PT. TRAFOINDO PRIMA PERKASA
KNEE POINT TEST
1. Purpose
This test is intended to obtain the knee point voltage of current transformer (CT).
2. Test equipment
2.1.Slide regulator, 5 A, 230 V. Use step up transformer to raise up output voltage.
2.2.Voltmeter
2.3.Amperemeter
2.4.Cable connection 2.5 mm2
3. Test circuit
Figure 1: Connection diagram of knee point test
4. Test procedure
4.1.Connect the circuit as shown as figure 1.
4.2.Primary winding and other(s) secondary winding is left opened.
4.3.Raise the voltage source step by step and record the voltage and current as table 1.
CT Specification:
Ratio :
Serial no :
Test core no :
No. Voltage (V) Current (A) Remarks
1.
2.
3.
4.
5.
6.
Table 1: Voltage and current of test
4.4.If current already reached to the nominal secondary current, the test is stopped.
4.5.For evaluation of test, send the record to: trafo@trafoindonesia.com/FAX: +6221-3850702
A
V
1S1
1S2
~ Adjustable
Voltage source
PT. TRAFOINDO PRIMA PERKASA
PRIMARY CURRENT INJECTION TEST
1. Purpose
This test is intended to verify that current transformation ratio as shown on the name
plate is correct. Primary current injection test is not accuracy test, therefore the result
of this test to calculate ratio error is not acceptable.
2. Test Circuit
Note: Ensure to short-circuited secondary terminal prior to conduct primary current
injection. Fail to do so will cause damage to current transformer.
3. Test procedure
3.1.Check the name plate ratio and primary current
3.2.Check the current source is able to raise up to nominal current of CT.
3.3.Check the size of primary cable
3.4.Check the terminal on secondary CT either core I, core II and or core III are short-
circuited.
3.5.Start to raise up the current and record with below simple table.
CT Specification:
Ratio :
Serial no :
Test core no :
No. Actual primary current
(A)
Actual secondary
current (A)
Actual ratio Calculated
ratio
1.
2.
3.
4.
5.
6.
A P1
P2
~ Adjustable
Current source
1S1
1S2
A

Contenu connexe

Tendances

Transformer testing
Transformer testingTransformer testing
Transformer testing
ajayknows
 
Commissioning of electrical equipments
Commissioning of electrical equipmentsCommissioning of electrical equipments
Commissioning of electrical equipments
Palak Ariwala
 
three phase inverter
three phase inverterthree phase inverter
three phase inverter
Malik Zaid
 
space vector PWM for 2 leg inverter
space vector PWM for 2 leg inverterspace vector PWM for 2 leg inverter
space vector PWM for 2 leg inverter
Sudhakar Reddy
 
Mini project submission
Mini project submissionMini project submission
Mini project submission
Akshay Ajay
 

Tendances (20)

Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Commissioning of electrical equipments
Commissioning of electrical equipmentsCommissioning of electrical equipments
Commissioning of electrical equipments
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential Transformer
 
Instrument Transformers
Instrument TransformersInstrument Transformers
Instrument Transformers
 
Theorms
TheormsTheorms
Theorms
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
Voltage Source Inverter
Voltage Source InverterVoltage Source Inverter
Voltage Source Inverter
 
Power electronics 2
Power electronics 2Power electronics 2
Power electronics 2
 
three phase inverter
three phase inverterthree phase inverter
three phase inverter
 
B230918
B230918B230918
B230918
 
Ct & pt
Ct & pt Ct & pt
Ct & pt
 
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
 
space vector PWM for 2 leg inverter
space vector PWM for 2 leg inverterspace vector PWM for 2 leg inverter
space vector PWM for 2 leg inverter
 
Multi phase Star Rectifier
Multi phase Star Rectifier Multi phase Star Rectifier
Multi phase Star Rectifier
 
Mini project submission
Mini project submissionMini project submission
Mini project submission
 
Dead time elimination for voltage source inverter
Dead time elimination for voltage source inverterDead time elimination for voltage source inverter
Dead time elimination for voltage source inverter
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
Controlled Rectifier
Controlled RectifierControlled Rectifier
Controlled Rectifier
 
Three phase power measurement
Three phase power measurementThree phase power measurement
Three phase power measurement
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
 

Similaire à Knee point & primary current injection test 1

Group 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final PresentationGroup 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final Presentation
Dan Greenwood
 
Circuit Analysis Lab
Circuit Analysis LabCircuit Analysis Lab
Circuit Analysis Lab
Sachin Airan
 

Similaire à Knee point & primary current injection test 1 (20)

Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
 
Transformer Rated Metering
Transformer Rated MeteringTransformer Rated Metering
Transformer Rated Metering
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Ect2
Ect2Ect2
Ect2
 
Site Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket DetectionSite Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket Detection
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Fat procedure for lv switchboards
Fat procedure for lv switchboardsFat procedure for lv switchboards
Fat procedure for lv switchboards
 
Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2
 
Group 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final PresentationGroup 1 Audio Amplifier Final Presentation
Group 1 Audio Amplifier Final Presentation
 
Circuit Analysis Lab
Circuit Analysis LabCircuit Analysis Lab
Circuit Analysis Lab
 
1 7 earth fault relay
1 7 earth fault relay1 7 earth fault relay
1 7 earth fault relay
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
 
Power converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaPower converter lab manual by chaturvedula
Power converter lab manual by chaturvedula
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 
Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
 
meter.pptx
meter.pptxmeter.pptx
meter.pptx
 

Dernier

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Dernier (20)

A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 

Knee point & primary current injection test 1

  • 1. PT. TRAFOINDO PRIMA PERKASA KNEE POINT TEST 1. Purpose This test is intended to obtain the knee point voltage of current transformer (CT). 2. Test equipment 2.1.Slide regulator, 5 A, 230 V. Use step up transformer to raise up output voltage. 2.2.Voltmeter 2.3.Amperemeter 2.4.Cable connection 2.5 mm2 3. Test circuit Figure 1: Connection diagram of knee point test 4. Test procedure 4.1.Connect the circuit as shown as figure 1. 4.2.Primary winding and other(s) secondary winding is left opened. 4.3.Raise the voltage source step by step and record the voltage and current as table 1. CT Specification: Ratio : Serial no : Test core no : No. Voltage (V) Current (A) Remarks 1. 2. 3. 4. 5. 6. Table 1: Voltage and current of test 4.4.If current already reached to the nominal secondary current, the test is stopped. 4.5.For evaluation of test, send the record to: trafo@trafoindonesia.com/FAX: +6221-3850702 A V 1S1 1S2 ~ Adjustable Voltage source
  • 2. PT. TRAFOINDO PRIMA PERKASA PRIMARY CURRENT INJECTION TEST 1. Purpose This test is intended to verify that current transformation ratio as shown on the name plate is correct. Primary current injection test is not accuracy test, therefore the result of this test to calculate ratio error is not acceptable. 2. Test Circuit Note: Ensure to short-circuited secondary terminal prior to conduct primary current injection. Fail to do so will cause damage to current transformer. 3. Test procedure 3.1.Check the name plate ratio and primary current 3.2.Check the current source is able to raise up to nominal current of CT. 3.3.Check the size of primary cable 3.4.Check the terminal on secondary CT either core I, core II and or core III are short- circuited. 3.5.Start to raise up the current and record with below simple table. CT Specification: Ratio : Serial no : Test core no : No. Actual primary current (A) Actual secondary current (A) Actual ratio Calculated ratio 1. 2. 3. 4. 5. 6. A P1 P2 ~ Adjustable Current source 1S1 1S2 A