SlideShare une entreprise Scribd logo
1  sur  7
Télécharger pour lire hors ligne
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-1 of 7
PLUMBING DESIGN CRITERIA
TABLE OF CONTENTS
I GENERAL....................................................................................................................2
II CRITERIA....................................................................................................................2
A. PIPING SYSTEMS...................................................................................................2
1. DOMESTIC WATER SYSTEM ..........................................................................2
2. SANITARY DRAINAGE SYSTEM .....................................................................3
3. FIRE PROTECTION SPRINKLER SYSTEM .........................................................3
B. PLUMBING COMPONENTS ....................................................................................3
1. LARGE DEMAND WATER HEATERS (KITCHENS AND GYMNASIUMS): ...........3
2. SMALL DEMAND WATER HEATERS: .............................................................3
3. HOSE BIBBS ON BUILDING EXTERIOR WALLS:..............................................3
4. HOSE BIBBS ON BUILDING INTERIOR ............................................................3
5. SHUTOFF VALVE TO ISOLATE THE WATER SUPPLY:.....................................3
6. PIPE...............................................................................................................4
C. SPECIFIC ROOMS..................................................................................................4
1. GROUP TOILET ROOM:..................................................................................4
2. SINGLE TOILET ROOMS:................................................................................4
3. SINGLE BATHS AND SHOWERS:.....................................................................4
4. GROUP SHOWERS:.........................................................................................4
5. KITCHENS: ....................................................................................................4
6. CUSTODIAL CLOSETS:...................................................................................4
7. CUSTODIAL ROOM/CENTRAL RECEIVING .....................................................4
8. CHEMISTRY LABORATORY - GAS SYSTEM:...................................................5
9. CHEMISTRY LABORATORY - COMPRESSED AIR AND LAB DRAIN SYSTEM:...5
10. SCIENCE CHEMISTRY LABORATORY – EMERGENCY SHOWER/EYE WASH ....5
11. ADMINISTRATION: ........................................................................................5
12. ART: .............................................................................................................6
13. PRE-KINDERGARTEN AND KINDERGARTEN: ..................................................6
14. PRIMARY AND INTERMEDIATE CLASSROOMS:...............................................6
15. SKILLS DEVELOPMENT LABORATORY (SCIENCE): ........................................6
16. ROOMS CONTAINING CLOTHES WASHING MACHINES.....................................6
D. MECHANICAL EQUIPMENT...................................................................................6
1. AIR-COOLED CHILLER YARD:.......................................................................6
2. WATER-COOLED CHILLER PLANT: ...............................................................6
3. AIR HANDLER UNIT ROOMS: ........................................................................7
4. COOLING TOWER ENCLOSURE: .....................................................................7
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-2 of 7
PLUMBING DESIGN CRITERIA
I GENERAL
A. The Design Professional shall use this document in conjunction with the Educational Specifications and
District Master Specifications (DMS) to develop the design and contract documents.
B. The Design Professional is encouraged to utilize low water and energy use equipment and components
when designing the plumbing system.
C. Goals: To present additional requirements for the design of a functional, efficient and code compliant
plumbing system that promotes a safe and sanitary environment for the students, employees and visitors
of School District of Palm Beach County Facilities.
D. This division contains requirements for the following elements:
1. Piping Systems
2. Plumbing Components
3. Specific Rooms
4. Mechanical Equipment
E. In this document the term Engineer represents the professionally qualified Design Engineer of Record
and/or Engineering Consultant, duly licensed in the State of Florida, that signs and seals project design
documents.
F. The Engineer is the person responsible for the design and development of all project documents.
G. The Engineer must request, in advance and in writing, deviations from the Plumbing requirements in this
document.
1. The SDPBC shall review the requested deviations; based on good engineering practices and/or
economics, and either approve or deny the request in writing.
2. Any approved deviations are valid only for the specific request.
H. This document presents design requirements for the School District of Palm Beach County that are either
more stringent than or not present in the building codes. For items not presented in this document the
requirements of the following codes shall apply:
1. Florida Building Code, FBC
2. National Fire Code, NFC
3. Florida Administrative Code, FAC
4. Americans with Disabilities Act Accessibility Guidelines, ADAAG
I. Submittal requirements as listed in procedure BD-001 – Submission for Project Documents.
J. The Criteria shall not limit or restrain the performance and liability of the Professional or Professionals
responsible for the integrity and performance of the structure.
K. The Criteria is applicable to new construction and to the remodeling and renovation of existing facilities.
L. The use of the Criteria in this document does not exempt the Design Professionals from any federal or
state code or standards controlling the design and construction of any Facility.
II CRITERIA
A. Piping Systems
1. Domestic Water System
a. Provide potable water stub outs for future portable classroom installation.
b. Schools designed as Enhanced Hurricane Protection Areas (EHPA):
1) Provide a plumbing system capable of supplying water for the capacity of the EHPA.
2) If pumps are required in the design, provide power from an emergency power source.
3) System to have automatic and manual controls.
c. Specify low water use fixtures where feasible.
d. When trap primers are required, connect to water closet supplies where feasible.
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-3 of 7
2. Sanitary Drainage System
a. Schools designed as (EHPA):
1) Provide a plumbing system capable of collecting sanitary waste for the capacity of the EHPA.
2) If pumps are required in the design, provide power from an emergency power source.
a) The design professional is encouraged to utilize passive storage capacity of EHPA system
to reduce the power requirements on the emergency generator capacity.
(1) Increase lift station capacity
(2) Use of line capacity
(3) Combination of two
3. Fire Protection Sprinkler System
a. Occupancy Classification
1) Classrooms and administration areas: light hazard
2) Kitchen: ordinary hazard group 1
3) Storage areas, wooden stages: ordinary hazard group 2
4) Generator Room: extra hazard group 1
b. Extended Coverage Heads are allowable if designed in accordance with NFPA 13.
c. Design the fire main in accordance with the School District Civil Design Criteria.
B. Plumbing Components
1. Large Demand Water Heaters (Kitchens and Gymnasiums):
a. Locate water heater rooms (WHR) on exterior walls with exterior doors.
1) Provide fire-rated WHR, coordinate with architect.
b. Use natural gas water heaters, if natural gas is not available, use propane gas.
1) Provide electronic ignition.
c. To reduce standby energy losses, schedule the operation of the water heaters and their circulating
pumps with the building automation system (BAS), coordinate with mechanical engineer and
District's BAS contractor.
d. Provide a copper fin water heater with separate storage tank.
e. Provide floor drain for the WHR.
2. Small Demand Water Heaters:
a. Use electric water heaters.
b. Do not place these water heaters on the BAS.
c. Provide a floor drain for the WHR for water heaters larger than 40-gallon capacity.
3. Hose Bibbs on Building Exterior Walls:
a. Provide hose bibbs at a maximum interval of 150' of exterior wall.
b. Provide hose bibbs with the following features: satin bronze finish, tamper proof vacuum breaker
with hose end connection and control key operator.
c. Provide a shutoff valve to isolate the water supply for that hose bibb.
4. Hose Bibbs on Building Interior
a. Provide hose bibbs in group toilet rooms, art rooms and patios, kiln rooms, and mechanical
equipment rooms.
b. Provide hose bibbs with the following features: satin bronze finish, tamper proof vacuum breaker
with hose end connection and control key operator.
c. Provide a shutoff valve to isolate the water supply for that hose bibb.
5. Shutoff Valve To Isolate The Water Supply:
1) Locate the shutoff valve above a suspended grid ceiling in that area.
2) If no suspended grid ceiling, provide a 24" x 24" hinged ceiling access panel.
3) Place a 1/2" square green sticker with a "W" on the ceiling grid or access panel.
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-4 of 7
4) Coordinate with architect.
6. Pipe
a. Above and below grade piping within 5’ of the building envelope shall be in accordance with
Plumbing Master Specification 15420 Plumbing Piping.
b. Above and below grade piping outside 5’ of the building envelope shall be in accordance with
Civil Master Specification; 02660 Water Distribution Systems, 02700 Storm Drainage Systems,
02730 Sanitary Sewer Collection Systems. (Also see Civil Design Criteria).
c. Design grease traps in accordance with the School District Civil Design Criteria.
C. Specific Rooms
1. Group Toilet Room:
a. Provide one hose bibb in each group toilet room located under the lavatories 12" AFF.
1) With satin chrome plated finish, tamper proof vacuum breaker with hose end connection and
control key operation.
b. Provide wall hung water closets, urinals and lavatories with carrier.
1) Lavatories shall be cast iron enamel coated.
c. Provide 3" floor drain with trap primer installed on the water closet supply.
d. Provide a shutoff valve for each toilet group to isolate the water supply for that group.
e. Provide cold water to lavatories.
f. Provide shock absorbers (not air chambers) in an accessible location.
1) If not possible provide a 24" x 24" hinged wall (ceiling) access panel.
2) Coordinate with architect.
2. Single Toilet Rooms:
a. Provide floor mounted water closet and wall hung lavatory.
b. Floor drain is not required.
c. Provide a shutoff valve for each single toilet room to isolate the water supply for that room.
d. Provide cold water to lavatory.
e. Provide shock absorbers (not air chambers) in an accessible location.
1) If not possible provide a 24” x 24” hinged wall (ceiling) access panel.
2) Coordinate with architect.
3. Single Baths and Showers:
a. Provide pressure and temperature control valves for tubs and showers.
b. Provide trap primer from water closet supply to tubs and showers.
4. Group Showers:
a. Locate the master shutoff valve and temperature control valve in the teacher planning room.
5. Kitchens:
a. Use natural gas for cooking if natural gas is not available use propane gas.
b. Size the gas water heater based on the thermostat set point of 140F.
c. Provide an electric booster heater to the dishwasher to provide 180F water.
d. Interlock the natural gas solenoid valve to the kitchen hood exhaust requiring the exhaust hood to
be in operation before the gas will flow.
6. Custodial Closets:
a. Provide floor mounted service sink with CW and HW:
1) 3” grid strainer and drain
b. Provide faucet with tamper proof vacuum breaker, pail hook, wall brace, ¾” hose thread outlet
and integral stops.
c. Provide a floor drain for the WHR for water heaters larger than 40 gallon capacity.
7. Custodial Room/Central Receiving
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-5 of 7
a. Provide a Single toilet room with shower.
b. Provide floor drains with trap primers.
c. Provide an eyewash station/safety shower.
8. Chemistry Laboratory - Gas System:
a. The main supply line to the classroom shall have a 24 VAC, normally closed solenoid valve with
manual reset.
1) The solenoid valve shall close on a signal from the fire alarm system.
b. Provide a push-pull mushroom head emergency button at the classroom exit.
1) When the emergency button is pushed, the solenoid valve shall close,
2) Shut off the compressed air and electrical power to the classroom, and
3) Start the emergency exhaust system.
c. Route the main supply line from the solenoid valve to the teacher demo table.
d. Route the main supply line from the teacher demo table, to the student stations.
1) In a cabinet below the teacher demo table, provide a manual, quarter-turn master valve to
control the gas supply to the student stations.
2) The master valve shall be lockable in the closed position only.
e. Pipe terminations to the teacher demo table and to each student station shall have gas cocks.
f. Underground pipe shall be in a sleeve.
1) Vent the sleeve to the outside atmosphere.
9. Chemistry Laboratory - Compressed Air and Lab Drain System:
a. The main supply line to the classroom shall have a 24 VAC, normally closed solenoid valve with
manual reset.
1) Provide a push-pull mushroom head emergency button at the classroom exit.
a) When the emergency button is pushed, the solenoid valve shall close,
b) Shut off the gas and electrical power to the classroom, and
c) Start the emergency exhaust system.
b. Route the main supply line from the solenoid valve to the teacher demo table.
c. Route the main supply line from the teacher demo table, to the student stations.
1) In a cabinet below the teacher demo table, provide a manual, quarter-turn master valve to
control the compressed air supply to the student stations.
d. Pipe terminations to the teacher demo table and to each student sink shall have shutoff valves.
e. Show the location of the future air compressor, and indicate the requirement to install;
1) An electrical conduit with pull string from the power panel to the junction box at the air
compressor, and
2) A floor drain for the air compressor.
f. Drain pipes shall be acid and chemical resistant from the lab drain to a neutralizing tank.
10. Science Chemistry Laboratory – Emergency Shower/Eye Wash
a. Locate near experimental tables but out of main student traffic flow out of classroom, coordinate
with the Architect.
b. Provide manual override shutoff above ceiling, mark locating on ceiling grid.
c. Provide floor drain by the fixture.
d. Design the system or space to minimize the spread of water and prevent damage to the classroom
or furnishings.
11. Administration:
a. Production/Workroom:
1) Stainless steel double sink, with CW and HW.
b. Clinic – See Board approved layout:
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-6 of 7
1) One toilet room for elementary and two toilet rooms for secondary with the following:
a) Wall mounted water closet, height appropriate for the school population.
b) Lavatory, wall mounted, with CW and HW.
c) Accessible shower, with CW and HW.
(1) Pressure and temperature compensating control valve
(2) 3" drain with satin finish nikaloy strainer and trap primer.
(3) Fold down seat meeting accessibility requirements.
2) 22" x 22" Sink mounted in counter with gooseneck faucet, CW and HW.
a) Swing-a-way eyewash connected with the sink.
b) Sink to meet accessibility requirements.
c. Staff Toilet:
1) Wall mounted water closet.
2) Lavatory, wall hung, CW.
12. Art:
a. Classroom:
1) Two double sinks, separate faucets and clay traps for each bowl, CW.
2) Provide floor drain(s).
b. Kiln:
1) Utility sink, 3" drain with clay trap, CW, HW.
13. Pre-kindergarten and Kindergarten:
a. Classroom:
1) Single sink, faucet, grid strainer, and water jet fountain, CW.
b. Toilet:
1) Wall mounted water closet.
2) Lavatory with a faucet, CW.
14. Primary and Intermediate Classrooms:
a. Single sink, with faucet and water jet fountain, CW.
15. Skills Development Laboratory (Science):
a. Student carrel with sink, faucet, CW.
16. Rooms containing clothes washing machines
a. Provide floor drain.
b. Provide HW and CW lines
D. Mechanical Equipment
1. Air-Cooled Chiller Yard:
a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum
breaker with hose end connection.
b. Provide cold water supply to the chilled water make-up water system.
c. Coordinate with mechanical engineer.
2. Water-Cooled Chiller Plant:
a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum
breaker with hose end connection.
b. Provide cold water supply:
1) To the chilled water make-up water system.
2) To the condenser water make-up water system.
3) Coordinate with mechanical engineer.
c. Provide 3” floor drains with trap primers and vents, connected to sanitary system.
1) Coordinate with architect to slope the floor to the floor drains.
Plumbing Design Criteria 2006 Edition 4/3/06
School District Palm Beach County Page-7 of 7
d. Provide 3” equipment drains with trap primers and vents connect to sanitary system, coordinate
with mechanical engineer to properly locate the equipment drains next to the equipment.
3. Air Handler Unit Rooms:
a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum
breaker with hose end connection.
b. Provide 3” floor drains with basket strainers, trap primers and vents, connected to sanitary
system, coordinate with architect to slope the floor to the floor drains.
c. Provide 3” condensate drain for each AHU with the following:
1) Open hub drain with perforated stainless steel sediment basket.
2) Install lip of condensate drain hub 1” above finished floor.
3) Provide trap, but no trap vent or primer.
4) Connect to storm water catch basin independent of the roof storm water system.
5) If connected to roof storm water system, provide accessible backwater valve.
6) Coordinate with mechanical engineer to properly locate condensate drain(s) next to AHU
equipment pad(s).
d. Condensate drainpipes from the air handler refer to SDPBC AHU Condensate Drain Detail #38.
1) Provide copper drainpipe full size of AHU connection.
2) Provide a trap and a ¼” per foot pitch for positive gravity drainage; refer to DMS, Section
15510, Item 2.7.A.
3) Coordinate height of AHU concrete pad to provide trap dimensions indicated in Detail #38.
4) Provide a 1” air gap above the rim of an open hub drain for the AHU drainpipe.
4. Cooling Tower Enclosure:
a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum
breaker with hose end connection.
b. Provide cold water supply to the condenser water make-up water system.
c. Provide drain(s) for the cooling tower(s) emergency overflow(s) and drain valve(s).
d. Provide 4” open hub drain(s) with perforated stainless steel sediment basket(s), trap primer(s),
and vent(s) connected to sanitary system.
1) Install lip of drain(s) 12” AFG.
2) Provide 1” air gap between the cooling tower discharge lines and drain; refer to District
Master Specification, Section 15510, Item 2.7.B.
END OF SECTION

Contenu connexe

En vedette

En vedette (20)

Heat loss guide slideshare part 7
Heat loss guide slideshare part 7Heat loss guide slideshare part 7
Heat loss guide slideshare part 7
 
Transom Window - Beautiful Stained Glass Products
Transom Window - Beautiful Stained Glass ProductsTransom Window - Beautiful Stained Glass Products
Transom Window - Beautiful Stained Glass Products
 
Michelle's Sprinkler 101 Presentation
Michelle's Sprinkler 101 PresentationMichelle's Sprinkler 101 Presentation
Michelle's Sprinkler 101 Presentation
 
Practical plumbing design guide
Practical plumbing design guidePractical plumbing design guide
Practical plumbing design guide
 
Ductwork
DuctworkDuctwork
Ductwork
 
Ductwork
DuctworkDuctwork
Ductwork
 
Duct design
Duct designDuct design
Duct design
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
 
HVAC Air distribution fundamentals
HVAC Air distribution fundamentalsHVAC Air distribution fundamentals
HVAC Air distribution fundamentals
 
Air duct system design
Air duct system designAir duct system design
Air duct system design
 
Duct system
Duct systemDuct system
Duct system
 
Hydraulic structures
Hydraulic structuresHydraulic structures
Hydraulic structures
 
Plumbing
PlumbingPlumbing
Plumbing
 
Duct design
Duct designDuct design
Duct design
 
Cem 350 hvac distribution systems sizing 10 2016
Cem  350 hvac distribution systems sizing 10 2016Cem  350 hvac distribution systems sizing 10 2016
Cem 350 hvac distribution systems sizing 10 2016
 
Sprinkler system.
Sprinkler system.Sprinkler system.
Sprinkler system.
 
Sprinkler system
Sprinkler systemSprinkler system
Sprinkler system
 
HVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air ConditioningHVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air Conditioning
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
 
Sanitary and water supply
Sanitary and water supplySanitary and water supply
Sanitary and water supply
 

Similaire à Plumbing Design Criteria for Schools

DesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfDesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfkahlaoui1
 
Common Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & InspectionCommon Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & InspectionMeghan Knudson
 
Building permit 2
Building permit 2Building permit 2
Building permit 2Lumbad 1989
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02JicelleBayan
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
Kitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive GuideKitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive GuideSamantha Angel
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & mariaMaria Archana
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16Tim Bail
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-12Osmar Gomes Pinto
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-1205061978
 
Willbros - Summary: Advanced Notice of Proposed Rulemaking
Willbros - Summary: Advanced Notice of Proposed RulemakingWillbros - Summary: Advanced Notice of Proposed Rulemaking
Willbros - Summary: Advanced Notice of Proposed RulemakingWillbros Group, Inc.
 
ECIV 401 – Engineering Ethics & Professional Practice F.docx
ECIV 401 – Engineering Ethics & Professional Practice  F.docxECIV 401 – Engineering Ethics & Professional Practice  F.docx
ECIV 401 – Engineering Ethics & Professional Practice F.docxtidwellveronique
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsAmer Abdul Aziz
 

Similaire à Plumbing Design Criteria for Schools (20)

DesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfDesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdf
 
Resume 5 13 16 months
Resume 5 13 16 monthsResume 5 13 16 months
Resume 5 13 16 months
 
Common Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & InspectionCommon Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & Inspection
 
Building permit 2
Building permit 2Building permit 2
Building permit 2
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
Kitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive GuideKitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive Guide
 
BioCorridor Zoning Amendment
BioCorridor Zoning AmendmentBioCorridor Zoning Amendment
BioCorridor Zoning Amendment
 
Mechanical
Mechanical Mechanical
Mechanical
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 
Dmfp fire
Dmfp fireDmfp fire
Dmfp fire
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
 
Willbros - Summary: Advanced Notice of Proposed Rulemaking
Willbros - Summary: Advanced Notice of Proposed RulemakingWillbros - Summary: Advanced Notice of Proposed Rulemaking
Willbros - Summary: Advanced Notice of Proposed Rulemaking
 
ECIV 401 – Engineering Ethics & Professional Practice F.docx
ECIV 401 – Engineering Ethics & Professional Practice  F.docxECIV 401 – Engineering Ethics & Professional Practice  F.docx
ECIV 401 – Engineering Ethics & Professional Practice F.docx
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling Projects
 
5.1 pressure pipelinedesign
5.1 pressure pipelinedesign5.1 pressure pipelinedesign
5.1 pressure pipelinedesign
 

Plus de bhattbhai

Dm p lhosp(1)
Dm p lhosp(1)Dm p lhosp(1)
Dm p lhosp(1)bhattbhai
 
100957233 19228966-plumbing-calculation
100957233 19228966-plumbing-calculation100957233 19228966-plumbing-calculation
100957233 19228966-plumbing-calculationbhattbhai
 
0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)bhattbhai
 
23.plumbing method statement_gn23
23.plumbing method statement_gn2323.plumbing method statement_gn23
23.plumbing method statement_gn23bhattbhai
 
59446885 hvac
59446885 hvac59446885 hvac
59446885 hvacbhattbhai
 
3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systemsbhattbhai
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manualbhattbhai
 
158742585 packaged-type-ac-units
158742585 packaged-type-ac-units158742585 packaged-type-ac-units
158742585 packaged-type-ac-unitsbhattbhai
 

Plus de bhattbhai (8)

Dm p lhosp(1)
Dm p lhosp(1)Dm p lhosp(1)
Dm p lhosp(1)
 
100957233 19228966-plumbing-calculation
100957233 19228966-plumbing-calculation100957233 19228966-plumbing-calculation
100957233 19228966-plumbing-calculation
 
0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)
 
23.plumbing method statement_gn23
23.plumbing method statement_gn2323.plumbing method statement_gn23
23.plumbing method statement_gn23
 
59446885 hvac
59446885 hvac59446885 hvac
59446885 hvac
 
3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems3 cf ch-006_hvac_systems
3 cf ch-006_hvac_systems
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
 
158742585 packaged-type-ac-units
158742585 packaged-type-ac-units158742585 packaged-type-ac-units
158742585 packaged-type-ac-units
 

Dernier

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 

Dernier (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 

Plumbing Design Criteria for Schools

  • 1. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 7 PLUMBING DESIGN CRITERIA TABLE OF CONTENTS I GENERAL....................................................................................................................2 II CRITERIA....................................................................................................................2 A. PIPING SYSTEMS...................................................................................................2 1. DOMESTIC WATER SYSTEM ..........................................................................2 2. SANITARY DRAINAGE SYSTEM .....................................................................3 3. FIRE PROTECTION SPRINKLER SYSTEM .........................................................3 B. PLUMBING COMPONENTS ....................................................................................3 1. LARGE DEMAND WATER HEATERS (KITCHENS AND GYMNASIUMS): ...........3 2. SMALL DEMAND WATER HEATERS: .............................................................3 3. HOSE BIBBS ON BUILDING EXTERIOR WALLS:..............................................3 4. HOSE BIBBS ON BUILDING INTERIOR ............................................................3 5. SHUTOFF VALVE TO ISOLATE THE WATER SUPPLY:.....................................3 6. PIPE...............................................................................................................4 C. SPECIFIC ROOMS..................................................................................................4 1. GROUP TOILET ROOM:..................................................................................4 2. SINGLE TOILET ROOMS:................................................................................4 3. SINGLE BATHS AND SHOWERS:.....................................................................4 4. GROUP SHOWERS:.........................................................................................4 5. KITCHENS: ....................................................................................................4 6. CUSTODIAL CLOSETS:...................................................................................4 7. CUSTODIAL ROOM/CENTRAL RECEIVING .....................................................4 8. CHEMISTRY LABORATORY - GAS SYSTEM:...................................................5 9. CHEMISTRY LABORATORY - COMPRESSED AIR AND LAB DRAIN SYSTEM:...5 10. SCIENCE CHEMISTRY LABORATORY – EMERGENCY SHOWER/EYE WASH ....5 11. ADMINISTRATION: ........................................................................................5 12. ART: .............................................................................................................6 13. PRE-KINDERGARTEN AND KINDERGARTEN: ..................................................6 14. PRIMARY AND INTERMEDIATE CLASSROOMS:...............................................6 15. SKILLS DEVELOPMENT LABORATORY (SCIENCE): ........................................6 16. ROOMS CONTAINING CLOTHES WASHING MACHINES.....................................6 D. MECHANICAL EQUIPMENT...................................................................................6 1. AIR-COOLED CHILLER YARD:.......................................................................6 2. WATER-COOLED CHILLER PLANT: ...............................................................6 3. AIR HANDLER UNIT ROOMS: ........................................................................7 4. COOLING TOWER ENCLOSURE: .....................................................................7
  • 2. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-2 of 7 PLUMBING DESIGN CRITERIA I GENERAL A. The Design Professional shall use this document in conjunction with the Educational Specifications and District Master Specifications (DMS) to develop the design and contract documents. B. The Design Professional is encouraged to utilize low water and energy use equipment and components when designing the plumbing system. C. Goals: To present additional requirements for the design of a functional, efficient and code compliant plumbing system that promotes a safe and sanitary environment for the students, employees and visitors of School District of Palm Beach County Facilities. D. This division contains requirements for the following elements: 1. Piping Systems 2. Plumbing Components 3. Specific Rooms 4. Mechanical Equipment E. In this document the term Engineer represents the professionally qualified Design Engineer of Record and/or Engineering Consultant, duly licensed in the State of Florida, that signs and seals project design documents. F. The Engineer is the person responsible for the design and development of all project documents. G. The Engineer must request, in advance and in writing, deviations from the Plumbing requirements in this document. 1. The SDPBC shall review the requested deviations; based on good engineering practices and/or economics, and either approve or deny the request in writing. 2. Any approved deviations are valid only for the specific request. H. This document presents design requirements for the School District of Palm Beach County that are either more stringent than or not present in the building codes. For items not presented in this document the requirements of the following codes shall apply: 1. Florida Building Code, FBC 2. National Fire Code, NFC 3. Florida Administrative Code, FAC 4. Americans with Disabilities Act Accessibility Guidelines, ADAAG I. Submittal requirements as listed in procedure BD-001 – Submission for Project Documents. J. The Criteria shall not limit or restrain the performance and liability of the Professional or Professionals responsible for the integrity and performance of the structure. K. The Criteria is applicable to new construction and to the remodeling and renovation of existing facilities. L. The use of the Criteria in this document does not exempt the Design Professionals from any federal or state code or standards controlling the design and construction of any Facility. II CRITERIA A. Piping Systems 1. Domestic Water System a. Provide potable water stub outs for future portable classroom installation. b. Schools designed as Enhanced Hurricane Protection Areas (EHPA): 1) Provide a plumbing system capable of supplying water for the capacity of the EHPA. 2) If pumps are required in the design, provide power from an emergency power source. 3) System to have automatic and manual controls. c. Specify low water use fixtures where feasible. d. When trap primers are required, connect to water closet supplies where feasible.
  • 3. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-3 of 7 2. Sanitary Drainage System a. Schools designed as (EHPA): 1) Provide a plumbing system capable of collecting sanitary waste for the capacity of the EHPA. 2) If pumps are required in the design, provide power from an emergency power source. a) The design professional is encouraged to utilize passive storage capacity of EHPA system to reduce the power requirements on the emergency generator capacity. (1) Increase lift station capacity (2) Use of line capacity (3) Combination of two 3. Fire Protection Sprinkler System a. Occupancy Classification 1) Classrooms and administration areas: light hazard 2) Kitchen: ordinary hazard group 1 3) Storage areas, wooden stages: ordinary hazard group 2 4) Generator Room: extra hazard group 1 b. Extended Coverage Heads are allowable if designed in accordance with NFPA 13. c. Design the fire main in accordance with the School District Civil Design Criteria. B. Plumbing Components 1. Large Demand Water Heaters (Kitchens and Gymnasiums): a. Locate water heater rooms (WHR) on exterior walls with exterior doors. 1) Provide fire-rated WHR, coordinate with architect. b. Use natural gas water heaters, if natural gas is not available, use propane gas. 1) Provide electronic ignition. c. To reduce standby energy losses, schedule the operation of the water heaters and their circulating pumps with the building automation system (BAS), coordinate with mechanical engineer and District's BAS contractor. d. Provide a copper fin water heater with separate storage tank. e. Provide floor drain for the WHR. 2. Small Demand Water Heaters: a. Use electric water heaters. b. Do not place these water heaters on the BAS. c. Provide a floor drain for the WHR for water heaters larger than 40-gallon capacity. 3. Hose Bibbs on Building Exterior Walls: a. Provide hose bibbs at a maximum interval of 150' of exterior wall. b. Provide hose bibbs with the following features: satin bronze finish, tamper proof vacuum breaker with hose end connection and control key operator. c. Provide a shutoff valve to isolate the water supply for that hose bibb. 4. Hose Bibbs on Building Interior a. Provide hose bibbs in group toilet rooms, art rooms and patios, kiln rooms, and mechanical equipment rooms. b. Provide hose bibbs with the following features: satin bronze finish, tamper proof vacuum breaker with hose end connection and control key operator. c. Provide a shutoff valve to isolate the water supply for that hose bibb. 5. Shutoff Valve To Isolate The Water Supply: 1) Locate the shutoff valve above a suspended grid ceiling in that area. 2) If no suspended grid ceiling, provide a 24" x 24" hinged ceiling access panel. 3) Place a 1/2" square green sticker with a "W" on the ceiling grid or access panel.
  • 4. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-4 of 7 4) Coordinate with architect. 6. Pipe a. Above and below grade piping within 5’ of the building envelope shall be in accordance with Plumbing Master Specification 15420 Plumbing Piping. b. Above and below grade piping outside 5’ of the building envelope shall be in accordance with Civil Master Specification; 02660 Water Distribution Systems, 02700 Storm Drainage Systems, 02730 Sanitary Sewer Collection Systems. (Also see Civil Design Criteria). c. Design grease traps in accordance with the School District Civil Design Criteria. C. Specific Rooms 1. Group Toilet Room: a. Provide one hose bibb in each group toilet room located under the lavatories 12" AFF. 1) With satin chrome plated finish, tamper proof vacuum breaker with hose end connection and control key operation. b. Provide wall hung water closets, urinals and lavatories with carrier. 1) Lavatories shall be cast iron enamel coated. c. Provide 3" floor drain with trap primer installed on the water closet supply. d. Provide a shutoff valve for each toilet group to isolate the water supply for that group. e. Provide cold water to lavatories. f. Provide shock absorbers (not air chambers) in an accessible location. 1) If not possible provide a 24" x 24" hinged wall (ceiling) access panel. 2) Coordinate with architect. 2. Single Toilet Rooms: a. Provide floor mounted water closet and wall hung lavatory. b. Floor drain is not required. c. Provide a shutoff valve for each single toilet room to isolate the water supply for that room. d. Provide cold water to lavatory. e. Provide shock absorbers (not air chambers) in an accessible location. 1) If not possible provide a 24” x 24” hinged wall (ceiling) access panel. 2) Coordinate with architect. 3. Single Baths and Showers: a. Provide pressure and temperature control valves for tubs and showers. b. Provide trap primer from water closet supply to tubs and showers. 4. Group Showers: a. Locate the master shutoff valve and temperature control valve in the teacher planning room. 5. Kitchens: a. Use natural gas for cooking if natural gas is not available use propane gas. b. Size the gas water heater based on the thermostat set point of 140F. c. Provide an electric booster heater to the dishwasher to provide 180F water. d. Interlock the natural gas solenoid valve to the kitchen hood exhaust requiring the exhaust hood to be in operation before the gas will flow. 6. Custodial Closets: a. Provide floor mounted service sink with CW and HW: 1) 3” grid strainer and drain b. Provide faucet with tamper proof vacuum breaker, pail hook, wall brace, ¾” hose thread outlet and integral stops. c. Provide a floor drain for the WHR for water heaters larger than 40 gallon capacity. 7. Custodial Room/Central Receiving
  • 5. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-5 of 7 a. Provide a Single toilet room with shower. b. Provide floor drains with trap primers. c. Provide an eyewash station/safety shower. 8. Chemistry Laboratory - Gas System: a. The main supply line to the classroom shall have a 24 VAC, normally closed solenoid valve with manual reset. 1) The solenoid valve shall close on a signal from the fire alarm system. b. Provide a push-pull mushroom head emergency button at the classroom exit. 1) When the emergency button is pushed, the solenoid valve shall close, 2) Shut off the compressed air and electrical power to the classroom, and 3) Start the emergency exhaust system. c. Route the main supply line from the solenoid valve to the teacher demo table. d. Route the main supply line from the teacher demo table, to the student stations. 1) In a cabinet below the teacher demo table, provide a manual, quarter-turn master valve to control the gas supply to the student stations. 2) The master valve shall be lockable in the closed position only. e. Pipe terminations to the teacher demo table and to each student station shall have gas cocks. f. Underground pipe shall be in a sleeve. 1) Vent the sleeve to the outside atmosphere. 9. Chemistry Laboratory - Compressed Air and Lab Drain System: a. The main supply line to the classroom shall have a 24 VAC, normally closed solenoid valve with manual reset. 1) Provide a push-pull mushroom head emergency button at the classroom exit. a) When the emergency button is pushed, the solenoid valve shall close, b) Shut off the gas and electrical power to the classroom, and c) Start the emergency exhaust system. b. Route the main supply line from the solenoid valve to the teacher demo table. c. Route the main supply line from the teacher demo table, to the student stations. 1) In a cabinet below the teacher demo table, provide a manual, quarter-turn master valve to control the compressed air supply to the student stations. d. Pipe terminations to the teacher demo table and to each student sink shall have shutoff valves. e. Show the location of the future air compressor, and indicate the requirement to install; 1) An electrical conduit with pull string from the power panel to the junction box at the air compressor, and 2) A floor drain for the air compressor. f. Drain pipes shall be acid and chemical resistant from the lab drain to a neutralizing tank. 10. Science Chemistry Laboratory – Emergency Shower/Eye Wash a. Locate near experimental tables but out of main student traffic flow out of classroom, coordinate with the Architect. b. Provide manual override shutoff above ceiling, mark locating on ceiling grid. c. Provide floor drain by the fixture. d. Design the system or space to minimize the spread of water and prevent damage to the classroom or furnishings. 11. Administration: a. Production/Workroom: 1) Stainless steel double sink, with CW and HW. b. Clinic – See Board approved layout:
  • 6. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-6 of 7 1) One toilet room for elementary and two toilet rooms for secondary with the following: a) Wall mounted water closet, height appropriate for the school population. b) Lavatory, wall mounted, with CW and HW. c) Accessible shower, with CW and HW. (1) Pressure and temperature compensating control valve (2) 3" drain with satin finish nikaloy strainer and trap primer. (3) Fold down seat meeting accessibility requirements. 2) 22" x 22" Sink mounted in counter with gooseneck faucet, CW and HW. a) Swing-a-way eyewash connected with the sink. b) Sink to meet accessibility requirements. c. Staff Toilet: 1) Wall mounted water closet. 2) Lavatory, wall hung, CW. 12. Art: a. Classroom: 1) Two double sinks, separate faucets and clay traps for each bowl, CW. 2) Provide floor drain(s). b. Kiln: 1) Utility sink, 3" drain with clay trap, CW, HW. 13. Pre-kindergarten and Kindergarten: a. Classroom: 1) Single sink, faucet, grid strainer, and water jet fountain, CW. b. Toilet: 1) Wall mounted water closet. 2) Lavatory with a faucet, CW. 14. Primary and Intermediate Classrooms: a. Single sink, with faucet and water jet fountain, CW. 15. Skills Development Laboratory (Science): a. Student carrel with sink, faucet, CW. 16. Rooms containing clothes washing machines a. Provide floor drain. b. Provide HW and CW lines D. Mechanical Equipment 1. Air-Cooled Chiller Yard: a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum breaker with hose end connection. b. Provide cold water supply to the chilled water make-up water system. c. Coordinate with mechanical engineer. 2. Water-Cooled Chiller Plant: a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum breaker with hose end connection. b. Provide cold water supply: 1) To the chilled water make-up water system. 2) To the condenser water make-up water system. 3) Coordinate with mechanical engineer. c. Provide 3” floor drains with trap primers and vents, connected to sanitary system. 1) Coordinate with architect to slope the floor to the floor drains.
  • 7. Plumbing Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-7 of 7 d. Provide 3” equipment drains with trap primers and vents connect to sanitary system, coordinate with mechanical engineer to properly locate the equipment drains next to the equipment. 3. Air Handler Unit Rooms: a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum breaker with hose end connection. b. Provide 3” floor drains with basket strainers, trap primers and vents, connected to sanitary system, coordinate with architect to slope the floor to the floor drains. c. Provide 3” condensate drain for each AHU with the following: 1) Open hub drain with perforated stainless steel sediment basket. 2) Install lip of condensate drain hub 1” above finished floor. 3) Provide trap, but no trap vent or primer. 4) Connect to storm water catch basin independent of the roof storm water system. 5) If connected to roof storm water system, provide accessible backwater valve. 6) Coordinate with mechanical engineer to properly locate condensate drain(s) next to AHU equipment pad(s). d. Condensate drainpipes from the air handler refer to SDPBC AHU Condensate Drain Detail #38. 1) Provide copper drainpipe full size of AHU connection. 2) Provide a trap and a ¼” per foot pitch for positive gravity drainage; refer to DMS, Section 15510, Item 2.7.A. 3) Coordinate height of AHU concrete pad to provide trap dimensions indicated in Detail #38. 4) Provide a 1” air gap above the rim of an open hub drain for the AHU drainpipe. 4. Cooling Tower Enclosure: a. Provide a hose bibb with the following features: satin bronze finish and tamper proof vacuum breaker with hose end connection. b. Provide cold water supply to the condenser water make-up water system. c. Provide drain(s) for the cooling tower(s) emergency overflow(s) and drain valve(s). d. Provide 4” open hub drain(s) with perforated stainless steel sediment basket(s), trap primer(s), and vent(s) connected to sanitary system. 1) Install lip of drain(s) 12” AFG. 2) Provide 1” air gap between the cooling tower discharge lines and drain; refer to District Master Specification, Section 15510, Item 2.7.B. END OF SECTION