Genuine 9332606886 Hot and Beautiful 💕 Pune Escorts call Girls
Arnarfell Construction Company Testimonial
1. What Customers Are Saying…
Petro-Canada Lubricants at Work
“We’re impressed with the fact that we used less filters
in the drill, and the oil lasted twice as long.”
– Sigga Pala, Superintendent, Arnarfell Construction Company, Iceland
Commitment is the key to success at where we cannot cause damage or leave
the Arnarfell Construction Company. The behind debris.”
company is committed to its employees,
the environment and an excellent “We don’t set up our camps on concrete
maintenance program. foundations. The camps are wooden
structures with
THE CUSTOMER: Arnarfell, a family- basically a bed,
Arnarfell owned business closet, desk and lamp
Construction Company based in Akureyri, connected to a big
Akureyri Iceland, is kitchen. Everything is
Iceland involved in building under one roof and
roads and tunnels, we reuse the same
Construction Company drilling and blast- camp again and again.
Protects Equipment ing, producing We also use mobile
and Saves Costs with concrete, quarry- equipment and move
Environmentally-friendly ing and crushing. from site to site. Even
DURON* XL 15W-40. Founded in 1986, the large crushers are
the construction mobile.”
company employs
“We save on downtime 80 people who The Switch
because the operator work in remote Arnarfell began testing
has to drain the oil areas of the Petro-Canada’s
half the time with country and live in DURON XL Synthetic
mobile camps for Blend 15W-40 engine
DURON XL 15W-40.”
extended periods oil in one of their four
– Sigga Pala of time. Akureyri is Tamrock Ranger 700
Iceland’s second Arnarfell plans on using DURON Synthetic Blend XL Drills during a project
largest city, with in another 20 to 30 pieces of equipment on the in 2004. The project
a population of project site, including wheel loaders, bulldozers was in Karahnjukur,
14,000, and is and dump trucks. an environmentally
located in the sensitive area. It
northern part of the country, a short involved the construction of diversion
distance from the Arctic Circle. tunnels, surface excavation and road
building for a hydropower plant. The
The Conditions equipment, which operates 24 hours a
“We are contracted to work under harsh day, seven days a week, drills holes into
conditions; temperatures in the winter the ground into which explosives are
fall as low as -15° to -20° C (5° to -4° F),” placed for blasting. Drilling creates a lot
explains Sigga Pala, the company’s of dust, which impacts on the need for
superintendent. “And we work in places oil changes.
2. The switch to DURON XL was a big change for the If you would like to know more, please contact us at:
company. Arnarfell had been using another supplier for
more than 10 years, but liked what it saw in DURON XL Petro-Canada
on the internet ................. www.petro-canada.com
in a short period of time.
Petro-Canada Lubricants
The Results 2310 Lakeshore Road West
“DURON XL is a clean product; good for the Mississauga, Ontario
environment,” says Sigga. “We’re impressed with Canada L5J 1K2
the fact that we used less filters in the drill, and
Canada West .................... Phone 1-800-661-1199
the oil lasted twice as long as the one we were
Canada East (English) ...... Phone 1-800-268-5850
using previously. We also like the packaging of the
Canada East (French) ....... Phone 1-800-576-1686
Petro-Canada product because it comes in plastic
Other Areas ...................... Phone (416) 730-2408
containers and can be recycled.”
E-mail ............................... lubecsr@petro-canada.ca
As a result, Arnarfell decided that DURON XL would be Petro-Canada America Lubricants
used in their next contract, a two-year tunneling project 980 North Michigan Avenue
near Skaftafell Mountain. Not only does the oil provide Suite 1400, #1431
environmental benefits, it also helps the company keep Chicago, Illinois
its costs down. USA 60611
“DURON XL 15W-40 is both environmentally sensitive Phone .............................. 1-888-284-4572
and highly competitive in price; you need less Fax .................................. (708) 246-8994
maintenance with DURON XL,” says Sigga. “Anything E-mail ............................... email@petro-canadaamerica.com
involving less man hours is something you need to
watch out for. From the point of view of the operator, Petro-Canada Europe Lubricants
he wants any machine he is running to run in a stable The Manor, Haseley Business Centre
manner and not break down. We save on downtime Warwick, Warwickshire
because the operator has to drain the oil half the time CV35 7LS
with the DURON XL 15W-40, and that’s economical as United Kingdom
well. The quality of the product is high.” Phone .............................. +44 (0) 2476-247294
Fax .................................. +44 (0) 2476-247295
Sigga has also been told by her operator that
DURON XL has helped to maintain the desired viscosity;
the engine is cleaner, with less soot build up. This
contributes to better engine wear protection and longer
engine life.
Arnarfell plans on using DURON XL 15W-40 on its
three other Tamrock Ranger 700 Drills. The company
has also made the decision to use DURON Synthetic
Blend XL in another 20 to 30 pieces of equipment on
the project site, including wheel loaders, bulldozers and
dump trucks.
“I would definitely recommend DURON XL to people in
the construction industry,” said Sigga. “We’ve seen a
big difference.”
*Marque de commerce de Petro-Canada – Trademark
LUB 1910E (05.04)