SlideShare une entreprise Scribd logo
1  sur  6
V.BALACHANDRU, D.M.E.
Mobile: 09941130970
E-mail: balachandruv@gmail.com
PRODUCTION IN-CHARGE
EXECUTIVE SUMMARY
 Seasoned Professional with around 15 years of widespread
experience in Purchase and Production In-charge.
 Excellence in planning, executing, managing and spearheading in
Production.
 A strategist with expertise in planning and executing maintenance
projects with flair for adopting methodologies in compliance with
quality standards.
 Adopt in managing the machine Utility time by engaging the
Operators reducing idle time / downtime & enhancing operational
effectiveness of equipment.
 Well versed with the concepts of CNC, Advance New Tooling,
Advance Clamping Systems and Reconditioning of Machine Tools.
 An enterprising leader with proven abilities in leading teams towards
the achievement of organisational goals and industry best practices.
 Exposure about the concepts of procurement of machine goods,
budgeting
 Gained expertise in resource management and analytical
assessment to strengthen effectiveness and training the juniors.
 Excellent relationship management, analytical and negotiation skills
EMPLOYMENT CHRONICLE
Company Name: Larsen & Toubro Rubber Processing Machinery LTD, Kanchipuram
Designation: Production In-charge – Machine Shop.
Duration: JAN 2007 to Till Now.
Job Profile :
Inventory of Raw Material:
 To carry out Raw Material from Steel yard to Machine shop as the IIP and With Closed Production Order.
 Check the Raw Material with the Correct Production order with the Correct Part Number.
 Check the Production order with the SAP Application and Check the Stock also.
 Plan the HBM Machine as the Job Accuracy and size from the Design drawing given.
 Ensuring the Tooling, Lift Handling devices and Clamping Devices and Programming.
 Preparing the check sheet, Co-ordinate check sheet and Pareto chart given by Quality Assurance
Department.
 Preparing and Handover report to Quality Department & hand over to Assembly Department.
Inventory of Raw Material
Plan Machining as per Raw Material
Converted into Finished Goods
Hand over to Assembly
TPM Implementation
Safety Requirement
ISO 9001 System Implementation
ISO 14001System Implementation
Resource Management
Project management
Team Management
Plan Machining as per Raw Material:
 After Receive the Material. Plan the Machine as per the Drawing requirement.
 Check the Tooling Requirement for the Job and involve New tooling method to reduce the Process time of
the Job.
 Developing the Jig and fixture for the New Component for machining.
 Create the Setup sheet and process sheet for Various Machining Components.
New Methodology involve in Shop:
 Implementation of Japanese Technique like 5S & Kaizen to improve the machine Quality.
 Implementation of Theory of constrain (TOC) Techniques in the Bottle neck machines.
 Implementation of Single Mould Exchange of Dies (SMED) In the Horizontal Boring Machines(VMC &
HMC).
 Implementation of Value Stream Mapping in the Techniques in the Shop floor.
 Avoid the NVA Activities from the Component Machining.
 Implementation of Value Engineering in the Product Activities in the Shop floor.
 By Applying this Methodology to Increase the OEE 80% and Schedule Adherence 90% based on the
Weekly Schedule.
 Implementation of Lean Manufacturing in the Shop Floor Area.
 Implementation of 7QC Tools to improve the Quality of the Components.
 Daily Morning GEMBA Walk on the Shop Floor area to list out the Issues in the Shop floor.
Job Profile:
 Reduce the NCR Trend to small amount by attending Weekly QRM Meeting.
 Complete the Corrective Action and Preventive Action (CAPA) and 8D Procedure for the Closed NCR.
 Close the NCR with the Corresponding Design Department. And do the Corrective Actions.
 Take the Preventive Action to avoid the Repeated NCR in future thru’ One point lesson, Implementing
Fool Proof methods, KANBAN, Made Jigs or Fixtures.
Breakdown Maintenance
 To carry out Breakdown Maintenance report for all types of shop floor machines like CNC, HMC, VMC &
SPM machines,
 Implementation of Japanese Technique like 5S & Kaizen to improve the machine quality.
 Well experienced in implementing various activities for autonomous maintenance activities like, initiation of
tag for abnormality, tag removal, visual control, hard to reach clean lube inspects (CLIR).
 Exposure in taking corrective actions of increasing mean time between failure and decreasing mean time to
repair.
 Preparing breakdown analysis chart through WHY-WHY analysis.
 Responsible for analysing the machine failure & based on this modifying the maintenance checklist &
inspection Schedule.
Spare Parts Management
 Preparing the Critical parts list for all Bottle neck machine and budgetary offer will obtain for Budgeting
purpose.
 For all Critical Parts drawing will be drafted in Auto CAD.
 Co-ordinate with production engineering department for in-house machining of machine parts.
 Localizing the critical parts for Easy availability with the imported quality.
 Based on the results of the Preventive Maintenance, spare parts will be ordered & kept in stock for
replacement.
 For all regular wear parts and consumable items Minimum order level will be defined and stock will be
maintained.
 All the parts received are maintained in Maintenance Stores with easy identification.
ISO Documentation
 Prepared Departmental Manual to Maintenance Department for ISO 9001-2008, ISO 14001 as per the
standard.
 Prepared Departmental Procedure for Machine shop Team with Matrix table.
 Providing Numbers to the Documents as per the Standard & maintain regularly.
 Monitoring the Departmental Objective & reviewing every month through Tracking Sheet.
 Preparing the Compliance Chart for the Environmental Audit as per the Standard.
 Preparing Emergency Procedures & Operational Control Procedure for the Departmental Activities as per
the Standard.
 Participated in Internal Audit & maintaining the Documents up to date.
Safety
 Risk Analysis Meeting will be conducted daily before starting the work, where the safety measures for the
risk will be analysed.
 Method of Statement will be prepared for all Non-Routine Activities and it will be communicate to team
members.
 Monthly once Safety Audit will be conducted along with Safety team in all work areas for ensuring the
working Environment is safe.
 For all Maintenance Activities Hazard Identification & risk Assessment (HIRA) will prepared & significance
rating will be given. For High Significance activity, corrective action plan will prepare & implemented.
Team Management
 Skill Matrix will be prepared for all Sub-ordinates & training will be organized.
 Motivating & supporting the Sub-ordinates to implement Kaizen activity for productivity improvement.
 Allocating the man power for various jobs and controlling their activities.
 Small Group will be formed & projects will be allocated for Productivity improvement.
 Reporting the Activities Directly to GM & controlling team containing 20 members.
PREVIOUS ASSIGNMENTS
S.No. Company Department Designation Duration
1
VARIAC SYSTEM PVT
LTD; DRAFTING
CAD-
DRAFTMAN
FROM NOV 2001 TO
JAN 2004.
2
WHEELS INDIA (Zeal
Engineering
Consultant)
Wire Wheel; E.M;
H.V & L.V Research
& Development
CAD Designer
FROM JAN 2004 TO
MAY 2004.
3 BUL ENGINEERING QUALITY CONTROL
DEPARTMENT
Quality
Inspector &
Supervisor
FROM MAY 2004 TO
OCT 2004.
4
LARSEN & TOUBRO
(Image Cad System)
PRODUCTION
ENGINEERING
CAD Designer
FROM APR 2004 TO
JUNE 2006.
5
PROTECH System &
Circuits Pvt Ltd.,
PRODUCTION
PLANNING
CONTROL(SHEET
METAL)
PLANNER CUM
SUPERVISOR
FROM JUN 2006 TO
JAN 2007
EDUCATIONAL QUALIFICATIONS:
COURSE INSTITUTION UNIVERSITY YEAR OF PASSING PERCENTAGE
D.M.E
DIPLOMA IN
MECHANICAL
ENGINEERING
CVAT CHENNAI
Central Polytechnic 2000 79%
PROFESSIONAL ENHANCEMENTS
 Training on:
• Training on Auto-Cad 2000; Pro-E;
• CNC Programming(Siemens-840D);
COMPETITION PARTICIPATED
 Competition Participated in the Confederation of Indian Industries(CII)-2015
Project Tile : Elimination of dimensional Error in the Vertical Boring Machine(VBM)
PERSONAL INFORMATION:
Name : V.Balachandru.
D.O.B : 15.12.1981.
Marital Status : Married.
Nationality : Indian
Languages known : Language speak Read Write
Tamil S R W
English S R W
Telugu S - -
Mobile : 9941130970.
Passport Detail : F6015889
DECLARATION:
I assure that above said details are true to my knowledge and belief.
Date: yours truly,
Place:
(V.Balachandru)
Mobile : 9941130970.
Passport Detail : F6015889
DECLARATION:
I assure that above said details are true to my knowledge and belief.
Date: yours truly,
Place:
(V.Balachandru)

Contenu connexe

Tendances (20)

Harpreet Singh-Resume-QA
Harpreet Singh-Resume-QAHarpreet Singh-Resume-QA
Harpreet Singh-Resume-QA
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
updated CV (2)
updated CV (2)updated CV (2)
updated CV (2)
 
Sr Engg Quality_Shobha Ambekar
Sr Engg Quality_Shobha AmbekarSr Engg Quality_Shobha Ambekar
Sr Engg Quality_Shobha Ambekar
 
Resume
ResumeResume
Resume
 
RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015
 
RR CV
RR CVRR CV
RR CV
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
resume praveen david
resume praveen davidresume praveen david
resume praveen david
 
Brad Hicks
Brad HicksBrad Hicks
Brad Hicks
 
cv- L
cv- Lcv- L
cv- L
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
Waleed
WaleedWaleed
Waleed
 
Ahmed BakrResume
Ahmed BakrResumeAhmed BakrResume
Ahmed BakrResume
 
Altakavir adam makandar_engineering_professional
Altakavir adam makandar_engineering_professional  Altakavir adam makandar_engineering_professional
Altakavir adam makandar_engineering_professional
 
Subrota ghosh.doc resume
Subrota ghosh.doc resumeSubrota ghosh.doc resume
Subrota ghosh.doc resume
 
Ravindra pingale
Ravindra pingaleRavindra pingale
Ravindra pingale
 
New Updated CV
New Updated CVNew Updated CV
New Updated CV
 

En vedette

Research Paper_Schultz (2) BULLYING LINK
Research Paper_Schultz (2) BULLYING LINKResearch Paper_Schultz (2) BULLYING LINK
Research Paper_Schultz (2) BULLYING LINK
Samantha Schultz
 

En vedette (20)

Seminário de Uso das Redes Sociais Para Publicação Cientifica na USP_Dalton M...
Seminário de Uso das Redes Sociais Para Publicação Cientifica na USP_Dalton M...Seminário de Uso das Redes Sociais Para Publicação Cientifica na USP_Dalton M...
Seminário de Uso das Redes Sociais Para Publicação Cientifica na USP_Dalton M...
 
Social selling's impact on my own pipeline
Social selling's impact on my own pipelineSocial selling's impact on my own pipeline
Social selling's impact on my own pipeline
 
Code Cooking
Code Cooking Code Cooking
Code Cooking
 
Feedback Loops v4x3 Lightening
Feedback Loops v4x3 Lightening Feedback Loops v4x3 Lightening
Feedback Loops v4x3 Lightening
 
Bullying
BullyingBullying
Bullying
 
Psychologicalfoundationofeducation 130417163850-phpapp01
Psychologicalfoundationofeducation 130417163850-phpapp01Psychologicalfoundationofeducation 130417163850-phpapp01
Psychologicalfoundationofeducation 130417163850-phpapp01
 
O caminho da vida eterna.
O caminho da vida eterna.O caminho da vida eterna.
O caminho da vida eterna.
 
Pasantía semestre 5 noviembre 2016
Pasantía semestre 5 noviembre 2016Pasantía semestre 5 noviembre 2016
Pasantía semestre 5 noviembre 2016
 
PEI 2015
PEI 2015PEI 2015
PEI 2015
 
Resolucion rectoral no.7 del 30 sep de 2015
Resolucion rectoral no.7 del 30 sep de 2015Resolucion rectoral no.7 del 30 sep de 2015
Resolucion rectoral no.7 del 30 sep de 2015
 
Rentas de Tercera, Cuarta y Quinta Categoría 2015
Rentas de Tercera, Cuarta y Quinta Categoría 2015Rentas de Tercera, Cuarta y Quinta Categoría 2015
Rentas de Tercera, Cuarta y Quinta Categoría 2015
 
Logística de ferreyros 2016
Logística de ferreyros 2016Logística de ferreyros 2016
Logística de ferreyros 2016
 
Meu amigo invisível
Meu amigo invisívelMeu amigo invisível
Meu amigo invisível
 
How Do Community Improvement Plans work for Agriculture - Haldimand County - ...
How Do Community Improvement Plans work for Agriculture - Haldimand County - ...How Do Community Improvement Plans work for Agriculture - Haldimand County - ...
How Do Community Improvement Plans work for Agriculture - Haldimand County - ...
 
Ferreyros CAT
Ferreyros CATFerreyros CAT
Ferreyros CAT
 
O Cristão e os perigos das "Redes" Sociais
O Cristão e os perigos das "Redes" Sociais O Cristão e os perigos das "Redes" Sociais
O Cristão e os perigos das "Redes" Sociais
 
Kinds of sentences; compound sentences
Kinds of sentences; compound sentencesKinds of sentences; compound sentences
Kinds of sentences; compound sentences
 
Research Paper_Schultz (2) BULLYING LINK
Research Paper_Schultz (2) BULLYING LINKResearch Paper_Schultz (2) BULLYING LINK
Research Paper_Schultz (2) BULLYING LINK
 
Programación Festival Quindiano de Cine y Video en la Universidad del Quindío
Programación Festival Quindiano de Cine y Video en la Universidad del QuindíoProgramación Festival Quindiano de Cine y Video en la Universidad del Quindío
Programación Festival Quindiano de Cine y Video en la Universidad del Quindío
 
Programación Feria del Libro de Armenia 2016
Programación Feria del Libro de Armenia 2016Programación Feria del Libro de Armenia 2016
Programación Feria del Libro de Armenia 2016
 

Similaire à Resume_Balachandru

Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
Asik Ali
 
Sarath Sreedhar (082016)
Sarath Sreedhar (082016)Sarath Sreedhar (082016)
Sarath Sreedhar (082016)
Sarath Sreedhar
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
sanjay kumar A M
 
Resume of Anil Kumar sahu
Resume of Anil Kumar sahuResume of Anil Kumar sahu
Resume of Anil Kumar sahu
Anil Sahu
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
Carl Arens
 
Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
Rohit Tyagi
 
latestResume_Sushant
latestResume_SushantlatestResume_Sushant
latestResume_Sushant
Sushant Kumar
 

Similaire à Resume_Balachandru (20)

Rsume
RsumeRsume
Rsume
 
Doc
DocDoc
Doc
 
CV_Vinod
CV_VinodCV_Vinod
CV_Vinod
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Sarath Sreedhar (082016)
Sarath Sreedhar (082016)Sarath Sreedhar (082016)
Sarath Sreedhar (082016)
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Resume
ResumeResume
Resume
 
updated Resume
updated Resumeupdated Resume
updated Resume
 
NM CV 041114
NM CV 041114NM CV 041114
NM CV 041114
 
Sathishbabu
SathishbabuSathishbabu
Sathishbabu
 
Resume of Anil Kumar sahu
Resume of Anil Kumar sahuResume of Anil Kumar sahu
Resume of Anil Kumar sahu
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
 
Yajuvendra Bamrara CV
Yajuvendra Bamrara CVYajuvendra Bamrara CV
Yajuvendra Bamrara CV
 
Resume new
Resume newResume new
Resume new
 
latestResume_Sushant
latestResume_SushantlatestResume_Sushant
latestResume_Sushant
 

Resume_Balachandru

  • 1. V.BALACHANDRU, D.M.E. Mobile: 09941130970 E-mail: balachandruv@gmail.com PRODUCTION IN-CHARGE EXECUTIVE SUMMARY  Seasoned Professional with around 15 years of widespread experience in Purchase and Production In-charge.  Excellence in planning, executing, managing and spearheading in Production.  A strategist with expertise in planning and executing maintenance projects with flair for adopting methodologies in compliance with quality standards.  Adopt in managing the machine Utility time by engaging the Operators reducing idle time / downtime & enhancing operational effectiveness of equipment.  Well versed with the concepts of CNC, Advance New Tooling, Advance Clamping Systems and Reconditioning of Machine Tools.  An enterprising leader with proven abilities in leading teams towards the achievement of organisational goals and industry best practices.  Exposure about the concepts of procurement of machine goods, budgeting  Gained expertise in resource management and analytical assessment to strengthen effectiveness and training the juniors.  Excellent relationship management, analytical and negotiation skills EMPLOYMENT CHRONICLE Company Name: Larsen & Toubro Rubber Processing Machinery LTD, Kanchipuram Designation: Production In-charge – Machine Shop. Duration: JAN 2007 to Till Now. Job Profile : Inventory of Raw Material:  To carry out Raw Material from Steel yard to Machine shop as the IIP and With Closed Production Order.  Check the Raw Material with the Correct Production order with the Correct Part Number.  Check the Production order with the SAP Application and Check the Stock also.  Plan the HBM Machine as the Job Accuracy and size from the Design drawing given.  Ensuring the Tooling, Lift Handling devices and Clamping Devices and Programming.  Preparing the check sheet, Co-ordinate check sheet and Pareto chart given by Quality Assurance Department.  Preparing and Handover report to Quality Department & hand over to Assembly Department. Inventory of Raw Material Plan Machining as per Raw Material Converted into Finished Goods Hand over to Assembly TPM Implementation Safety Requirement ISO 9001 System Implementation ISO 14001System Implementation Resource Management Project management Team Management
  • 2. Plan Machining as per Raw Material:  After Receive the Material. Plan the Machine as per the Drawing requirement.  Check the Tooling Requirement for the Job and involve New tooling method to reduce the Process time of the Job.  Developing the Jig and fixture for the New Component for machining.  Create the Setup sheet and process sheet for Various Machining Components. New Methodology involve in Shop:  Implementation of Japanese Technique like 5S & Kaizen to improve the machine Quality.  Implementation of Theory of constrain (TOC) Techniques in the Bottle neck machines.  Implementation of Single Mould Exchange of Dies (SMED) In the Horizontal Boring Machines(VMC & HMC).  Implementation of Value Stream Mapping in the Techniques in the Shop floor.  Avoid the NVA Activities from the Component Machining.  Implementation of Value Engineering in the Product Activities in the Shop floor.  By Applying this Methodology to Increase the OEE 80% and Schedule Adherence 90% based on the Weekly Schedule.  Implementation of Lean Manufacturing in the Shop Floor Area.  Implementation of 7QC Tools to improve the Quality of the Components.  Daily Morning GEMBA Walk on the Shop Floor area to list out the Issues in the Shop floor. Job Profile:  Reduce the NCR Trend to small amount by attending Weekly QRM Meeting.  Complete the Corrective Action and Preventive Action (CAPA) and 8D Procedure for the Closed NCR.  Close the NCR with the Corresponding Design Department. And do the Corrective Actions.  Take the Preventive Action to avoid the Repeated NCR in future thru’ One point lesson, Implementing Fool Proof methods, KANBAN, Made Jigs or Fixtures. Breakdown Maintenance  To carry out Breakdown Maintenance report for all types of shop floor machines like CNC, HMC, VMC & SPM machines,  Implementation of Japanese Technique like 5S & Kaizen to improve the machine quality.  Well experienced in implementing various activities for autonomous maintenance activities like, initiation of tag for abnormality, tag removal, visual control, hard to reach clean lube inspects (CLIR).  Exposure in taking corrective actions of increasing mean time between failure and decreasing mean time to repair.  Preparing breakdown analysis chart through WHY-WHY analysis.  Responsible for analysing the machine failure & based on this modifying the maintenance checklist & inspection Schedule. Spare Parts Management
  • 3.  Preparing the Critical parts list for all Bottle neck machine and budgetary offer will obtain for Budgeting purpose.  For all Critical Parts drawing will be drafted in Auto CAD.  Co-ordinate with production engineering department for in-house machining of machine parts.  Localizing the critical parts for Easy availability with the imported quality.  Based on the results of the Preventive Maintenance, spare parts will be ordered & kept in stock for replacement.  For all regular wear parts and consumable items Minimum order level will be defined and stock will be maintained.  All the parts received are maintained in Maintenance Stores with easy identification. ISO Documentation  Prepared Departmental Manual to Maintenance Department for ISO 9001-2008, ISO 14001 as per the standard.  Prepared Departmental Procedure for Machine shop Team with Matrix table.  Providing Numbers to the Documents as per the Standard & maintain regularly.  Monitoring the Departmental Objective & reviewing every month through Tracking Sheet.  Preparing the Compliance Chart for the Environmental Audit as per the Standard.  Preparing Emergency Procedures & Operational Control Procedure for the Departmental Activities as per the Standard.  Participated in Internal Audit & maintaining the Documents up to date. Safety  Risk Analysis Meeting will be conducted daily before starting the work, where the safety measures for the risk will be analysed.  Method of Statement will be prepared for all Non-Routine Activities and it will be communicate to team members.  Monthly once Safety Audit will be conducted along with Safety team in all work areas for ensuring the working Environment is safe.  For all Maintenance Activities Hazard Identification & risk Assessment (HIRA) will prepared & significance rating will be given. For High Significance activity, corrective action plan will prepare & implemented. Team Management  Skill Matrix will be prepared for all Sub-ordinates & training will be organized.  Motivating & supporting the Sub-ordinates to implement Kaizen activity for productivity improvement.  Allocating the man power for various jobs and controlling their activities.  Small Group will be formed & projects will be allocated for Productivity improvement.  Reporting the Activities Directly to GM & controlling team containing 20 members. PREVIOUS ASSIGNMENTS S.No. Company Department Designation Duration
  • 4. 1 VARIAC SYSTEM PVT LTD; DRAFTING CAD- DRAFTMAN FROM NOV 2001 TO JAN 2004. 2 WHEELS INDIA (Zeal Engineering Consultant) Wire Wheel; E.M; H.V & L.V Research & Development CAD Designer FROM JAN 2004 TO MAY 2004. 3 BUL ENGINEERING QUALITY CONTROL DEPARTMENT Quality Inspector & Supervisor FROM MAY 2004 TO OCT 2004. 4 LARSEN & TOUBRO (Image Cad System) PRODUCTION ENGINEERING CAD Designer FROM APR 2004 TO JUNE 2006. 5 PROTECH System & Circuits Pvt Ltd., PRODUCTION PLANNING CONTROL(SHEET METAL) PLANNER CUM SUPERVISOR FROM JUN 2006 TO JAN 2007 EDUCATIONAL QUALIFICATIONS: COURSE INSTITUTION UNIVERSITY YEAR OF PASSING PERCENTAGE D.M.E DIPLOMA IN MECHANICAL ENGINEERING CVAT CHENNAI Central Polytechnic 2000 79% PROFESSIONAL ENHANCEMENTS  Training on: • Training on Auto-Cad 2000; Pro-E; • CNC Programming(Siemens-840D); COMPETITION PARTICIPATED  Competition Participated in the Confederation of Indian Industries(CII)-2015 Project Tile : Elimination of dimensional Error in the Vertical Boring Machine(VBM) PERSONAL INFORMATION: Name : V.Balachandru. D.O.B : 15.12.1981. Marital Status : Married. Nationality : Indian Languages known : Language speak Read Write Tamil S R W English S R W Telugu S - -
  • 5. Mobile : 9941130970. Passport Detail : F6015889 DECLARATION: I assure that above said details are true to my knowledge and belief. Date: yours truly, Place: (V.Balachandru)
  • 6. Mobile : 9941130970. Passport Detail : F6015889 DECLARATION: I assure that above said details are true to my knowledge and belief. Date: yours truly, Place: (V.Balachandru)