CONTENTS
 Single line diagram
 Lighting arresters
 Coupling capacitor
 Wave trap
 Current transformer
 Potential transformer
 Circuit breaker
 transformer
Control room
Battery room
Earthing importance
 Miscellaneous
Single Line Diagram-132/33/11kv Sub-station PGI
132kv incoming lines through Lightning Arrestor & is132kv incoming lines through Lightning Arrestor & is
connected to the Gantry through insulated discs.connected to the Gantry through insulated discs.
Disc insulators
Lightning
Arrestor
Incomer
gantryLightning
Arrestors
Bus bar for all 3
incomer & 1
outgoing line
It is connected between the line and earth so diverts the incoming
high voltage wave to earth.
Lightning arresters act as safety valves designed to discharge
electric surges resulting from lightning strokes, switching or other
disturbance .
LIGHTNING ARRESTERS
The communication device used for the
communication over the power lines is a MODEM,
commonly known as Power Line MODEM (PLM).
It works as both transmitter and receiver, i.e., it
transmits and receives data over the power lines
Coupling Capacitor
The modulated carrier is let into power line through coupling
capacitor specially designed to with stand line voltage under all-
weather condition. The upper end of the coupling capacitor is
connected directly to the line and the lower end is connected to
the ground through a carrier frequency chock coil or drain coil.
Thus coupling capacitor forms the link between the PLCC
equipment and power line. The coupling capacitor used in
UPSEB is 2200pf capacitance
Wave Trap or Line Trap
Wave trap is connected in series with power line between the point of connection of
coupling capacitor and S/S. Wave trap offers negligible impedance to HF carrier. Wave
trap stands electromechanically and thermally for short circuit current in the event of fault
on the line. On the basis of blocking frequency bank, the wave trap can be following
type:
All wave
Single Frequency
Double Frequency’
Broad Band
CURRENT TRANSFORMER
A current transformer (CT) is used for measurement of alternating electric
currents. When current in a circuit is too high to apply directly to
measuring instruments, a current transformer produces a reduced current
accurately proportional to the current in the circuit, which can be
conveniently connected to measuring and recording instruments. A
current transformer isolates the measuring instruments from what may be
very high voltage in the monitored circuit.
The line ,through the isolators is distributedThe line ,through the isolators is distributed
in the s/s through Main bus.in the s/s through Main bus.
Main Bus bar
132kv Bay
POTENTIAL OR VOLTAGE TRANSFORMER
Voltage transformers (VT) (also called potential transformers (PT)) are a
parallel connected type of instrument transformer, used for metering and
protection in high-voltage circuits or phasor phase shift isolation. They are
designed to present negligible load to the supply being measured and to
have an accurate voltage ratio to enable accurate metering. A potential
transformer may have several secondary windings on the same core as a
primary winding, for use in different metering or protection circuits
CIRCUIT BREAKERCIRCUIT BREAKER
TransformerTransformer
Control roomControl room
The control room is nerve center of a power station .
The various controls performed from here are voltage adjustment, load control, emergency
tripping of turbines etc.
Control roomControl room
EarthingEarthing
MISCELLANEOUSMISCELLANEOUS
NCT (Neutralising
Current
Transformer)
RVT
(Resistive
Voltage
Transformer)
Capacitor
Cells
132kv substation inplant training seminar
132kv substation inplant training seminar

Contenu connexe

Tendances

Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
ASHOK KHOJA
 

Tendances (20)

Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
33kv substation
33kv substation33kv substation
33kv substation
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
132 kv
132 kv132 kv
132 kv
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
Electric substation
Electric substation Electric substation
Electric substation
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
Substation
Substation Substation
Substation
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
 
Design of substation
Design of substationDesign of substation
Design of substation
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 

En vedette (9)

Sisener Substation Engineering
Sisener Substation EngineeringSisener Substation Engineering
Sisener Substation Engineering
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Shubham chamoli 132 kv substation presenttation
Shubham  chamoli 132 kv substation presenttationShubham  chamoli 132 kv substation presenttation
Shubham chamoli 132 kv substation presenttation
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
SMART GRID DEVELOPMENT IN INDIA - by Mr. S.R. Sethi, Senior Advisor UPES
SMART GRID DEVELOPMENT IN INDIA - by Mr. S.R. Sethi, Senior Advisor UPES SMART GRID DEVELOPMENT IN INDIA - by Mr. S.R. Sethi, Senior Advisor UPES
SMART GRID DEVELOPMENT IN INDIA - by Mr. S.R. Sethi, Senior Advisor UPES
 
Busbar configuarations
Busbar configuarationsBusbar configuarations
Busbar configuarations
 
Substation overview
Substation overviewSubstation overview
Substation overview
 

Similaire à 132kv substation inplant training seminar

Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
VSRAGHU
 

Similaire à 132kv substation inplant training seminar (20)

Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
introductory presentation on the transformer
introductory presentation on the transformer   introductory presentation on the transformer
introductory presentation on the transformer
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Summer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxSummer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptx
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 
Summer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxSummer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptx
 
pulse transformer ppt
pulse transformer pptpulse transformer ppt
pulse transformer ppt
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
industrial traninig.pptx
industrial traninig.pptxindustrial traninig.pptx
industrial traninig.pptx
 

Dernier

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Dernier (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

132kv substation inplant training seminar

  • 1. INPLANTINPLANT TRAININGTRAINING IN 132KVIN 132KV S/SS/S BYBY :-:- SHRIKANTSHRIKANT BHANSALIBHANSALI
  • 2. CONTENTS  Single line diagram  Lighting arresters  Coupling capacitor  Wave trap  Current transformer  Potential transformer  Circuit breaker  transformer Control room Battery room Earthing importance  Miscellaneous
  • 4. 132kv incoming lines through Lightning Arrestor & is132kv incoming lines through Lightning Arrestor & is connected to the Gantry through insulated discs.connected to the Gantry through insulated discs. Disc insulators Lightning Arrestor Incomer gantryLightning Arrestors Bus bar for all 3 incomer & 1 outgoing line
  • 5. It is connected between the line and earth so diverts the incoming high voltage wave to earth. Lightning arresters act as safety valves designed to discharge electric surges resulting from lightning strokes, switching or other disturbance . LIGHTNING ARRESTERS
  • 6. The communication device used for the communication over the power lines is a MODEM, commonly known as Power Line MODEM (PLM). It works as both transmitter and receiver, i.e., it transmits and receives data over the power lines
  • 7. Coupling Capacitor The modulated carrier is let into power line through coupling capacitor specially designed to with stand line voltage under all- weather condition. The upper end of the coupling capacitor is connected directly to the line and the lower end is connected to the ground through a carrier frequency chock coil or drain coil. Thus coupling capacitor forms the link between the PLCC equipment and power line. The coupling capacitor used in UPSEB is 2200pf capacitance
  • 8. Wave Trap or Line Trap Wave trap is connected in series with power line between the point of connection of coupling capacitor and S/S. Wave trap offers negligible impedance to HF carrier. Wave trap stands electromechanically and thermally for short circuit current in the event of fault on the line. On the basis of blocking frequency bank, the wave trap can be following type: All wave Single Frequency Double Frequency’ Broad Band
  • 9. CURRENT TRANSFORMER A current transformer (CT) is used for measurement of alternating electric currents. When current in a circuit is too high to apply directly to measuring instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments. A current transformer isolates the measuring instruments from what may be very high voltage in the monitored circuit.
  • 10. The line ,through the isolators is distributedThe line ,through the isolators is distributed in the s/s through Main bus.in the s/s through Main bus. Main Bus bar 132kv Bay
  • 11. POTENTIAL OR VOLTAGE TRANSFORMER Voltage transformers (VT) (also called potential transformers (PT)) are a parallel connected type of instrument transformer, used for metering and protection in high-voltage circuits or phasor phase shift isolation. They are designed to present negligible load to the supply being measured and to have an accurate voltage ratio to enable accurate metering. A potential transformer may have several secondary windings on the same core as a primary winding, for use in different metering or protection circuits
  • 14.
  • 15.
  • 16. Control roomControl room The control room is nerve center of a power station . The various controls performed from here are voltage adjustment, load control, emergency tripping of turbines etc.