SlideShare une entreprise Scribd logo
1  sur  58
Télécharger pour lire hors ligne
Get the Green Light to Go Greener
April 18, 2012 Program
Presenter: Bob Sawhill, CFM
Bob Sawhill, CFM
Solutions Consultant, EBUSINESS STRATEGIES
35 years in Workplace Management:
• Strategic Facility Planning, Industrial Engineering, Facility Project Management
• Workplace Management Technology Experience:
– Integrated Workplace Solutions Project Manager, Consultant
– IT Program Manager – RE & Workplace Services
– Software Product Manager, Strategist
Professional Association Involvement:
• Certified Facility Manager (CFM)
• IFMA - Chapter President, Information Technology Council leadership
• Open Standards Consortium for Real Estate (OSCRE) Workgroups
• Instructor & Guest Lecturer at Cal State University’s FM Program Course
Past Employers:
Hewlett-Packard, IBM-TRIRIGA, Tektronix, Lockheed, Memorex, USAA
About EBUSINESS STRATEGIES
IFMA’s 2011 Top 10 Trends & Outlooks
1. Sustainability
2. Complex Building Technology
3. Economic Recession & the Aging Building
4. Preparedness
5. Quantity and Complexity of FM Data
6. Finding Top Talent
7. Elevating The FM Profession
8. Evolving Skill Set and Business Acumen
9. Enhancing Workplace Productivity
10. Changing Workplace
Learning Objectives
• Understand the value of performance measurement and
management to detect issues, identify opportunities, and
foster data-driven decisions that align with sustainability
objectives.
• Discover analysis techniques and methodologies to
assess environmental opportunities, optimize scarce
resources, and deliver greener sustainability solutions.
• Learn, through case study examples, how best practices
and technology enablement can streamline sustainability
processes and get the decision-makers’ green light.
Situation - Facilities are the problem
49% Buildings Consume More Energy
Than Any Other Sector
77% Buildings consume of U.S. electricity
47% Largest Contributor to U.S. CO2 Emissions
And … they are the > 30% enterprise spend
Source: Architecture 2030 with data from the US Energy Information Administration http://architecture2030.org/the_problem/buildings_problem_why
Aberdeen Group Report: “Real Estate and Facility Lifecycle Management, The three keys to success: Visibility, Visibility, Visibility” – June 2007
Challenges
Process silosLack of resources Disparate Systems
Emergencies
Internal politics
Balancing Act:
Resources
Scope
Time
Juggling Act:
Cost Reduction
Capital Investment
Environment
Changing Workforce
Outsourcing
Aging Buildings
Technology Advances
Data Overload
Solutions
Measure
& Manage
• Reporting & Benchmarking
• Data Collection
• Performance Management
Optimize
Opportunities
• Identify Opportunities
• Analyze & Assess
• Portfolio Project Management
Integrate
Solutions
• High-Performance Workplace
• Intelligent Buildings
• Leading Practices & Solutions
MEASURE & MANAGE
• Reporting & Benchmarking
• Data Collection
• Performance Management
Reporting & Benchmarking
• What data is needed?
– Begin with the end in mind; outputs determine inputs
– What’s important to measure?
• How is data normalized for comparisons?
– apples to apples
• What industry standards/protocols are applicable?
• How is data transformed into actionable insights?
• Need data-driven decisions (not decibel-driven decisions)
Corporate Social Responsibility (CSR)
Greenhouse Gas Protocol – Scope 1, 2, 3
• Scope 1: Direct (minimum)
– onsite fuel combustion
– company owned vehicles
• Scope 2: Indirect (minimum)
– Purchased (consumption) of electricity, heat/cooling, steam
• Scope 3 Indirect (often)
– Waste disposal
– Business travel (transportation), Employee commute
Source: WRI – World Resources Institute
Green Building Certification
System Buildings Origin
BREEAM 110,000+ United Kingdom
LEED 7,400+ United States
Green Globes 1,400+ Canada
Green Star 220+ Australia
EPA’s EnergyStar
• EnergyStar Portfolio Manager
• With data integration capabilities
Benchmarking – Normalizing Data
• Climate variation
– ASHRAE Degree heat/cool days
• Region
• Building Type
• Industry Type
• Time period & duration
• Standard measures
– Area (gross)
– Unit of Measure (UOM)
Studies - Crossing the Sustainability Chasm
“Crossing the sustainability chasm: strategies and tactics to achieve sustainability goals” IBM Software thought leadership whitepaper, presented by J.Clark at IFMA WWP 2011
https://www14.software.ibm.com/webapp/iwm/web/signup.do?source=swg-spsm-tiv-am-rp&S_PKG=Crossing-the-sustainability-chasm
Data Collection
• What are the data sources?
– Who, what, where, when
• Is it the right data and accurate?
• How is it gathered?
• How can it be streamlined?
Case Study – Oil & Gas Company
• Project Stage: design complete, construction in-progress
• TRIRIGA Real Estate Environmental Sustainability (TREES)
– Data loading: Energy, Water, Waste, Emissions, Transportation…
– Carbon Calculator: Greenhouse Gas Emissions (GHG)
– LEED Certification Management (also possible BREEAM, GreenStar)
– EnergyStar integration
– TREES Workplace Performance Management
• Integrated Workplace Management System (IWMS)
– Primarily a leading practices and process standardization initiative
– IBM-TRIRIGA application, with configurations for leading practices
• Functional Areas:
– RE & Portfolio Management
– Facilities, Space and Move Management
– Project Management
– Maintenance & Operations
Process Improvement & Leading Practices
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
Streamlining Data Collection
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
Data Collection – Offline Utility
Managing Green Building Certifications
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
TREES Enhancements for LEED–EBOM
LEED Checklist Status Tracking
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
Track LEED Points & Cost
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
LEED Data Entry & Reference Docs
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
Reports – Manage LEED Certification
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
Performance Management
• How do we align to corporate objectives?
– CRE/FM strategies & initiatives
– Individual’s performance goals
– Accountability, ownership
• How do we analyze the overwhelming data?
• How do we manage performance?
Workplace Performance Management
Manage
Workplace Operations
Analyze
Workplace Performance
Act
Improve, Transform
Align
Workplace Strategies
Sets
objectives
Reports, alerts, issues
Prioritizes
improvements
Optimize goals
Workplace
Performance
Management
Aligning CRE/FM to Business Strategy
Adapted from, Anna-Liisa Lindholm et al., “A Framework for Identifying and
Measuring Value Added by Corporate Real Estate”, FMLink, 2006
Cascade Objectives Down to Drive Accountability
Maintenance Tech, Energy
Program, Space Planner
Facility/Maintenance
Managers
Workplace
Executive
Energy Intensity/
Occupant
Energy Intensity
/ Area
(Building Efficiency)
Energy Use Breakdown:
Electricity, Gas, Fuel Oil,
Renewable…
Area
/ Occupant
(Space Utilization)
Occupancy/Vacancy
Seating Density
Sharing Ratios (mobility)
Dimensional Analysis (drill-down, roll-up, slice & dice):
by Geography, Sites, Buildings, …
by Building Type, Lease vs. Owned…
by sub-meter
by/across Time
by utility company
by Cost
Balanced Scorecard
Traditional Corporate
(Kaplan & Norton)
• Financial
• Customer
• Internal Business Processes
• Learning and Growth
Workplace Performance
Management (WPM)
• Financial
• Customer
• Operational
• Portfolio
• Environmental
Case Study - Sustainability Metrics
• KPI’s for Environmental
– Energy Rating Certification (EnergyStar)
– Green Building Certification Rating (LEED)
– Water Use Intensity (GSF)
– Solid Waste Recovery (%)
– Tenant Survey Ratings
• Comfort/IEQ, Sustainability Involvement
• Analysis Metrics
– TREES Score-based version of metrics of above
– Energy Use
– Water Use
– Solid Waste Use
– Energy Cost per Area ($/sf)
– Water Cost per Area ($/sf)
– Energy Use Intensity (per Occupant)
– Water Use Intensity (per Occupant)
– Energy Use Intensity (GSF/Degree -day)
– GHG Emissions (Carbon) Intensity (GSF)
Technology Enabled – Case Study
Align - Role-based Scorecard
Scorecard
with navigation
Analyze to Detect, Identify, Pin-point…
Slice & Dice
By who, what,
where
Detect Issues
Poor & marginal
performance
Drill into Detail
Responses on a
survey
OPTIMIZE OPPORTUNITIES
• Portfolio Project Management
• Identify Opportunities
• Analyze & Assess
Portfolio Project Management (PPM)
• Align portfolio to strategic business goals
• Allocate resources to the right projects
• Govern with data-driven decisions
• Understand value contribution
Continuous
Business
Cycle
Ongoing
Project
Management
Iterative
Project Portfolio
Management
ProcessBusiness
Strategies
Projects
Portfolio
Optimization
Portfolio
Realignment
Performance
Measurement
Decision Gate
Evaluation
Identify Opportunities / Projects
Align Opportunities:
• Business Objectives
• Strategic Initiatives
• Program Management
• Operating Levels
• Condition Assessment
• Environmental
Assessment
• Energy Audits
• Environmental
Compliance
Diagram source: ProjectConnections.com
Managing the Project Pipeline
Diagram source: ProjectConnections.com
PPM Project Funnel and Pipeline – Align and Optimize
WPM - Identify Opportunities
Identify Opportunities
• Condition Assessment: deferred maintenance
• Environmental Assessment / Audit
• Maintenance inspections: day to day discovery
• Capital Project Planning
Sustainability Data-Driven Decisions
Opportunity Analysis
• Financial Return
– ROI, NPV, IRR
– Payback Period
• Energy Savings
• Energy Star Rating
• Carbon Footprint
• LEED Cost/Point
Compare Options - Side by Side
Analyze Best Opportunities
Launch the Right Programs
Low
High
LowHigh
Good-to-Go
high value, low risk
Retarget
Rethink,
or cancel
Postpone
Risk – ability to execute
BusinessValue
mitigate risk
focusscope
Adapted from: R. Napier, “The Role of Governance and Program Management in the CIO Office, HP CIO Summit, 2003
Balance LEED Targets & Funding
Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
INTEGRATE SOLUTIONS
• High-Performance Workplace
• Intelligent Buildings
• Leading Practices & Solutions
Case Study - Leading Practices
Integrated Workplace Management Systems (IWMS)
People role-centric perspective & change management
Process leading practices & cross-functional governance
Technology enabling tools to deliver integrated solutions
Integrating Sustainability Processes…
• Maintenance & Operations:
– Green Cleaning procedures and products
– Track and populate Energy Star rating information for assets and
buildings
– Tenant surveys for LEED-EBOM IEQ points
– Include inspections and readings for IAQ and LEED-EBOM IEQ needs
• Monitoring & Measuring ventilation, make-up air,
• Hot &Cold call tracking
• Preventive Maintenance and Inspections
– Commissioning, re-commission, retro-commission
– Refrigerant inspections, tracking
– Readings measurements related to LEED criteria, energy performance
– Cooling tower water consumption, chemicals
– Track asset retirement and disposition of assets (landfill, recycle, reuse)
– Track and Report O&M PM’s related to efficient energy use
Integrating Sustainability Processes
• Facility Condition Assessment (FCA)
– Use FCA for Environmental Sustainability related Assessments & Audits
• Energy Audits, IAQ/IEQ Assessments
• Environmental regulatory compliance assessments
• Portfolio Project Management
– Opportunity Assessments & Analysis, Pipeline Management
• Real Estate:
– Green Leases; Clauses, Conditions, …
– Green Lease Reporting
• Strategic Facility Planning
– Optimize space utilization to reduce carbon footprint
– Forward looking indicators to improve building and utilization
Strategic Facility Planning – Forward View
High-Performance Workplace
• Smart devices
• Smart buildings
• Pervasive connectivity
• Anywhere computing
• Info Management
• Knowledge/social sharing
• Service Management
• Orchestration
• Energy efficient
• Water efficient
• Indoor quality
• Optimal occupancy
• Management support
• Knowledge processes
• Capability Maturity
• Operational Excellence
Engaged
Workforce
Sustainable
Facilities
Intelligent
Infra-
structure
Technology
Enablers
Adapted/improved concepts from High –performance Workplace by Saibal Das Chowdhury
Smart Buildings
http://www.ibm.com/smarterplanet/us/en/green_buildings/overview/index.html
Where do you stand?
• Can you measure how green you are?
• Can you get decisions made, or are you stuck?
• Are you ready to take green to the next level?
Measure
& Manage
• Reporting & Benchmarking
• Data Collection
• Performance Management
Optimize
Opportunities
• Identify Opportunities
• Analyze & Assess
• Portfolio Project Management
Integrate
Solutions
• High-Performance Workplace
• Intelligent Buildings
• Leading Practices & Solutions
Get the green light
Go greener
Green Buildings Get Results: REDUCE
• Drive green performance
• Plan & prioritize the right projects
• Deliver a high-performance workplace
Source: adapted slide from US Green Building Council
Water
Use
40%
Solid
Waste
70%
Energy
Use
37%
CO2
Emissions
36%
Get the Green Light to Go Greener
April 18, 2012 Program
Bob Sawhill, CFM
Bob.Sawhill@AskEbiz.com
530.305.2843
AskEbiz.com

Contenu connexe

Tendances

CA World 2010 - leveraging cloud computing to build a lean change management ...
CA World 2010 - leveraging cloud computing to build a lean change management ...CA World 2010 - leveraging cloud computing to build a lean change management ...
CA World 2010 - leveraging cloud computing to build a lean change management ...
David Messineo
 
eCIO PPT How do I make Infrastructure Adaptive
eCIO PPT How do I make Infrastructure AdaptiveeCIO PPT How do I make Infrastructure Adaptive
eCIO PPT How do I make Infrastructure Adaptive
David Niles
 
Why EA's must drive cloud strategy
Why EA's must drive cloud strategyWhy EA's must drive cloud strategy
Why EA's must drive cloud strategy
Mike Walker
 
Define an EA Operating Model
Define an EA Operating ModelDefine an EA Operating Model
Define an EA Operating Model
Info-Tech Research Group
 
enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...
enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...
enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...
Michal Bukowski, MBA, P2P
 

Tendances (20)

WilliamKnightResumex
WilliamKnightResumexWilliamKnightResumex
WilliamKnightResumex
 
CA World 2010 - leveraging cloud computing to build a lean change management ...
CA World 2010 - leveraging cloud computing to build a lean change management ...CA World 2010 - leveraging cloud computing to build a lean change management ...
CA World 2010 - leveraging cloud computing to build a lean change management ...
 
Create an Enterprise Architecture Strategy in 3 Steps
Create an Enterprise Architecture Strategy in 3 StepsCreate an Enterprise Architecture Strategy in 3 Steps
Create an Enterprise Architecture Strategy in 3 Steps
 
eCIO PPT How do I make Infrastructure Adaptive
eCIO PPT How do I make Infrastructure AdaptiveeCIO PPT How do I make Infrastructure Adaptive
eCIO PPT How do I make Infrastructure Adaptive
 
Digital Transformation 2018
Digital Transformation 2018Digital Transformation 2018
Digital Transformation 2018
 
How to Allocate Your Close Time More Effectively
How to Allocate Your Close Time More EffectivelyHow to Allocate Your Close Time More Effectively
How to Allocate Your Close Time More Effectively
 
Enterprise Architecture Implementation And The Open Group Architecture Framew...
Enterprise Architecture Implementation And The Open Group Architecture Framew...Enterprise Architecture Implementation And The Open Group Architecture Framew...
Enterprise Architecture Implementation And The Open Group Architecture Framew...
 
Dr MR Spano Career 1 Page
Dr MR Spano Career 1 PageDr MR Spano Career 1 Page
Dr MR Spano Career 1 Page
 
Strategic IT Transformation at Accenture
Strategic IT Transformation at AccentureStrategic IT Transformation at Accenture
Strategic IT Transformation at Accenture
 
Why EA's must drive cloud strategy
Why EA's must drive cloud strategyWhy EA's must drive cloud strategy
Why EA's must drive cloud strategy
 
The Value of Enterprise Architecture
The Value of Enterprise ArchitectureThe Value of Enterprise Architecture
The Value of Enterprise Architecture
 
Technology Executive Resume
Technology Executive ResumeTechnology Executive Resume
Technology Executive Resume
 
Setting Some Realistic Enterprise Architecture Goals
Setting Some Realistic Enterprise Architecture GoalsSetting Some Realistic Enterprise Architecture Goals
Setting Some Realistic Enterprise Architecture Goals
 
Ea Value And Benefits Ver1 0
Ea Value And Benefits Ver1 0Ea Value And Benefits Ver1 0
Ea Value And Benefits Ver1 0
 
IT Capability Maturity Framework & Capability Improvement Program
IT Capability Maturity Framework & Capability Improvement ProgramIT Capability Maturity Framework & Capability Improvement Program
IT Capability Maturity Framework & Capability Improvement Program
 
Cloud Operating Model Design
Cloud Operating Model DesignCloud Operating Model Design
Cloud Operating Model Design
 
Doing Enterprise Architecture
Doing Enterprise ArchitectureDoing Enterprise Architecture
Doing Enterprise Architecture
 
Define an EA Operating Model
Define an EA Operating ModelDefine an EA Operating Model
Define an EA Operating Model
 
Resume ajay chodankar_1
Resume ajay chodankar_1Resume ajay chodankar_1
Resume ajay chodankar_1
 
enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...
enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...
enterprise_architecture_as_a_tool_of_digital_state_transformation_-_m._bukows...
 

Similaire à Get the Green Light to Go Greener

Emerging Technologies: Green IT
Emerging Technologies: Green ITEmerging Technologies: Green IT
Emerging Technologies: Green IT
j_tsai
 
Simplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approachSimplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approach
p6academy
 
Implementing hyperion epm bi as a system - delivering on world class analytics
Implementing hyperion epm bi as a system - delivering on world class analyticsImplementing hyperion epm bi as a system - delivering on world class analytics
Implementing hyperion epm bi as a system - delivering on world class analytics
Alithya
 
Net Zero - TSA presentation
Net Zero - TSA presentationNet Zero - TSA presentation
Net Zero - TSA presentation
Peter Hoffmann
 

Similaire à Get the Green Light to Go Greener (20)

Emerging Technologies: Green IT
Emerging Technologies: Green ITEmerging Technologies: Green IT
Emerging Technologies: Green IT
 
Small-medium business sustainability metrics yalonis-SEC5.12
Small-medium business sustainability metrics yalonis-SEC5.12Small-medium business sustainability metrics yalonis-SEC5.12
Small-medium business sustainability metrics yalonis-SEC5.12
 
Carbon Footprinting Compliance Schemes - Australia
Carbon Footprinting Compliance Schemes - AustraliaCarbon Footprinting Compliance Schemes - Australia
Carbon Footprinting Compliance Schemes - Australia
 
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocksSAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
 
Collaborate 2012: Environmental Accounting and Reporting
Collaborate 2012: Environmental Accounting and ReportingCollaborate 2012: Environmental Accounting and Reporting
Collaborate 2012: Environmental Accounting and Reporting
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management Journey
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
 
Simplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approachSimplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approach
 
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
 
2014 ogbp akili-cisco-bp con-hana-og-widescreen-ppt
2014 ogbp akili-cisco-bp con-hana-og-widescreen-ppt2014 ogbp akili-cisco-bp con-hana-og-widescreen-ppt
2014 ogbp akili-cisco-bp con-hana-og-widescreen-ppt
 
Implementing hyperion epm bi as a system - delivering on world class analytics
Implementing hyperion epm bi as a system - delivering on world class analyticsImplementing hyperion epm bi as a system - delivering on world class analytics
Implementing hyperion epm bi as a system - delivering on world class analytics
 
Enterprise Systems - Real World Perspective
Enterprise Systems - Real World PerspectiveEnterprise Systems - Real World Perspective
Enterprise Systems - Real World Perspective
 
Energy Data Analysis Techniques
Energy Data Analysis TechniquesEnergy Data Analysis Techniques
Energy Data Analysis Techniques
 
Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012
 
Linked In Presentation 2012
Linked In Presentation 2012Linked In Presentation 2012
Linked In Presentation 2012
 
Linked In Presentation 2012
Linked In Presentation 2012Linked In Presentation 2012
Linked In Presentation 2012
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
CII Mumbai_Align F&IT_24-Sep-19.pptx
CII Mumbai_Align F&IT_24-Sep-19.pptxCII Mumbai_Align F&IT_24-Sep-19.pptx
CII Mumbai_Align F&IT_24-Sep-19.pptx
 
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
 
Net Zero - TSA presentation
Net Zero - TSA presentationNet Zero - TSA presentation
Net Zero - TSA presentation
 

Dernier

Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
rajputriyana310
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
kumarajju5765
 

Dernier (20)

VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
 

Get the Green Light to Go Greener

  • 1. Get the Green Light to Go Greener April 18, 2012 Program Presenter: Bob Sawhill, CFM
  • 2. Bob Sawhill, CFM Solutions Consultant, EBUSINESS STRATEGIES 35 years in Workplace Management: • Strategic Facility Planning, Industrial Engineering, Facility Project Management • Workplace Management Technology Experience: – Integrated Workplace Solutions Project Manager, Consultant – IT Program Manager – RE & Workplace Services – Software Product Manager, Strategist Professional Association Involvement: • Certified Facility Manager (CFM) • IFMA - Chapter President, Information Technology Council leadership • Open Standards Consortium for Real Estate (OSCRE) Workgroups • Instructor & Guest Lecturer at Cal State University’s FM Program Course Past Employers: Hewlett-Packard, IBM-TRIRIGA, Tektronix, Lockheed, Memorex, USAA
  • 4. IFMA’s 2011 Top 10 Trends & Outlooks 1. Sustainability 2. Complex Building Technology 3. Economic Recession & the Aging Building 4. Preparedness 5. Quantity and Complexity of FM Data 6. Finding Top Talent 7. Elevating The FM Profession 8. Evolving Skill Set and Business Acumen 9. Enhancing Workplace Productivity 10. Changing Workplace
  • 5. Learning Objectives • Understand the value of performance measurement and management to detect issues, identify opportunities, and foster data-driven decisions that align with sustainability objectives. • Discover analysis techniques and methodologies to assess environmental opportunities, optimize scarce resources, and deliver greener sustainability solutions. • Learn, through case study examples, how best practices and technology enablement can streamline sustainability processes and get the decision-makers’ green light.
  • 6. Situation - Facilities are the problem 49% Buildings Consume More Energy Than Any Other Sector 77% Buildings consume of U.S. electricity 47% Largest Contributor to U.S. CO2 Emissions And … they are the > 30% enterprise spend Source: Architecture 2030 with data from the US Energy Information Administration http://architecture2030.org/the_problem/buildings_problem_why Aberdeen Group Report: “Real Estate and Facility Lifecycle Management, The three keys to success: Visibility, Visibility, Visibility” – June 2007
  • 7. Challenges Process silosLack of resources Disparate Systems Emergencies Internal politics Balancing Act: Resources Scope Time Juggling Act: Cost Reduction Capital Investment Environment Changing Workforce Outsourcing Aging Buildings Technology Advances Data Overload
  • 8. Solutions Measure & Manage • Reporting & Benchmarking • Data Collection • Performance Management Optimize Opportunities • Identify Opportunities • Analyze & Assess • Portfolio Project Management Integrate Solutions • High-Performance Workplace • Intelligent Buildings • Leading Practices & Solutions
  • 9. MEASURE & MANAGE • Reporting & Benchmarking • Data Collection • Performance Management
  • 10. Reporting & Benchmarking • What data is needed? – Begin with the end in mind; outputs determine inputs – What’s important to measure? • How is data normalized for comparisons? – apples to apples • What industry standards/protocols are applicable? • How is data transformed into actionable insights? • Need data-driven decisions (not decibel-driven decisions)
  • 12. Greenhouse Gas Protocol – Scope 1, 2, 3 • Scope 1: Direct (minimum) – onsite fuel combustion – company owned vehicles • Scope 2: Indirect (minimum) – Purchased (consumption) of electricity, heat/cooling, steam • Scope 3 Indirect (often) – Waste disposal – Business travel (transportation), Employee commute Source: WRI – World Resources Institute
  • 13. Green Building Certification System Buildings Origin BREEAM 110,000+ United Kingdom LEED 7,400+ United States Green Globes 1,400+ Canada Green Star 220+ Australia
  • 14. EPA’s EnergyStar • EnergyStar Portfolio Manager • With data integration capabilities
  • 15. Benchmarking – Normalizing Data • Climate variation – ASHRAE Degree heat/cool days • Region • Building Type • Industry Type • Time period & duration • Standard measures – Area (gross) – Unit of Measure (UOM)
  • 16. Studies - Crossing the Sustainability Chasm “Crossing the sustainability chasm: strategies and tactics to achieve sustainability goals” IBM Software thought leadership whitepaper, presented by J.Clark at IFMA WWP 2011 https://www14.software.ibm.com/webapp/iwm/web/signup.do?source=swg-spsm-tiv-am-rp&S_PKG=Crossing-the-sustainability-chasm
  • 17. Data Collection • What are the data sources? – Who, what, where, when • Is it the right data and accurate? • How is it gathered? • How can it be streamlined?
  • 18. Case Study – Oil & Gas Company • Project Stage: design complete, construction in-progress • TRIRIGA Real Estate Environmental Sustainability (TREES) – Data loading: Energy, Water, Waste, Emissions, Transportation… – Carbon Calculator: Greenhouse Gas Emissions (GHG) – LEED Certification Management (also possible BREEAM, GreenStar) – EnergyStar integration – TREES Workplace Performance Management • Integrated Workplace Management System (IWMS) – Primarily a leading practices and process standardization initiative – IBM-TRIRIGA application, with configurations for leading practices • Functional Areas: – RE & Portfolio Management – Facilities, Space and Move Management – Project Management – Maintenance & Operations
  • 19. Process Improvement & Leading Practices Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 20. Streamlining Data Collection Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 21. Data Collection – Offline Utility
  • 22. Managing Green Building Certifications Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 23. TREES Enhancements for LEED–EBOM
  • 24. LEED Checklist Status Tracking Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 25. Track LEED Points & Cost Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 26. LEED Data Entry & Reference Docs Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 27. Reports – Manage LEED Certification Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 28. Performance Management • How do we align to corporate objectives? – CRE/FM strategies & initiatives – Individual’s performance goals – Accountability, ownership • How do we analyze the overwhelming data? • How do we manage performance?
  • 29. Workplace Performance Management Manage Workplace Operations Analyze Workplace Performance Act Improve, Transform Align Workplace Strategies Sets objectives Reports, alerts, issues Prioritizes improvements Optimize goals Workplace Performance Management
  • 30. Aligning CRE/FM to Business Strategy Adapted from, Anna-Liisa Lindholm et al., “A Framework for Identifying and Measuring Value Added by Corporate Real Estate”, FMLink, 2006
  • 31. Cascade Objectives Down to Drive Accountability Maintenance Tech, Energy Program, Space Planner Facility/Maintenance Managers Workplace Executive Energy Intensity/ Occupant Energy Intensity / Area (Building Efficiency) Energy Use Breakdown: Electricity, Gas, Fuel Oil, Renewable… Area / Occupant (Space Utilization) Occupancy/Vacancy Seating Density Sharing Ratios (mobility) Dimensional Analysis (drill-down, roll-up, slice & dice): by Geography, Sites, Buildings, … by Building Type, Lease vs. Owned… by sub-meter by/across Time by utility company by Cost
  • 32. Balanced Scorecard Traditional Corporate (Kaplan & Norton) • Financial • Customer • Internal Business Processes • Learning and Growth Workplace Performance Management (WPM) • Financial • Customer • Operational • Portfolio • Environmental
  • 33. Case Study - Sustainability Metrics • KPI’s for Environmental – Energy Rating Certification (EnergyStar) – Green Building Certification Rating (LEED) – Water Use Intensity (GSF) – Solid Waste Recovery (%) – Tenant Survey Ratings • Comfort/IEQ, Sustainability Involvement • Analysis Metrics – TREES Score-based version of metrics of above – Energy Use – Water Use – Solid Waste Use – Energy Cost per Area ($/sf) – Water Cost per Area ($/sf) – Energy Use Intensity (per Occupant) – Water Use Intensity (per Occupant) – Energy Use Intensity (GSF/Degree -day) – GHG Emissions (Carbon) Intensity (GSF)
  • 35. Align - Role-based Scorecard Scorecard with navigation
  • 36. Analyze to Detect, Identify, Pin-point… Slice & Dice By who, what, where Detect Issues Poor & marginal performance Drill into Detail Responses on a survey
  • 37. OPTIMIZE OPPORTUNITIES • Portfolio Project Management • Identify Opportunities • Analyze & Assess
  • 38. Portfolio Project Management (PPM) • Align portfolio to strategic business goals • Allocate resources to the right projects • Govern with data-driven decisions • Understand value contribution Continuous Business Cycle Ongoing Project Management Iterative Project Portfolio Management ProcessBusiness Strategies Projects Portfolio Optimization Portfolio Realignment Performance Measurement Decision Gate Evaluation
  • 39. Identify Opportunities / Projects Align Opportunities: • Business Objectives • Strategic Initiatives • Program Management • Operating Levels • Condition Assessment • Environmental Assessment • Energy Audits • Environmental Compliance Diagram source: ProjectConnections.com
  • 40. Managing the Project Pipeline Diagram source: ProjectConnections.com PPM Project Funnel and Pipeline – Align and Optimize
  • 41. WPM - Identify Opportunities
  • 42. Identify Opportunities • Condition Assessment: deferred maintenance • Environmental Assessment / Audit • Maintenance inspections: day to day discovery • Capital Project Planning
  • 43. Sustainability Data-Driven Decisions Opportunity Analysis • Financial Return – ROI, NPV, IRR – Payback Period • Energy Savings • Energy Star Rating • Carbon Footprint • LEED Cost/Point
  • 44. Compare Options - Side by Side
  • 46. Launch the Right Programs Low High LowHigh Good-to-Go high value, low risk Retarget Rethink, or cancel Postpone Risk – ability to execute BusinessValue mitigate risk focusscope Adapted from: R. Napier, “The Role of Governance and Program Management in the CIO Office, HP CIO Summit, 2003
  • 47. Balance LEED Targets & Funding Proprietary document excerpt, Copyright © 2010, 2011 eBusiness Strategies LLC
  • 48. INTEGRATE SOLUTIONS • High-Performance Workplace • Intelligent Buildings • Leading Practices & Solutions
  • 49. Case Study - Leading Practices Integrated Workplace Management Systems (IWMS) People role-centric perspective & change management Process leading practices & cross-functional governance Technology enabling tools to deliver integrated solutions
  • 50. Integrating Sustainability Processes… • Maintenance & Operations: – Green Cleaning procedures and products – Track and populate Energy Star rating information for assets and buildings – Tenant surveys for LEED-EBOM IEQ points – Include inspections and readings for IAQ and LEED-EBOM IEQ needs • Monitoring & Measuring ventilation, make-up air, • Hot &Cold call tracking • Preventive Maintenance and Inspections – Commissioning, re-commission, retro-commission – Refrigerant inspections, tracking – Readings measurements related to LEED criteria, energy performance – Cooling tower water consumption, chemicals – Track asset retirement and disposition of assets (landfill, recycle, reuse) – Track and Report O&M PM’s related to efficient energy use
  • 51. Integrating Sustainability Processes • Facility Condition Assessment (FCA) – Use FCA for Environmental Sustainability related Assessments & Audits • Energy Audits, IAQ/IEQ Assessments • Environmental regulatory compliance assessments • Portfolio Project Management – Opportunity Assessments & Analysis, Pipeline Management • Real Estate: – Green Leases; Clauses, Conditions, … – Green Lease Reporting • Strategic Facility Planning – Optimize space utilization to reduce carbon footprint – Forward looking indicators to improve building and utilization
  • 52. Strategic Facility Planning – Forward View
  • 53. High-Performance Workplace • Smart devices • Smart buildings • Pervasive connectivity • Anywhere computing • Info Management • Knowledge/social sharing • Service Management • Orchestration • Energy efficient • Water efficient • Indoor quality • Optimal occupancy • Management support • Knowledge processes • Capability Maturity • Operational Excellence Engaged Workforce Sustainable Facilities Intelligent Infra- structure Technology Enablers Adapted/improved concepts from High –performance Workplace by Saibal Das Chowdhury
  • 55. Where do you stand? • Can you measure how green you are? • Can you get decisions made, or are you stuck? • Are you ready to take green to the next level?
  • 56. Measure & Manage • Reporting & Benchmarking • Data Collection • Performance Management Optimize Opportunities • Identify Opportunities • Analyze & Assess • Portfolio Project Management Integrate Solutions • High-Performance Workplace • Intelligent Buildings • Leading Practices & Solutions Get the green light Go greener
  • 57. Green Buildings Get Results: REDUCE • Drive green performance • Plan & prioritize the right projects • Deliver a high-performance workplace Source: adapted slide from US Green Building Council Water Use 40% Solid Waste 70% Energy Use 37% CO2 Emissions 36%
  • 58. Get the Green Light to Go Greener April 18, 2012 Program Bob Sawhill, CFM Bob.Sawhill@AskEbiz.com 530.305.2843 AskEbiz.com