JISC Project:
    CRM Self Analysis Tools

Project Findings, Tools and Wider
           Applicability

     Dr Matthew Donaghy
       Project Manager
What was the vision?


      To develop an open source self-analysis
      toolkit, empowering Higher Education
      Institutions (HEIs) to think through their
      people, process and technology issues
      before, during or after a Business and
      Community Engagement (BCE) orientated
      Customer Relationship Management (CRM)
      implementation.

      In other words: Look before you leap!



Proposal Writing Skills for Scientists and Engineers
What did we deliver?
      Process Maps                                     Self Analysis Tools (‘Easy
                                                       to Use’, Open Source)
      On how different HEIs                            Focussing on how HEIs can
      (peripheral, tactical,                           think through people,
      strategic) manage their                          process and technology
      processes where CRM and                          issues prior, during or after
      BCE are concerned                                CRM implementation. This
                                                       means tools / diagnostics
                                                       on:
                                                  • Linking CRM to BCE strategy
                                                  • Change readiness
                                                  • Process Mapping
                                                  • Risk management (and scoring)
                                                  • Thinking through security /
                                                    ownership
                                                  • Implementation planning
                                                  • Checklists


Proposal Writing Skills for Scientists and Engineers
How did we do it?

   Team Work!
      Project Advisory Group
    (Academics, Staff, External
          Organisations)
                                                          Process
                                                          Mapping and
                                                          Research!
         Project Manager                                • Over 20 Institutions
                                                          (HEIs and FECs)
                                                        • Peripheral, Tactical,
                                                          Strategic
        Process Mapper /              Process Mapping
        Tools Developer                   Support




Proposal Writing Skills for Scientists and Engineers
What did we find (Process Maps)?

      For ‘peripheral’ institutions, our process
      research found that many HEIs shared similar
      characteristics:

  • Limited approach to information sharing
  • Sporadic use of technology to maintain BCE
    contacts (but more of a localised ‘c-drive’ culture)
  • Some interoperability between systems but
    nonetheless cultural issues in terms of a lack of
    willingness by schools or departments to share
    contacts and knowledge


Proposal Writing Skills for Scientists and Engineers
An example....
                                                Business Engagement – From University to Company

                                                                                    End

                                                                      No
                                                                                                                                                                                                     Company
 Business/
 Company




                         Telephone/Email/                                                   Yes                                                                                                  Participation and
                           Face-to-Face                                                                                                                                                          Financial Support
                             Contact

                                                                               Agreement on
                                                                              Research/Project
                                                                                                                                                                                       End
                                                                                                                             No

                                                                                                                                                                           No
Development
 University
 Business




                            Funding
                                                                                                                     Pre-Award Team                   Yes
   Team




                          Opportunity for                                                         Sign Contract                                                                                  Post-Award Team
                                                                                                                        Evaluation
                         Research Project                                                                                                                                                             Monitor
                 Start                                                                                                                                        3-6 Months
                                                                                                                                                                                           Yes
                                                                                                                                         Submit Application                     Project
                                                                                                                                                                               approved?
 Department/
 Academics




                             Email/
   School/




                                                                       Discussion on the                                                               No
                            Telefone/            Estblish Cooperate                                                 Carry out Research                             Completion of                 Research Project
                                                                        Research and             Project Proposal
                         Meeting Contact            Partnership                                                          Project?                                 Research Project                Written Report
                                                                            Project
                           Academics




                                                                                                                                           Yes
                                            1
      Students




                                                                                                                                                                 Research Student
                                                                                                                                                                  Working on the
                                                                                                        2                                                        Research Project
                                                                                                                                                                                                         End



                                                                                                                                                                           3
    Department
     Finance




                                                                                                                                                                 Receive Research
                                                                                                                                                                     Funding

Proposal Writing Skills for Scientists and Engineers
What did we find (Process Maps)?


      For ‘tactical / strategic’ institutions, our process research
      noted that:



  • There is clear leadership embedded in the process (VC in
    HEI E);
  • Strategic thinking and transparent policy development has
    supported information sharing approaches (HEI E and F on
    information sharing);
  • There is ‘buy in’ to the processes (FEC As commitment to
    reducing departmental workload);
  • Systems can be tailored to suit individual departments
    (HEI H have their own software support unit; FEC A are
    working towards CRM screens that appear ‘familiar’ to
    users).

Proposal Writing Skills for Scientists and Engineers
An example....
Commercial Enquiries


                                                                                     Enquiry received and details
                                                                                     put on “My Projects” by the
               Commercial enquiry                                                                                               Regional enquiry
                                                                                      commercial development
                                                                                                team

                                                                                   Skills/services search using “My
                                                                                                Projects”
                                                           Enquiry passed
              Already have a contact                        to commercial
                                               N
               within the university?                        development
                                                                 team                    Can university meet                        Regional
                                                                                             customer                   N          Knowledge
                                                                 N                         requirements?                          House Process
                        Y

                                                                                                   Y
                                                                                   Client and Consultant introduction
               Can the contact help                 Does the contact know
                                           N                                      and discussions regarding proposal
                     directly?                      anybody who can help?
                                                                                              and delivery


                                                       Y
                                                                                      Proposal and contract sent
                        Y               Introduce useful
                                             contact

                                                                                             Client accept
                 Discussions and
University




                                                           Details put on                                                   Revise proposal
                  proposal with
                                                           “My Projects”                                                    and update cost
                      client
                                                                                  Request purchase order and start
                                                                                               work



                                                                                              Changes
                                                                                                                            Y
                                                                                              required?


                                                                                                  N
                                               Make enquiries and issue further
                                                        instructions                        Carry out work

                                                                                               Progre
                                                                                                  ss
                                                                                               monitor
                                                                                                 ing



                                                                                              Is the work
                                                                     N
                                                                                              complete?


                                                                                                  Y

                                                                                       Invoice issued and paid



 Proposal Writing Skills for Scientists and Engineers                                  Feedback sought, project
                                                                                     reviewed & records archived
Tools

      www.nottingham.ac.uk/gradschool/crm/




Proposal Writing Skills for Scientists and Engineers
Conclusion

  • Tools ‘testing’
  • Wider applicability of tools




  Thank You!




Proposal Writing Skills for Scientists and Engineers

Contenu connexe

Tendances

Clarify And Connect 4 12 10
Clarify And Connect 4 12 10Clarify And Connect 4 12 10
Clarify And Connect 4 12 10gomezgrp
 
Open BI Initiative Educause11
Open BI Initiative Educause11Open BI Initiative Educause11
Open BI Initiative Educause11Thomas Danford
 
2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation
2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation
2010 ALLIES Learning Exchange: Sheherazade Hirji- EvaluationMaytree
 
Mark wiese
Mark wieseMark wiese
Mark wieseNASAPMC
 
Charles.leising
Charles.leisingCharles.leising
Charles.leisingNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidyNASAPMC
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel daveNASAPMC
 
David.atwell
David.atwellDavid.atwell
David.atwellNASAPMC
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation OverviewMark Gavora
 
B sherwood dmc_cleese
B sherwood dmc_cleeseB sherwood dmc_cleese
B sherwood dmc_cleeseNASAPMC
 
Bush.stewart
Bush.stewartBush.stewart
Bush.stewartNASAPMC
 

Tendances (20)

Clarify And Connect 4 12 10
Clarify And Connect 4 12 10Clarify And Connect 4 12 10
Clarify And Connect 4 12 10
 
Open BI Initiative Educause11
Open BI Initiative Educause11Open BI Initiative Educause11
Open BI Initiative Educause11
 
2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation
2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation
2010 ALLIES Learning Exchange: Sheherazade Hirji- Evaluation
 
E136
E136E136
E136
 
Mark wiese
Mark wieseMark wiese
Mark wiese
 
P775
P775P775
P775
 
P775
P775P775
P775
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Jill_D_Jahn_2013_IT
Jill_D_Jahn_2013_ITJill_D_Jahn_2013_IT
Jill_D_Jahn_2013_IT
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
T349 Pi Web
T349 Pi WebT349 Pi Web
T349 Pi Web
 
David.atwell
David.atwellDavid.atwell
David.atwell
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation Overview
 
Jill D. Jahn_2013
Jill D. Jahn_2013Jill D. Jahn_2013
Jill D. Jahn_2013
 
B sherwood dmc_cleese
B sherwood dmc_cleeseB sherwood dmc_cleese
B sherwood dmc_cleese
 
B328
B328B328
B328
 
T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
 
Bush.stewart
Bush.stewartBush.stewart
Bush.stewart
 

En vedette

Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)BCE A&E
 
01 BCE Programme Overview
01 BCE Programme Overview01 BCE Programme Overview
01 BCE Programme OverviewBCE A&E
 
09 Extending It For External Engagement Full Version
09 Extending It For External Engagement Full Version09 Extending It For External Engagement Full Version
09 Extending It For External Engagement Full VersionBCE A&E
 
JISC Collections & BCE
JISC Collections & BCEJISC Collections & BCE
JISC Collections & BCEBCE A&E
 
Relationship Mangement: Challenges, Processes & Pitfalls
Relationship Mangement: Challenges, Processes & PitfallsRelationship Mangement: Challenges, Processes & Pitfalls
Relationship Mangement: Challenges, Processes & PitfallsBCE A&E
 
JANET: Supporting BCE
JANET: Supporting BCEJANET: Supporting BCE
JANET: Supporting BCEBCE A&E
 
Embedding BCE: Project summary
Embedding BCE: Project summaryEmbedding BCE: Project summary
Embedding BCE: Project summaryBCE A&E
 
Jisc access mgmt_scoping_study_v0_2
Jisc access mgmt_scoping_study_v0_2Jisc access mgmt_scoping_study_v0_2
Jisc access mgmt_scoping_study_v0_2BCE A&E
 

En vedette (8)

Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes (Handout)
 
01 BCE Programme Overview
01 BCE Programme Overview01 BCE Programme Overview
01 BCE Programme Overview
 
09 Extending It For External Engagement Full Version
09 Extending It For External Engagement Full Version09 Extending It For External Engagement Full Version
09 Extending It For External Engagement Full Version
 
JISC Collections & BCE
JISC Collections & BCEJISC Collections & BCE
JISC Collections & BCE
 
Relationship Mangement: Challenges, Processes & Pitfalls
Relationship Mangement: Challenges, Processes & PitfallsRelationship Mangement: Challenges, Processes & Pitfalls
Relationship Mangement: Challenges, Processes & Pitfalls
 
JANET: Supporting BCE
JANET: Supporting BCEJANET: Supporting BCE
JANET: Supporting BCE
 
Embedding BCE: Project summary
Embedding BCE: Project summaryEmbedding BCE: Project summary
Embedding BCE: Project summary
 
Jisc access mgmt_scoping_study_v0_2
Jisc access mgmt_scoping_study_v0_2Jisc access mgmt_scoping_study_v0_2
Jisc access mgmt_scoping_study_v0_2
 

Similaire à 03 CRM Self Analyisis Tools

Flexible Resources Project Management Office
Flexible Resources Project Management OfficeFlexible Resources Project Management Office
Flexible Resources Project Management OfficeJason Carter
 
It's the organisation, Stupid
It's the organisation, StupidIt's the organisation, Stupid
It's the organisation, StupidJohn M Walsh
 
Strøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardisera
Strøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardiseraStrøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardisera
Strøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardiseraProsjekt 2013
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentHelene Heller, PMP
 
Putting the Ready in Business Readiness
Putting the Ready in Business ReadinessPutting the Ready in Business Readiness
Putting the Ready in Business ReadinessDarren Nerland
 
Module planning template
Module planning templateModule planning template
Module planning templateSimon Shott
 
Bpr toolkit series
Bpr toolkit seriesBpr toolkit series
Bpr toolkit series123nt
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
Agile Developers Create Their Own Identity
Agile Developers Create Their Own IdentityAgile Developers Create Their Own Identity
Agile Developers Create Their Own IdentityAjay Danait
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)flexibleresources
 
ASAE Presentation: Managing Enterprise Projects
ASAE Presentation: Managing Enterprise ProjectsASAE Presentation: Managing Enterprise Projects
ASAE Presentation: Managing Enterprise Projectsjgomez555
 
CrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff Bilder
CrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff BilderCrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff Bilder
CrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff BilderCrossref
 
Aligning people process and technology in km arma metro ny presentation
Aligning people process and technology in km arma metro ny presentationAligning people process and technology in km arma metro ny presentation
Aligning people process and technology in km arma metro ny presentationStephanie Barnes
 
Abdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot ResumeAbdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot Resumejalilmaraicar
 
Abdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot ResumeAbdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot Resumejalilmaraicar
 

Similaire à 03 CRM Self Analyisis Tools (20)

Flexible Resources Project Management Office
Flexible Resources Project Management OfficeFlexible Resources Project Management Office
Flexible Resources Project Management Office
 
It's the organisation, Stupid
It's the organisation, StupidIt's the organisation, Stupid
It's the organisation, Stupid
 
Strøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardisera
Strøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardiseraStrøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardisera
Strøm 5 - Inger Bergman - Agila projekt, ett nytt sätt att standardisera
 
Strategic Implementation
Strategic Implementation Strategic Implementation
Strategic Implementation
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT Investment
 
Putting the Ready in Business Readiness
Putting the Ready in Business ReadinessPutting the Ready in Business Readiness
Putting the Ready in Business Readiness
 
Module planning template
Module planning templateModule planning template
Module planning template
 
Bpr toolkit series
Bpr toolkit seriesBpr toolkit series
Bpr toolkit series
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Agile Developers Create Their Own Identity
Agile Developers Create Their Own IdentityAgile Developers Create Their Own Identity
Agile Developers Create Their Own Identity
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
ASAE Presentation: Managing Enterprise Projects
ASAE Presentation: Managing Enterprise ProjectsASAE Presentation: Managing Enterprise Projects
ASAE Presentation: Managing Enterprise Projects
 
Business Sustainability Process
Business Sustainability ProcessBusiness Sustainability Process
Business Sustainability Process
 
PM & PM LC.pptx
PM & PM LC.pptxPM & PM LC.pptx
PM & PM LC.pptx
 
Strategic management ppt
Strategic management pptStrategic management ppt
Strategic management ppt
 
CrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff Bilder
CrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff BilderCrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff Bilder
CrossRef Annual Meeting 2012 Strategic Initiatives Update Geoff Bilder
 
Icon ecpma09
Icon ecpma09Icon ecpma09
Icon ecpma09
 
Aligning people process and technology in km arma metro ny presentation
Aligning people process and technology in km arma metro ny presentationAligning people process and technology in km arma metro ny presentation
Aligning people process and technology in km arma metro ny presentation
 
Abdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot ResumeAbdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot Resume
 
Abdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot ResumeAbdul Jalil Maraicar Snap Shot Resume
Abdul Jalil Maraicar Snap Shot Resume
 

Plus de BCE A&E

Supporting and Enabling External Engagement
Supporting and Enabling External EngagementSupporting and Enabling External Engagement
Supporting and Enabling External EngagementBCE A&E
 
BCE A&E: How did we get here?
BCE A&E: How did we get here?BCE A&E: How did we get here?
BCE A&E: How did we get here?BCE A&E
 
JISC Advance: Services, RSCs & BCE
JISC Advance: Services, RSCs & BCEJISC Advance: Services, RSCs & BCE
JISC Advance: Services, RSCs & BCEBCE A&E
 
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes
Jisc Advance BCE Evidencing Outcomes Benefits & OutcomesJisc Advance BCE Evidencing Outcomes Benefits & Outcomes
Jisc Advance BCE Evidencing Outcomes Benefits & OutcomesBCE A&E
 
BCE @ Stirling: Mark Toole
BCE @ Stirling: Mark TooleBCE @ Stirling: Mark Toole
BCE @ Stirling: Mark TooleBCE A&E
 
Event Programme
Event ProgrammeEvent Programme
Event ProgrammeBCE A&E
 
07 Open ICT Tools
07 Open ICT Tools07 Open ICT Tools
07 Open ICT ToolsBCE A&E
 
06 The G Blog Project
06 The G Blog Project06 The G Blog Project
06 The G Blog ProjectBCE A&E
 
04 A View From The Sharp End
04 A View From The Sharp End04 A View From The Sharp End
04 A View From The Sharp EndBCE A&E
 
05 Trialling Of Collaborative Online Tools Project
05 Trialling Of Collaborative Online Tools Project05 Trialling Of Collaborative Online Tools Project
05 Trialling Of Collaborative Online Tools ProjectBCE A&E
 
02 Embedding Bce
02 Embedding Bce02 Embedding Bce
02 Embedding BceBCE A&E
 

Plus de BCE A&E (12)

Supporting and Enabling External Engagement
Supporting and Enabling External EngagementSupporting and Enabling External Engagement
Supporting and Enabling External Engagement
 
BCE A&E: How did we get here?
BCE A&E: How did we get here?BCE A&E: How did we get here?
BCE A&E: How did we get here?
 
JISC Advance: Services, RSCs & BCE
JISC Advance: Services, RSCs & BCEJISC Advance: Services, RSCs & BCE
JISC Advance: Services, RSCs & BCE
 
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes
Jisc Advance BCE Evidencing Outcomes Benefits & OutcomesJisc Advance BCE Evidencing Outcomes Benefits & Outcomes
Jisc Advance BCE Evidencing Outcomes Benefits & Outcomes
 
BCE @ Stirling: Mark Toole
BCE @ Stirling: Mark TooleBCE @ Stirling: Mark Toole
BCE @ Stirling: Mark Toole
 
JISC:
JISC: JISC:
JISC:
 
Event Programme
Event ProgrammeEvent Programme
Event Programme
 
07 Open ICT Tools
07 Open ICT Tools07 Open ICT Tools
07 Open ICT Tools
 
06 The G Blog Project
06 The G Blog Project06 The G Blog Project
06 The G Blog Project
 
04 A View From The Sharp End
04 A View From The Sharp End04 A View From The Sharp End
04 A View From The Sharp End
 
05 Trialling Of Collaborative Online Tools Project
05 Trialling Of Collaborative Online Tools Project05 Trialling Of Collaborative Online Tools Project
05 Trialling Of Collaborative Online Tools Project
 
02 Embedding Bce
02 Embedding Bce02 Embedding Bce
02 Embedding Bce
 

Dernier

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Dernier (20)

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

03 CRM Self Analyisis Tools

  • 1. JISC Project: CRM Self Analysis Tools Project Findings, Tools and Wider Applicability Dr Matthew Donaghy Project Manager
  • 2. What was the vision? To develop an open source self-analysis toolkit, empowering Higher Education Institutions (HEIs) to think through their people, process and technology issues before, during or after a Business and Community Engagement (BCE) orientated Customer Relationship Management (CRM) implementation. In other words: Look before you leap! Proposal Writing Skills for Scientists and Engineers
  • 3. What did we deliver? Process Maps Self Analysis Tools (‘Easy to Use’, Open Source) On how different HEIs Focussing on how HEIs can (peripheral, tactical, think through people, strategic) manage their process and technology processes where CRM and issues prior, during or after BCE are concerned CRM implementation. This means tools / diagnostics on: • Linking CRM to BCE strategy • Change readiness • Process Mapping • Risk management (and scoring) • Thinking through security / ownership • Implementation planning • Checklists Proposal Writing Skills for Scientists and Engineers
  • 4. How did we do it? Team Work! Project Advisory Group (Academics, Staff, External Organisations) Process Mapping and Research! Project Manager • Over 20 Institutions (HEIs and FECs) • Peripheral, Tactical, Strategic Process Mapper / Process Mapping Tools Developer Support Proposal Writing Skills for Scientists and Engineers
  • 5. What did we find (Process Maps)? For ‘peripheral’ institutions, our process research found that many HEIs shared similar characteristics: • Limited approach to information sharing • Sporadic use of technology to maintain BCE contacts (but more of a localised ‘c-drive’ culture) • Some interoperability between systems but nonetheless cultural issues in terms of a lack of willingness by schools or departments to share contacts and knowledge Proposal Writing Skills for Scientists and Engineers
  • 6. An example.... Business Engagement – From University to Company End No Company Business/ Company Telephone/Email/ Yes Participation and Face-to-Face Financial Support Contact Agreement on Research/Project End No No Development University Business Funding Pre-Award Team Yes Team Opportunity for Sign Contract Post-Award Team Evaluation Research Project Monitor Start 3-6 Months Yes Submit Application Project approved? Department/ Academics Email/ School/ Discussion on the No Telefone/ Estblish Cooperate Carry out Research Completion of Research Project Research and Project Proposal Meeting Contact Partnership Project? Research Project Written Report Project Academics Yes 1 Students Research Student Working on the 2 Research Project End 3 Department Finance Receive Research Funding Proposal Writing Skills for Scientists and Engineers
  • 7. What did we find (Process Maps)? For ‘tactical / strategic’ institutions, our process research noted that: • There is clear leadership embedded in the process (VC in HEI E); • Strategic thinking and transparent policy development has supported information sharing approaches (HEI E and F on information sharing); • There is ‘buy in’ to the processes (FEC As commitment to reducing departmental workload); • Systems can be tailored to suit individual departments (HEI H have their own software support unit; FEC A are working towards CRM screens that appear ‘familiar’ to users). Proposal Writing Skills for Scientists and Engineers
  • 8. An example.... Commercial Enquiries Enquiry received and details put on “My Projects” by the Commercial enquiry Regional enquiry commercial development team Skills/services search using “My Projects” Enquiry passed Already have a contact to commercial N within the university? development team Can university meet Regional customer N Knowledge N requirements? House Process Y Y Client and Consultant introduction Can the contact help Does the contact know N and discussions regarding proposal directly? anybody who can help? and delivery Y Proposal and contract sent Y Introduce useful contact Client accept Discussions and University Details put on Revise proposal proposal with “My Projects” and update cost client Request purchase order and start work Changes Y required? N Make enquiries and issue further instructions Carry out work Progre ss monitor ing Is the work N complete? Y Invoice issued and paid Proposal Writing Skills for Scientists and Engineers Feedback sought, project reviewed & records archived
  • 9. Tools www.nottingham.ac.uk/gradschool/crm/ Proposal Writing Skills for Scientists and Engineers
  • 10. Conclusion • Tools ‘testing’ • Wider applicability of tools Thank You! Proposal Writing Skills for Scientists and Engineers