SlideShare une entreprise Scribd logo
1  sur  12
Vertically Integrated Deployment For Seamless ExecutionConsulting Network Design Site Acquisition Engineering Procurement Construction
Communication Centers
LMR Consulting
LTE Broadband
Next Generation 9-1-1
Public Safety Services
Consolidation and co-location plans
Staffing and operations studies
Space planning
Dispatch console design
Computer aided dispatch (CAD)
Records management systems (RMS)
Mobile data computing
Automatic vehicle location
Geographic information systems
Traffic management systems
Communication
Centers
Fairfax County, Virginia
Helped design the space plan to house the Virginia State
Police, Virginia Department of Transportation, and Fairfax
County’s Police, Fire & Rescue and Office of Emergency
Management under one roof at the McConnell Public Safety
and Transportation Operations Center.
Kentucky
Developed a statewide NG9-1-1 plan and assisting in the
design and procurement of an ESInet. Also prepared the grant
funds for implementation.
Massachusetts
Developing design plan to upgrade the statewide GIS system,
create a statewide ESInet and migrate to 272 PSAPs to
NG9-1-1 compliance with proposed i3 standards.
Charleston County, South Carolina
Helping design a countywide ESInet to facilitate information
sharing and prepare the County for NG9-1-1. Our work
ensures that the design will support current and future
County requirements.
Communication
Centers
Project management
Assessment / feasibility studies
RF design
Coverage, prediction and verification
Microwave services
Site deployment
 Site acquisition
 Site design
 Site construction
 Acceptance testing
 Installation & commissioning
LMR Consulting,
Design & Build
RF planning and engineering
Site acquisition
Leasing and zoning
Architecture and engineering
Installation and optimization
De-installation and disposal
Procurement and fulfillment
Site construction
LTE Broadband
50years of
telecom
National
Design/Build
Solutions
110
Offices
TOP
Safety
Records
100K+
SITES
Top
Consultant
July 2016 issue
MissionCritical
Communications
Feasibility studies
Strategic and transition planning
Call traffic forecasting
Staffing analysis
System design / specifications
IP network design
Data normalization
Next Generation 9-1-1
Commonwealth of Pennsylvania
Commonwealth of Kentucky
Charlotte, North Carolina
West Virginia
Houston, Texas
Fairfax County, Virginia
Public Safety Clients
Dallas/Fort Worth International Airport
Assisted in first-ever public demonstration of the P25 ISSI
interoperability bridge, between the Dallas Motorola P25
system and the airport Harris P25 system.
Houston, Texas
Helped the City of Houston save 30% on the world’s largest
municipal P25 system. $130 million, 48 sites, 4 cells,
2,200 square miles and 15,000 user radios.
Maricopa County, Arizona
Assisted the county in the replacement of its Motorola
trunked radio system with a new P25 system. Maricopa
County is one of the larger counties in the U.S. with an area of
9,200 sq. miles.
Garland & Mesquite, Texas
Assisted cities in all project phases 9 site shared $25M
simulcast P25 Phase 2 TDMA simulcast trunked system.
Carrolton, Addison, Farmers Branch & Coppell, Texas
Upgraded their public safety system with a modern
P25 system.
Public Safety Clients
Visit bv.com/publicsafety to learn more.

Contenu connexe

Similaire à Delivering Value Through End-to-End Solutions

Government Broadband Applications Gary Shelton, County Administrator, Scott C...
Government Broadband Applications Gary Shelton, County Administrator, Scott C...Government Broadband Applications Gary Shelton, County Administrator, Scott C...
Government Broadband Applications Gary Shelton, County Administrator, Scott C...Ann Treacy
 
Leech Lake Band Of Ojibwe Technology Development
Leech Lake Band Of Ojibwe Technology DevelopmentLeech Lake Band Of Ojibwe Technology Development
Leech Lake Band Of Ojibwe Technology DevelopmentJohn Schultz
 
CARLETON_SrSysEng08.11.2015
CARLETON_SrSysEng08.11.2015CARLETON_SrSysEng08.11.2015
CARLETON_SrSysEng08.11.2015Rich Carleton
 
Anthony Theriot Resume with IP
Anthony Theriot Resume with IPAnthony Theriot Resume with IP
Anthony Theriot Resume with IPAnthony Theriot
 
Paulo Campolina Resume - Sr RF Engineer 09182016
Paulo Campolina  Resume - Sr RF Engineer 09182016Paulo Campolina  Resume - Sr RF Engineer 09182016
Paulo Campolina Resume - Sr RF Engineer 09182016paulo_campolina
 
Mr Ram Network Services Power Point Presentation (2) Wachovia
Mr Ram Network Services Power Point Presentation (2) WachoviaMr Ram Network Services Power Point Presentation (2) Wachovia
Mr Ram Network Services Power Point Presentation (2) Wachoviarmoyer1
 
WCP Mobile Network Market Overview
WCP Mobile Network Market OverviewWCP Mobile Network Market Overview
WCP Mobile Network Market OverviewWoodsideCapital
 
LJT Corporate Capabilities
LJT Corporate CapabilitiesLJT Corporate Capabilities
LJT Corporate Capabilitieskongphooey
 
Wireless Applications Corp 2010 Overview
Wireless Applications Corp 2010 OverviewWireless Applications Corp 2010 Overview
Wireless Applications Corp 2010 OverviewTadBeckelman
 
jmnappo resume 062015
jmnappo resume 062015jmnappo resume 062015
jmnappo resume 062015Joseph Nappo
 
Early Builders' Roundtable APCO 2013 Conference 08-20-13
Early Builders' Roundtable APCO 2013 Conference 08-20-13Early Builders' Roundtable APCO 2013 Conference 08-20-13
Early Builders' Roundtable APCO 2013 Conference 08-20-13Bill Schrier
 
CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC
 
Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017Joseph Nappo
 
WP1402 - Harris LTE_Portfolio
WP1402 - Harris LTE_PortfolioWP1402 - Harris LTE_Portfolio
WP1402 - Harris LTE_PortfolioSatyajit Adhyapak
 
Franklin County Broadband Partnership
Franklin County Broadband PartnershipFranklin County Broadband Partnership
Franklin County Broadband PartnershipSandieT
 
Ram Network Services Wireless
Ram Network Services WirelessRam Network Services Wireless
Ram Network Services Wirelessjtpotter1
 

Similaire à Delivering Value Through End-to-End Solutions (20)

Government Broadband Applications Gary Shelton, County Administrator, Scott C...
Government Broadband Applications Gary Shelton, County Administrator, Scott C...Government Broadband Applications Gary Shelton, County Administrator, Scott C...
Government Broadband Applications Gary Shelton, County Administrator, Scott C...
 
Leech Lake Band Of Ojibwe Technology Development
Leech Lake Band Of Ojibwe Technology DevelopmentLeech Lake Band Of Ojibwe Technology Development
Leech Lake Band Of Ojibwe Technology Development
 
CARLETON_SrSysEng08.11.2015
CARLETON_SrSysEng08.11.2015CARLETON_SrSysEng08.11.2015
CARLETON_SrSysEng08.11.2015
 
Anthony Theriot Resume with IP
Anthony Theriot Resume with IPAnthony Theriot Resume with IP
Anthony Theriot Resume with IP
 
Paulo Campolina Resume - Sr RF Engineer 09182016
Paulo Campolina  Resume - Sr RF Engineer 09182016Paulo Campolina  Resume - Sr RF Engineer 09182016
Paulo Campolina Resume - Sr RF Engineer 09182016
 
Mr Ram Network Services Power Point Presentation (2) Wachovia
Mr Ram Network Services Power Point Presentation (2) WachoviaMr Ram Network Services Power Point Presentation (2) Wachovia
Mr Ram Network Services Power Point Presentation (2) Wachovia
 
WCP Mobile Network Market Overview
WCP Mobile Network Market OverviewWCP Mobile Network Market Overview
WCP Mobile Network Market Overview
 
LJT Corporate Capabilities
LJT Corporate CapabilitiesLJT Corporate Capabilities
LJT Corporate Capabilities
 
Mark Whitlatch 2016
Mark Whitlatch 2016Mark Whitlatch 2016
Mark Whitlatch 2016
 
Wireless Applications Corp 2010 Overview
Wireless Applications Corp 2010 OverviewWireless Applications Corp 2010 Overview
Wireless Applications Corp 2010 Overview
 
jmnappo resume 062015
jmnappo resume 062015jmnappo resume 062015
jmnappo resume 062015
 
Early Builders' Roundtable APCO 2013 Conference 08-20-13
Early Builders' Roundtable APCO 2013 Conference 08-20-13Early Builders' Roundtable APCO 2013 Conference 08-20-13
Early Builders' Roundtable APCO 2013 Conference 08-20-13
 
CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010
 
Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017
 
WAC, Its Dirt Simple
WAC, Its Dirt SimpleWAC, Its Dirt Simple
WAC, Its Dirt Simple
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
 
WP1402 - Harris LTE_Portfolio
WP1402 - Harris LTE_PortfolioWP1402 - Harris LTE_Portfolio
WP1402 - Harris LTE_Portfolio
 
Franklin County Broadband Partnership
Franklin County Broadband PartnershipFranklin County Broadband Partnership
Franklin County Broadband Partnership
 
Ram Network Services Wireless
Ram Network Services WirelessRam Network Services Wireless
Ram Network Services Wireless
 
Kansas ITS Update
Kansas ITS UpdateKansas ITS Update
Kansas ITS Update
 

Plus de Black & Veatch

Whitepaper: Priming the United States Grid for High-Powered Electric Vehicle...
Whitepaper: Priming the United States Grid for High-Powered  Electric Vehicle...Whitepaper: Priming the United States Grid for High-Powered  Electric Vehicle...
Whitepaper: Priming the United States Grid for High-Powered Electric Vehicle...Black & Veatch
 
Briefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power DeliveryBriefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power DeliveryBlack & Veatch
 
5 Reasons Your NG9-1-1 Center Can’t Wait
5 Reasons Your NG9-1-1 Center Can’t Wait5 Reasons Your NG9-1-1 Center Can’t Wait
5 Reasons Your NG9-1-1 Center Can’t WaitBlack & Veatch
 
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesBlack & Veatch
 
Priming the U.S. Grid for High-Powered Electric Vehicle Charging
Priming the U.S. Grid for High-Powered Electric Vehicle ChargingPriming the U.S. Grid for High-Powered Electric Vehicle Charging
Priming the U.S. Grid for High-Powered Electric Vehicle ChargingBlack & Veatch
 
2017 Strategic Directions: Electric Industry Survey
2017 Strategic Directions: Electric Industry Survey 2017 Strategic Directions: Electric Industry Survey
2017 Strategic Directions: Electric Industry Survey Black & Veatch
 
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...Black & Veatch
 
Big Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and CitiesBig Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and CitiesBlack & Veatch
 
Black & Veatch Public Safety: Benefits of a Full Lifecycle Provider
Black & Veatch Public Safety: Benefits of a Full Lifecycle ProviderBlack & Veatch Public Safety: Benefits of a Full Lifecycle Provider
Black & Veatch Public Safety: Benefits of a Full Lifecycle ProviderBlack & Veatch
 
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Black & Veatch
 
5 Reasons Your NG9-1-1 Center Can't Wait
5 Reasons Your NG9-1-1 Center Can't Wait5 Reasons Your NG9-1-1 Center Can't Wait
5 Reasons Your NG9-1-1 Center Can't WaitBlack & Veatch
 
2017 Strategic Directions: Smart City/Smart Utility Report
2017 Strategic Directions: Smart City/Smart Utility Report2017 Strategic Directions: Smart City/Smart Utility Report
2017 Strategic Directions: Smart City/Smart Utility ReportBlack & Veatch
 
Justifying Utility Security Investments
 Justifying Utility Security Investments Justifying Utility Security Investments
Justifying Utility Security InvestmentsBlack & Veatch
 
SEKOIA for Grid Modernization
SEKOIA for Grid ModernizationSEKOIA for Grid Modernization
SEKOIA for Grid ModernizationBlack & Veatch
 
More Affordable, Reliable and Recoverable Nutrient Removal
More Affordable, Reliable and Recoverable Nutrient RemovalMore Affordable, Reliable and Recoverable Nutrient Removal
More Affordable, Reliable and Recoverable Nutrient RemovalBlack & Veatch
 
Impacts of the Renewable Energy Future
Impacts of the Renewable Energy Future Impacts of the Renewable Energy Future
Impacts of the Renewable Energy Future Black & Veatch
 
Disruptive technologies and the future of the utility business model
Disruptive technologies and the future of the utility business modelDisruptive technologies and the future of the utility business model
Disruptive technologies and the future of the utility business modelBlack & Veatch
 
A Smarter Customer Segmentation Approach for Utilities
A Smarter Customer Segmentation Approach for UtilitiesA Smarter Customer Segmentation Approach for Utilities
A Smarter Customer Segmentation Approach for UtilitiesBlack & Veatch
 

Plus de Black & Veatch (20)

Whitepaper: Priming the United States Grid for High-Powered Electric Vehicle...
Whitepaper: Priming the United States Grid for High-Powered  Electric Vehicle...Whitepaper: Priming the United States Grid for High-Powered  Electric Vehicle...
Whitepaper: Priming the United States Grid for High-Powered Electric Vehicle...
 
Briefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power DeliveryBriefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power Delivery
 
5 Reasons Your NG9-1-1 Center Can’t Wait
5 Reasons Your NG9-1-1 Center Can’t Wait5 Reasons Your NG9-1-1 Center Can’t Wait
5 Reasons Your NG9-1-1 Center Can’t Wait
 
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical Opportunities
 
Priming the U.S. Grid for High-Powered Electric Vehicle Charging
Priming the U.S. Grid for High-Powered Electric Vehicle ChargingPriming the U.S. Grid for High-Powered Electric Vehicle Charging
Priming the U.S. Grid for High-Powered Electric Vehicle Charging
 
2017 Strategic Directions: Electric Industry Survey
2017 Strategic Directions: Electric Industry Survey 2017 Strategic Directions: Electric Industry Survey
2017 Strategic Directions: Electric Industry Survey
 
LMR to LTE Odyssey
LMR to LTE OdysseyLMR to LTE Odyssey
LMR to LTE Odyssey
 
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
 
Big Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and CitiesBig Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and Cities
 
Black & Veatch Public Safety: Benefits of a Full Lifecycle Provider
Black & Veatch Public Safety: Benefits of a Full Lifecycle ProviderBlack & Veatch Public Safety: Benefits of a Full Lifecycle Provider
Black & Veatch Public Safety: Benefits of a Full Lifecycle Provider
 
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
 
5 Reasons Your NG9-1-1 Center Can't Wait
5 Reasons Your NG9-1-1 Center Can't Wait5 Reasons Your NG9-1-1 Center Can't Wait
5 Reasons Your NG9-1-1 Center Can't Wait
 
2017 Strategic Directions: Smart City/Smart Utility Report
2017 Strategic Directions: Smart City/Smart Utility Report2017 Strategic Directions: Smart City/Smart Utility Report
2017 Strategic Directions: Smart City/Smart Utility Report
 
Justifying Utility Security Investments
 Justifying Utility Security Investments Justifying Utility Security Investments
Justifying Utility Security Investments
 
SEKOIA for Grid Modernization
SEKOIA for Grid ModernizationSEKOIA for Grid Modernization
SEKOIA for Grid Modernization
 
More Affordable, Reliable and Recoverable Nutrient Removal
More Affordable, Reliable and Recoverable Nutrient RemovalMore Affordable, Reliable and Recoverable Nutrient Removal
More Affordable, Reliable and Recoverable Nutrient Removal
 
Becoming A Smart City
Becoming A Smart CityBecoming A Smart City
Becoming A Smart City
 
Impacts of the Renewable Energy Future
Impacts of the Renewable Energy Future Impacts of the Renewable Energy Future
Impacts of the Renewable Energy Future
 
Disruptive technologies and the future of the utility business model
Disruptive technologies and the future of the utility business modelDisruptive technologies and the future of the utility business model
Disruptive technologies and the future of the utility business model
 
A Smarter Customer Segmentation Approach for Utilities
A Smarter Customer Segmentation Approach for UtilitiesA Smarter Customer Segmentation Approach for Utilities
A Smarter Customer Segmentation Approach for Utilities
 

Dernier

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 

Dernier (20)

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 

Delivering Value Through End-to-End Solutions

  • 1.
  • 2. Vertically Integrated Deployment For Seamless ExecutionConsulting Network Design Site Acquisition Engineering Procurement Construction
  • 3. Communication Centers LMR Consulting LTE Broadband Next Generation 9-1-1 Public Safety Services
  • 4. Consolidation and co-location plans Staffing and operations studies Space planning Dispatch console design Computer aided dispatch (CAD) Records management systems (RMS) Mobile data computing Automatic vehicle location Geographic information systems Traffic management systems Communication Centers
  • 5. Fairfax County, Virginia Helped design the space plan to house the Virginia State Police, Virginia Department of Transportation, and Fairfax County’s Police, Fire & Rescue and Office of Emergency Management under one roof at the McConnell Public Safety and Transportation Operations Center. Kentucky Developed a statewide NG9-1-1 plan and assisting in the design and procurement of an ESInet. Also prepared the grant funds for implementation. Massachusetts Developing design plan to upgrade the statewide GIS system, create a statewide ESInet and migrate to 272 PSAPs to NG9-1-1 compliance with proposed i3 standards. Charleston County, South Carolina Helping design a countywide ESInet to facilitate information sharing and prepare the County for NG9-1-1. Our work ensures that the design will support current and future County requirements. Communication Centers
  • 6. Project management Assessment / feasibility studies RF design Coverage, prediction and verification Microwave services Site deployment  Site acquisition  Site design  Site construction  Acceptance testing  Installation & commissioning LMR Consulting, Design & Build
  • 7. RF planning and engineering Site acquisition Leasing and zoning Architecture and engineering Installation and optimization De-installation and disposal Procurement and fulfillment Site construction LTE Broadband
  • 9. Feasibility studies Strategic and transition planning Call traffic forecasting Staffing analysis System design / specifications IP network design Data normalization Next Generation 9-1-1
  • 10. Commonwealth of Pennsylvania Commonwealth of Kentucky Charlotte, North Carolina West Virginia Houston, Texas Fairfax County, Virginia Public Safety Clients
  • 11. Dallas/Fort Worth International Airport Assisted in first-ever public demonstration of the P25 ISSI interoperability bridge, between the Dallas Motorola P25 system and the airport Harris P25 system. Houston, Texas Helped the City of Houston save 30% on the world’s largest municipal P25 system. $130 million, 48 sites, 4 cells, 2,200 square miles and 15,000 user radios. Maricopa County, Arizona Assisted the county in the replacement of its Motorola trunked radio system with a new P25 system. Maricopa County is one of the larger counties in the U.S. with an area of 9,200 sq. miles. Garland & Mesquite, Texas Assisted cities in all project phases 9 site shared $25M simulcast P25 Phase 2 TDMA simulcast trunked system. Carrolton, Addison, Farmers Branch & Coppell, Texas Upgraded their public safety system with a modern P25 system. Public Safety Clients

Notes de l'éditeur

  1. Thank you for the opportunity to share information about Black & Veatch with you today. If you are interested in learning more, please visit our website, bv.com, or follow us on social media.