Case Study : Indonesian Red Cross
• Background
• Tsunami Early Warning System
• EQ Situation
• Challenges & Lessons
• Two earthquakes with 8.6 and 8.2
Richter scale magnitudes occurred at
the west coast of northern Sumatra
on April 11, 2012.
• The earthquakes were located
respectively 100 km and 200 km to
the southwest of the major subduction zone that defines the plate
boundary between the India/Australia
and Sunda plate’s offshore Sumatra
where at this location, the
India/Australia plates move northnortheast with respect to the Sunda
plate at a velocity of approximately
52 mm/year.
• These earthquakes triggered tsunami
warning for areas on the west coast
of Sumatera including Aceh and West
Sumatra provinces.
• The study is done on April-May, 2014, to review the
effectiveness of its Disaster Management system including the
Contingency Plan and personnel capacities; as well as for other
stakeholders including the Indonesia Red Cross (PMI-palang
Merah Indonesia) to assess the impact of its intervention in
strengthening DP-DR capacities at the community and
government levels in addition to their own institutional
capacities
• The review team consists of staff and volunteers from PMI,
Aceh Provincial Disaster Management Agency (BPBA/BPBD),
American Red Cross, and Canadian Red Cross
The Data Collection was done at 2 level :
• At the provincial government and PMI , the data were gathered
from PMI internal review and stakeholder review meetings, on
April 18, 2013.
• At the district and community level, the data were collected
through focus group discussions, in-depth interviews, and
observations in 13 villages in Banda Aceh, Aceh Besar, and Aceh
Jaya districts during April 24 – May 2, 2012. Those villages were
selected purposively with judgment sampling approach that
enabled researchers to study information rich samples.
11/24/2013

Willy Wicaksono - Local Advisor
Padang

6
Collect Data and
Information
from Credible
External Provider

Translate and
Analysis Early
Warning into
Local Language

Disseminate
Early Warning to
the community

Mobilize
Community to
Conduct Early
Action
0” (15:38)
EQ 8,5 SM

70” (16:48)
Activate siren manually in
Governor Office

5” (15:43)
BMKG Issue
First Warning
6” (15:44)
BMKG Issue
First Warning
10” (15:48)
BMKG activate
siren (fail)

19” (15:57)
Electricity Black
Out

15:38

16:38

91” (17:09)
Activate siren
manually (fail)
93” (17:12)
Activate siren
manually (fail)
101” (17:20)
Activate siren
manually

17:38
124” (17:43)
BMKG issue
First Warning
2nd EQ 8.1 SM

19:38

21:38
237” (19:45)
BMKG issue
“all-clear”

322” (22:00)
Electricity
Company turn
on the
electricity wire
• Newly established Regional Disaster Management
Agency (BPBA) prevented them to provide adequate
response within the first 20 minutes after the earthquake on
April 11, 2012.
• The Quick Response Team (SRC) is in place, but they had
not been provided with any training.

• Contingency Plan, Early warning System (EWS) and
Standard Operation Procedure (SOP) for earthquake and
tsunami in place but was not operationalized during the April 11,
2012 earthquakes.
• The absence of an approved contingency plan at the PMI chapter has
provided a gap in its capacity to response internally.
• the equipment (radio base, handhelds, hand siren, etc) were not all fully
functioning because on maintenance and electricity black out.
• With the current HF radio, PMI could only communicate internally and
monitor others but cannot exchange communication with other
stakeholders such as RAPI (Radio antar Penduduk Indonesia, People Radio
Network).
• PMI chapter and branches received the updates from village volunteers
(CBAT).
• PMI assisted the communities to evacuate to safer areas and also
provided first aid support to those injured because of accident during the
evacuation process.
• Most of communities knew that they need to evacuate
immediately to higher ground, but they did not have
preparedness bag or bring some supplies along with them to
evacuation point and knew which route to take too.
• Although there are 3 evacuation buildings, very few people used
the facilities but instead decided to farther location which require
more than 30 minutes to reach and would be at risk if tsunami
was to happen, not to mention the risk of being injured and stuck
in traffic.
• the communities knowledge on tsunami signs is limited to the sea
level and water retraction.
• Improve the effectiveness of DP/DR system…
…..Improve tsunami and Earthquake Contingency Plan, EWS and
SOP including its chain command and support system
…..Agreed radio channel managed to communicate and update
information during emergency
• Strengthening the effectiveness of Evacuation Shelter…
…..Review the effectiveness and capacities as well as location
of current escape buildings, and consider to build more so
that the facilities can be reached within 10 – 15 minutes.
…..Explore the possibility of utilizing escape building for other
public activities in order to help ensure its maintenance
…..Consider reviewing the road arrangement and evacuation
routes to avoid traffic jam during evacuation process in
emergency
• Improve PMI’s Preparedness and Response
capacities…
….Finalize its Contingency Plan, radio communication protocols
and equipment, as well as finalize the Disaster Command Post
management.
…..Review the existing capacities at the branches so that gaps can
be addressed.
…..review the SoP of hand siren utilization and placement once
they update the village contingency plan so that the
equipment can be better used in the future
• Strengthening the auxiliary role to the government…
…..Optimize the partnership with BPBA as defined in the MoU between the two
agencies and play an active role in strengthening the capacities of BPBD’s Quick
Response team and promoting the utilisation of its SATGANA team as well as
assisting in the contingency plan development/ review and increase its effort in
strengthening community capacities in DP/DR
…..Collect information on all community evacuation points including their GPS
coordinates and altitudes and existing facilities, capacities, and condition to
address the gaps in facilities as well as to be a reference in distributing logistic
support in emergency.
….. Facilitating the integration of DRR into the government planning and funding
mechanism, policy on district contingency plan development and regular
drill, and the link between need to combine government-funded structural
mitigation activities with community-based DRR initiative.
…..Facilitate and link the Village Committee and CBATs with BPBD and promote
their involvement in the development of the Earthquake and tsunami
contingency plan as well as to acknowledge their roles in the document.
• Strengthening The DP/DR System at Community Level…
…..Village contingency plans need to be revisited and simplified
and then socialized to all community members so that it can
guide them in emergency.
…..The Integration between community and school evacuation
plan (e.g. sharing responsibilities; teachers will evacuate
students and community will look after the teachers family in
the villages), link Community Contingency Plan (CCP) with the
government plan, link CBAT into PMI volunteer network and
with the government, increased frequency of awareness and
simulation
• Improve Community awareness to respond to disaster…
…..Include knowledge on the characteristics of earthquake that
triggers tsunami as well as the physical signs of tsunami,
evacuation routes and place, its distances to seaside and time
required to reach the safer place
….. Include the importance of having a family contingency plan
and preparedness bag.
…..the use of different media to disseminate messages on DP/DR
measures including through the use of sms and emergency
radio channel, as well as village leaders as the Government
representation who are the closest to communities
Lesson Learnt from INA TEWS

Contenu connexe

Similaire à Lesson Learnt from INA TEWS

Malteser International
Malteser InternationalMalteser International
Malteser Internationalkashif81
 
Presentation by js (dm) (1)
Presentation by js (dm) (1)Presentation by js (dm) (1)
Presentation by js (dm) (1)Shilpi Garg
 
Central Disaster Management and Mitigation Schemes .pptx
Central Disaster Management and Mitigation Schemes .pptxCentral Disaster Management and Mitigation Schemes .pptx
Central Disaster Management and Mitigation Schemes .pptxAnisha794368
 
Capstone Final Briefing_02-15-2013
Capstone Final Briefing_02-15-2013Capstone Final Briefing_02-15-2013
Capstone Final Briefing_02-15-2013Ian Alexander
 
Mainstreaming DRR into Development n Recovery: Experience sharing
Mainstreaming DRR into Development n Recovery: Experience sharingMainstreaming DRR into Development n Recovery: Experience sharing
Mainstreaming DRR into Development n Recovery: Experience sharingKumar Sudhir
 
DM Basic Concepts.ppt
DM Basic Concepts.pptDM Basic Concepts.ppt
DM Basic Concepts.pptVinIta546343
 
Required duties for leaders at times of disaster
Required duties for leaders at times of disasterRequired duties for leaders at times of disaster
Required duties for leaders at times of disasterGlobal Risk Forum GRFDavos
 
Ssop workshop 08 may 2013 ioc unesco
Ssop workshop 08 may 2013   ioc unescoSsop workshop 08 may 2013   ioc unesco
Ssop workshop 08 may 2013 ioc unescoABU_DRRGroup
 
An Introduction to Disaster Information Sharing System
An Introduction to Disaster Information Sharing SystemAn Introduction to Disaster Information Sharing System
An Introduction to Disaster Information Sharing SystemTadashi Ise
 
Phases of Disaster Management and Its Applications (Bangladesh)
Phases of Disaster Management and Its Applications (Bangladesh)Phases of Disaster Management and Its Applications (Bangladesh)
Phases of Disaster Management and Its Applications (Bangladesh)Jasarat Atun
 
Cases of Disaster Prevention Activities in Japan
Cases of Disaster Prevention Activities in JapanCases of Disaster Prevention Activities in Japan
Cases of Disaster Prevention Activities in JapanNopphawanTamkuan
 

Similaire à Lesson Learnt from INA TEWS (20)

18EE753-Module3.ppt
18EE753-Module3.ppt18EE753-Module3.ppt
18EE753-Module3.ppt
 
Rahul Sharma
Rahul SharmaRahul Sharma
Rahul Sharma
 
Malteser International
Malteser InternationalMalteser International
Malteser International
 
Presentation by js (dm) (1)
Presentation by js (dm) (1)Presentation by js (dm) (1)
Presentation by js (dm) (1)
 
Central Disaster Management and Mitigation Schemes .pptx
Central Disaster Management and Mitigation Schemes .pptxCentral Disaster Management and Mitigation Schemes .pptx
Central Disaster Management and Mitigation Schemes .pptx
 
Dm
DmDm
Dm
 
Osdma
OsdmaOsdma
Osdma
 
Flood risk reduction adpc - cambodia
Flood risk reduction adpc - cambodiaFlood risk reduction adpc - cambodia
Flood risk reduction adpc - cambodia
 
Current Practices by VNIT Nagpur
Current Practices by VNIT NagpurCurrent Practices by VNIT Nagpur
Current Practices by VNIT Nagpur
 
GradeAssignment6B
GradeAssignment6BGradeAssignment6B
GradeAssignment6B
 
GradeAssignment6B
GradeAssignment6BGradeAssignment6B
GradeAssignment6B
 
Capstone Final Briefing_02-15-2013
Capstone Final Briefing_02-15-2013Capstone Final Briefing_02-15-2013
Capstone Final Briefing_02-15-2013
 
Current Practices by MANIT, Bhopal
Current Practices by MANIT, BhopalCurrent Practices by MANIT, Bhopal
Current Practices by MANIT, Bhopal
 
Mainstreaming DRR into Development n Recovery: Experience sharing
Mainstreaming DRR into Development n Recovery: Experience sharingMainstreaming DRR into Development n Recovery: Experience sharing
Mainstreaming DRR into Development n Recovery: Experience sharing
 
DM Basic Concepts.ppt
DM Basic Concepts.pptDM Basic Concepts.ppt
DM Basic Concepts.ppt
 
Required duties for leaders at times of disaster
Required duties for leaders at times of disasterRequired duties for leaders at times of disaster
Required duties for leaders at times of disaster
 
Ssop workshop 08 may 2013 ioc unesco
Ssop workshop 08 may 2013   ioc unescoSsop workshop 08 may 2013   ioc unesco
Ssop workshop 08 may 2013 ioc unesco
 
An Introduction to Disaster Information Sharing System
An Introduction to Disaster Information Sharing SystemAn Introduction to Disaster Information Sharing System
An Introduction to Disaster Information Sharing System
 
Phases of Disaster Management and Its Applications (Bangladesh)
Phases of Disaster Management and Its Applications (Bangladesh)Phases of Disaster Management and Its Applications (Bangladesh)
Phases of Disaster Management and Its Applications (Bangladesh)
 
Cases of Disaster Prevention Activities in Japan
Cases of Disaster Prevention Activities in JapanCases of Disaster Prevention Activities in Japan
Cases of Disaster Prevention Activities in Japan
 

Dernier

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 

Dernier (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

Lesson Learnt from INA TEWS

  • 1. Case Study : Indonesian Red Cross
  • 2. • Background • Tsunami Early Warning System • EQ Situation • Challenges & Lessons
  • 3. • Two earthquakes with 8.6 and 8.2 Richter scale magnitudes occurred at the west coast of northern Sumatra on April 11, 2012. • The earthquakes were located respectively 100 km and 200 km to the southwest of the major subduction zone that defines the plate boundary between the India/Australia and Sunda plate’s offshore Sumatra where at this location, the India/Australia plates move northnortheast with respect to the Sunda plate at a velocity of approximately 52 mm/year. • These earthquakes triggered tsunami warning for areas on the west coast of Sumatera including Aceh and West Sumatra provinces.
  • 4. • The study is done on April-May, 2014, to review the effectiveness of its Disaster Management system including the Contingency Plan and personnel capacities; as well as for other stakeholders including the Indonesia Red Cross (PMI-palang Merah Indonesia) to assess the impact of its intervention in strengthening DP-DR capacities at the community and government levels in addition to their own institutional capacities • The review team consists of staff and volunteers from PMI, Aceh Provincial Disaster Management Agency (BPBA/BPBD), American Red Cross, and Canadian Red Cross
  • 5. The Data Collection was done at 2 level : • At the provincial government and PMI , the data were gathered from PMI internal review and stakeholder review meetings, on April 18, 2013. • At the district and community level, the data were collected through focus group discussions, in-depth interviews, and observations in 13 villages in Banda Aceh, Aceh Besar, and Aceh Jaya districts during April 24 – May 2, 2012. Those villages were selected purposively with judgment sampling approach that enabled researchers to study information rich samples.
  • 6. 11/24/2013 Willy Wicaksono - Local Advisor Padang 6
  • 7.
  • 8. Collect Data and Information from Credible External Provider Translate and Analysis Early Warning into Local Language Disseminate Early Warning to the community Mobilize Community to Conduct Early Action
  • 9. 0” (15:38) EQ 8,5 SM 70” (16:48) Activate siren manually in Governor Office 5” (15:43) BMKG Issue First Warning 6” (15:44) BMKG Issue First Warning 10” (15:48) BMKG activate siren (fail) 19” (15:57) Electricity Black Out 15:38 16:38 91” (17:09) Activate siren manually (fail) 93” (17:12) Activate siren manually (fail) 101” (17:20) Activate siren manually 17:38 124” (17:43) BMKG issue First Warning 2nd EQ 8.1 SM 19:38 21:38 237” (19:45) BMKG issue “all-clear” 322” (22:00) Electricity Company turn on the electricity wire
  • 10. • Newly established Regional Disaster Management Agency (BPBA) prevented them to provide adequate response within the first 20 minutes after the earthquake on April 11, 2012. • The Quick Response Team (SRC) is in place, but they had not been provided with any training. • Contingency Plan, Early warning System (EWS) and Standard Operation Procedure (SOP) for earthquake and tsunami in place but was not operationalized during the April 11, 2012 earthquakes.
  • 11. • The absence of an approved contingency plan at the PMI chapter has provided a gap in its capacity to response internally. • the equipment (radio base, handhelds, hand siren, etc) were not all fully functioning because on maintenance and electricity black out. • With the current HF radio, PMI could only communicate internally and monitor others but cannot exchange communication with other stakeholders such as RAPI (Radio antar Penduduk Indonesia, People Radio Network). • PMI chapter and branches received the updates from village volunteers (CBAT). • PMI assisted the communities to evacuate to safer areas and also provided first aid support to those injured because of accident during the evacuation process.
  • 12. • Most of communities knew that they need to evacuate immediately to higher ground, but they did not have preparedness bag or bring some supplies along with them to evacuation point and knew which route to take too. • Although there are 3 evacuation buildings, very few people used the facilities but instead decided to farther location which require more than 30 minutes to reach and would be at risk if tsunami was to happen, not to mention the risk of being injured and stuck in traffic. • the communities knowledge on tsunami signs is limited to the sea level and water retraction.
  • 13.
  • 14.
  • 15.
  • 16. • Improve the effectiveness of DP/DR system… …..Improve tsunami and Earthquake Contingency Plan, EWS and SOP including its chain command and support system …..Agreed radio channel managed to communicate and update information during emergency
  • 17. • Strengthening the effectiveness of Evacuation Shelter… …..Review the effectiveness and capacities as well as location of current escape buildings, and consider to build more so that the facilities can be reached within 10 – 15 minutes. …..Explore the possibility of utilizing escape building for other public activities in order to help ensure its maintenance …..Consider reviewing the road arrangement and evacuation routes to avoid traffic jam during evacuation process in emergency
  • 18. • Improve PMI’s Preparedness and Response capacities… ….Finalize its Contingency Plan, radio communication protocols and equipment, as well as finalize the Disaster Command Post management. …..Review the existing capacities at the branches so that gaps can be addressed. …..review the SoP of hand siren utilization and placement once they update the village contingency plan so that the equipment can be better used in the future
  • 19. • Strengthening the auxiliary role to the government… …..Optimize the partnership with BPBA as defined in the MoU between the two agencies and play an active role in strengthening the capacities of BPBD’s Quick Response team and promoting the utilisation of its SATGANA team as well as assisting in the contingency plan development/ review and increase its effort in strengthening community capacities in DP/DR …..Collect information on all community evacuation points including their GPS coordinates and altitudes and existing facilities, capacities, and condition to address the gaps in facilities as well as to be a reference in distributing logistic support in emergency. ….. Facilitating the integration of DRR into the government planning and funding mechanism, policy on district contingency plan development and regular drill, and the link between need to combine government-funded structural mitigation activities with community-based DRR initiative. …..Facilitate and link the Village Committee and CBATs with BPBD and promote their involvement in the development of the Earthquake and tsunami contingency plan as well as to acknowledge their roles in the document.
  • 20. • Strengthening The DP/DR System at Community Level… …..Village contingency plans need to be revisited and simplified and then socialized to all community members so that it can guide them in emergency. …..The Integration between community and school evacuation plan (e.g. sharing responsibilities; teachers will evacuate students and community will look after the teachers family in the villages), link Community Contingency Plan (CCP) with the government plan, link CBAT into PMI volunteer network and with the government, increased frequency of awareness and simulation
  • 21. • Improve Community awareness to respond to disaster… …..Include knowledge on the characteristics of earthquake that triggers tsunami as well as the physical signs of tsunami, evacuation routes and place, its distances to seaside and time required to reach the safer place ….. Include the importance of having a family contingency plan and preparedness bag. …..the use of different media to disseminate messages on DP/DR measures including through the use of sms and emergency radio channel, as well as village leaders as the Government representation who are the closest to communities