COMMERCIAL BUILDING SERVICES FLOW THINKING
Chilled Water System Presentation
COMMERCIAL BUILDING SERVICES FLOW THINKING
Constant Volume Distribution
Constant Volume Distribution
COMMERCIAL BUILDING SERVICES FLOW THINKING
Air-conditioning System Components
COMMERCIAL BUILDING SERVICES FLOW THINKING
Constant Volume System Components
COMMERCIAL BUILDING SERVICES FLOW THINKING
Typical 3-way Valve Zone
COMMERCIAL BUILDING SERVICES FLOW THINKING
Full Load Condition
COMMERCIAL BUILDING SERVICES FLOW THINKING
Fully Loaded Coil
• Supply water temperature 45°F
• Design return water temp. 55°F
• Coil design flow 100 GPM
• Coil design pressure drop 20 FT
• Load (flow x 10°F∆ x 500) 500,000 Btuh
• Coil ∆P @ design flow 20 FT
• Bypass flow 0 GPM
• Bypass ∆P 3-way valve closed
• 3-way valve pressure drop 10 FT
• Pump flow and head 100 GPM @ 30 FT
• Actual return water temp 55 °F
COMMERCIAL BUILDING SERVICES FLOW THINKING
Unloaded Condition
COMMERCIAL BUILDING SERVICES FLOW THINKING
Unloaded Coil
• Supply water temperature 45°F
• Design return water temp. 55°F
• Coil design flow 0 GPM
• Coil design pressure drop 3-way valve closed
• Load (flow x 10°F∆ x 500) 0.0 Btuh
• Coil ∆P @ design flow 0 FT
• Bypass flow 100 GPM
• Bypass ∆P 20 FT
• 3-way valve pressure drop 10 FT
• Pump flow and head 100 GPM @ 30 FT
• Actual return water temp 45 °F
COMMERCIAL BUILDING SERVICES FLOW THINKING
So What?
• When the load on the coil is zero, the valve is returning “unused”
chilled water at essentially supply temperature.
• Cold return water “unloads” the chillers, causing them to operate
inefficiently.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Part Load Condition
COMMERCIAL BUILDING SERVICES FLOW THINKING
Partially Loaded Coil
• Supply water temperature 45°F
• Design return water temp. 55°F
• Coil design flow 50 GPM
• Coil design pressure drop 20 FT
• Load (flow x 10°F∆ x 500) 250,000 Btuh
• Coil ∆P @ design flow 5 FT
• Bypass flow ??? GPM
• Bypass ∆P 3-way partially closed
• 3-way valve pressure drop 10 FT
• Pump flow and head ??? GPM @ 30 FT
• Actual return water temp ?? °F
COMMERCIAL BUILDING SERVICES FLOW THINKING
125
100
75
50
25
0
% Valve Stroke
25 50 75 100
%
Flow 1/2 Through Coil
1/2 Through Bypass
Full
Flow
Through
Coil
Full
Flow
Through
Bypass
3-way Valve Characteristic
COMMERCIAL BUILDING SERVICES FLOW THINKING
What’s Really Happening?
COMMERCIAL BUILDING SERVICES FLOW THINKING
Coil with 3-way Valve at Mid-position
• Supply water temperature 45 °F
• Design return water temp. 55 °F
• Load (flow x 10°F∆ x 500) 250,000 Btuh
• Coil design pressure drop 20 FT
• Coil flow 62.5 GPM
• Coil ∆P @ 62.5% flow 7.8 FT
• Coil leaving water temp 53 °F
• Bypass flow 62.5 GPM
• Bypass ∆P 7.8 FT
• 3-way valve pressure drop 10 FT
• Pump flow and head 125 GPM @ 30 FT
• Actual return water temp 49 °F (62.5 GPM @ 53 °F+
62.5 GPM @ 45 °F)
COMMERCIAL BUILDING SERVICES FLOW THINKING
Head2 = Head1(Flow2/ Flow1)2
Head2 = 20(.625/1)2
Head2 = 20(.3906 )
Head2 = 7.8
COMMERCIAL BUILDING SERVICES FLOW THINKING
∆T = Load/ Flow X 500
∆T = 250,000/62.5 X 500
∆T = 8
Therefore, LWTcoil = 45 + 8 = 53
COMMERCIAL BUILDING SERVICES FLOW THINKING
RWT = (Flow1 X EWT + Flow2 X LWT)/ Flow1 + 2
RWT = (62.5 X 45 + 62.5 X 53)/125
RWT = 49
COMMERCIAL BUILDING SERVICES FLOW THINKING
3-way Valve in Mid Position
COMMERCIAL BUILDING SERVICES FLOW THINKING
1.Low return water temperatures.
2.Robs chilled water from other coils at part
load conditions.
3.Increases flow in primary piping.
4.Adds additional chillers on line.
5.Chiller performance is reduced.
3-way Valve System Deficiencies
COMMERCIAL BUILDING SERVICES FLOW THINKING
1.1
20 30 40 50 60 70 80 90 100
10
1.0
0.9
0.8
0.7
0.6
0.5
KW
per
Ton
Percent Load
Chiller Performance Curve
COMMERCIAL BUILDING SERVICES FLOW THINKING
Pump Sizing
• Select for full chiller flow
• Head must be adequate for:
– Chiller evaporator
– Longest circuit
– Coil
– Three way valve
– Air separator
COMMERCIAL BUILDING SERVICES FLOW THINKING
System Configuration
Constant Volume
Any Questions?
Variable Volume Constant Speed
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary – Secondary System
Primary – Includes Chillers & Primary Pump.
Circuit Constant water flow through the chiller
is maintained and chilled water is
produced
Secondary – Chilled water is circulated to the
Circuit demand area (load) by using
Secondary pumps.
Variable Volume Constant Speed
COMMERCIAL BUILDING SERVICES FLOW THINKING
PRIMARY - SECONDARY
COMMERCIAL BUILDING SERVICES FLOW THINKING
Other Famous Names of Primary-
Secondary
Primary – Production Loop
Secondary – Distribution Loop
COMMERCIAL BUILDING SERVICES FLOW THINKING
Fundamental Idea
COMMERCIAL BUILDING SERVICES FLOW THINKING
No Secondary Flow
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary = Secondary
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary > Secondary
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary < Secondary
COMMERCIAL BUILDING SERVICES FLOW THINKING
Control Valve in Secondary
COMMERCIAL BUILDING SERVICES FLOW THINKING
• Use the flow of the largest chiller
– Chiller staging at half of this flow is common
• Head loss in common <1 1/2 ft
– Distribution pipe size is often used where reductions would be
inconvenient
• Three pipe diameters between tees
– Excessive length increases total head loss
• Low velocities in system piping
Common Pipe Design Criteria
COMMERCIAL BUILDING SERVICES FLOW THINKING
Variable flow through coil
Constant flow through system
Three Way Valve
Variable flow through coil
Variable flow through system
Two Way Valve
Control Valve in Secondary
COMMERCIAL BUILDING SERVICES FLOW THINKING
PRIMARY – SECONDARY CIRCUIT
Variable Volume Constant Speed
COMMERCIAL BUILDING SERVICES FLOW THINKING
Head
F1 F2 F3
H1
H2
H3
Flow
Control Valves Change the Secondary
System Curve
COMMERCIAL BUILDING SERVICES FLOW THINKING
% Flow
125
100
75
50
25
150
25 50 75 100
HD
Varying differential pressure
absorbed by control valve
System resistance
TDH of pump
Pump curve
Head Absorbed by 2-way Valves
COMMERCIAL BUILDING SERVICES FLOW THINKING
HP
125
100
75
50
25
150
25 50 75 100
% Design Flow
Primary Pumps = V/V
Secondary Pumps +
Constant Flow Primary Pumps, only
Pump Horsepower Comparison
COMMERCIAL BUILDING SERVICES FLOW THINKING
% Flow
90
80
70
60
50
40
30
20
10
0 10 100
90
80
70
60
50
40
30
20
100
110
120
130
140
150
Base
Design
HP %
% Full Load
(Design) HP
Pump Over-haded by 150%
Constant Flow, C/S Pump
(3 Way Valve)
Constant Flow, C/S Pump
(3 Way Valve)
C/S Pump
(2 Way Valve)
Pump HD Matched
to System @
Design Flow
C/S
Pump (2 W
ay Valve)
Constant vs Variable Volume
Any Questions?
Step Function of Chillers
COMMERCIAL BUILDING SERVICES FLOW THINKING
Production = Distribution
COMMERCIAL BUILDING SERVICES FLOW THINKING
Distribution > Production
COMMERCIAL BUILDING SERVICES FLOW THINKING
Production > Distribution
COMMERCIAL BUILDING SERVICES FLOW THINKING
“Loading” a Chiller
• A chiller is a heat transfer device. Like most equipment, it is
most efficient at full load.
• To “load” a chiller means:
– Supply it with its rated flow of water
– Insure that water is warm enough to permit removal of rated Btu
without freezing the water
COMMERCIAL BUILDING SERVICES FLOW THINKING
Chiller Performance Curve
1.1
20 30 40 50 60 70 80 90 100
10
1.0
0.9
0.8
0.7
0.6
0.5
KW
per
Ton
Percent Load
COMMERCIAL BUILDING SERVICES FLOW THINKING
Check Valve in Common?
COMMERCIAL BUILDING SERVICES FLOW THINKING
What can we do?
COMMERCIAL BUILDING SERVICES FLOW THINKING
What else can we do?
Reset Supply Temperature
• Lower chiller set point when mixing occurs to maintain a constant
temperature to the system.
• Expect increases in cost of chiller operation at lower set point: 1-3% per
degree of reset.
• Delays start of the next chiller.
COMMERCIAL BUILDING SERVICES FLOW THINKING
What else can we do?
• Coils that are selected at higher supply temperatures will not be
impaired by small changes.
• Loads that require fixed temperatures may use a small chiller to
reverse the effects of mixing.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Multiple Chillers
COMMERCIAL BUILDING SERVICES FLOW THINKING
60/40 Chiller Split to Help Minimize Low Part Load Operation
COMMERCIAL BUILDING SERVICES FLOW THINKING
0-10 30-40 60-70 90-100
0
5
10
15
20
25
30
0-10 30-40 60-70 90-100
%
Time
% Load
Typical Load Profile
COMMERCIAL BUILDING SERVICES FLOW THINKING
Three Unequally Sized Chillers
COMMERCIAL BUILDING SERVICES FLOW THINKING
% Load
Time
Approaching Flow = Load
Any Questions?Alternate
Pumping Methods
Comparison
COMMERCIAL BUILDING SERVICES FLOW THINKING
Two Pipe Direct Return
COMMERCIAL BUILDING SERVICES FLOW THINKING
Two Pipe Reverse Return
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary Pumping.
• Simplest to install.
• Simplest to operate.
• Flexible in design for present and future.
• Efficient to operate.
• May over-pressurize near zones.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary-Tertiary
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary-Tertiary Pumping.
• Best piping flexibility.
• Best expansion flexibility.
• Provides hydraulic decoupling.
• Efficient to operate.
• May require added horsepower.
• Requires additional pumps and piping.
• Increased controls complexity.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary-Tertiary Hybrid
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary-Tertiary Hybrid Pumping.
• Low present horsepower.
• Low future horsepower.
• Good piping flexibility.
• Good expansion flexibility.
• Provides hydraulic decoupling.
• May require added horsepower
• Requires additional pumps and piping.
• Increased controls complexity.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary Zone Pumping
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary-Secondary Zone Pumping.
• Low ‘built out’ horsepower.
• Low system head.
• Increased control complexity.
• Present horsepower total higher due to future needs.
• Present pumps sized for future requirements.
• Difficult to apply in retrofits projects.
Any Questions?
Variable Volume Variable Speed
COMMERCIAL BUILDING SERVICES FLOW THINKING
Why Do We Need Variable Speed
Secondary Pumps ???
•For Energy Saving….
•For better & optimise operation….
COMMERCIAL BUILDING SERVICES FLOW THINKING
How Do We Achieve This Reduction In Power
Consumption ??
By Using Variable Frequency Drive and Logic controller
with the Secondary Pumps….
COMMERCIAL BUILDING SERVICES FLOW THINKING
Power Comparison at Reduced Speed
COMMERCIAL BUILDING SERVICES FLOW THINKING
Basic Law which helps in achieving this – Affinity
law
1. Flow2 = Flow1(Speed2/ Speed1)
2. Head2 = Head1(Speed2/ Speed1)2
3. BKW2 = BKW1(Speed2/ Speed1)3
If Diameter of Impeller is to be trimmed then instead of
speed the same can be used in above formulas.
COMMERCIAL BUILDING SERVICES FLOW THINKING
0
50
100
150
200
250
300
350
400
450
50 100 150 200 250 300 350 400 450 500
Motor Horsepower
Annual
Operating
Cost
$1000
$0.10/kWh
Operating Cost
COMMERCIAL BUILDING SERVICES FLOW THINKING
Head
Flow
Pump
Curve
System
Curve
System Curve
as two way
valves close
Variable flow system
COMMERCIAL BUILDING SERVICES FLOW THINKING
Q
H
Pump
Curve
System Curve
at design flow
System Curve
at part load
Increased
head loss
Energy savings offset
COMMERCIAL BUILDING SERVICES FLOW THINKING
Head
Flow
Single
Pump
Pumps in
Parallel
System
Curve
Pumps in parallel
COMMERCIAL BUILDING SERVICES FLOW THINKING
Horsepower
%
100
90
80
70
60
50
40
30
20
10
00 10 20 30 40 50 60 70 80 90 100
Flow
%
Single Large Pump
Two Parallel
Pumps
Single Parallel
Pump
Parallel pumping power savings
COMMERCIAL BUILDING SERVICES FLOW THINKING
Theoretical Savings
COMMERCIAL BUILDING SERVICES FLOW THINKING
100 %
90 %
80 %
70 %
60 %
50%
40 %
30 %
80 %
85 %
80 %
70 %
60 %
50 %
85 %
% Speed Curves
Constant
Efficiency
Curve
% Efficiency
Head,
Feet
GPM
Establishing Efficiency Curves
COMMERCIAL BUILDING SERVICES FLOW THINKING
750
900 1150 1450 1770
600
900
1150
1450
1770
600
A
B
C
D
E
4500 gpm @ 100 FT, 85.9 %
Variable Speed Efficiencies
COMMERCIAL BUILDING SERVICES FLOW THINKING
“No Valve” System Curve
Flow
piping head
loss curve
Distribution
Pump
TDH
Overall
system curve
Head
80
60
40
20
110
0
200 400 600 800 1000 1200 1400 1600
0
100
Set Point
25 FT Differential Head
Maintained Across Load
(Set Point)
COMMERCIAL BUILDING SERVICES FLOW THINKING
Effect of Constant Set Point
piping head
loss curve
Distribution
Pump
TDH
Overall system curve
Head
80
60
40
20
110
0
200 400 600 800 1000 1200 1400 1600
0
Flow
100
Control curve
Set point,
25 FT
COMMERCIAL BUILDING SERVICES FLOW THINKING
100%
75%
50%
Flow
Head
Control
Curve
Variable
Head
Loss
∆P
P1 P2
Control curve
COMMERCIAL BUILDING SERVICES FLOW THINKING
Annual
Operating
Cost
($1000/year
@
$0.10/kwh)
50
45
40
35
30
25
20
15
10
05
00
1000 2000 3000 4000 5000
Total Equivalent Pipe Length
(feet)
Single C/S Pump, No Overheading
S
i
n
g
l
e
C
/
S
P
u
m
p
,
2
0
0
%
O
v
e
r
h
e
a
d
e
d
Variable Speed Pump
Large systems, long pipe runs
COMMERCIAL BUILDING SERVICES FLOW THINKING
Variable Head Loss Ratio
Percent
Design
BHP
% Flow
90
80
70
60
50
40
30
20
10
0 10 100
90
80
70
60
50
40
30
20
100
C/S, Constant Flow System Pump Head Matched to
System at Design Flow
C/S, Variable Flow
V/S, 0% Variable Hd Loss, 100% Constant ∆ Hd
V/S, 25% Variable Hd Loss, 75% Constant ∆ Hd
V/S, 50% Variable Hd Loss, 50% Constant ∆ Hd
V/S, 75% Variable Hd Loss, 25% Constant ∆ Hd
V/S, 100% Variable Hd Loss, 0% Constant ∆ Hd
Base
COMMERCIAL BUILDING SERVICES FLOW THINKING
Variable Head Ratio w/ Overheading
90
80
70
60
50
40
30
20
10
0 10 100
90
80
70
60
50
40
30
20
100
110
120
130
140
150
Base
Design
HP %
% Full Load
(Design) HP
Pump O’Headed by 150%
Constant Flow, C/S Pump
(3 Way Valve)
Constant Flow, C/S Pump
(3 Way Valve)
C/S Pump
(2 Way Valve)
Pump HD Matched
to System @
Design Flow
* 25/75 Means:
25 % Variable HD Loss
75 % Constant HD Loss
C/S Pump (2 Way Valve)
V/S, 100%
Constant HD
V/S, 25/75*
V/S, 50/50
V/S, 75/25
V/S, 100%
Variable HD
COMMERCIAL BUILDING SERVICES FLOW THINKING
Locations of Sensor
Where to install the Sensor?
What type of Sensor?
COMMERCIAL BUILDING SERVICES FLOW THINKING
Chillers
Primary Pumps
Secondary
Pumps
Load
Balancing Valve 2 – Way
Valve
Panel with
PLC & VFD`s
Air -
Separator
Common
Single Point Pressure
Sensing
Single Point Pressure Sensor
COMMERCIAL BUILDING SERVICES FLOW THINKING
Single Point Pressure Sensor
Is Single Point Pressure Sensor Correct?
Wrong !!
Why?
-Pump is a differential pressure device.
-A single point is only influence by pressure. This is good for booster only.
-In a closed loop system, system pressure rises due to thermal expansion,
pumps will slow down.
-When static pressure decrease, pumps will speed up.
-This is self-defeating since now the pump speed is not influence by the
system load changes, but rather by system water pressure.
-Therefore, single pressure sensor are a misapplication in a closed loop
HVAC system.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Chillers
Primary Pumps
Secondary
Pumps
Load
Balancing Valve 2 – Way
Valve
Panel with
PLC & VFD`s
Air -
Separator
Common
Primary - Secondary Circuit With Variable Speed
Secondary Pumps
DPT
Single Point Differential Pressure Sensor
COMMERCIAL BUILDING SERVICES FLOW THINKING
Opening/Closing of 2- Way Valve
-Signal from the sensor, installed at load
regulates the valve opening & closing.
-This way differential across 2-way valve also
changes & accordingly output signal is given to
PLC.
`
`
`
Temperature Sensor
Load
Output to PFU from DPT
2 Way Valve Control
Question:
Can we put the DPT across coil
alone?
Question:
Across the pumps?
COMMERCIAL BUILDING SERVICES FLOW THINKING
Primary - Secondary Circuit With Variable Speed
Secondary Pumps
Single Point Differential Pressure Sensor
To Maximize energy system, we must maximize the
variable head loss in the system. This is done by locating
the sensor at the most remote zone ( hydraulically) in the
system.
COMMERCIAL BUILDING SERVICES FLOW THINKING
piping head
loss curve
Distribution
Pump
TDH
Overall
system curve
Ft
Hd
80
60
40
20
110
0
200 400 600 800 1000 1200 1400 1600
0
Flow, gpm
100
Control curve
Set point,
25 FT
System Control Curve
COMMERCIAL BUILDING SERVICES FLOW THINKING
Variable vs Constant Head Loss
COMMERCIAL BUILDING SERVICES FLOW THINKING
The “Active Zone”
• Zone set points do not have to be the same.
• Pump controller scans all zones often, comparing process
variable to set point in each case.
• Pumps are controlled to satisfy the worst case.
• What happens to the rest of the zones?
COMMERCIAL BUILDING SERVICES FLOW THINKING
PFU
PMU
4 – 20 mA
Set Value
From Field
Sensor (DPT)
PFU – Pump Functional Unit
PMU – Pump Management Unit
Basic Concept
Output
To
VFD/Pump
COMMERCIAL BUILDING SERVICES FLOW THINKING
Chillers
Secondary
Pumps
Balancing Valve
DPT
DPT
Common
Panel with
PLC & VFD`s
Load
Different Sensor Signal To Common PFU Panel
Multi Point Differential Pressure Sensor
COMMERCIAL BUILDING SERVICES FLOW THINKING
PFU
PMU
Set Value
Multiple Process Signals
From Field Sensors
POSSIBILITY OF MULTIPLE PROCESS
SIGNALS FROM DIFFERENT ZONES
All zones can have different set values
Module
VFD
VFD
Multi Point Differential Pressure Sensor
COMMERCIAL BUILDING SERVICES FLOW THINKING
PFU
PMU
Set Value
Multiple Process Signals
From Field Sensors
POSSIBILITY OF MULTIPLE PROCESS
SIGNALS FROM DIFFERENT ZONES
All zones can have
different set values
Signal
Comparator
VFD
VFD
Multi Point Differential Pressure Sensor
Signal
Comparator
4 – 20 mA Sig
COMMERCIAL BUILDING SERVICES FLOW THINKING
HVAC Control System
DPT Signal Comparator
COMMERCIAL BUILDING SERVICES FLOW THINKING
HVAC Control System
DPT Signal Comparator
- High and Low Signal Selections
- Signal Averaging
- High/Low Limit Control
The module has the addition following features :
1) LED status indications
2) Accepts voltage or milliamp input signal
3) DIP switch-selectable operating modes
4) Accepts 24 VAC/DC power
COMMERCIAL BUILDING SERVICES FLOW THINKING
HVAC Control System
DPT Signal Comparator
Benefits
1) We are able to supply VFD systems with multiple inputs signals ranges to compete
with our competitors.
2) We are able to use Grundfos PFU 2000 as the main processor to control the full system
operations.
3) We will be minimising outsourcing or external controller in order to serve the HVAC
market.
4) The MM allows us to integrate into the system multiple sensor control at a more cost
effective price.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Other Types of
Systems
HVAC System
COMMERCIAL BUILDING SERVICES FLOW THINKING
Chillers
Primary Pumps
Balancing
Valve
Secondary
Pumps
Air -
Separator
Expansion
Tank
Load
Panel with
PLC & VFD`s
Common
DPT
2 – Way
Valve
DPT
Separate System for Each Zone
COMMERCIAL BUILDING SERVICES FLOW THINKING
Systems In Multi - Zones
Two options:
1. Separate Systems can be used for
different zones. So each zone will
have its own sensor.
2. Signal from different zone sensors is
given to the common PFU and most
deviated signal, from the set point, is
given as output.
Separate System for Each Zone
COMMERCIAL BUILDING SERVICES FLOW THINKING
Chillers
Primary Pumps
Balancing
Valve
Air -
Separator
Expansion
Tank
Load
Common
DPT
2 – Way
Valve
DPT
VFD pumps For Each Zone
E-pumps
E-pumps
Tertiary Pumping System
Secondary
Pump
COMMERCIAL BUILDING SERVICES FLOW THINKING
Reverse Return Pumping
Load
Air -
Separator
Chillers
Primary
Pumps
Secondary
Pumps
Balancing Valve
Panel with
PLC & VFD`s
Common DPT
COMMERCIAL BUILDING SERVICES FLOW THINKING
Reverse Return Pumping
Benefits :
1) Equalize the pressure drops of each zone.
2) Selections of the sensor becomes easier.
3) If load are similar or symmetrical, 1 centrally located sensor
is adequate.
4) As in direct return system, multiple sensor can still provide a
benefit to the end user.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Type of VFD Systems
COMMERCIAL BUILDING SERVICES FLOW THINKING
Possible Options of Variable Speed panels
Type ME - Multiple Pumps &
Multiple VFDs.
Type MF - Common VFD for Multiple
Pumps.
COMMERCIAL BUILDING SERVICES FLOW THINKING
Signal from Field
Sensor(s) (DPT)
Panel with
PFU & PMU
VFD - 1 VFD - 2
Secondary Pumps
System with Multi Pumps & Multi VFDs
COMMERCIAL BUILDING SERVICES FLOW THINKING
Signal from Field Sensor(s) (DPT)
VFD
Panel with
PFU & PMU
Secondary Pumps
System with Common VFD for All Pumps
COMMERCIAL BUILDING SERVICES FLOW THINKING
APPROVAL FROM INTERNATIONAL
AGENCIES
Approval from – CE, U/L
Conforms to - Electromagnetic compatibility
(89/336/EEC) to standard EN 50 081 – 1 and EN 50
082 – 2 and Electrical equipment design 73/23/EEC
standard to EN 60 204-1.
COMMERCIAL BUILDING SERVICES FLOW THINKING
PFU
PMU
Single PMU For Control of 8 Zones/Pumps
PFU
COMMERCIAL BUILDING SERVICES FLOW THINKING
PFU
PMU
Single PMU For Control of 8 Zones/Pumps
PFU
PFU PFU
The End

Contenu connexe

Similaire à chilled-water-system-presentation.pdf

A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 
Pumps for Process Industries
Pumps for Process IndustriesPumps for Process Industries
Pumps for Process IndustriesRanjeet Kumar
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Cb gf web in aug 2016, controls r2 8.23.16 final
Cb gf web in aug 2016, controls r2 8.23.16 finalCb gf web in aug 2016, controls r2 8.23.16 final
Cb gf web in aug 2016, controls r2 8.23.16 finallorenzo Monasca
 
Presentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptxPresentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptxKarthikSrinivasan94
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...Radha Krishna Sahoo
 
Pump and cooling tower energy performance
Pump and cooling tower energy performancePump and cooling tower energy performance
Pump and cooling tower energy performancemaulik610
 
Boiler feed and pump sizing c-b and grundfos july 2016(1)
Boiler feed and pump sizing   c-b and grundfos july 2016(1)Boiler feed and pump sizing   c-b and grundfos july 2016(1)
Boiler feed and pump sizing c-b and grundfos july 2016(1)lorenzo Monasca
 
Energy-Saving Designs for Existing Buildings
Energy-Saving Designs for Existing BuildingsEnergy-Saving Designs for Existing Buildings
Energy-Saving Designs for Existing BuildingsIllinois ASHRAE
 
Cold Water Supply Distribution In Building
Cold Water Supply Distribution In BuildingCold Water Supply Distribution In Building
Cold Water Supply Distribution In BuildingVan Heina
 
140919783-Cooling-Water-Basics.ppt
140919783-Cooling-Water-Basics.ppt140919783-Cooling-Water-Basics.ppt
140919783-Cooling-Water-Basics.pptArunkumar chandaran
 
Continuous Casting Forum-2015 - Copy (2)
Continuous Casting Forum-2015 - Copy (2)Continuous Casting Forum-2015 - Copy (2)
Continuous Casting Forum-2015 - Copy (2)Mohammed Albedour
 

Similaire à chilled-water-system-presentation.pdf (20)

Condensate system
Condensate systemCondensate system
Condensate system
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 
Pumps for Process Industries
Pumps for Process IndustriesPumps for Process Industries
Pumps for Process Industries
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
vdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.pptvdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.ppt
 
Cb gf web in aug 2016, controls r2 8.23.16 final
Cb gf web in aug 2016, controls r2 8.23.16 finalCb gf web in aug 2016, controls r2 8.23.16 final
Cb gf web in aug 2016, controls r2 8.23.16 final
 
Presentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptxPresentation 1 Training Slides.pptx
Presentation 1 Training Slides.pptx
 
INTRODUCING AQUAFAN
INTRODUCING AQUAFANINTRODUCING AQUAFAN
INTRODUCING AQUAFAN
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
 
Steam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvementSteam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvement
 
Pump and cooling tower energy performance
Pump and cooling tower energy performancePump and cooling tower energy performance
Pump and cooling tower energy performance
 
Boiler feed and pump sizing c-b and grundfos july 2016(1)
Boiler feed and pump sizing   c-b and grundfos july 2016(1)Boiler feed and pump sizing   c-b and grundfos july 2016(1)
Boiler feed and pump sizing c-b and grundfos july 2016(1)
 
Energy-Saving Designs for Existing Buildings
Energy-Saving Designs for Existing BuildingsEnergy-Saving Designs for Existing Buildings
Energy-Saving Designs for Existing Buildings
 
PH
PHPH
PH
 
Cold Water Supply Distribution In Building
Cold Water Supply Distribution In BuildingCold Water Supply Distribution In Building
Cold Water Supply Distribution In Building
 
Compressor
CompressorCompressor
Compressor
 
140919783-Cooling-Water-Basics.ppt
140919783-Cooling-Water-Basics.ppt140919783-Cooling-Water-Basics.ppt
140919783-Cooling-Water-Basics.ppt
 
Continuous Casting Forum-2015 - Copy (2)
Continuous Casting Forum-2015 - Copy (2)Continuous Casting Forum-2015 - Copy (2)
Continuous Casting Forum-2015 - Copy (2)
 
Machinery safety inspection
Machinery safety inspectionMachinery safety inspection
Machinery safety inspection
 
Chapter8
Chapter8Chapter8
Chapter8
 

Plus de bui thequan

InfiniBand in the Enterprise Data Center.pdf
InfiniBand in the Enterprise Data Center.pdfInfiniBand in the Enterprise Data Center.pdf
InfiniBand in the Enterprise Data Center.pdfbui thequan
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfbui thequan
 
2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf
2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf
2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdfbui thequan
 
Coolinside DTC Liquid Cooling Solution.pdf
Coolinside DTC Liquid Cooling Solution.pdfCoolinside DTC Liquid Cooling Solution.pdf
Coolinside DTC Liquid Cooling Solution.pdfbui thequan
 
(268) Total Thermal Solution - heat sink.pdf
(268) Total Thermal Solution - heat sink.pdf(268) Total Thermal Solution - heat sink.pdf
(268) Total Thermal Solution - heat sink.pdfbui thequan
 
an-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdf
an-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdfan-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdf
an-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdfbui thequan
 
dclc-r134a-968 detail.pdf
dclc-r134a-968 detail.pdfdclc-r134a-968 detail.pdf
dclc-r134a-968 detail.pdfbui thequan
 
ajeep_04a_energy_eficient_chiller - Mitsu.pdf
ajeep_04a_energy_eficient_chiller - Mitsu.pdfajeep_04a_energy_eficient_chiller - Mitsu.pdf
ajeep_04a_energy_eficient_chiller - Mitsu.pdfbui thequan
 
Performance Gain for Multiple Stage Centrifugal Compressor by usi.pdf
Performance Gain for Multiple Stage Centrifugal Compressor by usi.pdfPerformance Gain for Multiple Stage Centrifugal Compressor by usi.pdf
Performance Gain for Multiple Stage Centrifugal Compressor by usi.pdfbui thequan
 
Trane design chiller.pdf
Trane design chiller.pdfTrane design chiller.pdf
Trane design chiller.pdfbui thequan
 
multiple-chiller-system-design-and-control-trane-applications-engineering-man...
multiple-chiller-system-design-and-control-trane-applications-engineering-man...multiple-chiller-system-design-and-control-trane-applications-engineering-man...
multiple-chiller-system-design-and-control-trane-applications-engineering-man...bui thequan
 
399TGp_medical_light_ani.potx
399TGp_medical_light_ani.potx399TGp_medical_light_ani.potx
399TGp_medical_light_ani.potxbui thequan
 
29422920 overview-of-ng-sdh
29422920 overview-of-ng-sdh29422920 overview-of-ng-sdh
29422920 overview-of-ng-sdhbui thequan
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguidebui thequan
 
Cisco me4600 ont_rgw_user_manual_v3_2-4
Cisco me4600 ont_rgw_user_manual_v3_2-4Cisco me4600 ont_rgw_user_manual_v3_2-4
Cisco me4600 ont_rgw_user_manual_v3_2-4bui thequan
 
Wccp introduction final2
Wccp introduction final2Wccp introduction final2
Wccp introduction final2bui thequan
 
Qwilt transparent caching-6keyfactors
Qwilt transparent caching-6keyfactorsQwilt transparent caching-6keyfactors
Qwilt transparent caching-6keyfactorsbui thequan
 

Plus de bui thequan (20)

InfiniBand in the Enterprise Data Center.pdf
InfiniBand in the Enterprise Data Center.pdfInfiniBand in the Enterprise Data Center.pdf
InfiniBand in the Enterprise Data Center.pdf
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdf
 
2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf
2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf
2.01_Nvidia_NVswitch_HotChips2018_DGX2NVS_Final.pdf
 
Coolinside DTC Liquid Cooling Solution.pdf
Coolinside DTC Liquid Cooling Solution.pdfCoolinside DTC Liquid Cooling Solution.pdf
Coolinside DTC Liquid Cooling Solution.pdf
 
(268) Total Thermal Solution - heat sink.pdf
(268) Total Thermal Solution - heat sink.pdf(268) Total Thermal Solution - heat sink.pdf
(268) Total Thermal Solution - heat sink.pdf
 
6 - Oracle.pdf
6 - Oracle.pdf6 - Oracle.pdf
6 - Oracle.pdf
 
an-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdf
an-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdfan-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdf
an-advanced-liquid-cooling-design-for-data-center-final-v3-1-pdf.pdf
 
dclc-r134a-968 detail.pdf
dclc-r134a-968 detail.pdfdclc-r134a-968 detail.pdf
dclc-r134a-968 detail.pdf
 
ajeep_04a_energy_eficient_chiller - Mitsu.pdf
ajeep_04a_energy_eficient_chiller - Mitsu.pdfajeep_04a_energy_eficient_chiller - Mitsu.pdf
ajeep_04a_energy_eficient_chiller - Mitsu.pdf
 
Performance Gain for Multiple Stage Centrifugal Compressor by usi.pdf
Performance Gain for Multiple Stage Centrifugal Compressor by usi.pdfPerformance Gain for Multiple Stage Centrifugal Compressor by usi.pdf
Performance Gain for Multiple Stage Centrifugal Compressor by usi.pdf
 
Trane design chiller.pdf
Trane design chiller.pdfTrane design chiller.pdf
Trane design chiller.pdf
 
multiple-chiller-system-design-and-control-trane-applications-engineering-man...
multiple-chiller-system-design-and-control-trane-applications-engineering-man...multiple-chiller-system-design-and-control-trane-applications-engineering-man...
multiple-chiller-system-design-and-control-trane-applications-engineering-man...
 
399TGp_medical_light_ani.potx
399TGp_medical_light_ani.potx399TGp_medical_light_ani.potx
399TGp_medical_light_ani.potx
 
29422920 overview-of-ng-sdh
29422920 overview-of-ng-sdh29422920 overview-of-ng-sdh
29422920 overview-of-ng-sdh
 
20407473 ospf
20407473 ospf20407473 ospf
20407473 ospf
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguide
 
Cisco me4600 ont_rgw_user_manual_v3_2-4
Cisco me4600 ont_rgw_user_manual_v3_2-4Cisco me4600 ont_rgw_user_manual_v3_2-4
Cisco me4600 ont_rgw_user_manual_v3_2-4
 
Wccp introduction final2
Wccp introduction final2Wccp introduction final2
Wccp introduction final2
 
Qwilt transparent caching-6keyfactors
Qwilt transparent caching-6keyfactorsQwilt transparent caching-6keyfactors
Qwilt transparent caching-6keyfactors
 
Guide otn ang
Guide otn angGuide otn ang
Guide otn ang
 

Dernier

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 

Dernier (20)

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

chilled-water-system-presentation.pdf

  • 1. COMMERCIAL BUILDING SERVICES FLOW THINKING Chilled Water System Presentation
  • 2. COMMERCIAL BUILDING SERVICES FLOW THINKING Constant Volume Distribution Constant Volume Distribution
  • 3. COMMERCIAL BUILDING SERVICES FLOW THINKING Air-conditioning System Components
  • 4. COMMERCIAL BUILDING SERVICES FLOW THINKING Constant Volume System Components
  • 5. COMMERCIAL BUILDING SERVICES FLOW THINKING Typical 3-way Valve Zone
  • 6. COMMERCIAL BUILDING SERVICES FLOW THINKING Full Load Condition
  • 7. COMMERCIAL BUILDING SERVICES FLOW THINKING Fully Loaded Coil • Supply water temperature 45°F • Design return water temp. 55°F • Coil design flow 100 GPM • Coil design pressure drop 20 FT • Load (flow x 10°F∆ x 500) 500,000 Btuh • Coil ∆P @ design flow 20 FT • Bypass flow 0 GPM • Bypass ∆P 3-way valve closed • 3-way valve pressure drop 10 FT • Pump flow and head 100 GPM @ 30 FT • Actual return water temp 55 °F
  • 8. COMMERCIAL BUILDING SERVICES FLOW THINKING Unloaded Condition
  • 9. COMMERCIAL BUILDING SERVICES FLOW THINKING Unloaded Coil • Supply water temperature 45°F • Design return water temp. 55°F • Coil design flow 0 GPM • Coil design pressure drop 3-way valve closed • Load (flow x 10°F∆ x 500) 0.0 Btuh • Coil ∆P @ design flow 0 FT • Bypass flow 100 GPM • Bypass ∆P 20 FT • 3-way valve pressure drop 10 FT • Pump flow and head 100 GPM @ 30 FT • Actual return water temp 45 °F
  • 10. COMMERCIAL BUILDING SERVICES FLOW THINKING So What? • When the load on the coil is zero, the valve is returning “unused” chilled water at essentially supply temperature. • Cold return water “unloads” the chillers, causing them to operate inefficiently.
  • 11. COMMERCIAL BUILDING SERVICES FLOW THINKING Part Load Condition
  • 12. COMMERCIAL BUILDING SERVICES FLOW THINKING Partially Loaded Coil • Supply water temperature 45°F • Design return water temp. 55°F • Coil design flow 50 GPM • Coil design pressure drop 20 FT • Load (flow x 10°F∆ x 500) 250,000 Btuh • Coil ∆P @ design flow 5 FT • Bypass flow ??? GPM • Bypass ∆P 3-way partially closed • 3-way valve pressure drop 10 FT • Pump flow and head ??? GPM @ 30 FT • Actual return water temp ?? °F
  • 13. COMMERCIAL BUILDING SERVICES FLOW THINKING 125 100 75 50 25 0 % Valve Stroke 25 50 75 100 % Flow 1/2 Through Coil 1/2 Through Bypass Full Flow Through Coil Full Flow Through Bypass 3-way Valve Characteristic
  • 14. COMMERCIAL BUILDING SERVICES FLOW THINKING What’s Really Happening?
  • 15. COMMERCIAL BUILDING SERVICES FLOW THINKING Coil with 3-way Valve at Mid-position • Supply water temperature 45 °F • Design return water temp. 55 °F • Load (flow x 10°F∆ x 500) 250,000 Btuh • Coil design pressure drop 20 FT • Coil flow 62.5 GPM • Coil ∆P @ 62.5% flow 7.8 FT • Coil leaving water temp 53 °F • Bypass flow 62.5 GPM • Bypass ∆P 7.8 FT • 3-way valve pressure drop 10 FT • Pump flow and head 125 GPM @ 30 FT • Actual return water temp 49 °F (62.5 GPM @ 53 °F+ 62.5 GPM @ 45 °F)
  • 16. COMMERCIAL BUILDING SERVICES FLOW THINKING Head2 = Head1(Flow2/ Flow1)2 Head2 = 20(.625/1)2 Head2 = 20(.3906 ) Head2 = 7.8
  • 17. COMMERCIAL BUILDING SERVICES FLOW THINKING ∆T = Load/ Flow X 500 ∆T = 250,000/62.5 X 500 ∆T = 8 Therefore, LWTcoil = 45 + 8 = 53
  • 18. COMMERCIAL BUILDING SERVICES FLOW THINKING RWT = (Flow1 X EWT + Flow2 X LWT)/ Flow1 + 2 RWT = (62.5 X 45 + 62.5 X 53)/125 RWT = 49
  • 19. COMMERCIAL BUILDING SERVICES FLOW THINKING 3-way Valve in Mid Position
  • 20. COMMERCIAL BUILDING SERVICES FLOW THINKING 1.Low return water temperatures. 2.Robs chilled water from other coils at part load conditions. 3.Increases flow in primary piping. 4.Adds additional chillers on line. 5.Chiller performance is reduced. 3-way Valve System Deficiencies
  • 21. COMMERCIAL BUILDING SERVICES FLOW THINKING 1.1 20 30 40 50 60 70 80 90 100 10 1.0 0.9 0.8 0.7 0.6 0.5 KW per Ton Percent Load Chiller Performance Curve
  • 22. COMMERCIAL BUILDING SERVICES FLOW THINKING Pump Sizing • Select for full chiller flow • Head must be adequate for: – Chiller evaporator – Longest circuit – Coil – Three way valve – Air separator
  • 23. COMMERCIAL BUILDING SERVICES FLOW THINKING System Configuration Constant Volume
  • 26. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary – Secondary System Primary – Includes Chillers & Primary Pump. Circuit Constant water flow through the chiller is maintained and chilled water is produced Secondary – Chilled water is circulated to the Circuit demand area (load) by using Secondary pumps. Variable Volume Constant Speed
  • 27. COMMERCIAL BUILDING SERVICES FLOW THINKING PRIMARY - SECONDARY
  • 28. COMMERCIAL BUILDING SERVICES FLOW THINKING Other Famous Names of Primary- Secondary Primary – Production Loop Secondary – Distribution Loop
  • 29. COMMERCIAL BUILDING SERVICES FLOW THINKING Fundamental Idea
  • 30. COMMERCIAL BUILDING SERVICES FLOW THINKING No Secondary Flow
  • 31. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary = Secondary
  • 32. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary > Secondary
  • 33. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary < Secondary
  • 34. COMMERCIAL BUILDING SERVICES FLOW THINKING Control Valve in Secondary
  • 35. COMMERCIAL BUILDING SERVICES FLOW THINKING • Use the flow of the largest chiller – Chiller staging at half of this flow is common • Head loss in common <1 1/2 ft – Distribution pipe size is often used where reductions would be inconvenient • Three pipe diameters between tees – Excessive length increases total head loss • Low velocities in system piping Common Pipe Design Criteria
  • 36. COMMERCIAL BUILDING SERVICES FLOW THINKING Variable flow through coil Constant flow through system Three Way Valve Variable flow through coil Variable flow through system Two Way Valve Control Valve in Secondary
  • 37. COMMERCIAL BUILDING SERVICES FLOW THINKING PRIMARY – SECONDARY CIRCUIT Variable Volume Constant Speed
  • 38. COMMERCIAL BUILDING SERVICES FLOW THINKING Head F1 F2 F3 H1 H2 H3 Flow Control Valves Change the Secondary System Curve
  • 39. COMMERCIAL BUILDING SERVICES FLOW THINKING % Flow 125 100 75 50 25 150 25 50 75 100 HD Varying differential pressure absorbed by control valve System resistance TDH of pump Pump curve Head Absorbed by 2-way Valves
  • 40. COMMERCIAL BUILDING SERVICES FLOW THINKING HP 125 100 75 50 25 150 25 50 75 100 % Design Flow Primary Pumps = V/V Secondary Pumps + Constant Flow Primary Pumps, only Pump Horsepower Comparison
  • 41. COMMERCIAL BUILDING SERVICES FLOW THINKING % Flow 90 80 70 60 50 40 30 20 10 0 10 100 90 80 70 60 50 40 30 20 100 110 120 130 140 150 Base Design HP % % Full Load (Design) HP Pump Over-haded by 150% Constant Flow, C/S Pump (3 Way Valve) Constant Flow, C/S Pump (3 Way Valve) C/S Pump (2 Way Valve) Pump HD Matched to System @ Design Flow C/S Pump (2 W ay Valve) Constant vs Variable Volume
  • 43. Step Function of Chillers
  • 44. COMMERCIAL BUILDING SERVICES FLOW THINKING Production = Distribution
  • 45. COMMERCIAL BUILDING SERVICES FLOW THINKING Distribution > Production
  • 46. COMMERCIAL BUILDING SERVICES FLOW THINKING Production > Distribution
  • 47. COMMERCIAL BUILDING SERVICES FLOW THINKING “Loading” a Chiller • A chiller is a heat transfer device. Like most equipment, it is most efficient at full load. • To “load” a chiller means: – Supply it with its rated flow of water – Insure that water is warm enough to permit removal of rated Btu without freezing the water
  • 48. COMMERCIAL BUILDING SERVICES FLOW THINKING Chiller Performance Curve 1.1 20 30 40 50 60 70 80 90 100 10 1.0 0.9 0.8 0.7 0.6 0.5 KW per Ton Percent Load
  • 49. COMMERCIAL BUILDING SERVICES FLOW THINKING Check Valve in Common?
  • 50. COMMERCIAL BUILDING SERVICES FLOW THINKING What can we do?
  • 51. COMMERCIAL BUILDING SERVICES FLOW THINKING What else can we do? Reset Supply Temperature • Lower chiller set point when mixing occurs to maintain a constant temperature to the system. • Expect increases in cost of chiller operation at lower set point: 1-3% per degree of reset. • Delays start of the next chiller.
  • 52. COMMERCIAL BUILDING SERVICES FLOW THINKING What else can we do? • Coils that are selected at higher supply temperatures will not be impaired by small changes. • Loads that require fixed temperatures may use a small chiller to reverse the effects of mixing.
  • 53. COMMERCIAL BUILDING SERVICES FLOW THINKING Multiple Chillers
  • 54. COMMERCIAL BUILDING SERVICES FLOW THINKING 60/40 Chiller Split to Help Minimize Low Part Load Operation
  • 55. COMMERCIAL BUILDING SERVICES FLOW THINKING 0-10 30-40 60-70 90-100 0 5 10 15 20 25 30 0-10 30-40 60-70 90-100 % Time % Load Typical Load Profile
  • 56. COMMERCIAL BUILDING SERVICES FLOW THINKING Three Unequally Sized Chillers
  • 57. COMMERCIAL BUILDING SERVICES FLOW THINKING % Load Time Approaching Flow = Load
  • 59. COMMERCIAL BUILDING SERVICES FLOW THINKING Two Pipe Direct Return
  • 60. COMMERCIAL BUILDING SERVICES FLOW THINKING Two Pipe Reverse Return
  • 61. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary Pumping. • Simplest to install. • Simplest to operate. • Flexible in design for present and future. • Efficient to operate. • May over-pressurize near zones.
  • 62. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary-Tertiary
  • 63. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary-Tertiary Pumping. • Best piping flexibility. • Best expansion flexibility. • Provides hydraulic decoupling. • Efficient to operate. • May require added horsepower. • Requires additional pumps and piping. • Increased controls complexity.
  • 64. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary-Tertiary Hybrid
  • 65. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary-Tertiary Hybrid Pumping. • Low present horsepower. • Low future horsepower. • Good piping flexibility. • Good expansion flexibility. • Provides hydraulic decoupling. • May require added horsepower • Requires additional pumps and piping. • Increased controls complexity.
  • 66. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary Zone Pumping
  • 67. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary-Secondary Zone Pumping. • Low ‘built out’ horsepower. • Low system head. • Increased control complexity. • Present horsepower total higher due to future needs. • Present pumps sized for future requirements. • Difficult to apply in retrofits projects.
  • 70. COMMERCIAL BUILDING SERVICES FLOW THINKING Why Do We Need Variable Speed Secondary Pumps ??? •For Energy Saving…. •For better & optimise operation….
  • 71. COMMERCIAL BUILDING SERVICES FLOW THINKING How Do We Achieve This Reduction In Power Consumption ?? By Using Variable Frequency Drive and Logic controller with the Secondary Pumps….
  • 72. COMMERCIAL BUILDING SERVICES FLOW THINKING Power Comparison at Reduced Speed
  • 73. COMMERCIAL BUILDING SERVICES FLOW THINKING Basic Law which helps in achieving this – Affinity law 1. Flow2 = Flow1(Speed2/ Speed1) 2. Head2 = Head1(Speed2/ Speed1)2 3. BKW2 = BKW1(Speed2/ Speed1)3 If Diameter of Impeller is to be trimmed then instead of speed the same can be used in above formulas.
  • 74. COMMERCIAL BUILDING SERVICES FLOW THINKING 0 50 100 150 200 250 300 350 400 450 50 100 150 200 250 300 350 400 450 500 Motor Horsepower Annual Operating Cost $1000 $0.10/kWh Operating Cost
  • 75. COMMERCIAL BUILDING SERVICES FLOW THINKING Head Flow Pump Curve System Curve System Curve as two way valves close Variable flow system
  • 76. COMMERCIAL BUILDING SERVICES FLOW THINKING Q H Pump Curve System Curve at design flow System Curve at part load Increased head loss Energy savings offset
  • 77. COMMERCIAL BUILDING SERVICES FLOW THINKING Head Flow Single Pump Pumps in Parallel System Curve Pumps in parallel
  • 78. COMMERCIAL BUILDING SERVICES FLOW THINKING Horsepower % 100 90 80 70 60 50 40 30 20 10 00 10 20 30 40 50 60 70 80 90 100 Flow % Single Large Pump Two Parallel Pumps Single Parallel Pump Parallel pumping power savings
  • 79. COMMERCIAL BUILDING SERVICES FLOW THINKING Theoretical Savings
  • 80. COMMERCIAL BUILDING SERVICES FLOW THINKING 100 % 90 % 80 % 70 % 60 % 50% 40 % 30 % 80 % 85 % 80 % 70 % 60 % 50 % 85 % % Speed Curves Constant Efficiency Curve % Efficiency Head, Feet GPM Establishing Efficiency Curves
  • 81. COMMERCIAL BUILDING SERVICES FLOW THINKING 750 900 1150 1450 1770 600 900 1150 1450 1770 600 A B C D E 4500 gpm @ 100 FT, 85.9 % Variable Speed Efficiencies
  • 82. COMMERCIAL BUILDING SERVICES FLOW THINKING “No Valve” System Curve Flow piping head loss curve Distribution Pump TDH Overall system curve Head 80 60 40 20 110 0 200 400 600 800 1000 1200 1400 1600 0 100 Set Point 25 FT Differential Head Maintained Across Load (Set Point)
  • 83. COMMERCIAL BUILDING SERVICES FLOW THINKING Effect of Constant Set Point piping head loss curve Distribution Pump TDH Overall system curve Head 80 60 40 20 110 0 200 400 600 800 1000 1200 1400 1600 0 Flow 100 Control curve Set point, 25 FT
  • 84. COMMERCIAL BUILDING SERVICES FLOW THINKING 100% 75% 50% Flow Head Control Curve Variable Head Loss ∆P P1 P2 Control curve
  • 85. COMMERCIAL BUILDING SERVICES FLOW THINKING Annual Operating Cost ($1000/year @ $0.10/kwh) 50 45 40 35 30 25 20 15 10 05 00 1000 2000 3000 4000 5000 Total Equivalent Pipe Length (feet) Single C/S Pump, No Overheading S i n g l e C / S P u m p , 2 0 0 % O v e r h e a d e d Variable Speed Pump Large systems, long pipe runs
  • 86. COMMERCIAL BUILDING SERVICES FLOW THINKING Variable Head Loss Ratio Percent Design BHP % Flow 90 80 70 60 50 40 30 20 10 0 10 100 90 80 70 60 50 40 30 20 100 C/S, Constant Flow System Pump Head Matched to System at Design Flow C/S, Variable Flow V/S, 0% Variable Hd Loss, 100% Constant ∆ Hd V/S, 25% Variable Hd Loss, 75% Constant ∆ Hd V/S, 50% Variable Hd Loss, 50% Constant ∆ Hd V/S, 75% Variable Hd Loss, 25% Constant ∆ Hd V/S, 100% Variable Hd Loss, 0% Constant ∆ Hd Base
  • 87. COMMERCIAL BUILDING SERVICES FLOW THINKING Variable Head Ratio w/ Overheading 90 80 70 60 50 40 30 20 10 0 10 100 90 80 70 60 50 40 30 20 100 110 120 130 140 150 Base Design HP % % Full Load (Design) HP Pump O’Headed by 150% Constant Flow, C/S Pump (3 Way Valve) Constant Flow, C/S Pump (3 Way Valve) C/S Pump (2 Way Valve) Pump HD Matched to System @ Design Flow * 25/75 Means: 25 % Variable HD Loss 75 % Constant HD Loss C/S Pump (2 Way Valve) V/S, 100% Constant HD V/S, 25/75* V/S, 50/50 V/S, 75/25 V/S, 100% Variable HD
  • 88. COMMERCIAL BUILDING SERVICES FLOW THINKING Locations of Sensor Where to install the Sensor? What type of Sensor?
  • 89. COMMERCIAL BUILDING SERVICES FLOW THINKING Chillers Primary Pumps Secondary Pumps Load Balancing Valve 2 – Way Valve Panel with PLC & VFD`s Air - Separator Common Single Point Pressure Sensing Single Point Pressure Sensor
  • 90. COMMERCIAL BUILDING SERVICES FLOW THINKING Single Point Pressure Sensor Is Single Point Pressure Sensor Correct? Wrong !! Why? -Pump is a differential pressure device. -A single point is only influence by pressure. This is good for booster only. -In a closed loop system, system pressure rises due to thermal expansion, pumps will slow down. -When static pressure decrease, pumps will speed up. -This is self-defeating since now the pump speed is not influence by the system load changes, but rather by system water pressure. -Therefore, single pressure sensor are a misapplication in a closed loop HVAC system.
  • 91. COMMERCIAL BUILDING SERVICES FLOW THINKING Chillers Primary Pumps Secondary Pumps Load Balancing Valve 2 – Way Valve Panel with PLC & VFD`s Air - Separator Common Primary - Secondary Circuit With Variable Speed Secondary Pumps DPT Single Point Differential Pressure Sensor
  • 92. COMMERCIAL BUILDING SERVICES FLOW THINKING Opening/Closing of 2- Way Valve -Signal from the sensor, installed at load regulates the valve opening & closing. -This way differential across 2-way valve also changes & accordingly output signal is given to PLC. ` ` ` Temperature Sensor Load Output to PFU from DPT 2 Way Valve Control
  • 93. Question: Can we put the DPT across coil alone?
  • 95. COMMERCIAL BUILDING SERVICES FLOW THINKING Primary - Secondary Circuit With Variable Speed Secondary Pumps Single Point Differential Pressure Sensor To Maximize energy system, we must maximize the variable head loss in the system. This is done by locating the sensor at the most remote zone ( hydraulically) in the system.
  • 96. COMMERCIAL BUILDING SERVICES FLOW THINKING piping head loss curve Distribution Pump TDH Overall system curve Ft Hd 80 60 40 20 110 0 200 400 600 800 1000 1200 1400 1600 0 Flow, gpm 100 Control curve Set point, 25 FT System Control Curve
  • 97. COMMERCIAL BUILDING SERVICES FLOW THINKING Variable vs Constant Head Loss
  • 98. COMMERCIAL BUILDING SERVICES FLOW THINKING The “Active Zone” • Zone set points do not have to be the same. • Pump controller scans all zones often, comparing process variable to set point in each case. • Pumps are controlled to satisfy the worst case. • What happens to the rest of the zones?
  • 99. COMMERCIAL BUILDING SERVICES FLOW THINKING PFU PMU 4 – 20 mA Set Value From Field Sensor (DPT) PFU – Pump Functional Unit PMU – Pump Management Unit Basic Concept Output To VFD/Pump
  • 100. COMMERCIAL BUILDING SERVICES FLOW THINKING Chillers Secondary Pumps Balancing Valve DPT DPT Common Panel with PLC & VFD`s Load Different Sensor Signal To Common PFU Panel Multi Point Differential Pressure Sensor
  • 101. COMMERCIAL BUILDING SERVICES FLOW THINKING PFU PMU Set Value Multiple Process Signals From Field Sensors POSSIBILITY OF MULTIPLE PROCESS SIGNALS FROM DIFFERENT ZONES All zones can have different set values Module VFD VFD Multi Point Differential Pressure Sensor
  • 102. COMMERCIAL BUILDING SERVICES FLOW THINKING PFU PMU Set Value Multiple Process Signals From Field Sensors POSSIBILITY OF MULTIPLE PROCESS SIGNALS FROM DIFFERENT ZONES All zones can have different set values Signal Comparator VFD VFD Multi Point Differential Pressure Sensor Signal Comparator 4 – 20 mA Sig
  • 103. COMMERCIAL BUILDING SERVICES FLOW THINKING HVAC Control System DPT Signal Comparator
  • 104. COMMERCIAL BUILDING SERVICES FLOW THINKING HVAC Control System DPT Signal Comparator - High and Low Signal Selections - Signal Averaging - High/Low Limit Control The module has the addition following features : 1) LED status indications 2) Accepts voltage or milliamp input signal 3) DIP switch-selectable operating modes 4) Accepts 24 VAC/DC power
  • 105. COMMERCIAL BUILDING SERVICES FLOW THINKING HVAC Control System DPT Signal Comparator Benefits 1) We are able to supply VFD systems with multiple inputs signals ranges to compete with our competitors. 2) We are able to use Grundfos PFU 2000 as the main processor to control the full system operations. 3) We will be minimising outsourcing or external controller in order to serve the HVAC market. 4) The MM allows us to integrate into the system multiple sensor control at a more cost effective price.
  • 106. COMMERCIAL BUILDING SERVICES FLOW THINKING Other Types of Systems HVAC System
  • 107. COMMERCIAL BUILDING SERVICES FLOW THINKING Chillers Primary Pumps Balancing Valve Secondary Pumps Air - Separator Expansion Tank Load Panel with PLC & VFD`s Common DPT 2 – Way Valve DPT Separate System for Each Zone
  • 108. COMMERCIAL BUILDING SERVICES FLOW THINKING Systems In Multi - Zones Two options: 1. Separate Systems can be used for different zones. So each zone will have its own sensor. 2. Signal from different zone sensors is given to the common PFU and most deviated signal, from the set point, is given as output. Separate System for Each Zone
  • 109. COMMERCIAL BUILDING SERVICES FLOW THINKING Chillers Primary Pumps Balancing Valve Air - Separator Expansion Tank Load Common DPT 2 – Way Valve DPT VFD pumps For Each Zone E-pumps E-pumps Tertiary Pumping System Secondary Pump
  • 110. COMMERCIAL BUILDING SERVICES FLOW THINKING Reverse Return Pumping Load Air - Separator Chillers Primary Pumps Secondary Pumps Balancing Valve Panel with PLC & VFD`s Common DPT
  • 111. COMMERCIAL BUILDING SERVICES FLOW THINKING Reverse Return Pumping Benefits : 1) Equalize the pressure drops of each zone. 2) Selections of the sensor becomes easier. 3) If load are similar or symmetrical, 1 centrally located sensor is adequate. 4) As in direct return system, multiple sensor can still provide a benefit to the end user.
  • 112. COMMERCIAL BUILDING SERVICES FLOW THINKING Type of VFD Systems
  • 113. COMMERCIAL BUILDING SERVICES FLOW THINKING Possible Options of Variable Speed panels Type ME - Multiple Pumps & Multiple VFDs. Type MF - Common VFD for Multiple Pumps.
  • 114. COMMERCIAL BUILDING SERVICES FLOW THINKING Signal from Field Sensor(s) (DPT) Panel with PFU & PMU VFD - 1 VFD - 2 Secondary Pumps System with Multi Pumps & Multi VFDs
  • 115. COMMERCIAL BUILDING SERVICES FLOW THINKING Signal from Field Sensor(s) (DPT) VFD Panel with PFU & PMU Secondary Pumps System with Common VFD for All Pumps
  • 116. COMMERCIAL BUILDING SERVICES FLOW THINKING APPROVAL FROM INTERNATIONAL AGENCIES Approval from – CE, U/L Conforms to - Electromagnetic compatibility (89/336/EEC) to standard EN 50 081 – 1 and EN 50 082 – 2 and Electrical equipment design 73/23/EEC standard to EN 60 204-1.
  • 117. COMMERCIAL BUILDING SERVICES FLOW THINKING PFU PMU Single PMU For Control of 8 Zones/Pumps PFU
  • 118. COMMERCIAL BUILDING SERVICES FLOW THINKING PFU PMU Single PMU For Control of 8 Zones/Pumps PFU PFU PFU