Summary Notes from the Leslie St. Walking Safety Audit, Nov. 20, 10–11 AM
Attending:
Approximately 18 people attended the tour including
• Ward 30 Councillor Paula Fletcher
• Ward 32 Councillor Elect Mary Margaret McMahon
• Residents on or near Leslie
• Cycling Pedestrian advocacy groups (South
Riverdale Bicycle User Group & SoDa Bikes)
• City of Toronto Office of the Public Realm –
Pedestrian Design
• City of Toronto – Transportation Services
• Toronto Transit Commission (Leslie St. Maintenance
Barns Project Managers and design consultants)
• South Riverdale Community Health Centre
Introductions
Paul Young, health promoter and landscape architect from the South Riverdale Community Health
Centre welcomed everyone and explained the objectives of the tour:
1. To see first hand how the area functions as a local destination for shopping and for
recreational trails.
2. To discuss safety issues and improvements on Leslie – changes that would
improve safety for pedestrians (especially seniors and children), people with
disabilities and cyclists.
Paul cited a few statistics about how people move around in Toronto.
For example:
- Approximately half the people in Toronto do not have access to a car (they take transit,
walk or bike)
- On average 6 – 7 pedestrians are hit daily in Toronto, ½ of all traffic related fatalities are
pedestrians (Toronto Star).
- Over ½ people in Toronto are cyclists, of these ½ of these use their bikes for practical
purposes (shopping, work, school, etc.) 2009 Toronto Cycling Survey.
Paul clarified that this tour is not meant to raise expectations about how the TTC may or may not
re-design Leslie if/when the new service tracks go in. It is meant to begin a conversation on how the
TTC, City and community can pool their collective resources and wisdom to ensure Leslie is made
physically safer for our most vulnerable road users.
The Tour Route
The group went from Lakeshore Blvd. up the west side of Leslie to Queen St. E. and back down the
east side of Leslie.
Issues
The intersections and driveway entries feel dangerous and dominated by car and truck movements.
As a pedestrian or cyclist one feels out of place and in danger of being hit.
Local foot and cycling traffic is mixed with regional car commuters and truck traffic without much
physical separation. The car-oriented retail compounds the problem with large parking lots and few
pedestrian / cycling routes.
2
Statistically intersections and driveway crossings are where pedestrians or cyclists are most likely
to be hit. All the intersections on Leslie south of Queen feel dangerous.
Cyclists (especially young people) often use the sidewalks - most commonly on weekends.
Leslie St. sidewalks are dark at night in certain places. The back-lotted town houses make the
sidewalk feel like a back lane, unwatched and unsafe.
Drivers do not seem to respect pedestrians or cyclists (esp. at crossing points).
Connections between the sidewalk and the
store entries are difficult on foot and especially
difficult in a wheelchair. For example, there is
no clear route for pedestrians to access
Loblaws from Eastern and Leslie. The Tim
Hortons entry for pedestrians is dangerous
and not accessible. There are few cycling
connections between the existing bike lanes
(on Eastern, Dundas and Lakeshore) to the
stores.
There is significant flooding at the entrance of
the building at north west corner of Eastern
and Leslie (covers the sidewalk and bottom
steps going to the building). This area needs
to be raised and / or catch basin re-located.
Possible solutions:
Could Leslie become a “green way”
connecting people to the lake – as
Vancouver is doing?
There were discussions about designing
the section between Eastern and Queen
with permanent parking and/or a widened
sidewalk. Car volumes would need to be
considered but peak commuter volumes
seem to use Eastern.
Some pedestrian signals could be
adjusted to provide better conditions for
pedestrians (i.e. at Loblaws / Price
Chopper intersection).
Bright pavement markings might help (“zebra crossings”) where sidewalks cross intersections.
Toronto Hydro will come out if requested, to do a review of
lighting levels.
Re-grade area at north west corner of Leslie and Eastern Ave.
There may be an opportunity (depending on Loblaw’s future
plans) to create a pedestrian and cycling connection along the
east side of Leslie between Lakeshore Blvd. and Eastern Ave.
This would require a discussion with the City of Toronto area
3
planner and the property owner / tenant about feasibility and cost/benefit.
Other opportunities may exist to improve conditions on Leslie (i.e. sidewalks, trees, lighting) if any
new developments are planned. This too would require a meeting with the area planner.
Perhaps car and truck traffic could be re-routed onto Lakeshore Blvd rather than Leslie.
Perhaps a shared pedestrian / cycling facility could be introduced along one side of Leslie.
Speed control: perhaps some
intersections could have raised
crossings (i.e. similar to Esplanade
and Market St.)
A contra-flow bike lane on Leslie north
of Queen could connect Eastern bike
lanes up to the Dundas E. bicycle
lanes.
Next Steps
Councillors Fletcher and McMahon
will post information from the tour and will collect comments from others interested in the issue.
Send ideas to:
Ward 32 Councillor Elect Mary Margaret McMahon – spargy@rogers.com
Ward 30 Councillor Paula Fletcher councillor_fletcher@toronto.ca
It was suggested that the TTC design team will correspond with participants through the Councillors
regarding design options.
It was suggested that the Councillors meet with the Area Planner(s) to review options for the
Loblaw’s site frontage (and any other new development opportunities)
End of Notes
Recorded by Paul Young, South Riverdale Community Health Centre pyoung@srchc.com (416)
461-1925 ext. 241
Cc Attendees, South East Toronto Bicycle Users Group, SoDa Bikes, Toronto Coalition for Active
Transportation

Contenu connexe

Tendances

Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path PresentationAmy Hooker
 
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)A.U Architecture Alumni Association
 
Bikes and buses
Bikes and busesBikes and buses
Bikes and busesJohn Luton
 
Roundabouts - Township Council Presentation January 19, 2009
Roundabouts - Township Council Presentation January 19, 2009Roundabouts - Township Council Presentation January 19, 2009
Roundabouts - Township Council Presentation January 19, 2009jgabateman
 
Rotary 2015 final 2
Rotary 2015 final 2Rotary 2015 final 2
Rotary 2015 final 2Gordon James
 
Dan Burden Presentation
Dan Burden PresentationDan Burden Presentation
Dan Burden Presentationrendo
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRPO America
 
Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1rachel_butler
 
ThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsNLandUSA
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Toronto Public Consultation Unit
 
Roundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GARoundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GAWilliams and Associates
 
Uli hines student competition 2016
Uli hines student competition 2016Uli hines student competition 2016
Uli hines student competition 2016Florian Poix
 
KAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKittelson Slides
 
Presentation to Farrells By Finlay McNab for Sustrans
Presentation to Farrells By Finlay McNab for SustransPresentation to Farrells By Finlay McNab for Sustrans
Presentation to Farrells By Finlay McNab for SustransSustrans
 

Tendances (20)

Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path Presentation
 
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
 
Bike DFW
Bike DFWBike DFW
Bike DFW
 
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
 
Complete Streets Presentation
Complete Streets PresentationComplete Streets Presentation
Complete Streets Presentation
 
Bikes and buses
Bikes and busesBikes and buses
Bikes and buses
 
Roundabouts - Township Council Presentation January 19, 2009
Roundabouts - Township Council Presentation January 19, 2009Roundabouts - Township Council Presentation January 19, 2009
Roundabouts - Township Council Presentation January 19, 2009
 
Pwpb chattanooga
Pwpb chattanoogaPwpb chattanooga
Pwpb chattanooga
 
Rotary 2015 final 2
Rotary 2015 final 2Rotary 2015 final 2
Rotary 2015 final 2
 
Dan Burden Presentation
Dan Burden PresentationDan Burden Presentation
Dan Burden Presentation
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
 
Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1
 
ThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsThinkBike Workshops DC Recommendations
ThinkBike Workshops DC Recommendations
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
 
December 8, 2020 BPAC Virtual Workshop
December 8, 2020 BPAC Virtual Workshop December 8, 2020 BPAC Virtual Workshop
December 8, 2020 BPAC Virtual Workshop
 
Roundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GARoundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GA
 
Uli hines student competition 2016
Uli hines student competition 2016Uli hines student competition 2016
Uli hines student competition 2016
 
SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
 
KAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKAI - Modern Urban Roundabouts
KAI - Modern Urban Roundabouts
 
Presentation to Farrells By Finlay McNab for Sustrans
Presentation to Farrells By Finlay McNab for SustransPresentation to Farrells By Finlay McNab for Sustrans
Presentation to Farrells By Finlay McNab for Sustrans
 

En vedette

Rodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignRodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignDana Marie
 
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment SubmissionToronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submissionbikingtoronto
 
Bike Month Pedal Ad 1
Bike Month Pedal Ad 1Bike Month Pedal Ad 1
Bike Month Pedal Ad 1bikingtoronto
 
Bloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EABloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EAbikingtoronto
 
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts SheetAlliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheetbikingtoronto
 
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking ReportBicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking Reportbikingtoronto
 

En vedette (6)

Rodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignRodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaign
 
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment SubmissionToronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
 
Bike Month Pedal Ad 1
Bike Month Pedal Ad 1Bike Month Pedal Ad 1
Bike Month Pedal Ad 1
 
Bloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EABloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EA
 
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts SheetAlliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
 
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking ReportBicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
 

Similaire à Leslie safety tour nov 20 2010

Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCNLandUSA
 
Deanhill Road LTN response
Deanhill Road LTN responseDeanhill Road LTN response
Deanhill Road LTN responseTim Lennon
 
Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Joe Zaccaria
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Design South East
 
North Beach Neighbors: Slow Streets Initiative Stakeholder Survey
North Beach Neighbors: Slow Streets Initiative Stakeholder SurveyNorth Beach Neighbors: Slow Streets Initiative Stakeholder Survey
North Beach Neighbors: Slow Streets Initiative Stakeholder SurveyTony Wessling
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsAndy Duerr
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo bookletGardinerEast
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snydernjbikeped
 
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
volumeone
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxfordshireCC
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentationTim Lennon
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boardsGardinerEast
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Thomas Downs
 

Similaire à Leslie safety tour nov 20 2010 (20)

Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
 
Deanhill Road LTN response
Deanhill Road LTN responseDeanhill Road LTN response
Deanhill Road LTN response
 
Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
 
North Beach Neighbors: Slow Streets Initiative Stakeholder Survey
North Beach Neighbors: Slow Streets Initiative Stakeholder SurveyNorth Beach Neighbors: Slow Streets Initiative Stakeholder Survey
North Beach Neighbors: Slow Streets Initiative Stakeholder Survey
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township News
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo booklet
 
Great streets
Great streetsGreat streets
Great streets
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert

 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentation
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boards
 
NACTO 2013
NACTO  2013NACTO  2013
NACTO 2013
 
Proposal Example- NEGEF
Proposal Example- NEGEFProposal Example- NEGEF
Proposal Example- NEGEF
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
Midtown Portland
Midtown PortlandMidtown Portland
Midtown Portland
 
The Tube
The Tube The Tube
The Tube
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 

Plus de bikingtoronto

Cycling Committee May 14 2001
Cycling Committee   May 14 2001Cycling Committee   May 14 2001
Cycling Committee May 14 2001bikingtoronto
 
Cycling Committee June 18 2001
Cycling Committee   June 18 2001Cycling Committee   June 18 2001
Cycling Committee June 18 2001bikingtoronto
 
Cycling Committee July 16 2001
Cycling Committee   July 16 2001Cycling Committee   July 16 2001
Cycling Committee July 16 2001bikingtoronto
 
Cycling Committee Apr 23 2001
Cycling Committee   Apr 23 2001Cycling Committee   Apr 23 2001
Cycling Committee Apr 23 2001bikingtoronto
 
Cycling Committee Mar 19 2001
Cycling Committee   Mar 19 2001Cycling Committee   Mar 19 2001
Cycling Committee Mar 19 2001bikingtoronto
 
Cycling Committee Feb 19 2001
Cycling Committee   Feb 19 2001Cycling Committee   Feb 19 2001
Cycling Committee Feb 19 2001bikingtoronto
 
Bicycle Parking Guide
Bicycle Parking GuideBicycle Parking Guide
Bicycle Parking Guidebikingtoronto
 

Plus de bikingtoronto (7)

Cycling Committee May 14 2001
Cycling Committee   May 14 2001Cycling Committee   May 14 2001
Cycling Committee May 14 2001
 
Cycling Committee June 18 2001
Cycling Committee   June 18 2001Cycling Committee   June 18 2001
Cycling Committee June 18 2001
 
Cycling Committee July 16 2001
Cycling Committee   July 16 2001Cycling Committee   July 16 2001
Cycling Committee July 16 2001
 
Cycling Committee Apr 23 2001
Cycling Committee   Apr 23 2001Cycling Committee   Apr 23 2001
Cycling Committee Apr 23 2001
 
Cycling Committee Mar 19 2001
Cycling Committee   Mar 19 2001Cycling Committee   Mar 19 2001
Cycling Committee Mar 19 2001
 
Cycling Committee Feb 19 2001
Cycling Committee   Feb 19 2001Cycling Committee   Feb 19 2001
Cycling Committee Feb 19 2001
 
Bicycle Parking Guide
Bicycle Parking GuideBicycle Parking Guide
Bicycle Parking Guide
 

Dernier

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 

Dernier (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Leslie safety tour nov 20 2010

  • 1. 1 Summary Notes from the Leslie St. Walking Safety Audit, Nov. 20, 10–11 AM Attending: Approximately 18 people attended the tour including • Ward 30 Councillor Paula Fletcher • Ward 32 Councillor Elect Mary Margaret McMahon • Residents on or near Leslie • Cycling Pedestrian advocacy groups (South Riverdale Bicycle User Group & SoDa Bikes) • City of Toronto Office of the Public Realm – Pedestrian Design • City of Toronto – Transportation Services • Toronto Transit Commission (Leslie St. Maintenance Barns Project Managers and design consultants) • South Riverdale Community Health Centre Introductions Paul Young, health promoter and landscape architect from the South Riverdale Community Health Centre welcomed everyone and explained the objectives of the tour: 1. To see first hand how the area functions as a local destination for shopping and for recreational trails. 2. To discuss safety issues and improvements on Leslie – changes that would improve safety for pedestrians (especially seniors and children), people with disabilities and cyclists. Paul cited a few statistics about how people move around in Toronto. For example: - Approximately half the people in Toronto do not have access to a car (they take transit, walk or bike) - On average 6 – 7 pedestrians are hit daily in Toronto, ½ of all traffic related fatalities are pedestrians (Toronto Star). - Over ½ people in Toronto are cyclists, of these ½ of these use their bikes for practical purposes (shopping, work, school, etc.) 2009 Toronto Cycling Survey. Paul clarified that this tour is not meant to raise expectations about how the TTC may or may not re-design Leslie if/when the new service tracks go in. It is meant to begin a conversation on how the TTC, City and community can pool their collective resources and wisdom to ensure Leslie is made physically safer for our most vulnerable road users. The Tour Route The group went from Lakeshore Blvd. up the west side of Leslie to Queen St. E. and back down the east side of Leslie. Issues The intersections and driveway entries feel dangerous and dominated by car and truck movements. As a pedestrian or cyclist one feels out of place and in danger of being hit. Local foot and cycling traffic is mixed with regional car commuters and truck traffic without much physical separation. The car-oriented retail compounds the problem with large parking lots and few pedestrian / cycling routes.
  • 2. 2 Statistically intersections and driveway crossings are where pedestrians or cyclists are most likely to be hit. All the intersections on Leslie south of Queen feel dangerous. Cyclists (especially young people) often use the sidewalks - most commonly on weekends. Leslie St. sidewalks are dark at night in certain places. The back-lotted town houses make the sidewalk feel like a back lane, unwatched and unsafe. Drivers do not seem to respect pedestrians or cyclists (esp. at crossing points). Connections between the sidewalk and the store entries are difficult on foot and especially difficult in a wheelchair. For example, there is no clear route for pedestrians to access Loblaws from Eastern and Leslie. The Tim Hortons entry for pedestrians is dangerous and not accessible. There are few cycling connections between the existing bike lanes (on Eastern, Dundas and Lakeshore) to the stores. There is significant flooding at the entrance of the building at north west corner of Eastern and Leslie (covers the sidewalk and bottom steps going to the building). This area needs to be raised and / or catch basin re-located. Possible solutions: Could Leslie become a “green way” connecting people to the lake – as Vancouver is doing? There were discussions about designing the section between Eastern and Queen with permanent parking and/or a widened sidewalk. Car volumes would need to be considered but peak commuter volumes seem to use Eastern. Some pedestrian signals could be adjusted to provide better conditions for pedestrians (i.e. at Loblaws / Price Chopper intersection). Bright pavement markings might help (“zebra crossings”) where sidewalks cross intersections. Toronto Hydro will come out if requested, to do a review of lighting levels. Re-grade area at north west corner of Leslie and Eastern Ave. There may be an opportunity (depending on Loblaw’s future plans) to create a pedestrian and cycling connection along the east side of Leslie between Lakeshore Blvd. and Eastern Ave. This would require a discussion with the City of Toronto area
  • 3. 3 planner and the property owner / tenant about feasibility and cost/benefit. Other opportunities may exist to improve conditions on Leslie (i.e. sidewalks, trees, lighting) if any new developments are planned. This too would require a meeting with the area planner. Perhaps car and truck traffic could be re-routed onto Lakeshore Blvd rather than Leslie. Perhaps a shared pedestrian / cycling facility could be introduced along one side of Leslie. Speed control: perhaps some intersections could have raised crossings (i.e. similar to Esplanade and Market St.) A contra-flow bike lane on Leslie north of Queen could connect Eastern bike lanes up to the Dundas E. bicycle lanes. Next Steps Councillors Fletcher and McMahon will post information from the tour and will collect comments from others interested in the issue. Send ideas to: Ward 32 Councillor Elect Mary Margaret McMahon – spargy@rogers.com Ward 30 Councillor Paula Fletcher councillor_fletcher@toronto.ca It was suggested that the TTC design team will correspond with participants through the Councillors regarding design options. It was suggested that the Councillors meet with the Area Planner(s) to review options for the Loblaw’s site frontage (and any other new development opportunities) End of Notes Recorded by Paul Young, South Riverdale Community Health Centre pyoung@srchc.com (416) 461-1925 ext. 241 Cc Attendees, South East Toronto Bicycle Users Group, SoDa Bikes, Toronto Coalition for Active Transportation