RAILWAY TO GREENWAY Carl AndersonKelly LovalloBarbara Summers CENG 491 Final Presentation DANA 116 Thursday April 28, 2011 6:55pm
RAILWAY TO GREENWAY Inspiration for the Project High Line Project, Manhattan, NY  1.45 mile greenway built on built on a former elevated freight railroad
RAILWAY TO GREENWAY Location London, UK Borough of Harrow
RAILWAY TO GREENWAY Feasibility Study Two Potential Sites Analyzed Parkland Walk South and the Belmont Trail Why the Belmont Trail? Potential for development Support from local government and community Existing  Site Access
Project Scope and Assumptions Scope Geometric Design Pervious Pavement  Community Center Assumptions US standards and regulations Specific site conditions of Lewisburg due to availability RAILWAY TO GREENWAY
RAILWAY TO GREENWAY Existing Conditions of Site Narrow Dirt path 1.07 miles  Approx. walk-able width 10-15 ft Actual boundaries 10-85 ft Largely residential area
RAILWAY TO GREENWAY Plan View of Existing Belmont Trail
RAILWAY TO GREENWAY Existing Conditions Cont. Kenton Lane Underpass to  Parking Lot Paved Section near Dobbin Close
RAILWAY TO GREENWAY AutoCAD Civil 3D Overview Why Civil 3D? Ordnance Survey Maps were Inadequate Topographic capabilities through Google Earth Help Guide Design Verify Geometric Calculations
RAILWAY TO GREENWAY Geometric Design Overview Split into 3 Separate Sections Christchurch Ave. to Dobbin Close (3300 ft.) Kenton Lane Tunnel to Parking Lot Trailhead (430 ft.) Parking Lot Trailhead to Vernon Dr. (1070 ft.) General Assumptions Design Speed, V = 20 mph Lean Angle, θ = 15° Bicyclist Eye Height = 4’ 6” External Object Height= 0’ 0” AASHTO 1999 Guide  for the Development  of Bicycle Facilities
RAILWAY TO GREENWAY Vertical Curve Design Goals Maintain Access Point Elevations Minimize Grades Limit Cut and Fill Criteria By Point of Vertical Intersection Stopping Sight Distance Sag vs. Crest Curves 1% ≤ Grade ≤ 5%  Section 1: STA 2+00 to STA 17+00
RAILWAY TO GREENWAY Stopping Sight Distance Forf = 0.25 and V=20 mph: Could Estimate Lmin 119.52’ < S <136.62’ ± dependent on grade
RAILWAY TO GREENWAY Minimum Curve Length ForS > L: ForS < L: Assume S > L In reality, L > S Curve Lengths ranged from 20’ to 114’
RAILWAY TO GREENWAY Horizontal Curve Design Goals Curve Smoothing Minimize Curve Radii Avoid Lateral Obstructions Criteria By Point of Curvature Curve Radius Lateral Clearance Superelevation Curve 9  PCSTA: 14+96.63 L=13.26’ R=100’ M=18.41’ Curve 11  PCSTA: 18+51.78 L=4.46’ R=100’ M=18.64’ Curve 10  PCSTA: 15+62.64 L=3.46’ R=100’ M=20.09’ Section 1: STA 14+60 to STA 19+00
RAILWAY TO GREENWAY Minimum Curve Radius Forθ = 15° and V=20 mph: Whenθ  approaches 20° : Casual rider assumptions All horizontal curves used minimum radius
RAILWAY TO GREENWAY Plan View of  Section One ,[object Object],16 Horizontal Curves 1.19’< L < 15.88’
RAILWAY TO GREENWAY Minimum Lateral Clearance Values of M ranged from 18.41’ to 18.81’ Absolute Minimum from AASHTO is 3’
RAILWAY TO GREENWAY Plan View of  Sections Two and Three ,[object Object]
Existing Parking Lot
Residential
New Community Center4 Horizontal Curves (Section 2) 6.22’< L < 38.54’
RAILWAY TO GREENWAY Superelevation emax= 3%  due to ADA regulations Minimum transition distance of 7.5’ for consecutive curves Cut and Fill
RAILWAY TO GREENWAY Grading Aesthetic Contouring Ensure proper drainage of  stormwater runoff
RAILWAY TO GREENWAY Pavement Design Porous Asphalt Pavement Asphalt made up of coarse aggregate allowing for infiltration  Reservoir and filter coarses for additional storage  Environmental Benefits Increased initial infiltration Decreased runoff, in volume and velocity
RAILWAY TO GREENWAY Drainage Satisfied by Porous Asphalt Minimum 1% slope .5 in/hr infiltration rate equivalent to 24 hour capacity of 12 in (25-year storm) NCRS soil group B .52-1.07 in/hr infiltration rate
RAILWAY TO GREENWAY Community Center Overview ***CAD screenshot Small Timber-Frame Building Vehicle Parking and Driveway Green Roof Bike Park
RAILWAY TO GREENWAY
RAILWAY TO GREENWAY Building Floor Plan 2 Offices Conference Room Info Desk 2 Restrooms Mechanical Room Open Foyer
RAILWAY TO GREENWAY Site Layout and Traffic Plan Lewisburg, PA Zoning Ordinances Boundary set-backs Parking/driveway regulations AASHTO Geometric Design of Highways and Streets Required turning radius for driveway
RAILWAY TO GREENWAY Green Roof 1% Slope to prevent pooling Reduces runoff and energy consumption Filters surrounding air Provides habitat for native species
RAILWAY TO GREENWAY Roof and Framing ASTM E 2391: Standard Practice for Determination of Dead Loads and Live Loads Associated with Green Roof Systems National Design Specification for Wood Construction  4” x 12” Joists @ 16” O.C.
RAILWAY TO GREENWAY
RAILWAY TO GREENWAY Cost Estimate

Contenu connexe

Tendances

Flood susceptibility for the kennebecasis watershed
Flood susceptibility for the kennebecasis watershedFlood susceptibility for the kennebecasis watershed
Flood susceptibility for the kennebecasis watershedCOGS Presentations
 
High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...
High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...
High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...John Fontana
 
Analysis of Stormwater System for Urban Development Project in North Louisiana
Analysis of Stormwater System for Urban Development Project in North LouisianaAnalysis of Stormwater System for Urban Development Project in North Louisiana
Analysis of Stormwater System for Urban Development Project in North LouisianaBrian Elkins
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816Adina Levin
 

Tendances (10)

Flood susceptibility for the kennebecasis watershed
Flood susceptibility for the kennebecasis watershedFlood susceptibility for the kennebecasis watershed
Flood susceptibility for the kennebecasis watershed
 
Senior Thesis Poster
Senior Thesis PosterSenior Thesis Poster
Senior Thesis Poster
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...
High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...
High Resolution Site Characterization (#HRSC) of Gasoline LNAPL Plume Migrati...
 
Indiana Harbor Illinois
Indiana Harbor IllinoisIndiana Harbor Illinois
Indiana Harbor Illinois
 
Analysis of Stormwater System for Urban Development Project in North Louisiana
Analysis of Stormwater System for Urban Development Project in North LouisianaAnalysis of Stormwater System for Urban Development Project in North Louisiana
Analysis of Stormwater System for Urban Development Project in North Louisiana
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816
 
Route surveying
Route surveyingRoute surveying
Route surveying
 
Coastal erosion
Coastal erosionCoastal erosion
Coastal erosion
 
Public Workshop #3
Public Workshop #3Public Workshop #3
Public Workshop #3
 

En vedette

Big Dry Creek Greenway 2008
Big Dry Creek Greenway 2008Big Dry Creek Greenway 2008
Big Dry Creek Greenway 2008jmpflaum
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2Chris Carson
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMIChris Carson
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Baseline Schedules 1
Baseline Schedules 1Baseline Schedules 1
Baseline Schedules 1Chris Carson
 
Schedule Review PMI
Schedule Review PMISchedule Review PMI
Schedule Review PMIChris Carson
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact AnalysisChris Carson
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and trackingyenohhoney
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay AnalysisChris Carson
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysiskatrin enders
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 

En vedette (16)

Big Dry Creek Greenway 2008
Big Dry Creek Greenway 2008Big Dry Creek Greenway 2008
Big Dry Creek Greenway 2008
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Baseline Schedules 1
Baseline Schedules 1Baseline Schedules 1
Baseline Schedules 1
 
Schedule Review PMI
Schedule Review PMISchedule Review PMI
Schedule Review PMI
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact Analysis
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and tracking
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysis
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 

Similaire à Railwayto greenwayfinalpresentation

Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Malyar Talash
 
Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015Ashleigh Hough
 
Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015Ashleigh Hough
 
Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015Ashleigh Hough
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernizationMsplcdYkee69
 
Development of a road network plan for sylhet agricultural university
Development of a road network plan for sylhet agricultural universityDevelopment of a road network plan for sylhet agricultural university
Development of a road network plan for sylhet agricultural universityJoyshankar Baidya
 
Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentationfinkjosh
 
110024770 BIO8014 Consultancy report wind turbine
110024770 BIO8014 Consultancy report wind turbine110024770 BIO8014 Consultancy report wind turbine
110024770 BIO8014 Consultancy report wind turbineConnor Crowe
 
07 Open Channels.ppt
07 Open Channels.ppt07 Open Channels.ppt
07 Open Channels.pptzaid519176
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptswaongniyogi
 
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...City of Fairfax, Va.
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignmentPiter Biswas
 
LTCP meeting 02-10-05
LTCP meeting 02-10-05LTCP meeting 02-10-05
LTCP meeting 02-10-05HartTWI
 
Road way condition survey presentation final
Road way condition survey presentation finalRoad way condition survey presentation final
Road way condition survey presentation finalStone Rayhan
 
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...SevernEstuary
 
Environmental Science Research
Environmental Science ResearchEnvironmental Science Research
Environmental Science ResearchBrian Giroux
 
Presentation_for_Road.pptx
Presentation_for_Road.pptxPresentation_for_Road.pptx
Presentation_for_Road.pptxSantoshKapse9
 

Similaire à Railwayto greenwayfinalpresentation (20)

Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)
 
Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015
 
Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015
 
Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015Kite Hill Senior Design Final Presentation Fall 2015
Kite Hill Senior Design Final Presentation Fall 2015
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernization
 
Development of a road network plan for sylhet agricultural university
Development of a road network plan for sylhet agricultural universityDevelopment of a road network plan for sylhet agricultural university
Development of a road network plan for sylhet agricultural university
 
Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentation
 
110024770 BIO8014 Consultancy report wind turbine
110024770 BIO8014 Consultancy report wind turbine110024770 BIO8014 Consultancy report wind turbine
110024770 BIO8014 Consultancy report wind turbine
 
07 Open Channels.ppt
07 Open Channels.ppt07 Open Channels.ppt
07 Open Channels.ppt
 
Hill_Roads
Hill_RoadsHill_Roads
Hill_Roads
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
 
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignment
 
LTCP meeting 02-10-05
LTCP meeting 02-10-05LTCP meeting 02-10-05
LTCP meeting 02-10-05
 
Road way condition survey presentation final
Road way condition survey presentation finalRoad way condition survey presentation final
Road way condition survey presentation final
 
MATC Fall Lecture Series: Eugene Russell
MATC Fall Lecture Series: Eugene RussellMATC Fall Lecture Series: Eugene Russell
MATC Fall Lecture Series: Eugene Russell
 
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
 
Environmental Science Research
Environmental Science ResearchEnvironmental Science Research
Environmental Science Research
 
Presentation_for_Road.pptx
Presentation_for_Road.pptxPresentation_for_Road.pptx
Presentation_for_Road.pptx
 
PPT Estimate.pptx
PPT Estimate.pptxPPT Estimate.pptx
PPT Estimate.pptx
 

Railwayto greenwayfinalpresentation

  • 1. RAILWAY TO GREENWAY Carl AndersonKelly LovalloBarbara Summers CENG 491 Final Presentation DANA 116 Thursday April 28, 2011 6:55pm
  • 2. RAILWAY TO GREENWAY Inspiration for the Project High Line Project, Manhattan, NY 1.45 mile greenway built on built on a former elevated freight railroad
  • 3. RAILWAY TO GREENWAY Location London, UK Borough of Harrow
  • 4. RAILWAY TO GREENWAY Feasibility Study Two Potential Sites Analyzed Parkland Walk South and the Belmont Trail Why the Belmont Trail? Potential for development Support from local government and community Existing Site Access
  • 5. Project Scope and Assumptions Scope Geometric Design Pervious Pavement Community Center Assumptions US standards and regulations Specific site conditions of Lewisburg due to availability RAILWAY TO GREENWAY
  • 6. RAILWAY TO GREENWAY Existing Conditions of Site Narrow Dirt path 1.07 miles Approx. walk-able width 10-15 ft Actual boundaries 10-85 ft Largely residential area
  • 7. RAILWAY TO GREENWAY Plan View of Existing Belmont Trail
  • 8. RAILWAY TO GREENWAY Existing Conditions Cont. Kenton Lane Underpass to Parking Lot Paved Section near Dobbin Close
  • 9. RAILWAY TO GREENWAY AutoCAD Civil 3D Overview Why Civil 3D? Ordnance Survey Maps were Inadequate Topographic capabilities through Google Earth Help Guide Design Verify Geometric Calculations
  • 10. RAILWAY TO GREENWAY Geometric Design Overview Split into 3 Separate Sections Christchurch Ave. to Dobbin Close (3300 ft.) Kenton Lane Tunnel to Parking Lot Trailhead (430 ft.) Parking Lot Trailhead to Vernon Dr. (1070 ft.) General Assumptions Design Speed, V = 20 mph Lean Angle, θ = 15° Bicyclist Eye Height = 4’ 6” External Object Height= 0’ 0” AASHTO 1999 Guide for the Development of Bicycle Facilities
  • 11. RAILWAY TO GREENWAY Vertical Curve Design Goals Maintain Access Point Elevations Minimize Grades Limit Cut and Fill Criteria By Point of Vertical Intersection Stopping Sight Distance Sag vs. Crest Curves 1% ≤ Grade ≤ 5% Section 1: STA 2+00 to STA 17+00
  • 12. RAILWAY TO GREENWAY Stopping Sight Distance Forf = 0.25 and V=20 mph: Could Estimate Lmin 119.52’ < S <136.62’ ± dependent on grade
  • 13. RAILWAY TO GREENWAY Minimum Curve Length ForS > L: ForS < L: Assume S > L In reality, L > S Curve Lengths ranged from 20’ to 114’
  • 14. RAILWAY TO GREENWAY Horizontal Curve Design Goals Curve Smoothing Minimize Curve Radii Avoid Lateral Obstructions Criteria By Point of Curvature Curve Radius Lateral Clearance Superelevation Curve 9 PCSTA: 14+96.63 L=13.26’ R=100’ M=18.41’ Curve 11 PCSTA: 18+51.78 L=4.46’ R=100’ M=18.64’ Curve 10 PCSTA: 15+62.64 L=3.46’ R=100’ M=20.09’ Section 1: STA 14+60 to STA 19+00
  • 15. RAILWAY TO GREENWAY Minimum Curve Radius Forθ = 15° and V=20 mph: Whenθ approaches 20° : Casual rider assumptions All horizontal curves used minimum radius
  • 16.
  • 17. RAILWAY TO GREENWAY Minimum Lateral Clearance Values of M ranged from 18.41’ to 18.81’ Absolute Minimum from AASHTO is 3’
  • 18.
  • 21. New Community Center4 Horizontal Curves (Section 2) 6.22’< L < 38.54’
  • 22. RAILWAY TO GREENWAY Superelevation emax= 3% due to ADA regulations Minimum transition distance of 7.5’ for consecutive curves Cut and Fill
  • 23. RAILWAY TO GREENWAY Grading Aesthetic Contouring Ensure proper drainage of stormwater runoff
  • 24. RAILWAY TO GREENWAY Pavement Design Porous Asphalt Pavement Asphalt made up of coarse aggregate allowing for infiltration Reservoir and filter coarses for additional storage Environmental Benefits Increased initial infiltration Decreased runoff, in volume and velocity
  • 25. RAILWAY TO GREENWAY Drainage Satisfied by Porous Asphalt Minimum 1% slope .5 in/hr infiltration rate equivalent to 24 hour capacity of 12 in (25-year storm) NCRS soil group B .52-1.07 in/hr infiltration rate
  • 26. RAILWAY TO GREENWAY Community Center Overview ***CAD screenshot Small Timber-Frame Building Vehicle Parking and Driveway Green Roof Bike Park
  • 28. RAILWAY TO GREENWAY Building Floor Plan 2 Offices Conference Room Info Desk 2 Restrooms Mechanical Room Open Foyer
  • 29. RAILWAY TO GREENWAY Site Layout and Traffic Plan Lewisburg, PA Zoning Ordinances Boundary set-backs Parking/driveway regulations AASHTO Geometric Design of Highways and Streets Required turning radius for driveway
  • 30. RAILWAY TO GREENWAY Green Roof 1% Slope to prevent pooling Reduces runoff and energy consumption Filters surrounding air Provides habitat for native species
  • 31. RAILWAY TO GREENWAY Roof and Framing ASTM E 2391: Standard Practice for Determination of Dead Loads and Live Loads Associated with Green Roof Systems National Design Specification for Wood Construction 4” x 12” Joists @ 16” O.C.
  • 33. RAILWAY TO GREENWAY Cost Estimate
  • 34. RAILWAY TO GREENWAY References Lewisburg, PA Zoning Ordinances, Union County A Policy on Geometric Design of Highways and Streets: 2004. Washington, D.C.:, 2004. Print. 1999 Guide for the Development of Bicycle Facilities: American Association of State Highway and Transportation Officials. Print. ASTM E 2397: Standard Practice for Determination of Dead Loads and Live Loads Associated with Green Roof Systems National Design Specification for Wood Construction (1997 Edition)
  • 35. RAILWAY TO GREENWAY Questions?
  • 36. RAILWAY TO GREENWAY Acknowledgements Professor Gabauer Professor McGinnis Professor Salyards Sustrans (Greenway/Cycling NGO) Kate and William

Notes de l'éditeur

  1. Initially, the project was inspired by the “High Line” currently underway in Manhattan, New York.However, it was determined that there was a lack of appropriate current abandoned railways orelevated railways in London. The availability of abandoned railways is mainly due to the focus on railtransportation in London. Therefore, the focus of the study shifted to locations with former railwaytracks that have since been lifted.Advantages to former rail line properties are that the land is typically vacant, thepre-determined route has direct connections to towns, and they typically have a gentle gradient. Benefitsthat could result from the implementation of this project include the stimulation of economic growth in thesurrounding neighborhood, the production of tax benefits for the local government, health and wellbeing,and the creation of public space accessible to everyone.
  2. A site was chosen in the greater London area due the project team headquartersThe Borough of Harrow is located in Northwest London
  3. site selection based on the impact on and support of local community, size and condition of the site, andaccess to the current transportation networkParkland walk – drawbacks- 30 ft embankment, hard to make accessible to cyclists and meet ADA standards, Friends of parkland walk against paving the trail, limited space for construction of a community centerBelmont Trail – borough support, limited work necessary for access points, potential space for development at existing parking lots
  4. horizontal and vertical curve design of the greenwayGrading of bicycle pathCut and fillPavement Design and DrainageSite and structural layoutGreen roofDue to the design aspect of project occurring in Lewisburg and we assumed US standards and regulations (measurements system, design standards)Applied US standards to london ScenarioAlso due to a lack of available information, specific site conditions including soil, and zoning requirements were set in Lewisburg
  5. The path runs from the Christchurch Avenue/Forward Drive intersection to Vernon Drive.Over run with brush, narrows to
  6. Many informal access points with minimal slope, 3 major entrances- forward drive/christ church intersection, Kenton Lane, Vernon DriveTunnel underneath Kenton Lane leading to parking lot that interrupts the trail – adjacent to major intersection and commercial area, belmont circleKenton Lane Parking LotAdjacent to Belmont Circle
  7. When porous asphalt used in place of traditional impervious paving materials decreases the total amount of runoff leaving a site, promotes infiltration of runoff into the ground, reduces the amount of pollutants carried to a storm drain or waterway, and aids with reducing peak runoff velocity and volume.
  8. Can handle 25 year storm of .18 in/hr for 24 hour (Union County)
  9. As a result of the feasibility study, it was decided that the Borough of Harrow could benefit from the addition of a Community Center near the Belmont Circle. The Community Center features a small timber-frame building, vehicle parking and driveway, a Green Roof, a secure bike park facilities, and Barclay’s Cycle Hire Station, which is a highly successful cycle loan service that has been recently implemented throughout the Greater London area. This addition will enable people to use the greenway more often and will also help connect the Belmont Greenway to other greenways throughout London.
  10. This is theSmall Timber-Frame Building floor plan that includes 2 offices, a conference room, information desk, two individual restrooms, a mechanical room and open furnished spaced.
  11. The site layout was designed in accordance with the boundary set-backs established by Lewisburg, PA Zoning Ordinances. Due to limited space and boundary constraints, we decided this was the best way to situate the building, parking lot and driveway. The number of parking spaces and ADA accessibility was also designed based on design standards published by the Lewisburg Borough. As you can see in the drawing, the position of the driveway creates a tight turn for a vehicle driving west-bound. We used the AASHTO Geometric Design of Highways and Streets Manual to check the adequacy of the driveway angle and turning radius. The circles here represent the minimum allowable turning radii for a single-unit truck and a 31.7 degree steering angle.6, 10 foot by 20 foot parking spaces with stop bars1 Handicapable Van Accessible Space has been created, which means it is one space with an 8’ wide access aisle adjacent to the designated parking space
  12. In order to reduce the environmental impact of building the community center, an extensive green roof was designed to be installed on the timber structure. Thegreen roof is a vegetated roof system that is made up of an extensive vegetation layer, native soil, pollution control membrane, drainage layer, waterproof membrane, insulation and roof deck. Due to lack of standard for green roof design, we decided to base our green roof off of a design published by the Florida Department of Environmental Protection. This design effectively reducesrunoff, reduces energy consumption by insulating the building, increases the lifespan of the roof, provides a habitat for native species, filters air in the surrounding area, and makes the roof more aesthetically pleasing.
  13. The loads of the extensive green roof were calculated using ASTM E 2391: Standard Practice for Determination of Dead Loads and Live Loads Associated with Green Roof Systems. The roof system of the Community Center was designed according to the National Design Specification for Wood Construction using Allowable Strength Design spelled out by NDS. In order to resist the loads, we calculated that 4 by 12 ceiling joists spaced at 16 inches on center with 16.5’ spans would be an adequate design. The rest of the Western timber frame was designed in accordance with International Building Codes and traditional convention using timber 2 by 6 wall studs spaced at 16” on center.