(AIET/DOEE/2014-2015/PTS/i)
CERTIFICATE
This is to certify that the Practical Training report for Practical Training taken at
RAMGARH GAS THERMAL POWER PLANT, JAISALMER is submitted by Mr.
Bhagwana Ram (11EAIEE714) in partial fulfillment for the award of degree of Bachelor of
Technology in Electrical Engineering has been found satisfactory and is approved for
submission.
Mr. Vivek Prakash Ms. Shruti Chauhan
(PTS GUIDE) (PTS INCHARGE)
Assistant Professor Assistant Professor
Deptt. Of Electrical Engineering Deptt. Of Electrical Engineering
Mr. Bharat Bhushan Jain
(Head)
Associate Professor
Deptt. Of Electrical Engineering
DEPARTMENT OF ELECTRICAL ENGINEERING
ARYA INSTITUTE OF ENGINEERING & TECHNOLOGY
SP-40, RIICO INDUSTRIAL AREA, JAIPUR (RAJASTHAN) – 302 022
(AIET/DOEE/2014-2015/PTS/ii)
(AIET/DOEE/2014-2015/PTS/iii)
ACKNOWLEDGEMENT
I would like to express my gratitude to all those who gave me the possibilities to complete
this Industrial Training.
I want to thank the RAJ. RAJYA VIDYUT UTPADAN NIGAM LTD. for giving me
permission to commence this industrial training, in the first instance, to do training on
“RAMGARH GAS THERMAL POWER PLANT, JAISALMER”.
I have furthermore to thank Mr. Dadu Ram(X.EN.) last the all members of RAJ. RAJYA
VIDYUT UTPADAN NIGAM LTD. For respective stimulating support.
I am deeply indebted to my PTS Incharge Ms. Shruti Chauhan ma’am and my PTS
Guide Mr. Vivek Prakash whose help, stimulating suggestions & encouragement helped me
in all the time during my industrial training.
I would like to thank to Mr. Bharat Bhushan Jain, HOD, Deptt. Of Electrical
Engineering & all the faculty members.
Last I would like to thank the Principal Sir and the Management of Arya Institute of
Engineering and Technology.
BHAGWANA RAM
(11EAIEE714)
ELECTRICAL ENGINEERING
(AIET/DOEE/2014-2015/PTS/iv)
Abstract
I have completed my vocational training during the period 09-06-2014 to 08-07-2014 from
RGTPP,Jaisalmer. In this report the main emphasis is on the Power Generation Process.
In the starting of this report the introductory aspects of RGTPP allover India has been
covered. Later I have explained the principle of operation and basic equipments used for the
generation of power.
Recognizing its excellent performance and vast potential, Government of the India has
identified RGTPP as one of the jewels of Public Sector 'Navratnas'- a potential global giant.
Inspired by its glorious past and vibrant present, RGTPP is well on its way to realize it's
vision of being "A world class integrated power major, powering India's growth, with
increasing global presence".
A Combined Cycle Power Plant produces high power outputs at high efficiencies (up to 55%)
and with low emissions. In a Conventional power plant we are getting 33% electricity
only and remaining 67% as waste. By using combined cycle power plant we are getting 68%
electricity. The basic principle of the Combined Cycle is simple: burning gas in a gas turbine
(GT) produces not only power – which can be converted to electric power by a coupled
generator – but also fairly hot exhaust gases.
(AIET/DOEE/2014-2015/PTS/v)
LIST OF FIGURES
Fig. No. FIGURE NAME PAGE NO.
1.1. Ramgarh Gas Thermal Power Plant Entrance 01
1.2. Power Plant View 02
2.1. Brayton Cycle 07
2.2. Rankine Cycle 08
3.1. Operation of RGTPP 10
5.1. Filter 15
6.1. Oil Cooling System 26
6.2. Power Plant View 27
6.3. Water Tube Boiler 28
6.4. H.R.S.G 29
7.1. Steam Turbine 37
7.2. Bearing 37
7.3. Steam Turbine Cover 38
(AIET/DOEE/2014-2015/PTS/vi)
LIST OF TABLES
TAB. NO. TABLE NAME P. NO.
1.1. Total Energy Generated 04
1.2. Gas (full) Component 05
6.1. Gas Turbine-1 (GT-1) 23
6.2. Gas Turbine-2 (GT-2) 24
6.3. HRSG -1 & 2 28
7.1. Steam Turbine Generator 42
7.2. Insulation Level 42
(AIET/DOEE/2014-2015/PTS/vii)
CONTENTS
CERTIFICATE FROM DEPARTMENT i
CERTIFICATE FROM COMPANY ii
ACKNOWLEDGEMENT iii
ABSTRACT Iv
LIST OF FIGURES V
LIST OF TABLES Vi
1. Introduction About The Plant 01-05
1.1 -First Unit 02
1.2 -Second Unit 02
1.3 -Availability Of Water 03
1.4 -Electricity Transmission System 03
1.5 -Expected System Operation 03
1.6 -Gas Transmission System 04
2. Power Plant Cycle 06-08
2.1 -Open Cycle 06
2.2 -Combined Cycle 06
2.3 -Advantages Of Combine Cycle 06
2.4 -Brayton Cycle 07
2.5 -Rankine Cycle 08
3.Plant Operation 09-10
4. Gas Turbine 11-12
4.1 -Compressor 11
4.2 -Combustors 11
(AIET/DOEE/2014-2015/PTS/viii)
4.3 -Transition Pieces 11
4.4 -Turbine 11
4.5 -Exhaust 12
5. Gas Turbine Support System And Their Equipment 13-20
5.1- Starting System 13
5.1-1. Diesel Engine 13
5.1-2. Torque Converter 13
5.1-3. Accessory Gear Box 13
5.1-4. Jaw Clutch Mechanisms 14
5.2- Lubricating Oil System 14
5.2-1. Oil Reservoir 14
5.2-2. Lubricating Pump 14
5.2-3. Heat Exchange 14
5.2-4. Gas Skid 14
5.2-5. Scrubber 14
5.2-6. Filter 14
5.2-7. Pressure Control Valve 15
5.2-8. Condensate Tank 15
5.3- Air Intake System 15
5.3-1. Filter 15
5.3-2. Filter Cleaning 16
5.3-3. Air Processing unit 16
5.4- Cooling And Sealing Air System 16
5.4-1. Ventilating System 16
5.4-2. Gas Turbine And Compressor Cleaning 16
(AIET/DOEE/2014-2015/PTS/ix)
5.4-3. Reducing Gear Box 17
5.5- H.R.S.G And Steam Turbine Equipment 17
5.5-1. H.R.S.G 17
5.5-2. Steam Turbine 17
5.6- Condensate Circuit Equipment 17
5.6-1. Condenser 18
5.6-2. Ejector 18
5.6-3. Extraction Pump 18
5.6-4. Gland Steam Condenser 18
5.7- Feed Water Circuit 18
5.7-1. Feed Water Tank 18
5.7-2. HP Feed pumps 18
5.7-3. LP Feed Pumps 18
5.8- Common Support System for G.T. And S.T 19
5.8-1. CW And ACW System 19
5.8-2. Air Compressor 19
5.8-3. Raw Water System 19
5.8-4. Laboratory 19
5.8-5. Fire Protection System 20
5.8-6. Black Start D.G Set 20
6. Construction Details Of Gas Turbine 21-34
6.1- Compressor Section 21
6.1-1. Rotor 21
6.1-2. Stator 21
6.2- Combustion Section 22
6.2-1. Combustiomn Chambers 22
(AIET/DOEE/2014-2015/PTS/x)
6.2-2. Spark plugs 22
6.3- STG 24
6.3-1. Turbine 24
6.4- HRSG 26
6.5- Generator 29
6.6- Water and Steam Cycle Equipment 30
6.6-1. Water and Steam Cycle 30
6.6-1-1. Dearator 30
6.6-1-2. HP BFP 30
6.6-1-3. LP BFP 31
6.6-1-4. Condenser 32
6.6-1-5. Condenser Extraction Pump 32
6.6-1-6. Ejector 33
6.6-1-7. Gland Steam Cooler 33
6.6-1-8. Condensate Preheater 33
6.7- HP Bypass and LP Bypass (HPBP and LPBP) 33
6.8- Auxiliaries: 34
6.8-2. Circulating Water Pump 34
6.8-3. Aux. Cooling Water Pump (ACW Pump) 34
7. Construction Details Of Generator And Exciter 35-43
7.1- Stator 35
7.2- Rotor 35
7.3- Bearing 35
7.5- Excitation System 35
7.5-1. Pilot Excitor 43
7.5-2. Main Excitor 43
(AIET/DOEE/2014-2015/PTS/xi)
7.5-3. Rectifier Excitor 43
8. 132 kv Switch Yard 44-48
8.1- Bus Bars 44
8.2- Insulators 44
8.3- Isolators 44
8.4- Circuit Breakers 45
8.5- Protective Relays 46
8.6- Current Transformer 47
8.7- Potential Transformer 47
8.8- Lightning Arrestors 47
8.9- Current Voltage Transformer 48
8.10- Wave Trap 48
8.11- Bus Coupler 48
CONCLUSION 49
REFERENCE 50

Contenu connexe

Tendances

IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
Prashant ppt on ntpc anta
Prashant ppt on ntpc antaPrashant ppt on ntpc anta
Prashant ppt on ntpc antaprashant shukla
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAprashant shukla
 
IPGCL PPCL SUMMER TRAINING PPT
IPGCL PPCL SUMMER TRAINING PPTIPGCL PPCL SUMMER TRAINING PPT
IPGCL PPCL SUMMER TRAINING PPTAjayBhartiya2
 
Internship presentation1
Internship presentation1Internship presentation1
Internship presentation1Prashu Prakash
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Yuvraj Singh
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha powerAnish Ansari
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power PlantSmile Hossain
 
H.T.P.S., Korba West
H.T.P.S., Korba WestH.T.P.S., Korba West
H.T.P.S., Korba WestAkash Rathore
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalRazin Sazzad Molla
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 

Tendances (20)

IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
NTPC Dadri Gas plant
NTPC Dadri Gas plantNTPC Dadri Gas plant
NTPC Dadri Gas plant
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
Prashant ppt on ntpc anta
Prashant ppt on ntpc antaPrashant ppt on ntpc anta
Prashant ppt on ntpc anta
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTA
 
Training presentation
Training presentationTraining presentation
Training presentation
 
IPGCL PPCL SUMMER TRAINING PPT
IPGCL PPCL SUMMER TRAINING PPTIPGCL PPCL SUMMER TRAINING PPT
IPGCL PPCL SUMMER TRAINING PPT
 
Internship presentation1
Internship presentation1Internship presentation1
Internship presentation1
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur
 
Indraprastha power
Indraprastha powerIndraprastha power
Indraprastha power
 
NTPC anta
NTPC anta NTPC anta
NTPC anta
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
H.T.P.S., Korba West
H.T.P.S., Korba WestH.T.P.S., Korba West
H.T.P.S., Korba West
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine final
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 

En vedette

Internship_Certificate_Shivam (1)
Internship_Certificate_Shivam (1)Internship_Certificate_Shivam (1)
Internship_Certificate_Shivam (1)Shivam Srivastava
 
Real Estate Practice Certificate
Real Estate Practice Certificate Real Estate Practice Certificate
Real Estate Practice Certificate Sandy Tang
 
Internship sample letter
Internship sample letterInternship sample letter
Internship sample letterAyesha Arshad
 
TRRAIN: Internship certificate
TRRAIN: Internship certificateTRRAIN: Internship certificate
TRRAIN: Internship certificateNeil Merchant
 
Completion Letter Format
Completion Letter FormatCompletion Letter Format
Completion Letter Formatkashyap88
 
Internship Certificate
Internship CertificateInternship Certificate
Internship Certificatengoswami
 

En vedette (6)

Internship_Certificate_Shivam (1)
Internship_Certificate_Shivam (1)Internship_Certificate_Shivam (1)
Internship_Certificate_Shivam (1)
 
Real Estate Practice Certificate
Real Estate Practice Certificate Real Estate Practice Certificate
Real Estate Practice Certificate
 
Internship sample letter
Internship sample letterInternship sample letter
Internship sample letter
 
TRRAIN: Internship certificate
TRRAIN: Internship certificateTRRAIN: Internship certificate
TRRAIN: Internship certificate
 
Completion Letter Format
Completion Letter FormatCompletion Letter Format
Completion Letter Format
 
Internship Certificate
Internship CertificateInternship Certificate
Internship Certificate
 

Similaire à ramgarh gas thermal plant front page by bhagu bhatia

NTPC KAHALGAON Main page
 NTPC KAHALGAON Main page NTPC KAHALGAON Main page
NTPC KAHALGAON Main pageRanjan kumar
 
Final report on ntpc faridabad
Final report on ntpc faridabadFinal report on ntpc faridabad
Final report on ntpc faridabadPawan Agrawal
 
India presentation 2
India presentation 2India presentation 2
India presentation 2UKTI2014
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...SURENDRASINGH87542
 
GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex neeraj prasad
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportRaj Sharma
 
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfKhalidAyaz3
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPCRanjeet1501
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpcRanjeet1501
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...Umer Azeem
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET Journal
 
IRJET- Static Structural and Modal Analysis of Secondary Air Flow System
IRJET- Static Structural and Modal Analysis of Secondary Air Flow SystemIRJET- Static Structural and Modal Analysis of Secondary Air Flow System
IRJET- Static Structural and Modal Analysis of Secondary Air Flow SystemIRJET Journal
 
Shri akash bhai sundarkand wale thermal report
Shri akash bhai sundarkand wale thermal reportShri akash bhai sundarkand wale thermal report
Shri akash bhai sundarkand wale thermal reportEr Akash Saini
 
ME_63-_ENERGY_AUDIT_OF_APH
ME_63-_ENERGY_AUDIT_OF_APHME_63-_ENERGY_AUDIT_OF_APH
ME_63-_ENERGY_AUDIT_OF_APHDipesh Badgujar
 
Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...ProSIM R & D Pvt. Ltd.
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1dashdeepak33
 
Major project report part ii
Major project report part iiMajor project report part ii
Major project report part iiNitesh Prasad
 
Project report-TATA Power
Project report-TATA PowerProject report-TATA Power
Project report-TATA PowerSHIVAM DWIVEDI
 

Similaire à ramgarh gas thermal plant front page by bhagu bhatia (20)

NTPC KAHALGAON Main page
 NTPC KAHALGAON Main page NTPC KAHALGAON Main page
NTPC KAHALGAON Main page
 
Muneer GTPS
Muneer GTPSMuneer GTPS
Muneer GTPS
 
Final report on ntpc faridabad
Final report on ntpc faridabadFinal report on ntpc faridabad
Final report on ntpc faridabad
 
India presentation 2
India presentation 2India presentation 2
India presentation 2
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...
 
GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpc
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
 
IRJET- Static Structural and Modal Analysis of Secondary Air Flow System
IRJET- Static Structural and Modal Analysis of Secondary Air Flow SystemIRJET- Static Structural and Modal Analysis of Secondary Air Flow System
IRJET- Static Structural and Modal Analysis of Secondary Air Flow System
 
Shri akash bhai sundarkand wale thermal report
Shri akash bhai sundarkand wale thermal reportShri akash bhai sundarkand wale thermal report
Shri akash bhai sundarkand wale thermal report
 
ME_63-_ENERGY_AUDIT_OF_APH
ME_63-_ENERGY_AUDIT_OF_APHME_63-_ENERGY_AUDIT_OF_APH
ME_63-_ENERGY_AUDIT_OF_APH
 
Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
 
Major project report part ii
Major project report part iiMajor project report part ii
Major project report part ii
 
Project report-TATA Power
Project report-TATA PowerProject report-TATA Power
Project report-TATA Power
 
Internship saad
Internship saadInternship saad
Internship saad
 

Dernier

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Dernier (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 

ramgarh gas thermal plant front page by bhagu bhatia

  • 1. (AIET/DOEE/2014-2015/PTS/i) CERTIFICATE This is to certify that the Practical Training report for Practical Training taken at RAMGARH GAS THERMAL POWER PLANT, JAISALMER is submitted by Mr. Bhagwana Ram (11EAIEE714) in partial fulfillment for the award of degree of Bachelor of Technology in Electrical Engineering has been found satisfactory and is approved for submission. Mr. Vivek Prakash Ms. Shruti Chauhan (PTS GUIDE) (PTS INCHARGE) Assistant Professor Assistant Professor Deptt. Of Electrical Engineering Deptt. Of Electrical Engineering Mr. Bharat Bhushan Jain (Head) Associate Professor Deptt. Of Electrical Engineering DEPARTMENT OF ELECTRICAL ENGINEERING ARYA INSTITUTE OF ENGINEERING & TECHNOLOGY SP-40, RIICO INDUSTRIAL AREA, JAIPUR (RAJASTHAN) – 302 022
  • 3. (AIET/DOEE/2014-2015/PTS/iii) ACKNOWLEDGEMENT I would like to express my gratitude to all those who gave me the possibilities to complete this Industrial Training. I want to thank the RAJ. RAJYA VIDYUT UTPADAN NIGAM LTD. for giving me permission to commence this industrial training, in the first instance, to do training on “RAMGARH GAS THERMAL POWER PLANT, JAISALMER”. I have furthermore to thank Mr. Dadu Ram(X.EN.) last the all members of RAJ. RAJYA VIDYUT UTPADAN NIGAM LTD. For respective stimulating support. I am deeply indebted to my PTS Incharge Ms. Shruti Chauhan ma’am and my PTS Guide Mr. Vivek Prakash whose help, stimulating suggestions & encouragement helped me in all the time during my industrial training. I would like to thank to Mr. Bharat Bhushan Jain, HOD, Deptt. Of Electrical Engineering & all the faculty members. Last I would like to thank the Principal Sir and the Management of Arya Institute of Engineering and Technology. BHAGWANA RAM (11EAIEE714) ELECTRICAL ENGINEERING
  • 4. (AIET/DOEE/2014-2015/PTS/iv) Abstract I have completed my vocational training during the period 09-06-2014 to 08-07-2014 from RGTPP,Jaisalmer. In this report the main emphasis is on the Power Generation Process. In the starting of this report the introductory aspects of RGTPP allover India has been covered. Later I have explained the principle of operation and basic equipments used for the generation of power. Recognizing its excellent performance and vast potential, Government of the India has identified RGTPP as one of the jewels of Public Sector 'Navratnas'- a potential global giant. Inspired by its glorious past and vibrant present, RGTPP is well on its way to realize it's vision of being "A world class integrated power major, powering India's growth, with increasing global presence". A Combined Cycle Power Plant produces high power outputs at high efficiencies (up to 55%) and with low emissions. In a Conventional power plant we are getting 33% electricity only and remaining 67% as waste. By using combined cycle power plant we are getting 68% electricity. The basic principle of the Combined Cycle is simple: burning gas in a gas turbine (GT) produces not only power – which can be converted to electric power by a coupled generator – but also fairly hot exhaust gases.
  • 5. (AIET/DOEE/2014-2015/PTS/v) LIST OF FIGURES Fig. No. FIGURE NAME PAGE NO. 1.1. Ramgarh Gas Thermal Power Plant Entrance 01 1.2. Power Plant View 02 2.1. Brayton Cycle 07 2.2. Rankine Cycle 08 3.1. Operation of RGTPP 10 5.1. Filter 15 6.1. Oil Cooling System 26 6.2. Power Plant View 27 6.3. Water Tube Boiler 28 6.4. H.R.S.G 29 7.1. Steam Turbine 37 7.2. Bearing 37 7.3. Steam Turbine Cover 38
  • 6. (AIET/DOEE/2014-2015/PTS/vi) LIST OF TABLES TAB. NO. TABLE NAME P. NO. 1.1. Total Energy Generated 04 1.2. Gas (full) Component 05 6.1. Gas Turbine-1 (GT-1) 23 6.2. Gas Turbine-2 (GT-2) 24 6.3. HRSG -1 & 2 28 7.1. Steam Turbine Generator 42 7.2. Insulation Level 42
  • 7. (AIET/DOEE/2014-2015/PTS/vii) CONTENTS CERTIFICATE FROM DEPARTMENT i CERTIFICATE FROM COMPANY ii ACKNOWLEDGEMENT iii ABSTRACT Iv LIST OF FIGURES V LIST OF TABLES Vi 1. Introduction About The Plant 01-05 1.1 -First Unit 02 1.2 -Second Unit 02 1.3 -Availability Of Water 03 1.4 -Electricity Transmission System 03 1.5 -Expected System Operation 03 1.6 -Gas Transmission System 04 2. Power Plant Cycle 06-08 2.1 -Open Cycle 06 2.2 -Combined Cycle 06 2.3 -Advantages Of Combine Cycle 06 2.4 -Brayton Cycle 07 2.5 -Rankine Cycle 08 3.Plant Operation 09-10 4. Gas Turbine 11-12 4.1 -Compressor 11 4.2 -Combustors 11
  • 8. (AIET/DOEE/2014-2015/PTS/viii) 4.3 -Transition Pieces 11 4.4 -Turbine 11 4.5 -Exhaust 12 5. Gas Turbine Support System And Their Equipment 13-20 5.1- Starting System 13 5.1-1. Diesel Engine 13 5.1-2. Torque Converter 13 5.1-3. Accessory Gear Box 13 5.1-4. Jaw Clutch Mechanisms 14 5.2- Lubricating Oil System 14 5.2-1. Oil Reservoir 14 5.2-2. Lubricating Pump 14 5.2-3. Heat Exchange 14 5.2-4. Gas Skid 14 5.2-5. Scrubber 14 5.2-6. Filter 14 5.2-7. Pressure Control Valve 15 5.2-8. Condensate Tank 15 5.3- Air Intake System 15 5.3-1. Filter 15 5.3-2. Filter Cleaning 16 5.3-3. Air Processing unit 16 5.4- Cooling And Sealing Air System 16 5.4-1. Ventilating System 16 5.4-2. Gas Turbine And Compressor Cleaning 16
  • 9. (AIET/DOEE/2014-2015/PTS/ix) 5.4-3. Reducing Gear Box 17 5.5- H.R.S.G And Steam Turbine Equipment 17 5.5-1. H.R.S.G 17 5.5-2. Steam Turbine 17 5.6- Condensate Circuit Equipment 17 5.6-1. Condenser 18 5.6-2. Ejector 18 5.6-3. Extraction Pump 18 5.6-4. Gland Steam Condenser 18 5.7- Feed Water Circuit 18 5.7-1. Feed Water Tank 18 5.7-2. HP Feed pumps 18 5.7-3. LP Feed Pumps 18 5.8- Common Support System for G.T. And S.T 19 5.8-1. CW And ACW System 19 5.8-2. Air Compressor 19 5.8-3. Raw Water System 19 5.8-4. Laboratory 19 5.8-5. Fire Protection System 20 5.8-6. Black Start D.G Set 20 6. Construction Details Of Gas Turbine 21-34 6.1- Compressor Section 21 6.1-1. Rotor 21 6.1-2. Stator 21 6.2- Combustion Section 22 6.2-1. Combustiomn Chambers 22
  • 10. (AIET/DOEE/2014-2015/PTS/x) 6.2-2. Spark plugs 22 6.3- STG 24 6.3-1. Turbine 24 6.4- HRSG 26 6.5- Generator 29 6.6- Water and Steam Cycle Equipment 30 6.6-1. Water and Steam Cycle 30 6.6-1-1. Dearator 30 6.6-1-2. HP BFP 30 6.6-1-3. LP BFP 31 6.6-1-4. Condenser 32 6.6-1-5. Condenser Extraction Pump 32 6.6-1-6. Ejector 33 6.6-1-7. Gland Steam Cooler 33 6.6-1-8. Condensate Preheater 33 6.7- HP Bypass and LP Bypass (HPBP and LPBP) 33 6.8- Auxiliaries: 34 6.8-2. Circulating Water Pump 34 6.8-3. Aux. Cooling Water Pump (ACW Pump) 34 7. Construction Details Of Generator And Exciter 35-43 7.1- Stator 35 7.2- Rotor 35 7.3- Bearing 35 7.5- Excitation System 35 7.5-1. Pilot Excitor 43 7.5-2. Main Excitor 43
  • 11. (AIET/DOEE/2014-2015/PTS/xi) 7.5-3. Rectifier Excitor 43 8. 132 kv Switch Yard 44-48 8.1- Bus Bars 44 8.2- Insulators 44 8.3- Isolators 44 8.4- Circuit Breakers 45 8.5- Protective Relays 46 8.6- Current Transformer 47 8.7- Potential Transformer 47 8.8- Lightning Arrestors 47 8.9- Current Voltage Transformer 48 8.10- Wave Trap 48 8.11- Bus Coupler 48 CONCLUSION 49 REFERENCE 50