SlideShare une entreprise Scribd logo
1  sur  10
Project System Proposal



Trans Global Solutions…Driving the Future


              Brent Kelley
              1907 Technology Drive
              Columbus, OH 43224
              June 3, 2008


              Ms. Julie Carmichael
              Branch Manager
              Capital City Honda
              1 Mile Maker Drive
              Columbus, OH 43224


              Dear Ms. Carmichael:

              As a long-time admirer of the Honda of America and the outstanding business practices that you employ to deliver such a
              quality vehicle and outstanding customer service, I particularly enjoyed having the opportunity to see how you function from
              the inside. As you indicated during our meeting, your company has expressed a need to take your Service Department at
              your local dealership to the next level increasing the overall customer service experience to one that is on par with higher
              end service centers.

              This correspondence outlines the complete scope of work you requested, including objectives, procedures, identification of
              responsibilities, and estimated fees.

               OBJECTIVE

              Implement a cutting-edge technology solution that will increase the customer service experience following the trend of
              Honda Corporation to establish presence and image in the “introductory luxury” market. Install a Microsoft solution of both
              software and hardware, including implementation and setup, training, conversion assistance, and post-conversion support.
              Provide professional assistance related to this new system and coordinate the bridge to the new system from your current
              environment. Everything we do will be built around the idea of bringing it all back to how it relates to customer service.
              Success of this project is dependent not only on the software/hardware solution that we provide, but also on your
              personnel's skill, effort, and willingness to work as a team.

              Implementation of this solution should allow Capital City Honda to:
                   •    Compete in a Higher Market Segment
                   •    Increase Market Share
                   •    Utilize Advertising / Marketing Services
                   •    Increase Customer Service, and
                   •    Increase Customer Brand Recognition
Ms. Julie Carmichael
                                                                                                                                                          August 31, 2009
                                                                                                                                                                    Page 2


            CAPITAL CITY HONDA COMPANY HISTORY

        Capital City Honda was founded in April 2, 1992 in Charleston, West Virginia. The company started with 9 employees from the
Solutions
 Global large independently wealthy Carmichael family resident in Charleston. Capital City Honda opened their doors with an
 Trans  inventory of 25 cars and a service department with only 4 employees and two mechanic’s bays. Over the first three years
        of business, the company quickly grew and they had to expand their facilities. In 1997, Capital City Honda opened their
        second location in Columbus, OH with 15 employees (the manager being the only employee from the Carmichael family). This
        location was very successful and requirements grew to over 25 employees within 2 years and currently employ 50
        employees. In the year 2000, Capital City Honda opened its third store in Charlotte, NC. Additionally, the business expanded
        their market by building a store in Venice, FL in 2005 and their most recent store in Atlanta, GA; which opened January 22,
        2007. The entire company is still family owned and operated, Honda Certified, and each store is currently managed by a
        Carmichael. Capital City Honda believes that they can provide the customer with an experience that is on par with that of
        luxury vehicle dealerships.



            MISSION STATEMENT

        To provide the best Honda Certified vehicle and service at the greatest total value to our customers, and to make every
        customer feel like a part of our family in order to retain patrons for life.



            CAPITAL CITY HONDA ORGANIZATION

        Enterprise


                                                                                     Gloria Carmichael
                                                                                            CEO




                               Patricia Carmichael                         Tim Carmichael                      Ty Carmichael
                                VP, Parts/Service                            VP, Finance                    VP, Sales / Marketing




               Alyssa Carmichael                       Julie Carmichael                        Jon Carmichael                      Jim Carmichael                 Mary Carmichael
              Branch Manager - WV                    Branch Manager - OH                    Branch Manager - NC                 Branch Manager - GA             Branch Manager - FL
Ms. Julie Carmichael
                                                                                                                                                                         August 31, 2009
                                                                                                                                                                                   Page 3




        Columbus Branch
Solutions
 Global
                                                                                              Julie Carmichael
 Trans                                                                                        Branch Manager




                                                                                                                   Jessica Biel
                                                                                                              Administrative Assistant




             Jennifer McDougal              Charlie Clearwater                           Kim Stone                          Sid Johnson                     Joe Valderama       Brandon Skinner
            Marketing Coordinator            Service Manager                           Parts Manager                       Sales Manager                 Finance Coordinator   Facility Coordinator




                            4 Service Advisors                   14 Mechanics      2 Parts Sales Associates                                14 Client Advisors




                               2 Cashiers                         1 Dispatcher




                              4 Wash Bay                         1 Lot Attendant




            TRANS GLOBAL SOLUTIONS PROFILE

        Trans Global Solutions was founded in 1993 in Columbus, OH when it was determined that there was a need in the
        commercial marketplace for a consulting firm that could understand the customer’s needs and business environment and
        use that information to design, develop, and implement custom solutions that would take the customer’s business to the next
        level. In our 15 years of existence, Trans Global Solutions has created solutions for Fortune 500 companies such as Honda of
        America and Nationwide Insurance as well as for small companies of less than 50 employees and not-for-profit operations.

        Contact Information:
        TransGlobal Solutions
        1907 Technology Drive
        Columbus, OH 43224
        Project Contact: Brent Kelley
        Phone: 614.555.8107
        Fax: 614.555.8110
        E-mail: bkelley2@student.cscc.edu

        Project Name: Capital City Honda Service Department Upgrade
        April 1, 2008 – June 30, 2008
Ms. Julie Carmichael
                                                                                                               August 31, 2009
                                                                                                                         Page 4


            PROJECT TEAM
        Your Trans Global Solutions team consists of:
Solutions
 Global Brent Kelley, Project Manager / Marketing Analyst –
 Trans  Brent has an Associates Degree in Information Technology from Columbus State Community college. He has over 5 years of
        experience in IT. He is currently working on his B.S. in Information Technology. He has a Project Management Level 1
        Certificate. He has overseen and assisted with deployments, upgrades, installations, supporting and training in various
        network environments. Some of the clients sectors include Federal Government, State Government, Financial, Health Care
        and small businesses. He has a Network Certificate from Columbus State. One of his strengths is to lead and develop
        projects within time and cost requirements.

        Dustin Lutz, Web/Systems Engineer –
        Dustin has an Associates Degree in Network Administration from Columbus State Community College. He has been in the IT
        Field for over 7 years. He is currently working on his Bachelor’s Degree in Business Management. He also holds the
        following Certificates: MCP Microsoft Certified Professional 2.0, MCTS - Vista, MCITP – Enterprise Support Technician Vista,
        and MCTS – Exchange Server 2007. Clients include Honda, Macy’s, and Whitehall City Schools.

                    Credential Certification                                               Date Achieved
                    Microsoft Certified IT Professional                                    Feb 18, 2008
                    Enterprise Support Technician                                          Feb 18, 2008
                    Microsoft Certified Professional                                       Jan 25, 2008
                    Microsoft Certified Technology Specialist                              Jan 25, 2008
                    Microsoft Exchange Server 2007: Configuration                          Apr 15, 2008
                    Microsoft Windows Vista: Configuration

        Marc Laracuente, Business Systems Analyst / Database Engineer –
        Marc holds an Associate’s Degree of Applied Science in Computer Information Technology from Columbus State Community
        College. He has had 5 years of experience with Systems Administration, Design, and Implementation. Marc also has 10 years
        of experience in manufacturing and distribution environments utilizing Enterprise Resource Planning, Warehouse
        Management, Production Scheduling, Procurement, HR, and RF technologies. Marc is a Microsoft Certified Professional and is
        currently working on a Bachelor’s Degree from Franklin University as well as a MCSA Certificate.


            SCOPE OF SERVICES FOR THIS PROJECT

               1.   Research / Planning
                         a. Define business goals and objectives.
                         b. Assess current environment through site survey / company interview.
                         c. Produce preliminary investigation report / fact finding information.
                         d. Identify tools and resources available.
                         e. Identify specifications for hardware/software, database design, Intranet/Internet design, financial
                            system, and marketing/advertising materials.
Ms. Julie Carmichael
                                                                                                              August 31, 2009
                                                                                                                        Page 5

                        f.   Recommend steps required to successfully install the new system and assist in assembling setup
                             information and data used in the implementation process.
Solutions      2.   Development
 Global
                        a. Build systems as per design previously approved.
 Trans
                        b. Design Security and Disaster Recovery plans.
                        c.   Design data dictionary, hardware diagram, network diagram, context diagram, and business flow
                             diagrams as needed.
               3.   Implementation
                        a. Oversee the physical installation of hardware and networks.
                        b.   Upload Internet/intranet sites, as well as database to servers.
                        c.   Install / build Active Directory for authentication.
                        d.   Work with you and your staff during installation and implementation to help you gain a general
                             understanding of the system.
               4. Training and Testing
                        a. Train in the areas of transaction entry, query, and reporting, as well as periodic back-up procedures.
                        b.   Upon completion, perform a full system test to assure that it is functioning as intended and producing
                             accurate output.
                        c.   Successfully complete disaster recovery testing.
               5.   Conversion and Post-Conversion Support
                        a.   Assist in planning and assembling data for the conversion, as required. (Note: Data entry assistance is
                             $30 per hour. This cost is not included in our estimate.)
                        b. Provide free telephone support during and for 45 days after conversion. Subsequent charges for
                           support calls are billed in 10-minute units at $12.50 per unit.
                             Note: Support calls are invoiced weekly. Fees are subject to change annually, effective January 1 of each
                             year, based upon 30-day notice
                        c.   Provide all project documentation in Information System Binder and Project CD-ROM.



            SOFTWARE/HARDWARE COSTS AND PROFESSIONAL FEES

        Software costs and fee estimates are summarized on the attached schedule. These fees are effective provided (a) any
        required data for relevant systems is in good order, and (b) service staff members can devote full time to the
        implementation process as needed. Fees will be adjusted to actual accordingly. We will not incur additional hours without
        written prior approval. Our fee does not include modifications to the software, hardware, database, web-sites, etc after the
        design has been approved.

        Our terms are 30% deposit on project approval and before we begin, 50% upon project completion, and the balance due net
        30 after completion.
Ms. Julie Carmichael
                                                                                                              August 31, 2009
                                                                                                                        Page 6




            WORK PLAN
Solutions
 Global
 Trans          6/2/08                          Project Kick Off
                6/2/08 – 6/16/08                Design / Planning Phase
                6/16/08 – 7/15/08               Implementation Phase
                7/15/08 – 8/31/08               Testing and Training Phase
                8/29/08                         Project Wrap Up
                8/29/08 – 10/14/08              Support Phase




            CURRENT SYSTEMS ASSESSMENT DOCUMENT

        This company is an established automobile dealership. The organization has 5 dealerships in different states. It has a stable
        customer base with good sales volumes. The company as a whole has a very limited use of technology throughout all
        locations. As such the ability to measure, track and coordinate information and services that exist within the company is
        very limited. All business units functions mostly as an independent units. The goal of the business is to compete in a higher
        luxury market segment. Honda has now developed products that can compete with higher end pricier models but the
        business is not structured to meet this typical customers needs. Three critical areas the business needs to address are:
        marketing, value added focus, and technology.

        The company has a very basic marketing strategy. The only advertising in place that exists is in the Telephone book. The
        customer database is not leveraged to develop or create additional sales opportunities. The company does direct mail
        coupons through a mailing service. This attempt has no target strategy or customer focus with which to build sales on.
        They lack the strategy or plan to increase or enhance sales for existing or new customers. There is no Web or internet
        accessibility for customers to schedule and enquire about services & products.

        The focus of creating customer service by adding value is non existent in this organization. The company does not value
        service as much as sale in its business strategy. This is critical in order for this dealership to compete against competitors
        who understand that service experience and performance strongly affects the customer’s perception of your business. This
        will directly affect the company’s ability to compete successfully and generate long term revenue. The current service
        model design and work flow need to be reviewed and developed in a different plan that maximizes the resources and
        potential benefits to its customers. The capability to have services organized and performed efficiently goes along way to
        create customer satisfaction. It is important to provide opportunities and gauge the customer experience to make sure that
        any problems or challenges are quickly resolved.

        The technology that exists within the company is not adequate to meet its current or projected needs. This will require the
        addition of new hardware, software, and applications to enable successful competition within higher luxurious market
        segment. This capability will give the organization capability to find value in the data that exists within the company to
        create new sales opportunities and revenue. It will also provide a platform to broadcast & communicate the information,
        materials, and production that takes place on day to day operations.
Ms. Julie Carmichael
                                                                                                                 August 31, 2009
                                                                                                                           Page 7


        Type                                          Qty                Book Value                          Total BV
        Dell Optiplex GX270 Tower                       5            $            250.00                            $ 1,250.00
        Dell OptiPlex GX270 Desktop
Solutions                                              12                          215.00                           2,580.00
 Global Dell 19” CRT Monitor                           18                            75.00                           1,350.00
        RCA 21” mounted TV                              1                          150.00                               150.00
 Trans
        Dell Laser 1110 (B/W)                           4                           100.00                              400.00
        Dell MFP Laser Printer 1815dn                   1                          500.00                               500.00
                                                                                                            $      6,230.00
        Below are the results from our investigations into your current hardware quantities and estimated book value. These items
        will be re-deployed in effort to save money.



            YOUR RESPONSIBILITIES

        This project demands significant involvement by your service personnel. Ultimate success is highly dependent on their
        effort. To help achieve a smooth and successful implementation, it will be your responsibility to perform the following:

               •    Provide documentation and data as required regarding current business practices
               •    Provide access to the Capital City Honda facility during normal business hours
               •    Communicate updates and training to any applicable employees beyond the initial training scope
               •    Review any appropriate safety guidelines with our staff prior to coming on-site at your facility


            BENEFITS

        When the project is complete, your Columbus Branch will have integrated cutting-edge technology in place in your service
        department. Benefits will include:

               •    Increased overall customer service
               •    Use of customer information for marketing
               •    Decreased customer receiving time
               •    A modular plan that can easily be rolled out to other Capital City Honda locations
               •    Continuous improvement tools such as surveys and reporting
               •    Visibility in high end service market
Ms. Julie Carmichael
                                                                                                             August 31, 2009
                                                                                                                       Page 8




            CLOSING
Solutions
 Global
 Trans  We appreciate the opportunity to service your computer information technology needs. To accept this proposal, please sign
        one copy and return it with a 30% deposit.

        Sincerely,




        Brent Kelley
        Project Manager / Marketing Analyst

        Enclosure




                                                                 RESPONSE

        This letter correctly sets forth the understanding between Capital City Honda and Trans Global Solutions.




                      Accepted by                                   Title                                      Date
Ms. Julie Carmichael
                                                                                                 August 31, 2009
                                                                                                           Page 9



                                                            CAPITAL CITY HONDA
                                                        1200 WEST HIGHLAND STREET
Solutions                                                  COLUMBUS, OH 43201
 Global
                                                    INVESTMENT SCHEDULE
 Trans



        DATE:            8/31/2009                                   TO:      Ms. Julie Carmichael

        SOFTWARE COST:

                Microsoft Windows Vista Business                                              $495
                Microsoft Windows Server 2003                                                   799
                Microsoft Windows Server 2008                                                7,398
                Microsoft SQL Server 2005                                                     1,859
                Microsoft Exchange Server 2007                                                  699
                Microsoft Exchange Server 2007 Standard CAL                                  5,025
                Microsoft Office Suite 2007                                                    2,511
                Symantec Endpointe Protection 11.0                                            2,981
                Symantec Backup Exec 12 for Windows Servers                                    1,163
                TOTAL SOFTWARE                                                             $22,930

        HARDWARE COST:

                Servers                                                                     $18,066
                Desktops                                                                       6,130
                Laptops                                                                       5,876
                47” LCD Monitor                                                                1,448
                Switches                                                                      4,450
                Firewall/Filter/Routers                                                       5,800
                Offsite Data Storage                                                         13,626
                Wireless Access Points                                                            100
                Cabling                                                                      15,064
                ISP                                                                           4,788
                Wireless Barcode Scanners                                                      2,316
                Xbox 360 / Games                                                                800
                26” LCD Monitors                                                                1,120
                UPS / Miscellaneous                                                           4,234
                TOTAL HARDWARE                                                              $83,917
Ms. Julie Carmichael
                                                                              August 31, 2009
                                                                                       Page 10

        PROFESSIONAL FEE ESTIMATE:

                                                                          HOURS
        Installation Planning                                                180
Solutions
 Global
 Trans             Identify Responsibilities
                   Establish Schedule
                   Develop Diagrams (Hardware, Network, Work Flow)
                   Select Conversion Date/Method
        Installation of Hardware                                              60
                   Coordinate Physical implementation of Hardware
        Installation of Software                                             240
                  Install Client Operating Systems
                  Build Servers
                  Build Active Directory
                  Load Database / Website / Financial System
                  Set Printers and Defaults
                  Establish Security
        Testing                                                              180
                  Test All Switchboards, Forms Queries for Operability
                  Test Security
                  Test Disaster Recovery
        Training: All Modules and Backup                                     120
                  Document Procedures
                  Demonstrate Hands-On
        Supoort                                                              incl
                  Provide Onsite / Phone Support
                                TOTAL HOURS                                  780
                                TOTAL PROFESSIONAL FEES                  $52,260


        TOTAL FEES                                                       $159,107

Contenu connexe

En vedette

System Proposal(Personal Information & Leave Management System)
System Proposal(Personal Information & Leave Management System)System Proposal(Personal Information & Leave Management System)
System Proposal(Personal Information & Leave Management System)Akila Jayarathna
 
Mobile Bill Management System - Project Proposal
Mobile Bill Management System - Project ProposalMobile Bill Management System - Project Proposal
Mobile Bill Management System - Project ProposalAnuja Herath
 
Library Management Project Presentation
Library Management Project PresentationLibrary Management Project Presentation
Library Management Project PresentationSanket Kudalkar
 
online education system project report
online education system project reportonline education system project report
online education system project reportHagi Sahib
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
Booksell15pages slide shere
Booksell15pages slide shereBooksell15pages slide shere
Booksell15pages slide shereA.H.M Mohsin
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project ProposalGhulam Qadir
 
java Project report online banking system
java Project report online banking systemjava Project report online banking system
java Project report online banking systemVishNu KuNtal
 
Project Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemProject Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemCharitha Gamage
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 

En vedette (13)

Server side proposal
Server side proposalServer side proposal
Server side proposal
 
System Proposal(Personal Information & Leave Management System)
System Proposal(Personal Information & Leave Management System)System Proposal(Personal Information & Leave Management System)
System Proposal(Personal Information & Leave Management System)
 
Mobile Bill Management System - Project Proposal
Mobile Bill Management System - Project ProposalMobile Bill Management System - Project Proposal
Mobile Bill Management System - Project Proposal
 
Library Management Project Presentation
Library Management Project PresentationLibrary Management Project Presentation
Library Management Project Presentation
 
online education system project report
online education system project reportonline education system project report
online education system project report
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Project proposal
Project proposalProject proposal
Project proposal
 
Project proposal
Project proposalProject proposal
Project proposal
 
Booksell15pages slide shere
Booksell15pages slide shereBooksell15pages slide shere
Booksell15pages slide shere
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project Proposal
 
java Project report online banking system
java Project report online banking systemjava Project report online banking system
java Project report online banking system
 
Project Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemProject Proposal document for Hotel Management System
Project Proposal document for Hotel Management System
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 

Similaire à Project System Proposal to Upgrade Capital City Honda Service Department

Palme Thomas Resume
Palme Thomas ResumePalme Thomas Resume
Palme Thomas Resumethomasp442
 
Dominic Arcaroli 2010 Resume
Dominic Arcaroli 2010 ResumeDominic Arcaroli 2010 Resume
Dominic Arcaroli 2010 Resumedomarc33
 
Andrea Weiss Resume2
Andrea Weiss Resume2Andrea Weiss Resume2
Andrea Weiss Resume2Andrea Weiss
 
Jeffrey Cutler Resume 1
Jeffrey Cutler Resume 1Jeffrey Cutler Resume 1
Jeffrey Cutler Resume 1Jeffrey Cutler
 
Michael Gene Mills
Michael Gene MillsMichael Gene Mills
Michael Gene Millsmillman172
 
LDazniger RVP of Professional Services
LDazniger RVP of Professional ServicesLDazniger RVP of Professional Services
LDazniger RVP of Professional ServicesLinda Danziger
 
WinslowBMW_CluthReview 2
WinslowBMW_CluthReview 2WinslowBMW_CluthReview 2
WinslowBMW_CluthReview 2Keni Nelson
 
Sept Resume W Out Address Mgl
Sept Resume W Out Address MglSept Resume W Out Address Mgl
Sept Resume W Out Address MglMargie Gonzalez
 
Bill Stankiewicz Copy William Gates U Ti
Bill Stankiewicz Copy William Gates U TiBill Stankiewicz Copy William Gates U Ti
Bill Stankiewicz Copy William Gates U TiBillStankiewicz
 
R O B I N S O N RESUME OCT 2015.PDF
R O B I N S O N RESUME OCT 2015.PDFR O B I N S O N RESUME OCT 2015.PDF
R O B I N S O N RESUME OCT 2015.PDFMichael Robinson
 
Jeff\'s 2010 History
Jeff\'s 2010 HistoryJeff\'s 2010 History
Jeff\'s 2010 HistoryJeff Larger
 
Keuka_Experiental Learning_295924
Keuka_Experiental Learning_295924Keuka_Experiental Learning_295924
Keuka_Experiental Learning_295924Sơn Trần
 
CMB Automotive Marketing credentials 2016
CMB Automotive Marketing credentials 2016CMB Automotive Marketing credentials 2016
CMB Automotive Marketing credentials 2016Tim Foster
 
Better Together 2014 Branch Manager Sales Conference Newsletter
Better Together 2014  Branch Manager Sales Conference NewsletterBetter Together 2014  Branch Manager Sales Conference Newsletter
Better Together 2014 Branch Manager Sales Conference NewsletterDavid Brookfield
 

Similaire à Project System Proposal to Upgrade Capital City Honda Service Department (20)

Palme Thomas Resume
Palme Thomas ResumePalme Thomas Resume
Palme Thomas Resume
 
Dominic Arcaroli 2010 Resume
Dominic Arcaroli 2010 ResumeDominic Arcaroli 2010 Resume
Dominic Arcaroli 2010 Resume
 
Chad stahl
Chad stahlChad stahl
Chad stahl
 
resume 2015
resume 2015resume 2015
resume 2015
 
Andrea Weiss Resume2
Andrea Weiss Resume2Andrea Weiss Resume2
Andrea Weiss Resume2
 
Jeffrey Cutler Resume 1
Jeffrey Cutler Resume 1Jeffrey Cutler Resume 1
Jeffrey Cutler Resume 1
 
Michael Gene Mills
Michael Gene MillsMichael Gene Mills
Michael Gene Mills
 
Resume wmpdf
Resume wmpdfResume wmpdf
Resume wmpdf
 
ASQ
ASQASQ
ASQ
 
LDazniger RVP of Professional Services
LDazniger RVP of Professional ServicesLDazniger RVP of Professional Services
LDazniger RVP of Professional Services
 
Darshan&amit
Darshan&amitDarshan&amit
Darshan&amit
 
Darshan&amit
Darshan&amitDarshan&amit
Darshan&amit
 
WinslowBMW_CluthReview 2
WinslowBMW_CluthReview 2WinslowBMW_CluthReview 2
WinslowBMW_CluthReview 2
 
Sept Resume W Out Address Mgl
Sept Resume W Out Address MglSept Resume W Out Address Mgl
Sept Resume W Out Address Mgl
 
Bill Stankiewicz Copy William Gates U Ti
Bill Stankiewicz Copy William Gates U TiBill Stankiewicz Copy William Gates U Ti
Bill Stankiewicz Copy William Gates U Ti
 
R O B I N S O N RESUME OCT 2015.PDF
R O B I N S O N RESUME OCT 2015.PDFR O B I N S O N RESUME OCT 2015.PDF
R O B I N S O N RESUME OCT 2015.PDF
 
Jeff\'s 2010 History
Jeff\'s 2010 HistoryJeff\'s 2010 History
Jeff\'s 2010 History
 
Keuka_Experiental Learning_295924
Keuka_Experiental Learning_295924Keuka_Experiental Learning_295924
Keuka_Experiental Learning_295924
 
CMB Automotive Marketing credentials 2016
CMB Automotive Marketing credentials 2016CMB Automotive Marketing credentials 2016
CMB Automotive Marketing credentials 2016
 
Better Together 2014 Branch Manager Sales Conference Newsletter
Better Together 2014  Branch Manager Sales Conference NewsletterBetter Together 2014  Branch Manager Sales Conference Newsletter
Better Together 2014 Branch Manager Sales Conference Newsletter
 

Project System Proposal to Upgrade Capital City Honda Service Department

  • 1. Project System Proposal Trans Global Solutions…Driving the Future Brent Kelley 1907 Technology Drive Columbus, OH 43224 June 3, 2008 Ms. Julie Carmichael Branch Manager Capital City Honda 1 Mile Maker Drive Columbus, OH 43224 Dear Ms. Carmichael: As a long-time admirer of the Honda of America and the outstanding business practices that you employ to deliver such a quality vehicle and outstanding customer service, I particularly enjoyed having the opportunity to see how you function from the inside. As you indicated during our meeting, your company has expressed a need to take your Service Department at your local dealership to the next level increasing the overall customer service experience to one that is on par with higher end service centers. This correspondence outlines the complete scope of work you requested, including objectives, procedures, identification of responsibilities, and estimated fees. OBJECTIVE Implement a cutting-edge technology solution that will increase the customer service experience following the trend of Honda Corporation to establish presence and image in the “introductory luxury” market. Install a Microsoft solution of both software and hardware, including implementation and setup, training, conversion assistance, and post-conversion support. Provide professional assistance related to this new system and coordinate the bridge to the new system from your current environment. Everything we do will be built around the idea of bringing it all back to how it relates to customer service. Success of this project is dependent not only on the software/hardware solution that we provide, but also on your personnel's skill, effort, and willingness to work as a team. Implementation of this solution should allow Capital City Honda to: • Compete in a Higher Market Segment • Increase Market Share • Utilize Advertising / Marketing Services • Increase Customer Service, and • Increase Customer Brand Recognition
  • 2. Ms. Julie Carmichael August 31, 2009 Page 2 CAPITAL CITY HONDA COMPANY HISTORY Capital City Honda was founded in April 2, 1992 in Charleston, West Virginia. The company started with 9 employees from the Solutions Global large independently wealthy Carmichael family resident in Charleston. Capital City Honda opened their doors with an Trans inventory of 25 cars and a service department with only 4 employees and two mechanic’s bays. Over the first three years of business, the company quickly grew and they had to expand their facilities. In 1997, Capital City Honda opened their second location in Columbus, OH with 15 employees (the manager being the only employee from the Carmichael family). This location was very successful and requirements grew to over 25 employees within 2 years and currently employ 50 employees. In the year 2000, Capital City Honda opened its third store in Charlotte, NC. Additionally, the business expanded their market by building a store in Venice, FL in 2005 and their most recent store in Atlanta, GA; which opened January 22, 2007. The entire company is still family owned and operated, Honda Certified, and each store is currently managed by a Carmichael. Capital City Honda believes that they can provide the customer with an experience that is on par with that of luxury vehicle dealerships. MISSION STATEMENT To provide the best Honda Certified vehicle and service at the greatest total value to our customers, and to make every customer feel like a part of our family in order to retain patrons for life. CAPITAL CITY HONDA ORGANIZATION Enterprise Gloria Carmichael CEO Patricia Carmichael Tim Carmichael Ty Carmichael VP, Parts/Service VP, Finance VP, Sales / Marketing Alyssa Carmichael Julie Carmichael Jon Carmichael Jim Carmichael Mary Carmichael Branch Manager - WV Branch Manager - OH Branch Manager - NC Branch Manager - GA Branch Manager - FL
  • 3. Ms. Julie Carmichael August 31, 2009 Page 3 Columbus Branch Solutions Global Julie Carmichael Trans Branch Manager Jessica Biel Administrative Assistant Jennifer McDougal Charlie Clearwater Kim Stone Sid Johnson Joe Valderama Brandon Skinner Marketing Coordinator Service Manager Parts Manager Sales Manager Finance Coordinator Facility Coordinator 4 Service Advisors 14 Mechanics 2 Parts Sales Associates 14 Client Advisors 2 Cashiers 1 Dispatcher 4 Wash Bay 1 Lot Attendant TRANS GLOBAL SOLUTIONS PROFILE Trans Global Solutions was founded in 1993 in Columbus, OH when it was determined that there was a need in the commercial marketplace for a consulting firm that could understand the customer’s needs and business environment and use that information to design, develop, and implement custom solutions that would take the customer’s business to the next level. In our 15 years of existence, Trans Global Solutions has created solutions for Fortune 500 companies such as Honda of America and Nationwide Insurance as well as for small companies of less than 50 employees and not-for-profit operations. Contact Information: TransGlobal Solutions 1907 Technology Drive Columbus, OH 43224 Project Contact: Brent Kelley Phone: 614.555.8107 Fax: 614.555.8110 E-mail: bkelley2@student.cscc.edu Project Name: Capital City Honda Service Department Upgrade April 1, 2008 – June 30, 2008
  • 4. Ms. Julie Carmichael August 31, 2009 Page 4 PROJECT TEAM Your Trans Global Solutions team consists of: Solutions Global Brent Kelley, Project Manager / Marketing Analyst – Trans Brent has an Associates Degree in Information Technology from Columbus State Community college. He has over 5 years of experience in IT. He is currently working on his B.S. in Information Technology. He has a Project Management Level 1 Certificate. He has overseen and assisted with deployments, upgrades, installations, supporting and training in various network environments. Some of the clients sectors include Federal Government, State Government, Financial, Health Care and small businesses. He has a Network Certificate from Columbus State. One of his strengths is to lead and develop projects within time and cost requirements. Dustin Lutz, Web/Systems Engineer – Dustin has an Associates Degree in Network Administration from Columbus State Community College. He has been in the IT Field for over 7 years. He is currently working on his Bachelor’s Degree in Business Management. He also holds the following Certificates: MCP Microsoft Certified Professional 2.0, MCTS - Vista, MCITP – Enterprise Support Technician Vista, and MCTS – Exchange Server 2007. Clients include Honda, Macy’s, and Whitehall City Schools. Credential Certification Date Achieved Microsoft Certified IT Professional Feb 18, 2008 Enterprise Support Technician Feb 18, 2008 Microsoft Certified Professional Jan 25, 2008 Microsoft Certified Technology Specialist Jan 25, 2008 Microsoft Exchange Server 2007: Configuration Apr 15, 2008 Microsoft Windows Vista: Configuration Marc Laracuente, Business Systems Analyst / Database Engineer – Marc holds an Associate’s Degree of Applied Science in Computer Information Technology from Columbus State Community College. He has had 5 years of experience with Systems Administration, Design, and Implementation. Marc also has 10 years of experience in manufacturing and distribution environments utilizing Enterprise Resource Planning, Warehouse Management, Production Scheduling, Procurement, HR, and RF technologies. Marc is a Microsoft Certified Professional and is currently working on a Bachelor’s Degree from Franklin University as well as a MCSA Certificate. SCOPE OF SERVICES FOR THIS PROJECT 1. Research / Planning a. Define business goals and objectives. b. Assess current environment through site survey / company interview. c. Produce preliminary investigation report / fact finding information. d. Identify tools and resources available. e. Identify specifications for hardware/software, database design, Intranet/Internet design, financial system, and marketing/advertising materials.
  • 5. Ms. Julie Carmichael August 31, 2009 Page 5 f. Recommend steps required to successfully install the new system and assist in assembling setup information and data used in the implementation process. Solutions 2. Development Global a. Build systems as per design previously approved. Trans b. Design Security and Disaster Recovery plans. c. Design data dictionary, hardware diagram, network diagram, context diagram, and business flow diagrams as needed. 3. Implementation a. Oversee the physical installation of hardware and networks. b. Upload Internet/intranet sites, as well as database to servers. c. Install / build Active Directory for authentication. d. Work with you and your staff during installation and implementation to help you gain a general understanding of the system. 4. Training and Testing a. Train in the areas of transaction entry, query, and reporting, as well as periodic back-up procedures. b. Upon completion, perform a full system test to assure that it is functioning as intended and producing accurate output. c. Successfully complete disaster recovery testing. 5. Conversion and Post-Conversion Support a. Assist in planning and assembling data for the conversion, as required. (Note: Data entry assistance is $30 per hour. This cost is not included in our estimate.) b. Provide free telephone support during and for 45 days after conversion. Subsequent charges for support calls are billed in 10-minute units at $12.50 per unit. Note: Support calls are invoiced weekly. Fees are subject to change annually, effective January 1 of each year, based upon 30-day notice c. Provide all project documentation in Information System Binder and Project CD-ROM. SOFTWARE/HARDWARE COSTS AND PROFESSIONAL FEES Software costs and fee estimates are summarized on the attached schedule. These fees are effective provided (a) any required data for relevant systems is in good order, and (b) service staff members can devote full time to the implementation process as needed. Fees will be adjusted to actual accordingly. We will not incur additional hours without written prior approval. Our fee does not include modifications to the software, hardware, database, web-sites, etc after the design has been approved. Our terms are 30% deposit on project approval and before we begin, 50% upon project completion, and the balance due net 30 after completion.
  • 6. Ms. Julie Carmichael August 31, 2009 Page 6 WORK PLAN Solutions Global Trans  6/2/08 Project Kick Off  6/2/08 – 6/16/08 Design / Planning Phase  6/16/08 – 7/15/08 Implementation Phase  7/15/08 – 8/31/08 Testing and Training Phase  8/29/08 Project Wrap Up  8/29/08 – 10/14/08 Support Phase CURRENT SYSTEMS ASSESSMENT DOCUMENT This company is an established automobile dealership. The organization has 5 dealerships in different states. It has a stable customer base with good sales volumes. The company as a whole has a very limited use of technology throughout all locations. As such the ability to measure, track and coordinate information and services that exist within the company is very limited. All business units functions mostly as an independent units. The goal of the business is to compete in a higher luxury market segment. Honda has now developed products that can compete with higher end pricier models but the business is not structured to meet this typical customers needs. Three critical areas the business needs to address are: marketing, value added focus, and technology. The company has a very basic marketing strategy. The only advertising in place that exists is in the Telephone book. The customer database is not leveraged to develop or create additional sales opportunities. The company does direct mail coupons through a mailing service. This attempt has no target strategy or customer focus with which to build sales on. They lack the strategy or plan to increase or enhance sales for existing or new customers. There is no Web or internet accessibility for customers to schedule and enquire about services & products. The focus of creating customer service by adding value is non existent in this organization. The company does not value service as much as sale in its business strategy. This is critical in order for this dealership to compete against competitors who understand that service experience and performance strongly affects the customer’s perception of your business. This will directly affect the company’s ability to compete successfully and generate long term revenue. The current service model design and work flow need to be reviewed and developed in a different plan that maximizes the resources and potential benefits to its customers. The capability to have services organized and performed efficiently goes along way to create customer satisfaction. It is important to provide opportunities and gauge the customer experience to make sure that any problems or challenges are quickly resolved. The technology that exists within the company is not adequate to meet its current or projected needs. This will require the addition of new hardware, software, and applications to enable successful competition within higher luxurious market segment. This capability will give the organization capability to find value in the data that exists within the company to create new sales opportunities and revenue. It will also provide a platform to broadcast & communicate the information, materials, and production that takes place on day to day operations.
  • 7. Ms. Julie Carmichael August 31, 2009 Page 7 Type Qty Book Value Total BV Dell Optiplex GX270 Tower 5 $ 250.00 $ 1,250.00 Dell OptiPlex GX270 Desktop Solutions 12 215.00 2,580.00 Global Dell 19” CRT Monitor 18 75.00 1,350.00 RCA 21” mounted TV 1 150.00 150.00 Trans Dell Laser 1110 (B/W) 4 100.00 400.00 Dell MFP Laser Printer 1815dn 1 500.00 500.00 $ 6,230.00 Below are the results from our investigations into your current hardware quantities and estimated book value. These items will be re-deployed in effort to save money. YOUR RESPONSIBILITIES This project demands significant involvement by your service personnel. Ultimate success is highly dependent on their effort. To help achieve a smooth and successful implementation, it will be your responsibility to perform the following: • Provide documentation and data as required regarding current business practices • Provide access to the Capital City Honda facility during normal business hours • Communicate updates and training to any applicable employees beyond the initial training scope • Review any appropriate safety guidelines with our staff prior to coming on-site at your facility BENEFITS When the project is complete, your Columbus Branch will have integrated cutting-edge technology in place in your service department. Benefits will include: • Increased overall customer service • Use of customer information for marketing • Decreased customer receiving time • A modular plan that can easily be rolled out to other Capital City Honda locations • Continuous improvement tools such as surveys and reporting • Visibility in high end service market
  • 8. Ms. Julie Carmichael August 31, 2009 Page 8 CLOSING Solutions Global Trans We appreciate the opportunity to service your computer information technology needs. To accept this proposal, please sign one copy and return it with a 30% deposit. Sincerely, Brent Kelley Project Manager / Marketing Analyst Enclosure RESPONSE This letter correctly sets forth the understanding between Capital City Honda and Trans Global Solutions. Accepted by Title Date
  • 9. Ms. Julie Carmichael August 31, 2009 Page 9 CAPITAL CITY HONDA 1200 WEST HIGHLAND STREET Solutions COLUMBUS, OH 43201 Global INVESTMENT SCHEDULE Trans DATE: 8/31/2009 TO: Ms. Julie Carmichael SOFTWARE COST: Microsoft Windows Vista Business $495 Microsoft Windows Server 2003 799 Microsoft Windows Server 2008 7,398 Microsoft SQL Server 2005 1,859 Microsoft Exchange Server 2007 699 Microsoft Exchange Server 2007 Standard CAL 5,025 Microsoft Office Suite 2007 2,511 Symantec Endpointe Protection 11.0 2,981 Symantec Backup Exec 12 for Windows Servers 1,163 TOTAL SOFTWARE $22,930 HARDWARE COST: Servers $18,066 Desktops 6,130 Laptops 5,876 47” LCD Monitor 1,448 Switches 4,450 Firewall/Filter/Routers 5,800 Offsite Data Storage 13,626 Wireless Access Points 100 Cabling 15,064 ISP 4,788 Wireless Barcode Scanners 2,316 Xbox 360 / Games 800 26” LCD Monitors 1,120 UPS / Miscellaneous 4,234 TOTAL HARDWARE $83,917
  • 10. Ms. Julie Carmichael August 31, 2009 Page 10 PROFESSIONAL FEE ESTIMATE: HOURS Installation Planning 180 Solutions Global Trans Identify Responsibilities Establish Schedule Develop Diagrams (Hardware, Network, Work Flow) Select Conversion Date/Method Installation of Hardware 60 Coordinate Physical implementation of Hardware Installation of Software 240 Install Client Operating Systems Build Servers Build Active Directory Load Database / Website / Financial System Set Printers and Defaults Establish Security Testing 180 Test All Switchboards, Forms Queries for Operability Test Security Test Disaster Recovery Training: All Modules and Backup 120 Document Procedures Demonstrate Hands-On Supoort incl Provide Onsite / Phone Support TOTAL HOURS 780 TOTAL PROFESSIONAL FEES $52,260 TOTAL FEES $159,107