobilize
yet.
7 Construction of
Officer's House &
Infrastructure Works
at Tando Alam Sindh
Rs.75.00
millions
28.07.2
013
28.08.20
12
21.07.2013
(365 days)
Annulled and Case for
Caravans to be processed
by Admin Deptt.
8 Construction of Govt.
Rural Dispensary
(Social Welfare
Scheme), Village
Dhayala, Teh. Dina,
Distt. Jhelum,
Punjab.
Rs.4.765
M
06.06.2
0113
10.07.20
13
240 days Work under construction.
9 Construction of
Waste Pit & Skimmer
Tank at Kal Oil Field
Distt. Chakwal
Rs.3.898
millions
06.06.2
013
08.07.20
13 60 days
Work order issued on
14.03.2014. Work under
construction.
S
No
Name of Work Estimat
ed Cost
Press
Adverti
sement
date
Date of
Opening
Work Done By
Parties
Target
Compl
etion
Date
Present Status
AFE Cost
Lowest
Cost
10 Construction of
Assistant's Houses
(C-2) at Uch Gas
Field Uch-II
Rs.87.00
millions
06.06.2
013
09.07.201
3
365
days
Annulled and Case for
Caravans to be processed by
Admin Deptt.
11 Construction of
Worker's Houses (C-
3) at Uch Gas Field
Uch-II
Rs.87.00
millions
06.06.2
013
09.07.201
3
365
days
Annulled and Case for
Caravans to be processed by
Admin Deptt.
12 Up-gradation of
Pasaki Facility Road
from Hyderabad to
Mirpur Khas main
Road to new
constructed Kunnar
Plant Road
Rs.59.00
millions
06.06.2
013
04.07.201
3
180
days
Work order issued on
03.06.2014 Work is under
construction.
13 Construction of
Foundation for
Dehydration Plant
at Bobi
Rs.4.22
millions
06.06.2
013
04.07.201
3
30
days
Work order issued on
10.03.2014 and work is
under construction.
14
Renovation of OGTI
Hostel I-9 Islamabad
Rs.1.986
millions
27.07.2
013
30-08-
2013
60
days
After obtaining expenditure
approval from ED(Petroserv)
case submitted to SCM deptt
on 28.01.2014 for further
processing.
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Completio
n Date
Present Status
AFE
Cost
Lowest
Cost
15 Construction of PCC
courtyard & fixing of
Fiber Glass shed at
Masjid Chanda Plant
Rs.1.26
millions
28.07.20
13 27.08.2013 60 days
Sent for annullment on
14.03.14 due to expiry of bid
validity.
16 Construction of
Prefabricated worker
houses at Sinjhoro (C-
3) using SCIP
Rs.84.00
millions
28.07.20
13
27.082013 240 days Case deferred by
Procurement Committee.
Caravan as alternate option
suggested by PC.
17 Construction of Offices
& other allied building
at Bahu Well-2
Rs.10.03
millions
15.10.20
13 21.11.2013 240 days
Deffered by Procurement
Committee due low
production life of Bahu.
18 Construction of new
workshop shed at
Dakhni Plant
Rs.15.51
millions
15.10.20
13
25.11.2013 240 days Financial Evaluation done and
uploaded on 02.06.2014.
19 Construction of Hard
standing bath/wash
room & canteen for
ATA at Qadirpur
Rs.7.943
millions
15.10.20
13
28.11.2013 90 days annulled on 15.04.14 due to
no participation by bidders.
Fresh case is being prepared.
S
No
Name of Work Estimat
ed Cost
Press
Advertise
ment date
Date of
Openin
g
Work Done By
Parties
Target
Completio
n Date
Present Status
AFE
Cost
Lowest
Cost
20 Repair of Road from
Sohbatpur to Uch Plant
Rs.16.3
66
millions
28.07.2013 28.08.2
013
At 1130
hrs
90 days Work order issued on
_______. Work is under
construction.
21 Extension of Police Check
Post (changla wall Maue
Dariya) Near well No 3 at
Dakhni field
1.663
M
15.10.2013 18.11.2
013
60 days Contract Agreement
prepared and submitted to
SCM on 13.04.2014.
22 CONSTRUCTION OF
REGIONAL COORDINATOR
PRE FAB STRUCTURE
OFFIC I/C SEWRAGE
SYSTEM.DISTT:
HYDERABAD.
8.103
M
240 days Pended.
23 Costruction of 12 rooms &
27 bathrooms at Qadir Pur
Gas Field.
Distt:Ghotki Sindh.
10.86
M 08.08.2013
09.09.2
013 240 days
Annulled on 28.04.14 and
fresh case to be intiated for
re-tendering.
24 Construction of
Permanent Wire Woven
Mesh Fencing at Nashpa
#3 Well.Distt:Karak
1.532
M 08.09.2013
07.10.2
013
At 1130
hrs 30 days
Annulled due to expiry of
bid validity and case for
approval through Field
Tender is in process.
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
25 Engineering Works for
Bahu Wells #5,6,7 & 8
platform High Rising
at Bahu Gas Field,
Tehsil ahmad pur sial,
Distt: Jhang.
209.713
M
08.09.20
13
07.10.2013 365
days
Annulled on 11.04.14 due to
expiry of bid validity and case is
sent to user deptt to confirm if
the requirement still exists.
26 Hiring of vehicles for
Field Units of C&ESS
department OGDCL,
Islamabad
25.68 M 180
days
Case file lost at SCM deptt and
sent again on 12.05.14 to SCM
deptt for press advertisement.
27 CONSTRUCTION OF
FOUNDATION FOR
REBOILER,
CONDENSATE POTS &
SOFTENING UNITS AT
UCH#II,
Distt: DheraBugti.
1.773
Million
22.08.2013
At 1130
hrs
30 days Work executed departmentally.
Tender cancelled
28 CONSTRUCTION OF
UNDER GROUND
ROOM FOR HSD
STORAGE TANK AT
OGDCL HEAD OFFICE
ISLAMABAD.
1.13
Millions
02.08.20
13
20.08.2013 30 Days Work order issued on 14.05.14
and contractor mobilized but
change in site is under
consideration.
29 Construction of RCC
water pond at Nashpa
3.861
millions
15.10.20
13
27.11.2013 90 Days Contract Agreement prepared
and submitted to SCM on
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
30 Supply and fixing of
geo membrane sheet
0.50 mm thick at
effuluent water pits at
Dakhni, Distt. Attock
10.856
Millions
15.10.2
013 22.11.2013 30 days
Resubmitted to SCM
Departement on 21.o5.2014for
Retendering.
31 Construction of Civil
Works for 09 Wells for
Sinjhoro Gas field,
Distt. Sanghar, Sindh.
12.542
Millions
15.10.2
013
20.11.2013 90 Days After obtaining expenditure
approval from ED(Petroserv)
case submitted to M(S & FA) for
AFE No.
32 Construction of
Internal Road at
Nashpa Plant, Distt.
Karak, KPK
4.138
millions
04.01.2
014
06.02.2014 45 Days Contract Agreement prepared
and submitted to SCM on
13.04.2014.
33 Construction of Soldier
Room, Toilet, Bath
Kitchen For FC Post at
Uch Dera Bugti
Balochistan.
1.011
Millions
60 days Case returned to SCM on
22.05.2014 for retendering.
34 Hiring of Consultancy
Services for
Residential Camp at
Nashpa
Nil 30.09.2013 75 days.Case returned to SCM on
30.09.2013. with soft copy of
TOR
35 Pre-qualification /
enlistment of
contractors for PDEWs
Nil Nil Sent to GM (SCM) for on
25.11.2013.
S No Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
36 Construction of BMP
Posts in Tribal area
Ranjanpur, Distt:
Ranjanpur.
2.564
Million
45 days Completed departmental.
37 CONSTRUCTION OF
REPAIR OF ROAD
FROM JAND TO
CHOWK SHAHEEDAN
4.3 KM AT DAKHNI
FIELD
27.11.2
013
26.12.2013 90
DAYS
Case approved by Procurement
Committee on 10.06.2014.
87 Construction of BMP
Posts in Trible area
Ranjanpur, Distt:
Ranjanpur.
Rs.2.564 60 days Completed through party
resources.
39 CONSTRACTION/EXTE
NSION IN EXISTING
SOCIAL WELFARE
DISPENSERY AT
RAJIAN OIL FIELD,
Punjab
0.965
Million
26.01.2
014
26.02.2014 30 days Financial Evaluation done and
uploaded on 06.06.2014.
40 INSTALLATION OF
UNDER GROUND
POWER SUPPLY
SYSTEM AT KOT
SARANG Distt:
3.12
million
60 days Original case file lost. Bid
documents prepared and
approval is being sought again
for execution.
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
41 CONSTRUCTION OF
SOCIAL WELFARE PUBLIC
DOSPENSARY LPG PLANT
AT BOBI OIL FIELD,
DISTRICT SANGHAR
SINDH.
12.983
Million
180
days
BOQ prepared and bid
documents are under
preparation.
42 EXTENSION OF EXISTING
SOCIA WELFARE
DISPENSARY AT KUUNAR
OIL FEILD.
5.4
Million
26.01.20
14
04.03.2014 180
days
Technical Evaluation done on
12.05.14 and sent to SCM for
Financial opening / annullment.
43 CONSTRUCTION OF
PRODUCED WATER PIT,
BOUNDARY WALL AND
ALLIED CIVIL WORKS
OUTSIDE CHANDA
PLANT PREMISES.
15.429
Million
26.01.20
14
03.03.2014 120
days
Retendered on 07.05.2014 and
will be opened on 29.06.14.
44 Raising & Strengthening
of OGDC Bund at
Qadirpur Gas Field
District Ghotki Province
Sindh.
171
million
04.01.20
14
04.01.2014 120
days
To be presented in P & FC for
approval of award on
11.06.2014
45 CONSTRACTION OF 10
NO. NEW ROOMS IN
WORKER CAMP AT
LOGISTIC CAP
8.422
million
180
days
Sent to SCM Deptt for Press
Advertisement
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
46 IMPROVEMENT OF
WATER SUPPLY SCHEME
IN THE AREA OF KAL OIL
FIELD.
DISTRICT CHAKWAL,
PUNJAB
Rs 0.65
millions
15.02.20
14
21.03.2014 30 days To be done departmentally on
quotation basis within PPRA
limits.
47 CONSTRUCTION OF OH
WATER TANK AND CAR
PARKING AT CHANDA
PLANT.
5.267
Million
75 days Bid opened on 28.05.2014. Case
awaited from SCM for Technical
Evaluation.
48 CONSTRUCTION OF 02
NO.CLASS ROOMS WITH
VERANDAH FOR
GOVT.PRIMARY SCHOOL
ALWARGI BANDA AT
NASHPA .
1.125
Million
90 days Technical Evaluation done on
09.04.14 and sent to SCM for
Financial opening.
49 CONSTRUCTION OF
METALLED ROAD
(45.657 Kms) FROM UCH
PLANT TO UPL DERA
MURAD JAMALI
DISTRICT DERA BUGHTI,
PROVINCE
BALUCHISTAN.
868.27
million
22.02.20
14
24.03.2014 18
months
Annulled due to poor response
and case is being sent for press
advertisement for retendering.
S No Name of Work Estimated
Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Complet
ion Date
Present Status
AFE Cost
Lowest
Cost
509 CONSTRUCTION OF
REPAIR OF ROAD FROM
TANDO MURREE TO
TANDO ALAM # 15 BASE
CAMP
Rs 2.45
millions
26.01.20
14
28.02.2014 30 days Technical Evaluation done on
12.05.14 and sent to SCM for
Financial opening.
51 Repair Maintenance of 01
km Road, Mohri Rajgan to
Chak Tareda Under Social
Welfare. Tehsil Sohawa.
1.297
Million
04.01.20
14
10.02.2014 45 days Financial Evaluation done and
uploaded on 06.06.2014.
52 SUPPLY & INSTALLATION
& COMMISSIONING OF
DOUBLE GATE SYSTEM,
HYDRAULIC ROAD
BLOCKER & HYDRAULIC
BARRIER AT NASHPA
DISTRICT KARAK KPK.
Rs 4.10
millions
27.02.20
14
03.04.2014 60 days Technical Evaluation done on
11.04.2014. letter to sent to
bidder for withdrawal of
exceptions / deviations. Financial
opening awaited.
53 CONSTRUCTION OF 03
NOS PICKETS WITH
ATTACH BATH, KITCHEN
& TOILETS FOR PHASE-II
FC PICKETS AT UCH-II GAS
FIELD.
DISTRICT DERA BUGTI
BALUCHISTAN
Rs 2.518
millions
45 days Financial Evaluation done on
13.05.14 and case is with SCM for
further processing.
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Completi
on Date
Present Status
AFE
Cost
Lowest
Cost
48 CONSTRACTION OF
P.C.C HARD STANDING
FOR STOCK MATERIALS
AT NASHPA DISTRICT
KARAK,KPK.
Rs 0.716
millions
26.01.2
014
27.02.201
4
30 days Expenditure approval
obtianed and AFE No alloted
on 13.05.14. Financial
evaluation done and
uploaded on web 30.05.14.
56 Construction Of Police
Picket At Sinjhoro Plant
Gate District Sanghar.
Rs 1.602
millions
09.04.2
014
09.05.201
4
45 days Technical Evaluation done
and Financial opening is on
16.06.2014.
54 Raising of Sales Gas
ROW at Nashpa (1.5
km)
Distric karak, kpk.
Rs 4.45
millions
45 days Technical Evaluation done
and uploaded on 09.06.2014.
51 EARTH FILLING,
CONSTRUCTION OF
ONE WAY ROAD AND
PARKING SHED AT
NASHPA PLANT. DISTT:
KARAK, KPK
Rs
19.106
millions
15.02.2
014
20.03.201
4
120 days Received for endorsement of
Executive Summary on
11.06.2014.
55 CONSTRUCTION OF
COMPUTER ROOM FOR
WEIGHING BRIDGE AT
NASHPA PLANT. DISTT:
Rs 0.934
millions
60 days work in progress as an
additional work through the
same contractor for weigh
bridge.
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
56 CONSTRUCTION OF
HARD STANDING
FOUNDATION AREA OF
LOGISTIC WORKSHOP AT
LOGISTIC CAMP
KOTSARANG.DIST:
CHAKWAL, PUNJAB
Rs 16.06
millions
22.02.20
14
25.03.2014 30 days Technical Evaluation done on
07.04.2014 and case sent to SCM
for Financial Opening.
57 CONSTRUCTION OF
WATER TANK FOR
DRINKING PURPOSE FOR
LOCALS AT TANDO ALAM
OIL COMPLEX
Rs 0.816
millions
09.04.20
14
08.05.2014 60 days Technical Evaluation done on
21.05.2014 and sent to SCM
deptt for Financial Evaluation.
58 Feasibility Study Of
Existing Ogdcl Office
Building Office Building
Masood Mansion At F-8
Markaz For Addition Of
New Floors For
Gymnasium And
Design/Consultancy
Services For The
Improvement Measures
And Proposed
Gymnasium Thereof millions
16.04.20
14
16.05.2014 90 days Received on 28.05.14 for
Technical Evaluation.
S
No
Name of Work Estimated
Cost
Press
Adverti
sement
date
Date of
Openin
g
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
59 CONSTRUCTION OF ROW
31.05 KM FOR JAKHRO
WELL-1
DISTRIC: KHAIRPUR
,SINDH
30.953
million
45 days Press advertised.Bid will be
opened on 23.06.2014.
60 CONSTRUCTION OF 02
NOS. PRODUCTION
STORAGE SHED & HARD
STANDING AT NASHPA
PLANT. DISTT: KARAK, KPK
45.68
million
240
days
Sent to PTO (Mech) on 06.06.14
for Budget allocation.
61 CONSTRUCTION OF CIVIL
WORKS FOR FIELD
DEVELOPMENT AT WELL
LOCATION DACHRA PUR #
02 .DISTT: HYDERABAD,
SINDH.
2.41
million
30 days Technical Evaluation done on
02.06.2014 and sent for
Financial Opening.
62 REPAIR/MAINTENANCE OF
ROAD FROM REHMAT GAS
FIELD TURN TO ANWAR
ABAD. DISTT: GHOTKI
Rs 25.327
millions
60 days Sent to SCM Deptt on 08.05.14
for Press Advertisement.
63 CONSTRUCTION OF GEO-
MEMBRANE LINING FOR
PRODUCED WATER PIT AT
QADIR PUR PLANT..
2.445
million
30 days Bid documents are being
prepared.
S
No
Name of Work Estimated
Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Complet
ion Date
Present Status
AFE Cost
Lowest
Cost
64 RAISING OF APPROACH
ROAD AT QADIRPUR#35.
DISTRICT : GHOTKI,
SINDH
2.969 45 days Bid documents prepared. Budget
allocated by QP JV and file
received in (E.O) South Section on
05.05.14. Case is to be sent to
SCM for press advertisement.
65 CONSTRUCTION OF
RAISED PLATFORM AT
HRL-2. DISTRICT GHOTKI,
SINDH
27.56
million 90 days
Press advertised. Bids will be
opened on 24.06.2014.
66 CONSTRUCTION OF
RAISED PLATFORM AT
HRL-7. DISTRICT GHOTKI,
SINDH
27.55
million 90 days
Bid opened on 10.06.2014 and
case awiated from SCM deptt for
Technical Evaluation.
67 RAISING OF APPROACH
ROAD AT QADIRPUR#48.
DISTRICT : GHOTKI,
SINDH
5.11
million
45 days Bid documents prepared. Budget
allocated by QP JV and file
received in (E.O) South Section on
05.05.14. Case is to be sent to
SCM for press advertisement.
68 CONSTRUCTION OF ROAD
FROM DISPENSARY TO
WELL NO.6 (ABOUT 7
KM) AT DAKHNI PLANT
WELL.
DISTRICT: ATTOCK.
35.088
150
days
Press advertised on 16.05.2014
and bids will opened on
25.06.2014.
S
No
Name of Work Estimated
Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Complet
ion Date
Present Status
AFE Cost
Lowest
Cost
69 CONSTRUCTION OF
RAISED PLATFORM AT
QADIRPUR#50.
DISTRICT : GHOTKI,
SINDH
27.56
million
45 days Bid documents prepared. Budget
allocated by QP JV and file
received in (E.O) South Section on
05.05.14. Case is to be sent to
SCM for press advertisement.
70 CONSTRUCTION OF
RAISED PLATFORM AT
QADIRPUR#45.
DISTRICT : GHOTKI,
SINDH
27.56 45 days Bid documents prepared. Budget
allocated by QP JV and file
received in C&ESS on 06.05.14.
Case is to be sent to SCM for
press advertisement.
71 CONSTRUCTION OF
RAISING OF APPROCH
ROAD AT QADIRPUR#50.
DISTRICT : GHOTKI,
SINDH
3.39
million
45 days Bid documents prepared. Case is
with (E.O)South Section for
budget arrangement.
72 CONSTRUCTION OF
RAISING OF APPROACH
ROAD AT QADIRPUR#31.
DISTRICT : GHOTKI,
SINDH
6.10
million
45 days Bid documents prepared. File is
with (E.O)South section and is
being sent to JV Accounts for
budget allocation.
S
No
Name of Work Estimated
Cost
Press
Advert
iseme
nt
date
Date of
Opening
Work Done By
Parties
Target
Complet
ion Date
Present Status
AFE
Cost
Lowest
Cost
73 CONSTRUCTION OF STORE
SHED FROM RETERIEVED
MATERIAL OF TOOT AT
DAKHNI PLANT DISTRICT
ATTOCK, PUNJAB.
4.56
million 90 days
Bids opened on 06.06.2014 and
case awaited from SCM deptt for
Technical Evaluation.
74 CONSTRUCTION OF
METTALED ROAD FROM
BASIC HEALTH UNIT TO
AYUB LAKHAN TO
GOVERNAMENT HIGH
SCHOOL AYUB LAKHAN.
1.337
million
60 days Sent to SCM Deptt on 22.05.14 for
Press Advertisement.
75 CONSTRACTION OF
RAISING OF APPROCH
ROAD AT QADIRPUR#41.
DISTRICT : GHOTKI, SINDH
4.18
million
45 days Bid documents prepared. File is
with (E.O)South section and is
being sent to JV Accounts for
budget allocation.
76 Construction of Foundation
and Dyke Walls for Crude
Storage Tanks at Rajian
Well # 05
1.25 05.05.
2014
02.06.2014 Bids opened on 02.06.2014 and
case awaited from SCM deptt for
Technical Evaluation.
77 CONSTRACTION OF RAISED
PLAT FORM AT
QADIRPUR#38/39.
DISTRICT : GHOTKI, SINDH
37.67
million
45 days Confirmation of Budget allocation
is in Process
S
No
Name of Work Estimate
d Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
78 RAISING OF APPROACH
ROAD AT QADIRPUR#
11.
DISTRICT : GHOTKI,
SINDH
1.55
million
45 days Confirmation of Buget
allocation is in Process
79 RAISING OF APPROACH
ROAD AT QADIRPUR
DEEP#1 .
DISTRICT : GHOTKI,
SINDH
14.87
million
45 days Sent to SCM deptt on
06.06.2014 for Press
advertisement.
80 RAISING OF APPROACH
ROAD AT QADIRPUR#
45.
DISTRICT : GHOTKI,
SINDH
6.19
million
45 days Sent to SCM deptt on
06.06.2014 for Press
advertisement.
81 CONSTRACTION OF
RAISED PLAT FORM AT
QADIRPUR DEEP #01.
DISTRICT : GHOTKI,
SINDH
27.79
million
45 days Sent to SCM deptt on
06.06.2014 for Press
advertisement.
S No Name of Work Estimat
ed Cost
Press
Advertis
ement
date
Date of
Opening
Work Done By
Parties
Target
Comple
tion
Date
Present Status
AFE
Cost
Lowest
Cost
86
CONSTRACTION OF
RAISED PLAT FORM
AT QADIRPUR#48.
DISTRICT : GHOTKI,
SINDH 27.56
million 45 days
Bid documents prepared.
Budget allocated by QP JV and
file received in (E.O) South
Section on 05.05.14. Case is to
be sent to SCM for press
advertisement.
87 CONSTRACTION OF
RAISED PLAT FORM AT
QADIRPUR#46.
DISTRICT : GHOTKI,
SINDH
Rs
27.56
millions
45 days Budget allocated by QP JV
department. Case is with
(E.O)South Section.
PRE-DRILLING ENGINEERING WORKS AT EFP-3 DURING JUNE 2013 TO JUNE 2014
S.No Description
Approv
ed Cost
EFP-3 input
Remarks
Earh Work
Water Supply
System
Misc.Works
Appro
ach
Road
Preparati
on of
Well
location
Mud Pit
Additional
Mud Pit
Establi
shmen
t
Water
required for
drilling
Operation
Electric
al
Works
Plumbing
&
Sanitary
Works
Total
amount
MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs
1 PDCW at Jund-1 53.959 2.00 3.50 3.00 4.00 2.00 22.50 0 0 37.00
2 PDCW at Soghari-1 22.557 1.00 2.00 3.00 4.00 1.00 13.50 0.5 0.2 25.20
3 PDCW at Mela-4 39.856 4.00 5.00 4.00 3.00 1.00 22.50 0.5 0.2 40.20
4 PDCW at Rajian-7 23.505 1.50 3.00 4.00 3.00 1.00 13.50 0.5 0.2 26.70
5 PDCW at Rajian-8 60.100 2.00 4.00 4.00 5.00 0.00 18.00 33.00
6
Work over job at
Rajian-2 20.193 3.00 0.00 0.00 7.00 10.00
7 PDCW at Nashpa-5 99.850 12.00 24.00 2.00 0.00 0.00 0.00 0 0 38.00
8
PDCW at
Surqamar-1 25.00 25.00
9 PDCW at Kurrum-1 28.555 1.00 1.00 3.00 0.00 0.50 13.50 19.00
WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-3 DURING JUNE 2013 TO JUNE 2014
S.No Fields/ Plants Water Source
Water required for Operational
activities of Plants/ Fields
Remarks
Million Rupees
1
Chanda Plant/
Mela Plant
Mela Water Point situated in hilly
area ≈25 km away from Chanda
Plant 28.640
2
Missa Kaswall
Field
from local near by Nallah
4.091
3 Rajian Oil Field from Chohan Nallah 12.274
4 Sadqal Oil Field
Sadqal Water Point situated at
Shah pur Dam 10.229
REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013
TO JUNE 2014
S.No Approach Road Maintenance by EFP-3 Remarks
MRs
1
From Well
Nashpa-1,2,3,4
2.50
2
From Well Mela-
1,2,3,4
3.00
3
Road near
Tharraly Bridge
0.50
EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-3 DURING JUNE2013
TO JUNE 2014
S.No DESCRIPTION
Earth Work
Remarks
MRs
1
ROW for SNGPL Gas Pipe line
from Nashpa Plant
1.500
2
Restoration of Mud Waste Pit
at Nashpa-2
1.000
3
Restoration of Mud Waste Pit
at Nashpa-3
1.000
4
Leveling of Hilly area at Plant
for Loading Gantry and double
Road
15.00
5
Effulent Water Pits (3No) at
Dakhni Plant
0.900
6
Leveling of Store Area at
Dakhni Plant
0.500
PRE-DRILLING ENGINEERING WORKS AT EFP-1 DURING JUNE 2013 TO JUNE 2014
S.No Description
Approved
Cost
EFP-31input
Remarks
Earh Work
Water Supply
System
Misc.Works
Appro
ach
Road
Preparati
on of
Well
location
Mud Pit
Additional
Mud Pit
Establi
shmen
t
Water
required for
drilling
Operation
Electric
al
Works
Plumbing
&
Sanitary
Works
Total
amount
MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs
1
2
3
4
5
6
7
8
9
WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-1 DURING JUNE 2013 TO JUNE 2014
S.No Fields/ Plants Water Source
Water required for Operational
activities of Plants/ Fields
Remarks
Million Rupees
1
2
3
4
REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013
TO JUNE 2014
S.No Approach Road Maintenance by EFP-1 Remarks
MRs
1
2
3
EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-1 DURING JUNE2013
TO JUNE 2014
S.No DESCRIPTION
Earth Work
Remarks
MRs
1
2
3
4
5
6
PRE-DRILLING ENGINEERING WORKS AT EFP-2 DURING JUNE 2013 TO JUNE 2014
S.No Description
Approved
Cost
EFP-2 input
Remarks
Earh Work
Water Supply
System
Misc.Works
Appro
ach
Road
Preparati
on of
Well
location
Mud Pit
Additional
Mud Pit
Establi
shmen
t
Water
required for
drilling
Operation
Electric
al
Works
Plumbing
&
Sanitary
Works
Total
amount
    MRs MRs MRs MRs MRs MRs MRs MRs MRs   MRs  
1
2
3
4
5
6
7
8
9
WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-2 DURING JUNE 2013 TO JUNE 2014
S.No Fields/ Plants Water Source
Water required for Operational
activities of Plants/ Fields
Remarks
      Million Rupees  
1  
2  
3  
4  
       
REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013
TO JUNE 2014
S.No Approach Road Maintenance by EFP-2 Remarks
  MRs  
1
 
2
 
3
 
EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-2 DURING JUNE2013
TO JUNE 2014
S.No DESCRIPTION
Earth Work
Remarks
MRs
1
2
3
4
5
6
PRE-DRILLING ENGINEERING WORKS AT EFP-4 DURING JUNE 2013 TO JUNE 2014
S.No Description
Approved
Cost
EFP-4 input
Remarks
Earh Work
Water Supply
System
Misc.Works
Appro
ach
Road
Preparati
on of
Well
location
Mud Pit
Additional
Mud Pit
Establi
shmen
t
Water
required for
drilling
Operation
Electric
al
Works
Plumbing
&
Sanitary
Works
Total
amount
    MRs MRs MRs MRs MRs MRs MRs MRs MRs   MRs  
1
2
3
4
5
6
7
8
9
WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-4 DURING JUNE 2013 TO JUNE 2014
S.No Fields/ Plants Water Source
Water required for Operational
activities of Plants/ Fields
Remarks
      Million Rupees  
1  
2  
3  
4  
       
REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013
TO JUNE 2014
S.No Approach Road Maintenance by EFP-4 Remarks
  MRs  
1
 
2
 
3
 
EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-4 DURING JUNE2013
TO JUNE 2014
S.No DESCRIPTION
Earth Work
Remarks
MRs
1
2
3
4
5
6
PRE-DRILLING ENGINEERING WORKS AT EFP-5 DURING JUNE 2013 TO JUNE 2014
S.No Description
Approved
Cost
EFP-5 input
Remarks
Earh Work
Water Supply
System
Misc.Works
Appro
ach
Road
Preparati
on of
Well
location
Mud Pit
Additional
Mud Pit
Establi
shmen
t
Water
required for
drilling
Operation
Electric
al
Works
Plumbing
&
Sanitary
Works
Total
amount
    MRs MRs MRs MRs MRs MRs MRs MRs MRs   MRs  
1
2
3
4
5
6
7
8
9
WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-5 DURING JUNE 2013 TO JUNE 2014
S.No Fields/ Plants Water Source
Water required for Operational
activities of Plants/ Fields
Remarks
      Million Rupees  
1  
2  
3  
4  
       
REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013
TO JUNE 2014
S.No Approach Road Maintenance by EFP-5 Remarks
  MRs  
1
 
2
 
3
 
EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-5 DURING JUNE2013
TO JUNE 2014
S.No DESCRIPTION
Earth Work
Remarks
MRs
1
2
3
4
5
6
Financially Highlight of-
Total Works Done, EFP’s
FY 2013-14
1 EFP-I
2 EFP-II PAK Rs. 300.o1 Million
3 EFP-III  PAK Rs. 347.83 Million
4 EFP-IV
5 EFP-V
6 FGCP-I
7 FGCP-II

Contenu connexe

Tendances (15)

Updated CV of Satheeshkumar
Updated CV of SatheeshkumarUpdated CV of Satheeshkumar
Updated CV of Satheeshkumar
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Monthly Progress Report Sample
Monthly Progress Report SampleMonthly Progress Report Sample
Monthly Progress Report Sample
 
AS_CV
AS_CVAS_CV
AS_CV
 
Deepak Kumar_Project
Deepak Kumar_ProjectDeepak Kumar_Project
Deepak Kumar_Project
 
Key to a successful EGTL Site
Key to a successful EGTL SiteKey to a successful EGTL Site
Key to a successful EGTL Site
 
bio data 1
bio data 1bio data 1
bio data 1
 
Ashok kumar Verma
Ashok kumar VermaAshok kumar Verma
Ashok kumar Verma
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
RESUME.1
RESUME.1RESUME.1
RESUME.1
 
CV_CNS
CV_CNSCV_CNS
CV_CNS
 
jahangir
jahangirjahangir
jahangir
 
MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
Ashok kumar Verma
Ashok kumar VermaAshok kumar Verma
Ashok kumar Verma
 
SC Biodata 2016_v1
SC Biodata 2016_v1SC Biodata 2016_v1
SC Biodata 2016_v1
 

En vedette

Relational Databases Utilising Amazon RDS - Technical 201
Relational Databases Utilising Amazon RDS - Technical 201Relational Databases Utilising Amazon RDS - Technical 201
Relational Databases Utilising Amazon RDS - Technical 201Amazon Web Services
 
Analyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionAnalyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionMichael Pink
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 

En vedette (7)

4.3 assemblies estimating
4.3 assemblies estimating4.3 assemblies estimating
4.3 assemblies estimating
 
Relational Databases Utilising Amazon RDS - Technical 201
Relational Databases Utilising Amazon RDS - Technical 201Relational Databases Utilising Amazon RDS - Technical 201
Relational Databases Utilising Amazon RDS - Technical 201
 
Analyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionAnalyzing data, performance and impacts in construction
Analyzing data, performance and impacts in construction
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Estimation
EstimationEstimation
Estimation
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 

Similaire à Presentation 1

ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...r66025007
 
District Science Centre PPT as on 07-11-2023.pptx
District Science Centre PPT  as on 07-11-2023.pptxDistrict Science Centre PPT  as on 07-11-2023.pptx
District Science Centre PPT as on 07-11-2023.pptxdevasishlahkar
 
Virat Vanijya_ Vishwakarma Industrial Park_r.pptx
Virat Vanijya_  Vishwakarma Industrial Park_r.pptxVirat Vanijya_  Vishwakarma Industrial Park_r.pptx
Virat Vanijya_ Vishwakarma Industrial Park_r.pptxSomSaha1
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxMayankGandhi51
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resumeRAJINDER KUMAR
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)Amanat ali
 
T0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction SequenceT0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction Sequencechethanshivram
 
Experience Waskita in Earthworks scope of works
Experience Waskita in Earthworks scope of worksExperience Waskita in Earthworks scope of works
Experience Waskita in Earthworks scope of worksMuhammadFandiaz
 
Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011cmogsc
 
AGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptxAGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptxMdAbuNaser13
 

Similaire à Presentation 1 (20)

ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
 
District Science Centre PPT as on 07-11-2023.pptx
District Science Centre PPT  as on 07-11-2023.pptxDistrict Science Centre PPT  as on 07-11-2023.pptx
District Science Centre PPT as on 07-11-2023.pptx
 
cv2
cv2cv2
cv2
 
Virat Vanijya_ Vishwakarma Industrial Park_r.pptx
Virat Vanijya_  Vishwakarma Industrial Park_r.pptxVirat Vanijya_  Vishwakarma Industrial Park_r.pptx
Virat Vanijya_ Vishwakarma Industrial Park_r.pptx
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptx
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
wadhwa Briefing & Achievement
wadhwa Briefing & Achievementwadhwa Briefing & Achievement
wadhwa Briefing & Achievement
 
CV Mr. Haribabu
CV Mr. HaribabuCV Mr. Haribabu
CV Mr. Haribabu
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
T0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction SequenceT0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction Sequence
 
Experience Waskita in Earthworks scope of works
Experience Waskita in Earthworks scope of worksExperience Waskita in Earthworks scope of works
Experience Waskita in Earthworks scope of works
 
Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011
 
AGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptxAGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptx
 
CV
CVCV
CV
 
Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Sadab
SadabSadab
Sadab
 

Dernier

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Presentation 1

  • 1. C&ESS DEPARTMENT CONTRACT WORKS EFP-I S No Name of Work Estimated Cost Press Advertisem ent date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 1 CONSTRUCTION OF FOUNDATION FOR REBOILER, CONDENSATE POTS & SOFTENING UNITS AT UCH#II, Distt: DheraBugti. 1.773 Million 22.08.2013 At 1130 hrs 30 days Work executed departmentally. Tender cancelled. 2 Construction of Pre- Drilling Engineering Works for Zin PAB-2 (Zin#06), Distt. Dera Bughti, Balochistan 51.738 Millions 27.10.201 3 11.11.2013 90 Days work is in progress. 3 CONSTRUCTION OF PRE DRILLING CIVIL WORK AT LOTI DEEP # 01. DISTRICT DERA BUGHTI, BALUCHISTAN. 59.624 Millions 04.02.201 4 21.02.2014 90 days LOI issued. Contract agreement execution stage 4 CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION ZIN SML #04. DISTRICT DERA BUGTI BALOCHISTAN 54.031 millions 31.05.201 4 16.06.2014 60 days After retender. Bid advertised & opened on 16.06.2014.
  • 2. S No Name of Work Estimate d Cost Press Advertise ment date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 5 CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT LOTI WELL #19. DISTRICT DERA BUGHTI, BALUCHISTAN. 41.798 millions 04.04.201421.04.2014 60 days LOI issued on 03.06.2014 and contract agreement to be executed. 6 CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION PIRKO DEEP #01. DISTRICT DERA BUGTI BALOCHISTAN. 54.406 millions 28.04.14 60 days LOI issued on 03.06.2014 and contract agreement to be executed. 7 CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT LOTI#20. DISTRICT DERA BUGT BALOCHISTAN 41.798 millions 31.05.201420.06.2014 60 days After retender. Bid advertised & opened on 20.06.2014. CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION PIRKO #54. DISTRICT DERA BUGTI 44.762 millions Press advertised on 23.04.2014.open ed on 7.5.14 and is under management
  • 3. C&ESS DEPARTMENT CONTRACT WORKS EFP-II S No Name of Work Estimate d Cost Press Advertise ment date Date of Opening Work Done by Parties Target Completio n Date Present StatusAFE Cost Lowest Cost 1 Engineering works for Sohniwala Well # 1 at Tehsil Ahmedpur Distt. Jhang Rs.16 million 23.03.201 3 07.04.20 13 30 day Completed 2 Construction of Metalled Road, Boundary Wall & cement Concrete Stone Paving- additional works for Annxe at Regional Office Multan, District:Muzzafar Gahr. 2.64 M 03.09.201 3 2/10/20 13 30 days Work Completed. 3 CONSTRUCTION OF PRE DRILLING CIVIL WORK AT KUP-I (KULCHAS E.L).DISTT: DERA BUGTI BALOCHISTAN 55 Million 31.08.201 3 16.09.20 13 45 days Work is in Progress. Watch Towers, culverts and cause under progress.
  • 4. C&ESS DEPARTMENT CONTRACT WORKS EFP-III S No Name of Work Estimated Cost Press Advertisem ent date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 1 Engineering works for Jand well # 1 Distt. Attock Rs.20 millions 24.03.2013 09.04.2013 28.05.2013 Completed 2 Construction Of One R.C.C Underground Water Reservior At Water Source Near Mela #1 Water Point.Distt:Kohat 3.742 M 21.08.2013 06-09-2013 At 1130 hrs 90 days Completed. 3 Construction of Pre Drilling Engineering Works At Rajian-8 District Chakwal Punjab 27 M 15.07.2013 15.08.2013 45 days Completed. 4 Supply of Utility Water (170,000 liters per day) to Nashpa Oil Plant and Camps including Rig N-2 at Nashpa Field 14.10 M 27.07.2013 22.08.2013 365 days Work in progress 5 Construction of Pre Drilling Engineering Works AT NASHPA-5 District Karak KPK Rs:116.65 millions 04.02.14 45 days Work in progress
  • 5. S No Name of Work Estimat ed Cost Press Advertis ement date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 6 Construction of internal road at chanda plant, Distt: Kohat KPK. 3.364 Millions 01.11.20 13 18.11.201 3 45 Days Work in progress 7 Modification in new store shed at Dakhni Plant Well. 1.948 Millions 02.09.20 13 26-09- 2013 60 days Completed 8 Construction of Engineering Works Required For Workover Job At Rajian#2 District. 20.193 Millions 03.09.20 13 16.09.13 30 Days Completed. 9 CONSTRUCTION OF FOUNDATION FOR INSTALLATION OF WEIGH BRIDGE NASHPA OIL FIELD 0.931 M 30.08.20 13 19.09.201 3 45 days Completed. REPAIR OF (0.8KMS) ROAD AT RATTA MOHRA RAJIAN OIL FIELD, DISTRICT 2.232 14.12.20 30.12.201
  • 6. S No Name of Work Estimated Cost Press Advertisem ent date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 11 CONSTRACTION OF RCC WALL (LENGTH 816.RM) AT NASHPA PLANT. DISTT:KARAK 14.387 Million 23.11.2013 10.12.201 3 60 days 60 % Completed. Suspended due to land problem 12 CONSTRACTION OF FOUNDATION FOR INSTALLATION OF WEIGH BRIDGE AT RAJIAN OIL FIELD. DISTRICT ATTOCK. 1.5 MILLION 09.01.2014 27.01.201 4 45 days 80 % Completed. 13 CONSTRUCTION OF DYKE WALL AND P. C.C HARD STANDING FOR MELA CRUDE STORAGE TANK DISST:KOHAT, KPK. 1.854 Million 13.11.2013 28.11.201 3 45 days Work completed. Final bill payment is under process. 14 Construction of Engineering Works Required For Workover Job At Mela#1 District.Kohat KPK 25 Million 05.12.2013 21.12.201 3 30 days Well started flowing and tender was annulled after approval for award of work. Construction of Permanent Wire Woven Mesh Fencing at Nashpa#1 2.18 07.04.201 Work order issued on 15.05.14. work in
  • 7. S No Name of Work Estimated Cost Press Advertise ment date Date of Opening Work Done by Parties Target Completio n Date Present StatusAFE Cost Lowest Cost 16 Construction of Permanent Wire Woven Mesh Fencing at Nashpa #4 Well.Distt:Karak 2.62 Million 22.03.20 14 07.04.2 014 30 days Work order issued on 15.05.14. work in progress. 17 CONSTRUCTION OF ENGINEERING WORKS REQUIRED FOR WORKOVER JOB AT CHAK NAURANG SOUTH # 1.DISTRICT CHAKWAL 12.23 Million 11.01.20 14 23.01.2 013 30 days Completed. 18 CONSTRUCTION OF UNDER GROUND WATER STORAGE TANK AT CHANDA PLANT DISST:KOHAT, KPK. 6.988 Million 09.01.20 14 28.01.2 014 45 days Tender will be opened on 25-05- 2014 at EFP-III. Under management approval. 19 Construction of Pre Drilling Engineering Works at Nashpa -6 District: karak, KPK Rs:30.12 millions 30 DAYS Case for contractor scope of work is being initiated for press advertisement from management.
  • 8. S No Name of Work Estimate d Cost Press Advertisemen t date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 20 HIRING OF DOZERS (D-8K/D- 8N/KOMATTSU 155, MODEL 2000 & ABOVE) FOR NASHPA-6 WELL, DISTRICT KARAK, KPK. Rs: 2.00 million 3 months Case approved by management and LOI to be issued. 21 CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT DAKHNI DEEP WELL NO. 5 DISTRICT ATTOCK. 40.00 millions 03.04.2014 18.04.2014 45 days Work order issued on 25.05.2014. problem in land acquisition. 22 CONSTRUCTION OF R.C.C HARD STANDING FOR INSTALLATION OF 20000 BPD CAPACITY NEW SEPARATION BATTERY AT NASHPA District: Karak, KPK Rs:2.855 millions 05.04.2014 24.04.2014 45 days Work order issued on _______ and work is under progress.
  • 9. C&ESS DEPARTMENT CONTRACT WORKS EFP-IV S No Name of Work Estimated Cost Press Advertise ment date Date of Opening Work Done by Parties Target Completion Date Present StatusAFE Cost Lowest Cost 1 Engineering works for Qadirpur HRL well # 7 Distt. Ghotki Sindh Rs.18.00 millions 02.04.201 3 18.04.20 13 240 days after award Completed 2 Engineering works for Maru East Well # 1 at Distt. Ghotki Sindh Rs.36.31 millions 30.04.201 3 15.05.20 13 45 days after award Completed. 3 Engineering works for Qadirpur Well # 50 at Distt. Ghotki Sindh Rs.34.66 millions 05.06.201 3 20.06.20 13 30 days Completed 4 Construction of Pre- Drilling Engineering Works at QP-51 District Ghotki, Sindh. 30 Millions 07.09.201 3 30.09.20 13 30 days Completed 5 Construction of Pre- Drilling Engineering Works at HRL #08 District Ghotki, Sindh. 25 Millions 27.10.201 3 12.11.20 13 30 days Completed
  • 10. S No Name of Work Estimated Cost Press Advertisem ent date Work Done by Parties Date of Opening Target Completio n Date Present StatusAFE Cost Lowest Cost 6 Construction of Pre-Drilling Engineering Works at QP-52 District Ghotki, Sindh. 35.693 Millions 07.09.2013 07.10.2013 30 days Completed. 7 CONSTRUCTION OF CIVIL SYSTEM AT ERW PLATFORM (QP-42,43,44) FOR SCADA SYSTEM. DISTRICT GHOTKI, SINDH. 1.645 Million 17.11.2013 04.12.2013 30 days Completed 8 Construction of Pre Drilling Engineering Works at Well Location Sara West Well # 05.District Ghotk Rs.63.153 millions 60 days bids will be opened on 13.06.2014 agaist retendering. 9 Construction of Pre Drilling Engineering Works at Well Location, Reti # 02. District Ghotki. Rs.42.44 millions 08.03.2014 26.03.2014 45 days LOI issued on 30.05.14. 10 Construction of Pre Drilling Engineering Works at Qdir Pur Well # 53. . District Ghotki. Rs.25.727 millions 03.04.2014 21.04.2014 30 days Work order issued on 30.05.2014 and work in progress. 11 REPAIR / MAINTENANCE OF QADIRPUR INTERNAL ROAD.DISTRICT : GHOTKI, SINDH Rs 14.231 millions 24.05.2014 09.06.2014 90 DAYS case sent on 10.06.2014 for management approval by EFP- IV.
  • 11. C&ESS DEPARTMENT CONTRACT WORKS EFP-V S No Name of Work Estimated Cost Press Advertisem ent date Date of Opening Work Done by Parties Target Completio n Date Present StatusAFE Cost Lowest Cost 1 Engineering works for Jakhro West Well # 1 at Distt. Sanghar Sindh Rs.25.00 millions 20.04.2013 06.05.201 3 120 days Completed 2 CONSTRUCTION OF PRE DRILLING CIVIL WORKS AT WELL KUNNAR DEEP#09.Distt: Hyderabad. 23.00 M 24.07.2013 13.08.201 3 45 days Complted. 3 CONSTRUCTION OF PRE DRILLING CIVIL WORK AT WELL CHAK DIM5#3. 32.00 M 24.07.2013 13.08.201 3 30 days Completed 4 Construction of Pre Drilling Engineering Works AT CHAK 25C- 1, District Sanghar, Sindh. 32 Millions 13.08.2013 30.08.201 3 30 Days Completed 5 Construction of Pre- Drilling Engineering works at Manna-1 (Tay X-2), Distt. Hyderabad, Sindh. 24 Millions 29.08.2013 13.09.201 3 45 Days Completed
  • 12. S No Name of Work Estimated Cost Press Advertisem ent date Date of Opening Work Done By Parties Target Completio n Date Present StatusAFE Cost Lowest Cost 6 CONSTRUTION OF 550RFT LONG RCC SLUB CULVERT OVER BOBI & SINJORO PLANTS PIPE LINES DISTRICT SANGHAR SINDH. 3.645 Million 45 Days Tender cancelled before Press Advertisement 7 CONSTRUCTION OF WORK OVER JOB CIVI WORKS AT CHAK 66 NORTH EAST # 01, DISTRICT SHANGHER. 12.124 million 07.12.203 23.12.201 3 30 days Work order issued ______. 90 % Completed. Waiting for rig. 8 Construction of Pre Drilling Engineering Works at Goth Patafi Well # 01 (Hanif Siddiqui # 1 District Hyderabad Rs.22.270 millions 21.12.2013 07.01.201 4 30 days Completed 9 Construction of Pre Drilling Engineering Works at Pasaki Deep Well # 04 District Hyderabad Rs.23.050 millions 21.12.2013 09.01.201 4 30 days Completed
  • 13. S No Name of Work Estimate d Cost Press Advertise ment date Date of Opening Work Done By Parties Target Completi on Date Present StatusAFE Cost Lowest Cost 10 CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION SOUTH EAST X -01. (Pali Deep # 1) DISTRICT TANDO ALAHYAR, SINDH. 42.913 millions 27.03.201 4 11.04.20 14 45 days LOI issued on 02.06.2014. 11 CONSTRUCTION OF PRE DRILLING CIVIL WORK AT WELL LOCATION, SAAND #02 DISTT: TANDO ALLAH YAR. 39.446 12.03.201 4 26.03.14 45 days. Work order issued on _______ work in progress. 12 CONSTRUCTION OF PRE DRILLING CIVIL WORK AT WELL LOCATION,KUNNER #09 DISTRICT : HYDERABAD., SINDH RS.31.205 15.05.201 4 30.05.20 14 30 days Bids opened on 30.05.2014 and is under management approval.
  • 14. C&ESS DEPARTMENT CONTRACT WORKS FGCP-I S No Name of Work Estimated Cost Press Advertise ment date Date of Opening Work Done By Parties Target Completion Date Present StatusAFE Cost Lowest Cost 1 Hiring Services for Pipeline Construction work for Uch-II Development Project Rs.68.826 millions 15.03.201 3 30.03.20 13 17.06.2013 (60 days) Completed 2 Civil & Mechanical Works for Installation of Well Head Assembilies and Flow Line for 09 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan. 160 Millions 19.08.201 3 04.09.20 13 180 Days 55% work copmleted. 3 Electrical and Instrumentation Works for Well Head Facilities for 15 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan. 80 Millions 19.08.201 3 04.09.20 13 90 Days Work order is to be used.
  • 15. C&ESS DEPARTMENT CONTRACT WORKS FGCP-I S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Completion Date Present StatusAFE Cost Lowest Cost 1 Hiring Services for Pipeline Construction work for Uch-II Development Project Rs.68.82 6 millions 15.03.20 13 30.03.2013 17.06.2013 (60 days) Completed 2 Civil & Mechanical Works for Installation of Well Head Assembilies and Flow Line for 09 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan. 160 Millions 19.08.20 13 04.09.2013 180 Days 55% work copmleted. 3 Electrical and Instrumentation Works for Well Head Facilities for 15 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan. 80 Millions 19.08.20 13 04.09.2013 90 Days Work order is to be used.
  • 16. C&ESS DEPARTMENT CONTRACT WORKS HEAD OFFICE S No Name of Work Estimate d Cost Press Advertise ment date Date of Opening Work Done By Parties Target Completio n Date Present Status AFE Cost Lowest Cost 1 Construction of Admin building, warehouses & security office building (Contract C- 1), near Kunnar Oil Field Distt. Hyderabad Sindh Rs.66.70 millions 08.09.201 3 08.10.2013 240 days Management approval accorded and LOI issued by SCM department on 28.05.2014 . 2 Construction of workshop offices, MPE&I workshop, safety & Firefighting Building (Contract C- 2), Laboratory near Kunnar Oil Field Distt. Hyderabad Sindh Rs.48.40 millions 08.09.201 3 08.10.2013 240 days Contract Agreement Execution Stage. 3 Construction of Officer's Houses (C-1) at Sinjhoro Plant Distt. Sanghar Sindh Rs.89.61 9 millions 22.3.2014 26.03.2014 240 days Case deferred by Procurement Committee. Caravan as alternate option suggested by PC. 4 Construction of Assistant's Houses (C- II) at Sinjhoro Plant Distt. Sanghar Sindh Rs.63.00 millions 11.05.201 3 27.06.2013 240 days Case deferred by Procurement Committee. Caravan as alternate option suggested by PC.
  • 17. S No Name of Work Estimated Cost Press Advertis ement date Date of Opening Work Done By Parties Target Completion Date Present Status AFE Cost Lowest Cost 5 Construction of Officer's Houses (C- 1) at Uch Gas Field for Uch-II Rs.87.00 millions 08.09.2 013 09.10.20 13 365 days Annulled and Case for Caravans to be processed by Admin Deptt. 6 Construction of Boundary wall at Jhal Magsi Distt. Mera Murad Jamali Rs.28.00 millions 08.08.2 013 10.09.20 13 120 days Word order issued on 08.04.2014 and contractor is to mobilize yet. 7 Construction of Officer's House & Infrastructure Works at Tando Alam Sindh Rs.75.00 millions 28.07.2 013 28.08.20 12 21.07.2013 (365 days) Annulled and Case for Caravans to be processed by Admin Deptt. 8 Construction of Govt. Rural Dispensary (Social Welfare Scheme), Village Dhayala, Teh. Dina, Distt. Jhelum, Punjab. Rs.4.765 M 06.06.2 0113 10.07.20 13 240 days Work under construction. 9 Construction of Waste Pit & Skimmer Tank at Kal Oil Field Distt. Chakwal Rs.3.898 millions 06.06.2 013 08.07.20 13 60 days Work order issued on 14.03.2014. Work under construction.
  • 18. S No Name of Work Estimat ed Cost Press Adverti sement date Date of Opening Work Done By Parties Target Compl etion Date Present Status AFE Cost Lowest Cost 10 Construction of Assistant's Houses (C-2) at Uch Gas Field Uch-II Rs.87.00 millions 06.06.2 013 09.07.201 3 365 days Annulled and Case for Caravans to be processed by Admin Deptt. 11 Construction of Worker's Houses (C- 3) at Uch Gas Field Uch-II Rs.87.00 millions 06.06.2 013 09.07.201 3 365 days Annulled and Case for Caravans to be processed by Admin Deptt. 12 Up-gradation of Pasaki Facility Road from Hyderabad to Mirpur Khas main Road to new constructed Kunnar Plant Road Rs.59.00 millions 06.06.2 013 04.07.201 3 180 days Work order issued on 03.06.2014 Work is under construction. 13 Construction of Foundation for Dehydration Plant at Bobi Rs.4.22 millions 06.06.2 013 04.07.201 3 30 days Work order issued on 10.03.2014 and work is under construction. 14 Renovation of OGTI Hostel I-9 Islamabad Rs.1.986 millions 27.07.2 013 30-08- 2013 60 days After obtaining expenditure approval from ED(Petroserv) case submitted to SCM deptt on 28.01.2014 for further processing.
  • 19. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Completio n Date Present Status AFE Cost Lowest Cost 15 Construction of PCC courtyard & fixing of Fiber Glass shed at Masjid Chanda Plant Rs.1.26 millions 28.07.20 13 27.08.2013 60 days Sent for annullment on 14.03.14 due to expiry of bid validity. 16 Construction of Prefabricated worker houses at Sinjhoro (C- 3) using SCIP Rs.84.00 millions 28.07.20 13 27.082013 240 days Case deferred by Procurement Committee. Caravan as alternate option suggested by PC. 17 Construction of Offices & other allied building at Bahu Well-2 Rs.10.03 millions 15.10.20 13 21.11.2013 240 days Deffered by Procurement Committee due low production life of Bahu. 18 Construction of new workshop shed at Dakhni Plant Rs.15.51 millions 15.10.20 13 25.11.2013 240 days Financial Evaluation done and uploaded on 02.06.2014. 19 Construction of Hard standing bath/wash room & canteen for ATA at Qadirpur Rs.7.943 millions 15.10.20 13 28.11.2013 90 days annulled on 15.04.14 due to no participation by bidders. Fresh case is being prepared.
  • 20. S No Name of Work Estimat ed Cost Press Advertise ment date Date of Openin g Work Done By Parties Target Completio n Date Present Status AFE Cost Lowest Cost 20 Repair of Road from Sohbatpur to Uch Plant Rs.16.3 66 millions 28.07.2013 28.08.2 013 At 1130 hrs 90 days Work order issued on _______. Work is under construction. 21 Extension of Police Check Post (changla wall Maue Dariya) Near well No 3 at Dakhni field 1.663 M 15.10.2013 18.11.2 013 60 days Contract Agreement prepared and submitted to SCM on 13.04.2014. 22 CONSTRUCTION OF REGIONAL COORDINATOR PRE FAB STRUCTURE OFFIC I/C SEWRAGE SYSTEM.DISTT: HYDERABAD. 8.103 M 240 days Pended. 23 Costruction of 12 rooms & 27 bathrooms at Qadir Pur Gas Field. Distt:Ghotki Sindh. 10.86 M 08.08.2013 09.09.2 013 240 days Annulled on 28.04.14 and fresh case to be intiated for re-tendering. 24 Construction of Permanent Wire Woven Mesh Fencing at Nashpa #3 Well.Distt:Karak 1.532 M 08.09.2013 07.10.2 013 At 1130 hrs 30 days Annulled due to expiry of bid validity and case for approval through Field Tender is in process.
  • 21. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 25 Engineering Works for Bahu Wells #5,6,7 & 8 platform High Rising at Bahu Gas Field, Tehsil ahmad pur sial, Distt: Jhang. 209.713 M 08.09.20 13 07.10.2013 365 days Annulled on 11.04.14 due to expiry of bid validity and case is sent to user deptt to confirm if the requirement still exists. 26 Hiring of vehicles for Field Units of C&ESS department OGDCL, Islamabad 25.68 M 180 days Case file lost at SCM deptt and sent again on 12.05.14 to SCM deptt for press advertisement. 27 CONSTRUCTION OF FOUNDATION FOR REBOILER, CONDENSATE POTS & SOFTENING UNITS AT UCH#II, Distt: DheraBugti. 1.773 Million 22.08.2013 At 1130 hrs 30 days Work executed departmentally. Tender cancelled 28 CONSTRUCTION OF UNDER GROUND ROOM FOR HSD STORAGE TANK AT OGDCL HEAD OFFICE ISLAMABAD. 1.13 Millions 02.08.20 13 20.08.2013 30 Days Work order issued on 14.05.14 and contractor mobilized but change in site is under consideration. 29 Construction of RCC water pond at Nashpa 3.861 millions 15.10.20 13 27.11.2013 90 Days Contract Agreement prepared and submitted to SCM on
  • 22. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 30 Supply and fixing of geo membrane sheet 0.50 mm thick at effuluent water pits at Dakhni, Distt. Attock 10.856 Millions 15.10.2 013 22.11.2013 30 days Resubmitted to SCM Departement on 21.o5.2014for Retendering. 31 Construction of Civil Works for 09 Wells for Sinjhoro Gas field, Distt. Sanghar, Sindh. 12.542 Millions 15.10.2 013 20.11.2013 90 Days After obtaining expenditure approval from ED(Petroserv) case submitted to M(S & FA) for AFE No. 32 Construction of Internal Road at Nashpa Plant, Distt. Karak, KPK 4.138 millions 04.01.2 014 06.02.2014 45 Days Contract Agreement prepared and submitted to SCM on 13.04.2014. 33 Construction of Soldier Room, Toilet, Bath Kitchen For FC Post at Uch Dera Bugti Balochistan. 1.011 Millions 60 days Case returned to SCM on 22.05.2014 for retendering. 34 Hiring of Consultancy Services for Residential Camp at Nashpa Nil 30.09.2013 75 days.Case returned to SCM on 30.09.2013. with soft copy of TOR 35 Pre-qualification / enlistment of contractors for PDEWs Nil Nil Sent to GM (SCM) for on 25.11.2013.
  • 23. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 36 Construction of BMP Posts in Tribal area Ranjanpur, Distt: Ranjanpur. 2.564 Million 45 days Completed departmental. 37 CONSTRUCTION OF REPAIR OF ROAD FROM JAND TO CHOWK SHAHEEDAN 4.3 KM AT DAKHNI FIELD 27.11.2 013 26.12.2013 90 DAYS Case approved by Procurement Committee on 10.06.2014. 87 Construction of BMP Posts in Trible area Ranjanpur, Distt: Ranjanpur. Rs.2.564 60 days Completed through party resources. 39 CONSTRACTION/EXTE NSION IN EXISTING SOCIAL WELFARE DISPENSERY AT RAJIAN OIL FIELD, Punjab 0.965 Million 26.01.2 014 26.02.2014 30 days Financial Evaluation done and uploaded on 06.06.2014. 40 INSTALLATION OF UNDER GROUND POWER SUPPLY SYSTEM AT KOT SARANG Distt: 3.12 million 60 days Original case file lost. Bid documents prepared and approval is being sought again for execution.
  • 24. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 41 CONSTRUCTION OF SOCIAL WELFARE PUBLIC DOSPENSARY LPG PLANT AT BOBI OIL FIELD, DISTRICT SANGHAR SINDH. 12.983 Million 180 days BOQ prepared and bid documents are under preparation. 42 EXTENSION OF EXISTING SOCIA WELFARE DISPENSARY AT KUUNAR OIL FEILD. 5.4 Million 26.01.20 14 04.03.2014 180 days Technical Evaluation done on 12.05.14 and sent to SCM for Financial opening / annullment. 43 CONSTRUCTION OF PRODUCED WATER PIT, BOUNDARY WALL AND ALLIED CIVIL WORKS OUTSIDE CHANDA PLANT PREMISES. 15.429 Million 26.01.20 14 03.03.2014 120 days Retendered on 07.05.2014 and will be opened on 29.06.14. 44 Raising & Strengthening of OGDC Bund at Qadirpur Gas Field District Ghotki Province Sindh. 171 million 04.01.20 14 04.01.2014 120 days To be presented in P & FC for approval of award on 11.06.2014 45 CONSTRACTION OF 10 NO. NEW ROOMS IN WORKER CAMP AT LOGISTIC CAP 8.422 million 180 days Sent to SCM Deptt for Press Advertisement
  • 25. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 46 IMPROVEMENT OF WATER SUPPLY SCHEME IN THE AREA OF KAL OIL FIELD. DISTRICT CHAKWAL, PUNJAB Rs 0.65 millions 15.02.20 14 21.03.2014 30 days To be done departmentally on quotation basis within PPRA limits. 47 CONSTRUCTION OF OH WATER TANK AND CAR PARKING AT CHANDA PLANT. 5.267 Million 75 days Bid opened on 28.05.2014. Case awaited from SCM for Technical Evaluation. 48 CONSTRUCTION OF 02 NO.CLASS ROOMS WITH VERANDAH FOR GOVT.PRIMARY SCHOOL ALWARGI BANDA AT NASHPA . 1.125 Million 90 days Technical Evaluation done on 09.04.14 and sent to SCM for Financial opening. 49 CONSTRUCTION OF METALLED ROAD (45.657 Kms) FROM UCH PLANT TO UPL DERA MURAD JAMALI DISTRICT DERA BUGHTI, PROVINCE BALUCHISTAN. 868.27 million 22.02.20 14 24.03.2014 18 months Annulled due to poor response and case is being sent for press advertisement for retendering.
  • 26. S No Name of Work Estimated Cost Press Advertis ement date Date of Opening Work Done By Parties Target Complet ion Date Present Status AFE Cost Lowest Cost 509 CONSTRUCTION OF REPAIR OF ROAD FROM TANDO MURREE TO TANDO ALAM # 15 BASE CAMP Rs 2.45 millions 26.01.20 14 28.02.2014 30 days Technical Evaluation done on 12.05.14 and sent to SCM for Financial opening. 51 Repair Maintenance of 01 km Road, Mohri Rajgan to Chak Tareda Under Social Welfare. Tehsil Sohawa. 1.297 Million 04.01.20 14 10.02.2014 45 days Financial Evaluation done and uploaded on 06.06.2014. 52 SUPPLY & INSTALLATION & COMMISSIONING OF DOUBLE GATE SYSTEM, HYDRAULIC ROAD BLOCKER & HYDRAULIC BARRIER AT NASHPA DISTRICT KARAK KPK. Rs 4.10 millions 27.02.20 14 03.04.2014 60 days Technical Evaluation done on 11.04.2014. letter to sent to bidder for withdrawal of exceptions / deviations. Financial opening awaited. 53 CONSTRUCTION OF 03 NOS PICKETS WITH ATTACH BATH, KITCHEN & TOILETS FOR PHASE-II FC PICKETS AT UCH-II GAS FIELD. DISTRICT DERA BUGTI BALUCHISTAN Rs 2.518 millions 45 days Financial Evaluation done on 13.05.14 and case is with SCM for further processing.
  • 27. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Completi on Date Present Status AFE Cost Lowest Cost 48 CONSTRACTION OF P.C.C HARD STANDING FOR STOCK MATERIALS AT NASHPA DISTRICT KARAK,KPK. Rs 0.716 millions 26.01.2 014 27.02.201 4 30 days Expenditure approval obtianed and AFE No alloted on 13.05.14. Financial evaluation done and uploaded on web 30.05.14. 56 Construction Of Police Picket At Sinjhoro Plant Gate District Sanghar. Rs 1.602 millions 09.04.2 014 09.05.201 4 45 days Technical Evaluation done and Financial opening is on 16.06.2014. 54 Raising of Sales Gas ROW at Nashpa (1.5 km) Distric karak, kpk. Rs 4.45 millions 45 days Technical Evaluation done and uploaded on 09.06.2014. 51 EARTH FILLING, CONSTRUCTION OF ONE WAY ROAD AND PARKING SHED AT NASHPA PLANT. DISTT: KARAK, KPK Rs 19.106 millions 15.02.2 014 20.03.201 4 120 days Received for endorsement of Executive Summary on 11.06.2014. 55 CONSTRUCTION OF COMPUTER ROOM FOR WEIGHING BRIDGE AT NASHPA PLANT. DISTT: Rs 0.934 millions 60 days work in progress as an additional work through the same contractor for weigh bridge.
  • 28. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 56 CONSTRUCTION OF HARD STANDING FOUNDATION AREA OF LOGISTIC WORKSHOP AT LOGISTIC CAMP KOTSARANG.DIST: CHAKWAL, PUNJAB Rs 16.06 millions 22.02.20 14 25.03.2014 30 days Technical Evaluation done on 07.04.2014 and case sent to SCM for Financial Opening. 57 CONSTRUCTION OF WATER TANK FOR DRINKING PURPOSE FOR LOCALS AT TANDO ALAM OIL COMPLEX Rs 0.816 millions 09.04.20 14 08.05.2014 60 days Technical Evaluation done on 21.05.2014 and sent to SCM deptt for Financial Evaluation. 58 Feasibility Study Of Existing Ogdcl Office Building Office Building Masood Mansion At F-8 Markaz For Addition Of New Floors For Gymnasium And Design/Consultancy Services For The Improvement Measures And Proposed Gymnasium Thereof millions 16.04.20 14 16.05.2014 90 days Received on 28.05.14 for Technical Evaluation.
  • 29. S No Name of Work Estimated Cost Press Adverti sement date Date of Openin g Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 59 CONSTRUCTION OF ROW 31.05 KM FOR JAKHRO WELL-1 DISTRIC: KHAIRPUR ,SINDH 30.953 million 45 days Press advertised.Bid will be opened on 23.06.2014. 60 CONSTRUCTION OF 02 NOS. PRODUCTION STORAGE SHED & HARD STANDING AT NASHPA PLANT. DISTT: KARAK, KPK 45.68 million 240 days Sent to PTO (Mech) on 06.06.14 for Budget allocation. 61 CONSTRUCTION OF CIVIL WORKS FOR FIELD DEVELOPMENT AT WELL LOCATION DACHRA PUR # 02 .DISTT: HYDERABAD, SINDH. 2.41 million 30 days Technical Evaluation done on 02.06.2014 and sent for Financial Opening. 62 REPAIR/MAINTENANCE OF ROAD FROM REHMAT GAS FIELD TURN TO ANWAR ABAD. DISTT: GHOTKI Rs 25.327 millions 60 days Sent to SCM Deptt on 08.05.14 for Press Advertisement. 63 CONSTRUCTION OF GEO- MEMBRANE LINING FOR PRODUCED WATER PIT AT QADIR PUR PLANT.. 2.445 million 30 days Bid documents are being prepared.
  • 30. S No Name of Work Estimated Cost Press Advertis ement date Date of Opening Work Done By Parties Target Complet ion Date Present Status AFE Cost Lowest Cost 64 RAISING OF APPROACH ROAD AT QADIRPUR#35. DISTRICT : GHOTKI, SINDH 2.969 45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement. 65 CONSTRUCTION OF RAISED PLATFORM AT HRL-2. DISTRICT GHOTKI, SINDH 27.56 million 90 days Press advertised. Bids will be opened on 24.06.2014. 66 CONSTRUCTION OF RAISED PLATFORM AT HRL-7. DISTRICT GHOTKI, SINDH 27.55 million 90 days Bid opened on 10.06.2014 and case awiated from SCM deptt for Technical Evaluation. 67 RAISING OF APPROACH ROAD AT QADIRPUR#48. DISTRICT : GHOTKI, SINDH 5.11 million 45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement. 68 CONSTRUCTION OF ROAD FROM DISPENSARY TO WELL NO.6 (ABOUT 7 KM) AT DAKHNI PLANT WELL. DISTRICT: ATTOCK. 35.088 150 days Press advertised on 16.05.2014 and bids will opened on 25.06.2014.
  • 31. S No Name of Work Estimated Cost Press Advertis ement date Date of Opening Work Done By Parties Target Complet ion Date Present Status AFE Cost Lowest Cost 69 CONSTRUCTION OF RAISED PLATFORM AT QADIRPUR#50. DISTRICT : GHOTKI, SINDH 27.56 million 45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement. 70 CONSTRUCTION OF RAISED PLATFORM AT QADIRPUR#45. DISTRICT : GHOTKI, SINDH 27.56 45 days Bid documents prepared. Budget allocated by QP JV and file received in C&ESS on 06.05.14. Case is to be sent to SCM for press advertisement. 71 CONSTRUCTION OF RAISING OF APPROCH ROAD AT QADIRPUR#50. DISTRICT : GHOTKI, SINDH 3.39 million 45 days Bid documents prepared. Case is with (E.O)South Section for budget arrangement. 72 CONSTRUCTION OF RAISING OF APPROACH ROAD AT QADIRPUR#31. DISTRICT : GHOTKI, SINDH 6.10 million 45 days Bid documents prepared. File is with (E.O)South section and is being sent to JV Accounts for budget allocation.
  • 32. S No Name of Work Estimated Cost Press Advert iseme nt date Date of Opening Work Done By Parties Target Complet ion Date Present Status AFE Cost Lowest Cost 73 CONSTRUCTION OF STORE SHED FROM RETERIEVED MATERIAL OF TOOT AT DAKHNI PLANT DISTRICT ATTOCK, PUNJAB. 4.56 million 90 days Bids opened on 06.06.2014 and case awaited from SCM deptt for Technical Evaluation. 74 CONSTRUCTION OF METTALED ROAD FROM BASIC HEALTH UNIT TO AYUB LAKHAN TO GOVERNAMENT HIGH SCHOOL AYUB LAKHAN. 1.337 million 60 days Sent to SCM Deptt on 22.05.14 for Press Advertisement. 75 CONSTRACTION OF RAISING OF APPROCH ROAD AT QADIRPUR#41. DISTRICT : GHOTKI, SINDH 4.18 million 45 days Bid documents prepared. File is with (E.O)South section and is being sent to JV Accounts for budget allocation. 76 Construction of Foundation and Dyke Walls for Crude Storage Tanks at Rajian Well # 05 1.25 05.05. 2014 02.06.2014 Bids opened on 02.06.2014 and case awaited from SCM deptt for Technical Evaluation. 77 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR#38/39. DISTRICT : GHOTKI, SINDH 37.67 million 45 days Confirmation of Budget allocation is in Process
  • 33. S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 78 RAISING OF APPROACH ROAD AT QADIRPUR# 11. DISTRICT : GHOTKI, SINDH 1.55 million 45 days Confirmation of Buget allocation is in Process 79 RAISING OF APPROACH ROAD AT QADIRPUR DEEP#1 . DISTRICT : GHOTKI, SINDH 14.87 million 45 days Sent to SCM deptt on 06.06.2014 for Press advertisement. 80 RAISING OF APPROACH ROAD AT QADIRPUR# 45. DISTRICT : GHOTKI, SINDH 6.19 million 45 days Sent to SCM deptt on 06.06.2014 for Press advertisement. 81 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR DEEP #01. DISTRICT : GHOTKI, SINDH 27.79 million 45 days Sent to SCM deptt on 06.06.2014 for Press advertisement.
  • 34. S No Name of Work Estimat ed Cost Press Advertis ement date Date of Opening Work Done By Parties Target Comple tion Date Present Status AFE Cost Lowest Cost 86 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR#48. DISTRICT : GHOTKI, SINDH 27.56 million 45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement. 87 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR#46. DISTRICT : GHOTKI, SINDH Rs 27.56 millions 45 days Budget allocated by QP JV department. Case is with (E.O)South Section.
  • 35. PRE-DRILLING ENGINEERING WORKS AT EFP-3 DURING JUNE 2013 TO JUNE 2014 S.No Description Approv ed Cost EFP-3 input Remarks Earh Work Water Supply System Misc.Works Appro ach Road Preparati on of Well location Mud Pit Additional Mud Pit Establi shmen t Water required for drilling Operation Electric al Works Plumbing & Sanitary Works Total amount MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs 1 PDCW at Jund-1 53.959 2.00 3.50 3.00 4.00 2.00 22.50 0 0 37.00 2 PDCW at Soghari-1 22.557 1.00 2.00 3.00 4.00 1.00 13.50 0.5 0.2 25.20 3 PDCW at Mela-4 39.856 4.00 5.00 4.00 3.00 1.00 22.50 0.5 0.2 40.20 4 PDCW at Rajian-7 23.505 1.50 3.00 4.00 3.00 1.00 13.50 0.5 0.2 26.70 5 PDCW at Rajian-8 60.100 2.00 4.00 4.00 5.00 0.00 18.00 33.00 6 Work over job at Rajian-2 20.193 3.00 0.00 0.00 7.00 10.00 7 PDCW at Nashpa-5 99.850 12.00 24.00 2.00 0.00 0.00 0.00 0 0 38.00 8 PDCW at Surqamar-1 25.00 25.00 9 PDCW at Kurrum-1 28.555 1.00 1.00 3.00 0.00 0.50 13.50 19.00
  • 36. WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-3 DURING JUNE 2013 TO JUNE 2014 S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks Million Rupees 1 Chanda Plant/ Mela Plant Mela Water Point situated in hilly area ≈25 km away from Chanda Plant 28.640 2 Missa Kaswall Field from local near by Nallah 4.091 3 Rajian Oil Field from Chohan Nallah 12.274 4 Sadqal Oil Field Sadqal Water Point situated at Shah pur Dam 10.229 REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014 S.No Approach Road Maintenance by EFP-3 Remarks MRs 1 From Well Nashpa-1,2,3,4 2.50 2 From Well Mela- 1,2,3,4 3.00 3 Road near Tharraly Bridge 0.50
  • 37. EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-3 DURING JUNE2013 TO JUNE 2014 S.No DESCRIPTION Earth Work Remarks MRs 1 ROW for SNGPL Gas Pipe line from Nashpa Plant 1.500 2 Restoration of Mud Waste Pit at Nashpa-2 1.000 3 Restoration of Mud Waste Pit at Nashpa-3 1.000 4 Leveling of Hilly area at Plant for Loading Gantry and double Road 15.00 5 Effulent Water Pits (3No) at Dakhni Plant 0.900 6 Leveling of Store Area at Dakhni Plant 0.500
  • 38. PRE-DRILLING ENGINEERING WORKS AT EFP-1 DURING JUNE 2013 TO JUNE 2014 S.No Description Approved Cost EFP-31input Remarks Earh Work Water Supply System Misc.Works Appro ach Road Preparati on of Well location Mud Pit Additional Mud Pit Establi shmen t Water required for drilling Operation Electric al Works Plumbing & Sanitary Works Total amount MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs 1 2 3 4 5 6 7 8 9
  • 39. WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-1 DURING JUNE 2013 TO JUNE 2014 S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks Million Rupees 1 2 3 4 REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014 S.No Approach Road Maintenance by EFP-1 Remarks MRs 1 2 3
  • 40. EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-1 DURING JUNE2013 TO JUNE 2014 S.No DESCRIPTION Earth Work Remarks MRs 1 2 3 4 5 6
  • 41. PRE-DRILLING ENGINEERING WORKS AT EFP-2 DURING JUNE 2013 TO JUNE 2014 S.No Description Approved Cost EFP-2 input Remarks Earh Work Water Supply System Misc.Works Appro ach Road Preparati on of Well location Mud Pit Additional Mud Pit Establi shmen t Water required for drilling Operation Electric al Works Plumbing & Sanitary Works Total amount     MRs MRs MRs MRs MRs MRs MRs MRs MRs   MRs   1 2 3 4 5 6 7 8 9
  • 42. WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-2 DURING JUNE 2013 TO JUNE 2014 S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks       Million Rupees   1   2   3   4           REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014 S.No Approach Road Maintenance by EFP-2 Remarks   MRs   1   2   3  
  • 43. EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-2 DURING JUNE2013 TO JUNE 2014 S.No DESCRIPTION Earth Work Remarks MRs 1 2 3 4 5 6
  • 44. PRE-DRILLING ENGINEERING WORKS AT EFP-4 DURING JUNE 2013 TO JUNE 2014 S.No Description Approved Cost EFP-4 input Remarks Earh Work Water Supply System Misc.Works Appro ach Road Preparati on of Well location Mud Pit Additional Mud Pit Establi shmen t Water required for drilling Operation Electric al Works Plumbing & Sanitary Works Total amount     MRs MRs MRs MRs MRs MRs MRs MRs MRs   MRs   1 2 3 4 5 6 7 8 9
  • 45. WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-4 DURING JUNE 2013 TO JUNE 2014 S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks       Million Rupees   1   2   3   4           REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014 S.No Approach Road Maintenance by EFP-4 Remarks   MRs   1   2   3  
  • 46. EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-4 DURING JUNE2013 TO JUNE 2014 S.No DESCRIPTION Earth Work Remarks MRs 1 2 3 4 5 6
  • 47. PRE-DRILLING ENGINEERING WORKS AT EFP-5 DURING JUNE 2013 TO JUNE 2014 S.No Description Approved Cost EFP-5 input Remarks Earh Work Water Supply System Misc.Works Appro ach Road Preparati on of Well location Mud Pit Additional Mud Pit Establi shmen t Water required for drilling Operation Electric al Works Plumbing & Sanitary Works Total amount     MRs MRs MRs MRs MRs MRs MRs MRs MRs   MRs   1 2 3 4 5 6 7 8 9
  • 48. WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-5 DURING JUNE 2013 TO JUNE 2014 S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks       Million Rupees   1   2   3   4           REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014 S.No Approach Road Maintenance by EFP-5 Remarks   MRs   1   2   3  
  • 49. EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-5 DURING JUNE2013 TO JUNE 2014 S.No DESCRIPTION Earth Work Remarks MRs 1 2 3 4 5 6
  • 50. Financially Highlight of- Total Works Done, EFP’s FY 2013-14 1 EFP-I 2 EFP-II PAK Rs. 300.o1 Million 3 EFP-III  PAK Rs. 347.83 Million 4 EFP-IV 5 EFP-V 6 FGCP-I 7 FGCP-II