7. N
FEnCHURCH MEdICaL
SNEDE
SNEDE
1
2
GEVEL
N
SNEDE
SNEDE
2
1
GEVEL
1 2 3 4 5 6 7 8 9 10
C C C C
ZW
ZW
GEVEL
GEVEL
GEVEL
GEVEL
NO
NO
B B B B
A A A A
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
NIVEAU +1 NIVEAU +3
SNEDE
SNEDE
SNEDE
SNEDE
GEVEL GEVEL
1
1
2
2
Z Z
0 1 2 5m 0 1 2 5m
N N
SNEDE
SNEDE
SNEDE
SNEDE
1
2
1
2
GEVEL GEVEL
C C C C
ZW
ZW
GEVEL
GEVEL
GEVEL
GEVEL
NO
NO
B B B B
A A A A
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
NIVEAU +0 NIVEAU +2
SNEDE
SNEDE
SNEDE
SNEDE
1
1
GEVEL GEVEL
2
2
Z Z
0 1 2 5m 0 1 2 5m
layout of the offices and the production areas
11. EdEn CHOCOLatES
Complex material flows and procedures are moulded into one Location:
solution. The central core contains the “production knowledge” Suzhou, China
and is surrounded by a mulit-functional space for storage and
production. Client:
Eden Chocolates Co., Ltd.
The shape of the outer parameter is controlled by optimal ac-
cess points and turning circles. A route brings visitors along Team:
interesting learning zones, gardens and meeting area`s into the PLUS office architects
core of the building.
Status:
Completed in 2009
date:
February 2008 - September 2009
Surface:
9,100 m²
west elevation
12. EdEn CHOCOLatES
OPERATIONAL CORE AREA
OFFICE & UTILITIES
PRODUCTION & WAREHOUSING
CAR & TRUCK AREA
GOODS PRODUCTS
PACKAGING LIQUID CHOCOLATE Fire truck road
DOCK
LOBBY UNLOAD DOCK
UTILITY AREA
LOAD
VISITORS
SHOP
WAREHOUSE WAREHOUSE
GOODS IN GOODS OUT
GUESTS
LOBBY PREPARE KITCHEN LABORATORY (2F)
GARBAGE PRODUCTION 01 PRODUCTION 02
CLEAN
EQUIPM.
Fire truck road
first floor layout
13. EdEn CHOCOLatES
visitors
office people
supply & cleaning workers
material flow
17
14. EDEN material flow chart: truck to truck
imported
Dark & Milk Liquid chocolate blocks local or imported fresh products Alcohol
Chocolate, sourced on pallets: 18 x fillings, nuts,... Packaging material transport
locally 750 kg / pallet
Unload,
Visual Check &
unload,unpack,
20 Ton Liquid
Chocolate Tank Buffer area visual check
AIR LOCK Quality
Testing area
storage
Outside Packaging material Storage Raw Ma- Cold room fresh
Rubbish Storage warehouse terials (pallets) and products buffer
filling products
1 month
buffer RM umwrap & pre-
Short Time rubbish / unwrap / buffer
Storage pre-filling products pare
AIR LOCK
??
??
????
prepare pro-
Storage un- Filling preparation Fresh product cess & buffer
Batch tempering Rework Area Melting tanks wrapped chocolate (blending/ weigh- kitchen
tanks ing) 1 shift
washing station Line 1 (Mouleerlijn) Line 2 enrobing Line 3 future Line 4 future
process sing
packing
buffer
naked product store cold room
volume
Packaging assem-
bling line
Packag-
check &
Air Lock ing automated check with rejector packing
line(boxing and &metal detector
flowpacking
palets
fresh product cold Air Lock storage finished
storage out
room products buffer 2
months
send out-visual
check-packing area
Legend transportation methods normal truck load- load
ing area loading dock
Forklift
Pallet truck (manual)
Stainless steel container ?
Plates in box ?
fresh products pallets for export transport
transported on a trolley export or local or local
Pumped in Pipeline
EdEn CHOCOLatES
20. MORgan CRUCIBLES
The total ground floor is occupied by production & warehouse. Location:
Offices and canteen are on upper floors, creating a sharp, Suzhou, China
horizontal hygienic separation within one building.
Client:
Morgan Crucibles Co., Ltd.
The rooftop, designed as a secluded garden, will give visual
and recreational quality to the location. Skylights bring light Team:
into the production and allow visitors to cath a glimpse of the PLUS office architects
production process.
Status:
Completed in 2008
date:
January 2007 - April 2008
Surface:
8,100 m²
visualisation
21. MORgan CRUCIBLES
Production tower
skylight
office
production & warehouse
37
22. MagOttEaUX MatERIaLS
The building is readable as a minimal, fixed structure, which is Location:
then filled up with sectional doors, ventilation louvres, cladding Suzhou, China
materials... . This makes future reorganisations more flexible.
Assignment:
the head of the building, facing south, is cladded with perforated Private tender procedure
aluminium sheets, filtering the sun towards the offices behind the
wall and at the same time feature a billboard towards the street. Client:
Magotteaux Alloyed Materials Co.,
This building shows clearly its solid structure, evocing an impres- Ltd.
sion of strength.
Team:
PLUS office architects
Status:
Completed in 2007
date:
February 2006 - February 2007
Surface:
5,000 m²
corner detail of the west facade
25. aRPadIS CHEMICaLS
A greenfield project for a paint producing factory. blocks, painted Location:
in colours derived from the company logo, are combined with Nanjing, China
windows and gates, creating a pixelated facade.
Assignment:
The independent office building is insulated and blends into the Private selection
total site. the necessary fire fighting water pond becomes a water
element in the garden. Client:
Arpadis Co., Ltd.
Team:
PLUS office architects
date:
January 2009 - May 2010
Surface:
7,000 m²
visualisation 47
27. EXPO 2010 Belgian Pavilion
World Expo 2010
06.03.2009
43
The pavilion hoovers over a plaza, creating an partly covered Location:
outdoor space. The object contains a bar, restaurant and exposi- Shanghai, China
tion room and
Assignment:
Competition: 1 of 5 finalists
Client:
Belgian Government
Team:
Plus office, Buro II,
Schuiten, Tjadri,
Belien, Cceed
visualisation 49
28. Belgian Pavilion
CONCEPT SCHEMES
Belgian Pavilion
World Expo 2010 World Expo 2010
EXPO 2010
06.03.2009
06.03.2009
6 7
ICONIC BUILDING
IAGONAL CIRCULATION EXPANDED PUBLIC DOMAIN
ICONIC BUILDING
DIAGONAL CIRCULATION EXPANDED PUBLIC DOMAIN
DYNAMIC CIRCULATION ICONIC BUILDING EXPANDED PUBLIC DOMAIN
concept scheme of the Belgian pavilion (1 of 5 finalists)
29. Belgian Pavilion
EXPO 2010
World Expo 2010
06.03.2009
42
visualisation 51
32. PROJECt IndEX
year client location client activity size
`09 - ... Fenchurch Medical Filters phase. 3 Suzhou SND medical 1500 m²
`09 - ... Arpadis Processing Nanjing NCIP chemical 7000 m²
`09 - … Rubi Technologies Suzhou SIP tool production 16,000 m²
`09 - `09 Belgian Pavilion Shanghai Expo Shanghai (1 of 5 finalists) entertainment 5000 m²
`08 - `09 Eden Chocolates Suzhou SND food 9000 m²
`08 - `09 Agfa Imaging Wuxi WND imaging materials 8000 m²
`08 - `08 University Leuven (KUL) Nanjing Expo exposition structure 100 m²
`07 - `09 Bekaert Wuxi WND textile 6000 m²
`07 - `08 Morgan Suzhou SIP crucibles 8000 m²
`07 - `08 Concordia Suzhou SIP textile 2500 m²
`07 - `08 Shanghai Rice Mill Shanghai food 180,000 m²
`06 - `08 Fenchurch Medical Filters Ph. 2 Suzhou SND medical 4800 m²
`06 - `07 ABM-Antriebe Suzhou SIP auto industry 1800 m²
`06 - `07 Magotteaux Suzhou SIP alloyed materials 5300 m²
`05 - `06 Van De Wiele Wuxi WND machinery production 12,300 m²
53
33. CENTRAL PLAZA, TOWER A, ROOM 804
SUXIU ROAD 388, SUZHOU SIP, 25021
+86(0)51262953515
+86(0)51262953515
info@plusoffice.asia - www.plusoffice.eu BUILDING CONSULTANCY