What do we want to achieve?

2

• Fully converted Information Technology Environment.
• Savings through equipment, locations, and vendor contracts.
• Savings through better controls and efficiency.
• Continuity of Business achieved through Enterprise Resiliency.
• World-Wide Compliance achieved through Corporate Certification.
• Additional savings through integration with everyday functions.
• Improved Reputation and Higher Employee Morale.
• Better retention of staff and clients.

• More able to recruit new personnel and close client business.
• Costs go down and efficiency goes up.
• Improved Savings and Profitability.
Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com
3

Outsourcing Project Time Line of Events
Phase I
Inventory

Bid

•
•
•
•
•
•

RFP;
Bid;
SOW;
Scope;
Goals and
Timeframe

•
•
•
•
•
•
•
•
•

Phase II
Build Regionals

Transition

Phase IV

Phase V

• Move
Applications to
Regional Data
Center;
• Test Successful
Operation; and
• Use
Virtualization.

•
•
•
•
•
•
•
•
•
•
•
•
•
•

Initial Training Class

Phase VI

Build Recovery Disaster Recovery

Recovery
Site

• Prod 1;
• Prod 2;
• Prod 3.

What they Have;
Infrastructure;
Equipment;
Software;
Applications;
Locations;
Computer Sites;
Recovery Sites;
Applications with
Recovery Plans; and
• Application that need
Recovery Plans.

Thomas Bronack ©

Phase III

“Proof of Concept”;
Infrastructure Readiness;
Disaster Recovery;
Application Recovery;
Business Recovery;
Workplace Safety and
Violence Prevention;
Emergency Management;
Crisis Management;
Protection, Salvage, and
Restoration;
Supply Chain
Management;
Insurance;
Community Relations;
Communications; and
Use of Social Media.

Compliance

• Laws and Regulations;
• Requirements to
Comply with;
• Present Compliance;
• Gaps & Exceptions;
• Obstacles;
• Domestic;
• International; and
• Cross Border
Requirements.

Phone: (917) 673-6992 / Email: bronackt@dcag.com
Phase V – Perform Application Recovery Certification
Three Regional Data Centers and One Global Recovery Site
Prod 1
(Americas)

Prod 2
(Europe)

Recovery Site is Built
so that existing
recovery sites and
vendor contracts can
be eliminated.

User
Sites

Prod 3
(Asia Pacific)

Phase V – Application Recovery
Certification is accomplished;
initially for selected applications
to validate Regional Sites can
recover to Global Recovery Site,

Cloud
or
WAN

User
Sites

Global Recovery
Site

User
Sites

User Locations connected to Regional Data Centers and Global Recovery Site
Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com

4
Failover / Failback DR Process
• Use
Existing
Recovery
Plan to
Certify
Application
Recovery

Failover

Production
Site

Failback
Old ID
Address

New IP
Address

Users Switched to
Recovery Site

Production
Path

User 1

Recovery
Site

Disaster
Recovery Path

Cloud
or
WAN

User 2

• Declare Disaster;
• Failover to Recovery
Site;
• Continue User
Processing within RTO;
• Supplies are routed to
Recovery Site;
• Original Site is
Safeguarded, Salvaged,
and Restored;
• Failback to Original Site

User 3

User n

1. Users stay at their site, while Production is switched to Recovery Site.
2. User has to move to a secondary site because User site is lost, connect to Region Site & Test Recovery.
3. Users move to recovery site and production is switched to Recovery.
Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com

5
6

Logical DR Environment
DR Logical Architecture from Prod to Recovery
Recovery
Site

WAN

Array
Replication
Over WAN

Virtual Machines (VM) are maintained
by the VMware vSphere system which
manages a vCenter Server used for Site
Recovery Management. VM can be
considered as a Resource Manager that
separates Real Equipment (Storage,
Computer, Network, etc.) into Logical
Equipment Sections. Each VM can
represent a Real Server, but many VM
can reside in a Real Server which will
free up real servers presently used for
disposal and a reduction in cost. VMs
save space, power, and reduce
environmental concerns, all of which
affects the bottom line and reputation of
the company. It also takes fewer people
to manage a Virtual Environment that
the number of people now required to
manage a real environment.
Servers are Rack Mounted in what is
called a Blade to save floor space and
infrastructure. Switches can re-route
servers to the Recovery Point
Application to the Recovery Site when a
disaster event occurs.

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com
7

DR Environment Target

Recovery Site

This diagram describes what the DR
Environment will look like when
completed. Remote sites are
transformed and virtualized via the
Avamar Virtual Environment, which will
allow for the removal of remote
equipment and support personnel.
Windows, UNIX, and ESX Operating
Systems will be housed in an EMC VNX
Unified Storage facility. Network
Backup Servers will protect
communications, and Data Domains will
protect Remote Users. A Tape Library is
provided for long term storage and
electronic transfer to the Iron Mountain
Tape Vault via encrypted
communications.
The System Attached Network (SAN)
and EMC Unified Storage Facility are
connected to the wide Area Network
through EMC Recovery Point
Applications (RPAs) that can
automatically switch a failing location to
the recovery site to continue
processing.

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com
Lifecycle of a Disaster Event (Why we create Recovery Plans)
“The goal of Enterprise Resiliency is to achieve ZERO DOWNTIME by implementing Application Recovery Certification for HA and
Gold Standard Recovery Certification for CA Applications”

Point of
Failure

Failover Production Recovery Processing

CA
Flip / Flop
Switch Over

 RPO (Last
Snapshot)

 RTO 
Data Sync

Continuous
Availability (CA) is
immediate Switch

Production

Failback
Shut Down

Secondary Site

HA

Flip / Flop
Switch Over

Failover
Start Up

Failback from Secondary Site after Restoration

Primary Site

High Availability
(HA) is RTO / SLA
based Switch

Repair Primary Site to Resume Production via Failback

Production

Primary Site

Primary Site

Primary Site

Primary Site

Primary Site

Disaster Event:
• Event;
• Analyze;
• Declare;
• Failover.

Safeguard:
• Evacuate;
• Protect Site;
• First
Responders.

Salvage:
• Clean
Facility;
• Repair;
• Resupply.

Restoration:
• Restart;
• Test;
• Success;
• Failback.

Resume:
• Reload
Data;
• Restart;
• Continue.

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com

8
Disaster Recovery Testing Process

9

The DR Testing process is illustrated
here and includes:
1. Select Application for DR Testing;
2. Define DR Testing Goals and
Objectives;
3. Define Production Site where
application resides;
4. Complete Pre-Staging form to
provide DR team with the
information need to make the
recovery site ready to perform DR
Testing;
5. Complete DR Exercise Booklet for
Application;
6. Conduct the Actual DR Exercise;
7. DR Coordinator receives Work
Sheets and prepares a Report and
Presentation of findings for the
Post Mortem;
8. Implement recommendations for
improvement,

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com
Recovery Testing process
A.

Develop Recovery Objectives and Testing Schedule:
1.
2.
3.
4.
5.
6.

B.

Create a Recovery Site DR Site Testing;
Validate Production Site to Recovery Site Connectivity;
Disaster Recovery Plans for interruptions to Information technology;
Application Recovery Certification (CA, HA, Best Effort, Deferred);
Business Recovery for loss of a location;
Emergency Management for Incidents and Natural Disasters; etc.

DR Testing is conducted in Five Steps, which are:
1. DR Planning Meeting – to orientate Application DR Team;
2. Infrastructure Readiness – To prepare the Recovery Site and Obtain Data;
3. DR Pre-Test – To prepare the Recovery Site for Application DR Test:
a. Recovery Site establishes recovery environment for disaster event or test.
b. Develop procedures for providing Recovery Site with the information they
need.
4. Actual DR Recovery / Test – to DR Test the Application:
a. Follow the “Script of Actions” contained in the Recovery Plan.
b. Record event times, comments, and encountered problems.
5. Post Mortem Meeting – Review of DR Test Results:
a. To discuss recovery events and recommend improvements.

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com

10
Where do we go from here
A.

Develop Application Actual DR Testing process:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

B.

Application Actual DR Test Activities Sheet is completed with Estimated Times.
Production Servers are brought-down in Production.
Recovery Servers are brought-up in Recovery.
Application is connected to Recovery Facility.
Data is Synchronized to point just before failure.
Application resumes normal processing like in Production Mode.
Application connectivity and functionality is verified.
Recovery Servers are Brought-Down.
Production Servers are Brought-Up.
Application resumes processing at Production Site and is verified.
If Successful, Application receives Application Recovery Certification – otherwise Application
DR problems are repaired and the Application goes through DR Testing again until Application
Recovery Certification is achieved.

Develop Application Work Sheet;
1.

C.

11

Same as Activities Sheets, but is used to record Actual Times, Durations, Encountered
Problems, and Comments.

Post Mortem Meeting is conducted to review results, go over “Lessons
Learned” and make “Recommendations for Improvement”.

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com

11
Disaster Recovery Dashboard and Documents
12
1. DR Planning Guide

2. DR Management Dashboard

3. DR Exercise Booklet Template

4. Planning Meeting Agenda

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com
What should be accomplished during the Planning
Meetings
1. Infrastructure Readiness Information

2. Contact List

3. EMC Disaster Recovery and Business Continuity
Solutions.
4. VMware vSphere, vCenter Prep

5. VMware Usage and Recovery

Thomas Bronack ©

Initial Training Class

Phone: (917) 673-6992 / Email: bronackt@dcag.com

13

Contenu connexe

Tendances

T3 Consortium's Performance Center of Excellence
T3 Consortium's Performance Center of ExcellenceT3 Consortium's Performance Center of Excellence
T3 Consortium's Performance Center of Excellenceveehikle
 
Performance and scale in cloud
Performance and scale in cloudPerformance and scale in cloud
Performance and scale in cloudjeffgaris
 
WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...
WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...
WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...Adlib - The PDF Experts
 
Ian Butler - Resume 2015
Ian Butler - Resume 2015Ian Butler - Resume 2015
Ian Butler - Resume 2015Ian Butler
 
Pc Order To Installation Cycle Time Reduction Display
Pc Order To Installation Cycle Time Reduction DisplayPc Order To Installation Cycle Time Reduction Display
Pc Order To Installation Cycle Time Reduction Displaywhayes2000
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and ProjectsCory Larsen
 
RiskManagementPlanFinal1.3
RiskManagementPlanFinal1.3RiskManagementPlanFinal1.3
RiskManagementPlanFinal1.3Fahad Saleem
 
f5-reference-architecture-for-vmware-nsx
f5-reference-architecture-for-vmware-nsxf5-reference-architecture-for-vmware-nsx
f5-reference-architecture-for-vmware-nsxNathan Pearce
 
Test data management a case study Presented at SiGIST
Test data management a case study Presented at SiGISTTest data management a case study Presented at SiGIST
Test data management a case study Presented at SiGISTrenardv74
 
Intro Resource Datamine
Intro Resource DatamineIntro Resource Datamine
Intro Resource DatamineSarah_netedge
 
Implementation Strategy Linda Doll
Implementation Strategy Linda Doll Implementation Strategy Linda Doll
Implementation Strategy Linda Doll Linda Doll
 
CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX
CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX	CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX
CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX Roy Wassili
 
Java deployments in an enterprise environment whitepaper - xebialabs
Java deployments in an enterprise environment   whitepaper - xebialabsJava deployments in an enterprise environment   whitepaper - xebialabs
Java deployments in an enterprise environment whitepaper - xebialabsXebiaLabs
 
Bilal ITM
Bilal ITMBilal ITM
Bilal ITMBill M
 

Tendances (20)

T3 Consortium's Performance Center of Excellence
T3 Consortium's Performance Center of ExcellenceT3 Consortium's Performance Center of Excellence
T3 Consortium's Performance Center of Excellence
 
Performance and scale in cloud
Performance and scale in cloudPerformance and scale in cloud
Performance and scale in cloud
 
WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...
WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...
WEBINAR PRESENTATION: Controlling critical documents with Dassault Systemes E...
 
Ian Butler - Resume 2015
Ian Butler - Resume 2015Ian Butler - Resume 2015
Ian Butler - Resume 2015
 
Pc Order To Installation Cycle Time Reduction Display
Pc Order To Installation Cycle Time Reduction DisplayPc Order To Installation Cycle Time Reduction Display
Pc Order To Installation Cycle Time Reduction Display
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and Projects
 
CERTIFIED DATA CENTRE EXPERT
CERTIFIED DATA CENTRE EXPERTCERTIFIED DATA CENTRE EXPERT
CERTIFIED DATA CENTRE EXPERT
 
Amitabha Cv 15022010
Amitabha Cv 15022010Amitabha Cv 15022010
Amitabha Cv 15022010
 
Mortgage Stability 20120420
Mortgage Stability 20120420Mortgage Stability 20120420
Mortgage Stability 20120420
 
RiskManagementPlanFinal1.3
RiskManagementPlanFinal1.3RiskManagementPlanFinal1.3
RiskManagementPlanFinal1.3
 
Raghu-UpdatedCV -2016
Raghu-UpdatedCV -2016Raghu-UpdatedCV -2016
Raghu-UpdatedCV -2016
 
f5-reference-architecture-for-vmware-nsx
f5-reference-architecture-for-vmware-nsxf5-reference-architecture-for-vmware-nsx
f5-reference-architecture-for-vmware-nsx
 
Test data management a case study Presented at SiGIST
Test data management a case study Presented at SiGISTTest data management a case study Presented at SiGIST
Test data management a case study Presented at SiGIST
 
Intro Resource Datamine
Intro Resource DatamineIntro Resource Datamine
Intro Resource Datamine
 
Anthony Bordley Resume
Anthony Bordley ResumeAnthony Bordley Resume
Anthony Bordley Resume
 
Kenneth M. Fischler
Kenneth M. FischlerKenneth M. Fischler
Kenneth M. Fischler
 
Implementation Strategy Linda Doll
Implementation Strategy Linda Doll Implementation Strategy Linda Doll
Implementation Strategy Linda Doll
 
CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX
CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX	CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX
CONTINUOUS APPLICATION AVAILABILITY WITH EMC VPLEX
 
Java deployments in an enterprise environment whitepaper - xebialabs
Java deployments in an enterprise environment   whitepaper - xebialabsJava deployments in an enterprise environment   whitepaper - xebialabs
Java deployments in an enterprise environment whitepaper - xebialabs
 
Bilal ITM
Bilal ITMBilal ITM
Bilal ITM
 

Similaire à Dcag training on VMware DR Process

Bluelock's Recovery Suite
Bluelock's Recovery SuiteBluelock's Recovery Suite
Bluelock's Recovery SuiteBluelock
 
VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...
VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...
VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...VMworld
 
Plate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery SolutionPlate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery Solutionmuralis3
 
EVault Technical DRaaS Guide_Final
EVault Technical DRaaS Guide_FinalEVault Technical DRaaS Guide_Final
EVault Technical DRaaS Guide_FinalJamie Evans
 
Varrow Madness 2014 DR Presentation
Varrow Madness 2014 DR PresentationVarrow Madness 2014 DR Presentation
Varrow Madness 2014 DR PresentationAndrew Miller
 
AITP July 2012 Presentation - Disaster Recovery - Business + Technology
AITP July 2012 Presentation - Disaster Recovery - Business + TechnologyAITP July 2012 Presentation - Disaster Recovery - Business + Technology
AITP July 2012 Presentation - Disaster Recovery - Business + TechnologyAndrew Miller
 
Technologent-CS-Disaster_Recovery_Business_Continuity-Energy
Technologent-CS-Disaster_Recovery_Business_Continuity-EnergyTechnologent-CS-Disaster_Recovery_Business_Continuity-Energy
Technologent-CS-Disaster_Recovery_Business_Continuity-EnergyLorraine Barrows
 
Smaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate CertificationSmaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate CertificationThomas Bronack
 
Disaster Recovery - Business & Technology
Disaster Recovery - Business & Technology Disaster Recovery - Business & Technology
Disaster Recovery - Business & Technology Andrew Miller
 
RapidScale CloudRecovery
RapidScale CloudRecoveryRapidScale CloudRecovery
RapidScale CloudRecoveryRapidScale
 
Sample Solution Blueprint
Sample Solution BlueprintSample Solution Blueprint
Sample Solution BlueprintMike Alvarado
 
Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...
Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...
Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...iland Cloud
 
Cloud Based Disaster Recovery (DRaaS)
Cloud Based Disaster Recovery (DRaaS)Cloud Based Disaster Recovery (DRaaS)
Cloud Based Disaster Recovery (DRaaS)PT Datacomm Diangraha
 
Disaster Recovery Planning using Azure Site Recovery
Disaster Recovery Planning using Azure Site RecoveryDisaster Recovery Planning using Azure Site Recovery
Disaster Recovery Planning using Azure Site RecoveryNitin Agarwal
 
7 Habits for High Effective Disaster Recovery Administrators
7 Habits for High Effective Disaster Recovery Administrators7 Habits for High Effective Disaster Recovery Administrators
7 Habits for High Effective Disaster Recovery AdministratorsQuorumLabs
 
Drp Bcp Testing Alternatives
Drp Bcp Testing AlternativesDrp Bcp Testing Alternatives
Drp Bcp Testing AlternativesGewurtz
 
Enterprise grade disaster recovery without breaking the bank
Enterprise grade disaster recovery without breaking the bankEnterprise grade disaster recovery without breaking the bank
Enterprise grade disaster recovery without breaking the bankactualtechmedia
 
5 Applications of Cloud Computing
5 Applications of Cloud Computing5 Applications of Cloud Computing
5 Applications of Cloud ComputingCentriLogic
 

Similaire à Dcag training on VMware DR Process (20)

HADRFINAL13112016
HADRFINAL13112016HADRFINAL13112016
HADRFINAL13112016
 
Bluelock's Recovery Suite
Bluelock's Recovery SuiteBluelock's Recovery Suite
Bluelock's Recovery Suite
 
VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...
VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...
VMworld 2013: DR to The Cloud with VMware Site Recovery Manager and Rackspace...
 
Plate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery SolutionPlate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery Solution
 
EVault Technical DRaaS Guide_Final
EVault Technical DRaaS Guide_FinalEVault Technical DRaaS Guide_Final
EVault Technical DRaaS Guide_Final
 
Varrow Madness 2014 DR Presentation
Varrow Madness 2014 DR PresentationVarrow Madness 2014 DR Presentation
Varrow Madness 2014 DR Presentation
 
AITP July 2012 Presentation - Disaster Recovery - Business + Technology
AITP July 2012 Presentation - Disaster Recovery - Business + TechnologyAITP July 2012 Presentation - Disaster Recovery - Business + Technology
AITP July 2012 Presentation - Disaster Recovery - Business + Technology
 
Technologent-CS-Disaster_Recovery_Business_Continuity-Energy
Technologent-CS-Disaster_Recovery_Business_Continuity-EnergyTechnologent-CS-Disaster_Recovery_Business_Continuity-Energy
Technologent-CS-Disaster_Recovery_Business_Continuity-Energy
 
Smaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate CertificationSmaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate Certification
 
Disaster Recovery - Business & Technology
Disaster Recovery - Business & Technology Disaster Recovery - Business & Technology
Disaster Recovery - Business & Technology
 
RapidScale CloudRecovery
RapidScale CloudRecoveryRapidScale CloudRecovery
RapidScale CloudRecovery
 
Sample Solution Blueprint
Sample Solution BlueprintSample Solution Blueprint
Sample Solution Blueprint
 
Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...
Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...
Webinar: IT Disaster Recovery - Simplifying IT Resilience With the Help of th...
 
Cloud Based Disaster Recovery (DRaaS)
Cloud Based Disaster Recovery (DRaaS)Cloud Based Disaster Recovery (DRaaS)
Cloud Based Disaster Recovery (DRaaS)
 
K.I.S.S In The Cloud with AWS
K.I.S.S In The Cloud with AWSK.I.S.S In The Cloud with AWS
K.I.S.S In The Cloud with AWS
 
Disaster Recovery Planning using Azure Site Recovery
Disaster Recovery Planning using Azure Site RecoveryDisaster Recovery Planning using Azure Site Recovery
Disaster Recovery Planning using Azure Site Recovery
 
7 Habits for High Effective Disaster Recovery Administrators
7 Habits for High Effective Disaster Recovery Administrators7 Habits for High Effective Disaster Recovery Administrators
7 Habits for High Effective Disaster Recovery Administrators
 
Drp Bcp Testing Alternatives
Drp Bcp Testing AlternativesDrp Bcp Testing Alternatives
Drp Bcp Testing Alternatives
 
Enterprise grade disaster recovery without breaking the bank
Enterprise grade disaster recovery without breaking the bankEnterprise grade disaster recovery without breaking the bank
Enterprise grade disaster recovery without breaking the bank
 
5 Applications of Cloud Computing
5 Applications of Cloud Computing5 Applications of Cloud Computing
5 Applications of Cloud Computing
 

Plus de Thomas Bronack

Enterprise resiliency and world-wide compliance, in-depth article.
Enterprise resiliency and world-wide compliance, in-depth article.Enterprise resiliency and world-wide compliance, in-depth article.
Enterprise resiliency and world-wide compliance, in-depth article.Thomas Bronack
 
Optimizing the IT and Business Environment
Optimizing the IT and Business EnvironmentOptimizing the IT and Business Environment
Optimizing the IT and Business EnvironmentThomas Bronack
 
Dcag service optimization offering01
Dcag service optimization offering01Dcag service optimization offering01
Dcag service optimization offering01Thomas Bronack
 
Recovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom BronackRecovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom BronackThomas Bronack
 
Auditing contingency Plans
Auditing contingency PlansAuditing contingency Plans
Auditing contingency PlansThomas Bronack
 
Equipment Redeployment and Termination Procedures
Equipment Redeployment and Termination ProceduresEquipment Redeployment and Termination Procedures
Equipment Redeployment and Termination ProceduresThomas Bronack
 
Article on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate CertificationArticle on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate CertificationThomas Bronack
 
Updated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance PresentationUpdated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance PresentationThomas Bronack
 
Exec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate CertificationExec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate CertificationThomas Bronack
 
Executive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry complianceExecutive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry complianceThomas Bronack
 
Personnel Productivity System - Updated 6-6-2013
Personnel Productivity System - Updated 6-6-2013Personnel Productivity System - Updated 6-6-2013
Personnel Productivity System - Updated 6-6-2013Thomas Bronack
 
Achieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationAchieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationThomas Bronack
 
Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(Thomas Bronack
 
Application migration guideline document
Application migration guideline documentApplication migration guideline document
Application migration guideline documentThomas Bronack
 
Tape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysisTape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysisThomas Bronack
 
Achieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationAchieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationThomas Bronack
 

Plus de Thomas Bronack (16)

Enterprise resiliency and world-wide compliance, in-depth article.
Enterprise resiliency and world-wide compliance, in-depth article.Enterprise resiliency and world-wide compliance, in-depth article.
Enterprise resiliency and world-wide compliance, in-depth article.
 
Optimizing the IT and Business Environment
Optimizing the IT and Business EnvironmentOptimizing the IT and Business Environment
Optimizing the IT and Business Environment
 
Dcag service optimization offering01
Dcag service optimization offering01Dcag service optimization offering01
Dcag service optimization offering01
 
Recovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom BronackRecovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom Bronack
 
Auditing contingency Plans
Auditing contingency PlansAuditing contingency Plans
Auditing contingency Plans
 
Equipment Redeployment and Termination Procedures
Equipment Redeployment and Termination ProceduresEquipment Redeployment and Termination Procedures
Equipment Redeployment and Termination Procedures
 
Article on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate CertificationArticle on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate Certification
 
Updated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance PresentationUpdated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance Presentation
 
Exec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate CertificationExec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate Certification
 
Executive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry complianceExecutive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry compliance
 
Personnel Productivity System - Updated 6-6-2013
Personnel Productivity System - Updated 6-6-2013Personnel Productivity System - Updated 6-6-2013
Personnel Productivity System - Updated 6-6-2013
 
Achieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationAchieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate Certification
 
Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(
 
Application migration guideline document
Application migration guideline documentApplication migration guideline document
Application migration guideline document
 
Tape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysisTape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysis
 
Achieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationAchieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate Certification
 

Dernier

John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Dernier (20)

John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Dcag training on VMware DR Process

  • 1. DR Planning Project Training Document Prepared by: Thomas Bronack, CBCP (917) 673-6992 bronackt@dcag.com Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 2. What do we want to achieve? 2 • Fully converted Information Technology Environment. • Savings through equipment, locations, and vendor contracts. • Savings through better controls and efficiency. • Continuity of Business achieved through Enterprise Resiliency. • World-Wide Compliance achieved through Corporate Certification. • Additional savings through integration with everyday functions. • Improved Reputation and Higher Employee Morale. • Better retention of staff and clients. • More able to recruit new personnel and close client business. • Costs go down and efficiency goes up. • Improved Savings and Profitability. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 3. 3 Outsourcing Project Time Line of Events Phase I Inventory Bid • • • • • • RFP; Bid; SOW; Scope; Goals and Timeframe • • • • • • • • • Phase II Build Regionals Transition Phase IV Phase V • Move Applications to Regional Data Center; • Test Successful Operation; and • Use Virtualization. • • • • • • • • • • • • • • Initial Training Class Phase VI Build Recovery Disaster Recovery Recovery Site • Prod 1; • Prod 2; • Prod 3. What they Have; Infrastructure; Equipment; Software; Applications; Locations; Computer Sites; Recovery Sites; Applications with Recovery Plans; and • Application that need Recovery Plans. Thomas Bronack © Phase III “Proof of Concept”; Infrastructure Readiness; Disaster Recovery; Application Recovery; Business Recovery; Workplace Safety and Violence Prevention; Emergency Management; Crisis Management; Protection, Salvage, and Restoration; Supply Chain Management; Insurance; Community Relations; Communications; and Use of Social Media. Compliance • Laws and Regulations; • Requirements to Comply with; • Present Compliance; • Gaps & Exceptions; • Obstacles; • Domestic; • International; and • Cross Border Requirements. Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 4. Phase V – Perform Application Recovery Certification Three Regional Data Centers and One Global Recovery Site Prod 1 (Americas) Prod 2 (Europe) Recovery Site is Built so that existing recovery sites and vendor contracts can be eliminated. User Sites Prod 3 (Asia Pacific) Phase V – Application Recovery Certification is accomplished; initially for selected applications to validate Regional Sites can recover to Global Recovery Site, Cloud or WAN User Sites Global Recovery Site User Sites User Locations connected to Regional Data Centers and Global Recovery Site Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com 4
  • 5. Failover / Failback DR Process • Use Existing Recovery Plan to Certify Application Recovery Failover Production Site Failback Old ID Address New IP Address Users Switched to Recovery Site Production Path User 1 Recovery Site Disaster Recovery Path Cloud or WAN User 2 • Declare Disaster; • Failover to Recovery Site; • Continue User Processing within RTO; • Supplies are routed to Recovery Site; • Original Site is Safeguarded, Salvaged, and Restored; • Failback to Original Site User 3 User n 1. Users stay at their site, while Production is switched to Recovery Site. 2. User has to move to a secondary site because User site is lost, connect to Region Site & Test Recovery. 3. Users move to recovery site and production is switched to Recovery. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com 5
  • 6. 6 Logical DR Environment DR Logical Architecture from Prod to Recovery Recovery Site WAN Array Replication Over WAN Virtual Machines (VM) are maintained by the VMware vSphere system which manages a vCenter Server used for Site Recovery Management. VM can be considered as a Resource Manager that separates Real Equipment (Storage, Computer, Network, etc.) into Logical Equipment Sections. Each VM can represent a Real Server, but many VM can reside in a Real Server which will free up real servers presently used for disposal and a reduction in cost. VMs save space, power, and reduce environmental concerns, all of which affects the bottom line and reputation of the company. It also takes fewer people to manage a Virtual Environment that the number of people now required to manage a real environment. Servers are Rack Mounted in what is called a Blade to save floor space and infrastructure. Switches can re-route servers to the Recovery Point Application to the Recovery Site when a disaster event occurs. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 7. 7 DR Environment Target Recovery Site This diagram describes what the DR Environment will look like when completed. Remote sites are transformed and virtualized via the Avamar Virtual Environment, which will allow for the removal of remote equipment and support personnel. Windows, UNIX, and ESX Operating Systems will be housed in an EMC VNX Unified Storage facility. Network Backup Servers will protect communications, and Data Domains will protect Remote Users. A Tape Library is provided for long term storage and electronic transfer to the Iron Mountain Tape Vault via encrypted communications. The System Attached Network (SAN) and EMC Unified Storage Facility are connected to the wide Area Network through EMC Recovery Point Applications (RPAs) that can automatically switch a failing location to the recovery site to continue processing. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 8. Lifecycle of a Disaster Event (Why we create Recovery Plans) “The goal of Enterprise Resiliency is to achieve ZERO DOWNTIME by implementing Application Recovery Certification for HA and Gold Standard Recovery Certification for CA Applications” Point of Failure Failover Production Recovery Processing CA Flip / Flop Switch Over  RPO (Last Snapshot)  RTO  Data Sync Continuous Availability (CA) is immediate Switch Production Failback Shut Down Secondary Site HA Flip / Flop Switch Over Failover Start Up Failback from Secondary Site after Restoration Primary Site High Availability (HA) is RTO / SLA based Switch Repair Primary Site to Resume Production via Failback Production Primary Site Primary Site Primary Site Primary Site Primary Site Disaster Event: • Event; • Analyze; • Declare; • Failover. Safeguard: • Evacuate; • Protect Site; • First Responders. Salvage: • Clean Facility; • Repair; • Resupply. Restoration: • Restart; • Test; • Success; • Failback. Resume: • Reload Data; • Restart; • Continue. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com 8
  • 9. Disaster Recovery Testing Process 9 The DR Testing process is illustrated here and includes: 1. Select Application for DR Testing; 2. Define DR Testing Goals and Objectives; 3. Define Production Site where application resides; 4. Complete Pre-Staging form to provide DR team with the information need to make the recovery site ready to perform DR Testing; 5. Complete DR Exercise Booklet for Application; 6. Conduct the Actual DR Exercise; 7. DR Coordinator receives Work Sheets and prepares a Report and Presentation of findings for the Post Mortem; 8. Implement recommendations for improvement, Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 10. Recovery Testing process A. Develop Recovery Objectives and Testing Schedule: 1. 2. 3. 4. 5. 6. B. Create a Recovery Site DR Site Testing; Validate Production Site to Recovery Site Connectivity; Disaster Recovery Plans for interruptions to Information technology; Application Recovery Certification (CA, HA, Best Effort, Deferred); Business Recovery for loss of a location; Emergency Management for Incidents and Natural Disasters; etc. DR Testing is conducted in Five Steps, which are: 1. DR Planning Meeting – to orientate Application DR Team; 2. Infrastructure Readiness – To prepare the Recovery Site and Obtain Data; 3. DR Pre-Test – To prepare the Recovery Site for Application DR Test: a. Recovery Site establishes recovery environment for disaster event or test. b. Develop procedures for providing Recovery Site with the information they need. 4. Actual DR Recovery / Test – to DR Test the Application: a. Follow the “Script of Actions” contained in the Recovery Plan. b. Record event times, comments, and encountered problems. 5. Post Mortem Meeting – Review of DR Test Results: a. To discuss recovery events and recommend improvements. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com 10
  • 11. Where do we go from here A. Develop Application Actual DR Testing process: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. B. Application Actual DR Test Activities Sheet is completed with Estimated Times. Production Servers are brought-down in Production. Recovery Servers are brought-up in Recovery. Application is connected to Recovery Facility. Data is Synchronized to point just before failure. Application resumes normal processing like in Production Mode. Application connectivity and functionality is verified. Recovery Servers are Brought-Down. Production Servers are Brought-Up. Application resumes processing at Production Site and is verified. If Successful, Application receives Application Recovery Certification – otherwise Application DR problems are repaired and the Application goes through DR Testing again until Application Recovery Certification is achieved. Develop Application Work Sheet; 1. C. 11 Same as Activities Sheets, but is used to record Actual Times, Durations, Encountered Problems, and Comments. Post Mortem Meeting is conducted to review results, go over “Lessons Learned” and make “Recommendations for Improvement”. Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com 11
  • 12. Disaster Recovery Dashboard and Documents 12 1. DR Planning Guide 2. DR Management Dashboard 3. DR Exercise Booklet Template 4. Planning Meeting Agenda Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com
  • 13. What should be accomplished during the Planning Meetings 1. Infrastructure Readiness Information 2. Contact List 3. EMC Disaster Recovery and Business Continuity Solutions. 4. VMware vSphere, vCenter Prep 5. VMware Usage and Recovery Thomas Bronack © Initial Training Class Phone: (917) 673-6992 / Email: bronackt@dcag.com 13