SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
PT. TRAFOINDO PRIMA PERKASA
KNEE POINT TEST
1. Purpose
This test is intended to obtain the knee point voltage of current transformer (CT).
2. Test equipment
2.1.Slide regulator, 5 A, 230 V. Use step up transformer to raise up output voltage.
2.2.Voltmeter
2.3.Amperemeter
2.4.Cable connection 2.5 mm2
3. Test circuit
Figure 1: Connection diagram of knee point test
4. Test procedure
4.1.Connect the circuit as shown as figure 1.
4.2.Primary winding and other(s) secondary winding is left opened.
4.3.Raise the voltage source step by step and record the voltage and current as table 1.
CT Specification:
Ratio :
Serial no :
Test core no :
No. Voltage (V) Current (A) Remarks
1.
2.
3.
4.
5.
6.
Table 1: Voltage and current of test
4.4.If current already reached to the nominal secondary current, the test is stopped.
4.5.For evaluation of test, send the record to: trafo@trafoindonesia.com/FAX: +6221-3850702
A
V
1S1
1S2
~ Adjustable
Voltage source
PT. TRAFOINDO PRIMA PERKASA
PRIMARY CURRENT INJECTION TEST
1. Purpose
This test is intended to verify that current transformation ratio as shown on the name
plate is correct. Primary current injection test is not accuracy test, therefore the result
of this test to calculate ratio error is not acceptable.
2. Test Circuit
Note: Ensure to short-circuited secondary terminal prior to conduct primary current
injection. Fail to do so will cause damage to current transformer.
3. Test procedure
3.1.Check the name plate ratio and primary current
3.2.Check the current source is able to raise up to nominal current of CT.
3.3.Check the size of primary cable
3.4.Check the terminal on secondary CT either core I, core II and or core III are short-
circuited.
3.5.Start to raise up the current and record with below simple table.
CT Specification:
Ratio :
Serial no :
Test core no :
No. Actual primary current
(A)
Actual secondary
current (A)
Actual ratio Calculated
ratio
1.
2.
3.
4.
5.
6.
A P1
P2
~ Adjustable
Current source
1S1
1S2
A

Contenu connexe

Similaire à Knee point & primary current injection test

Group 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final PresentationGroup 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final Presentation
Dan Greenwood
 
Circuit Analysis Lab
Circuit Analysis LabCircuit Analysis Lab
Circuit Analysis Lab
Sachin Airan
 

Similaire à Knee point & primary current injection test (20)

Transformer Rated Metering
Transformer Rated MeteringTransformer Rated Metering
Transformer Rated Metering
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Ect2
Ect2Ect2
Ect2
 
Site Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket DetectionSite Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket Detection
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Fat procedure for lv switchboards
Fat procedure for lv switchboardsFat procedure for lv switchboards
Fat procedure for lv switchboards
 
Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2
 
Group 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final PresentationGroup 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final Presentation
 
Circuit Analysis Lab
Circuit Analysis LabCircuit Analysis Lab
Circuit Analysis Lab
 
1 7 earth fault relay
1 7 earth fault relay1 7 earth fault relay
1 7 earth fault relay
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
 
Power converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaPower converter lab manual by chaturvedula
Power converter lab manual by chaturvedula
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 
Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
 
meter.pptx
meter.pptxmeter.pptx
meter.pptx
 
dtsd1352-manual.pdf
dtsd1352-manual.pdfdtsd1352-manual.pdf
dtsd1352-manual.pdf
 

Dernier

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Dernier (20)

2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Knee point & primary current injection test

  • 1. PT. TRAFOINDO PRIMA PERKASA KNEE POINT TEST 1. Purpose This test is intended to obtain the knee point voltage of current transformer (CT). 2. Test equipment 2.1.Slide regulator, 5 A, 230 V. Use step up transformer to raise up output voltage. 2.2.Voltmeter 2.3.Amperemeter 2.4.Cable connection 2.5 mm2 3. Test circuit Figure 1: Connection diagram of knee point test 4. Test procedure 4.1.Connect the circuit as shown as figure 1. 4.2.Primary winding and other(s) secondary winding is left opened. 4.3.Raise the voltage source step by step and record the voltage and current as table 1. CT Specification: Ratio : Serial no : Test core no : No. Voltage (V) Current (A) Remarks 1. 2. 3. 4. 5. 6. Table 1: Voltage and current of test 4.4.If current already reached to the nominal secondary current, the test is stopped. 4.5.For evaluation of test, send the record to: trafo@trafoindonesia.com/FAX: +6221-3850702 A V 1S1 1S2 ~ Adjustable Voltage source
  • 2. PT. TRAFOINDO PRIMA PERKASA PRIMARY CURRENT INJECTION TEST 1. Purpose This test is intended to verify that current transformation ratio as shown on the name plate is correct. Primary current injection test is not accuracy test, therefore the result of this test to calculate ratio error is not acceptable. 2. Test Circuit Note: Ensure to short-circuited secondary terminal prior to conduct primary current injection. Fail to do so will cause damage to current transformer. 3. Test procedure 3.1.Check the name plate ratio and primary current 3.2.Check the current source is able to raise up to nominal current of CT. 3.3.Check the size of primary cable 3.4.Check the terminal on secondary CT either core I, core II and or core III are short- circuited. 3.5.Start to raise up the current and record with below simple table. CT Specification: Ratio : Serial no : Test core no : No. Actual primary current (A) Actual secondary current (A) Actual ratio Calculated ratio 1. 2. 3. 4. 5. 6. A P1 P2 ~ Adjustable Current source 1S1 1S2 A