Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
CSP Presentation from ASES
1. Concentrating Solar: Readyfortakeoff – or stalled on the launchpad? ASES May 18, 2011 Brett Prior, CFA Senior Analyst Greentech Media / GTM Research
9. Robust pipeline with trough & tower Abengoa Solana STA Blythe NextEra Genesis & Beacon BrightSource Ivanpah UA Tech Park Source: GTM Research
10. Crescent Dunes NEVADA US CSP Project Tracker UTAH CALIFORNIA Amargosa Farm Road Beacon Solar Coyote Springs (I & II) Fort Irwin Gaskell (I & II) BrightSource-Ivanpah eSolar (I & II) Kingman Project (I & II) AMS Harper Lake Palmdale Parabolic Trough Hualapai Valley Solar Project Mojave Solar Victorville Genesis (I & II) Rice Solar ARIZONA Power Tower Palen Quartzsite Solar Imperial Valley II Solana Dish-Engine Blythe (I & II) Sonoran Solar PPA Signed No PPA Signed Imperial Valley I UA Tech Park Mt. Signal Solar Size Represents Project Capacity in MW SolarCAT Pilot Last update 2/14/11 Created by Brett Prior (prior@gtmresearch.com) 5 MW 100 MW 250 MW 500 MW >1,000 MW