3. IH 35E
★
Project Description
¬ Located in Dallas, Texas
¬ Project is being developed by TxDOT in
conjunction with local stakeholders US 380
¬ Total project cost up to approximately
$4.2 billion North
¬ Project segments FM 2181
• North (10.5 miles): FM 2181 to US Middle
380
PGBT
• Middle (12.1 miles): President George
Bush Turnpike (PGBT) to FM 2181 South
• South (5.5 miles): IH 635 to PGBT IH 635
• Total length: 28.2 miles
Strategic Infrastructure Leadership Forum February 23, 2012
4. IH 35E
★
Project Objectives
¬ Secure quality design and construction to optimize the operational life
cycle performance of the Project
¬ Expedite delivery of Project improvements
¬ Manage mobility within the Project area during construction
¬ Improve mobility within the Project area after the construction period
¬ Implement safe construction, operation and maintenance
¬ Potentially utilize cost-effective financing to leverage available local,
regional and state/federal funds and toll revenue to maximize funding
for the Project
Strategic Infrastructure Leadership Forum February 23, 2012
5. IH 35E
★
¬ Proposed “full build” typical section for each direction
• Two managed lanes
• Four general purpose lanes
• Two to three frontage roads
40’ 4 @12’ 2@12’ 2@12’ 4 @12’ 40’
440’ Right -of -Way “Usual”
Strategic Infrastructure Leadership Forum February 23, 2012
6. IH 35E
★
Project Schedule
¬ RFQ issued seeking statements of qualifications for both Design-
Build and Concession
¬ Responses to Request for Qualifications due March 2012
¬ Target commercial close by end of 2012
¬ Target date for the project to be open to traffic is early 2018
Strategic Infrastructure Leadership Forum February 23, 2012
8. Grand Parkway
★
Project Description
¬ The Grand Parkway is approximately 180 miles
of toll lanes and will be developed in a phased
manner
¬ The Grand Parkway is located in the Houston
area
¬ The initial phase of the Grand Parkway
includes:
• Segment E (currently under construction by
TxDOT)
• Segments F-1, F-2 and G (currently being
developed as a design build)
¬ TxDOT has primacy to deliver Segments E, F-1,
F2 and G
¬ Total cost for Segments F-1, F2 and G is
approximately $1.2 billion
Strategic Infrastructure Leadership Forum February 23, 2012
9. Grand Parkway
★
¬ The initial phase of the Grand Parkway that is being developed as a design-
build consists of the following three segments
Segment F-1 Segment F-2 Segment G
• Construct 4-lane tollway w/ • Construct 4-lane tollway w/ • Construct 4-lane tollway w/
discontinuous frontage roads discontinuous frontage roads discontinuous frontage roads
between US 290 to SH 249 between SH 249 to IH 45 North between IH 45 to US 59 North
• Construct 4-DCs at US 290 • Construct 2-DCs at IH 45 North • Construct 2-DCs at US 59 North
• Construct 8,000’ bridge over • Acquire ultimate ROW footprint • Acquire ultimate ROW footprint
Willow Flats
• Acquire ultimate ROW footprint
Strategic Infrastructure Leadership Forum February 23, 2012
10. Grand Parkway
★
Project Schedule
¬ RFQ responses have been received
¬ Shortlist of proposers is expected to be announced by the end of
February 2012
¬ Final RFP expected to be released May 2012
¬ Target commercial close by end of 2012
¬ Target date for the project to be open to traffic is mid 2015
Strategic Infrastructure Leadership Forum February 23, 2012
12. SH 183
★
¬ Approximately 9.0 miles in length comprising two sections and two interchanges
– Middle Section – SH183 from SH114/Loop 12 Interchange (Carl Road) to SH161
– East Section – SH183 from I35E to the SH114/Loop 12 Interchange
– Beltline and Irving Blvd Interchange Area
– SH114/Loop 12/SH183 Interchange locally referred to as “The Diamond”
– Project Pegasus and Trinity Blvd Interchange Area
¬ Responses to Requests for Information are due March 2012
International
Parkway SH 161
Carl Road
SH 114
Pegasus
Project
West Middle SH 114
(NTE Segment 2E) Interchange
East
Strategic Infrastructure Leadership Forum February 23, 2012
13. ★
James Bass
Contact Texas Department of Transportation
Information Chief Financial Officer
1-512-305-9507
james.bass@txdot.gov
Project websites:
http://www.dot.state.tx.us/project_information/projects/dallas/
i35e/default.htm
http://www.dot.state.tx.us/grandparkway.htm
http://www.dot.state.tx.us/dal/mis/sh183stage2/index.htm
Strategic Infrastructure Leadership Forum February 23, 2012