1. V.BALACHANDRU, D.M.E.
Mobile: 09941130970
E-mail: balachandruv@gmail.com
PRODUCTION IN-CHARGE
EXECUTIVE SUMMARY
Seasoned Professional with around 15 years of widespread
experience in Purchase and Production In-charge.
Excellence in planning, executing, managing and spearheading in
Production.
A strategist with expertise in planning and executing maintenance
projects with flair for adopting methodologies in compliance with
quality standards.
Adopt in managing the machine Utility time by engaging the
Operators reducing idle time / downtime & enhancing operational
effectiveness of equipment.
Well versed with the concepts of CNC, Advance New Tooling,
Advance Clamping Systems and Reconditioning of Machine Tools.
An enterprising leader with proven abilities in leading teams towards
the achievement of organisational goals and industry best practices.
Exposure about the concepts of procurement of machine goods,
budgeting
Gained expertise in resource management and analytical
assessment to strengthen effectiveness and training the juniors.
Excellent relationship management, analytical and negotiation skills
EMPLOYMENT CHRONICLE
Company Name: Larsen & Toubro Rubber Processing Machinery LTD, Kanchipuram
Designation: Production In-charge – Machine Shop.
Duration: JAN 2007 to Till Now.
Job Profile :
Inventory of Raw Material:
To carry out Raw Material from Steel yard to Machine shop as the IIP and With Closed Production Order.
Check the Raw Material with the Correct Production order with the Correct Part Number.
Check the Production order with the SAP Application and Check the Stock also.
Plan the HBM Machine as the Job Accuracy and size from the Design drawing given.
Ensuring the Tooling, Lift Handling devices and Clamping Devices and Programming.
Preparing the check sheet, Co-ordinate check sheet and Pareto chart given by Quality Assurance
Department.
Preparing and Handover report to Quality Department & hand over to Assembly Department.
Inventory of Raw Material
Plan Machining as per Raw Material
Converted into Finished Goods
Hand over to Assembly
TPM Implementation
Safety Requirement
ISO 9001 System Implementation
ISO 14001System Implementation
Resource Management
Project management
Team Management
2. Plan Machining as per Raw Material:
After Receive the Material. Plan the Machine as per the Drawing requirement.
Check the Tooling Requirement for the Job and involve New tooling method to reduce the Process time of
the Job.
Developing the Jig and fixture for the New Component for machining.
Create the Setup sheet and process sheet for Various Machining Components.
New Methodology involve in Shop:
Implementation of Japanese Technique like 5S & Kaizen to improve the machine Quality.
Implementation of Theory of constrain (TOC) Techniques in the Bottle neck machines.
Implementation of Single Mould Exchange of Dies (SMED) In the Horizontal Boring Machines(VMC &
HMC).
Implementation of Value Stream Mapping in the Techniques in the Shop floor.
Avoid the NVA Activities from the Component Machining.
Implementation of Value Engineering in the Product Activities in the Shop floor.
By Applying this Methodology to Increase the OEE 80% and Schedule Adherence 90% based on the
Weekly Schedule.
Implementation of Lean Manufacturing in the Shop Floor Area.
Implementation of 7QC Tools to improve the Quality of the Components.
Daily Morning GEMBA Walk on the Shop Floor area to list out the Issues in the Shop floor.
Job Profile:
Reduce the NCR Trend to small amount by attending Weekly QRM Meeting.
Complete the Corrective Action and Preventive Action (CAPA) and 8D Procedure for the Closed NCR.
Close the NCR with the Corresponding Design Department. And do the Corrective Actions.
Take the Preventive Action to avoid the Repeated NCR in future thru’ One point lesson, Implementing
Fool Proof methods, KANBAN, Made Jigs or Fixtures.
Breakdown Maintenance
To carry out Breakdown Maintenance report for all types of shop floor machines like CNC, HMC, VMC &
SPM machines,
Implementation of Japanese Technique like 5S & Kaizen to improve the machine quality.
Well experienced in implementing various activities for autonomous maintenance activities like, initiation of
tag for abnormality, tag removal, visual control, hard to reach clean lube inspects (CLIR).
Exposure in taking corrective actions of increasing mean time between failure and decreasing mean time to
repair.
Preparing breakdown analysis chart through WHY-WHY analysis.
Responsible for analysing the machine failure & based on this modifying the maintenance checklist &
inspection Schedule.
Spare Parts Management
3. Preparing the Critical parts list for all Bottle neck machine and budgetary offer will obtain for Budgeting
purpose.
For all Critical Parts drawing will be drafted in Auto CAD.
Co-ordinate with production engineering department for in-house machining of machine parts.
Localizing the critical parts for Easy availability with the imported quality.
Based on the results of the Preventive Maintenance, spare parts will be ordered & kept in stock for
replacement.
For all regular wear parts and consumable items Minimum order level will be defined and stock will be
maintained.
All the parts received are maintained in Maintenance Stores with easy identification.
ISO Documentation
Prepared Departmental Manual to Maintenance Department for ISO 9001-2008, ISO 14001 as per the
standard.
Prepared Departmental Procedure for Machine shop Team with Matrix table.
Providing Numbers to the Documents as per the Standard & maintain regularly.
Monitoring the Departmental Objective & reviewing every month through Tracking Sheet.
Preparing the Compliance Chart for the Environmental Audit as per the Standard.
Preparing Emergency Procedures & Operational Control Procedure for the Departmental Activities as per
the Standard.
Participated in Internal Audit & maintaining the Documents up to date.
Safety
Risk Analysis Meeting will be conducted daily before starting the work, where the safety measures for the
risk will be analysed.
Method of Statement will be prepared for all Non-Routine Activities and it will be communicate to team
members.
Monthly once Safety Audit will be conducted along with Safety team in all work areas for ensuring the
working Environment is safe.
For all Maintenance Activities Hazard Identification & risk Assessment (HIRA) will prepared & significance
rating will be given. For High Significance activity, corrective action plan will prepare & implemented.
Team Management
Skill Matrix will be prepared for all Sub-ordinates & training will be organized.
Motivating & supporting the Sub-ordinates to implement Kaizen activity for productivity improvement.
Allocating the man power for various jobs and controlling their activities.
Small Group will be formed & projects will be allocated for Productivity improvement.
Reporting the Activities Directly to GM & controlling team containing 20 members.
PREVIOUS ASSIGNMENTS
S.No. Company Department Designation Duration
4. 1
VARIAC SYSTEM PVT
LTD; DRAFTING
CAD-
DRAFTMAN
FROM NOV 2001 TO
JAN 2004.
2
WHEELS INDIA (Zeal
Engineering
Consultant)
Wire Wheel; E.M;
H.V & L.V Research
& Development
CAD Designer
FROM JAN 2004 TO
MAY 2004.
3 BUL ENGINEERING QUALITY CONTROL
DEPARTMENT
Quality
Inspector &
Supervisor
FROM MAY 2004 TO
OCT 2004.
4
LARSEN & TOUBRO
(Image Cad System)
PRODUCTION
ENGINEERING
CAD Designer
FROM APR 2004 TO
JUNE 2006.
5
PROTECH System &
Circuits Pvt Ltd.,
PRODUCTION
PLANNING
CONTROL(SHEET
METAL)
PLANNER CUM
SUPERVISOR
FROM JUN 2006 TO
JAN 2007
EDUCATIONAL QUALIFICATIONS:
COURSE INSTITUTION UNIVERSITY YEAR OF PASSING PERCENTAGE
D.M.E
DIPLOMA IN
MECHANICAL
ENGINEERING
CVAT CHENNAI
Central Polytechnic 2000 79%
PROFESSIONAL ENHANCEMENTS
Training on:
• Training on Auto-Cad 2000; Pro-E;
• CNC Programming(Siemens-840D);
COMPETITION PARTICIPATED
Competition Participated in the Confederation of Indian Industries(CII)-2015
Project Tile : Elimination of dimensional Error in the Vertical Boring Machine(VBM)
PERSONAL INFORMATION:
Name : V.Balachandru.
D.O.B : 15.12.1981.
Marital Status : Married.
Nationality : Indian
Languages known : Language speak Read Write
Tamil S R W
English S R W
Telugu S - -
5. Mobile : 9941130970.
Passport Detail : F6015889
DECLARATION:
I assure that above said details are true to my knowledge and belief.
Date: yours truly,
Place:
(V.Balachandru)
6. Mobile : 9941130970.
Passport Detail : F6015889
DECLARATION:
I assure that above said details are true to my knowledge and belief.
Date: yours truly,
Place:
(V.Balachandru)