Flow chart of the process of application for
building plan approval
Consultant prepare and
submit the building plan
MPSJ
Plan is checked for
compliance of basic
requirements for
submission of plan.
If incomplete,
prepare letter of
non-compliance
and return to
consultant
If complied, open
file, calculate plan
processing fee and
send payment
notice to
Circulate plan to relevant
departments, i.e. Jabatan
Bomba, Health Department
and other departments, where
Jabatan Bomba, Health
Department and other
departments give comments
regarding the plan
Plan will be checked and if
there are complications or case
is not " straight forward " one,
the plan will be referred to the
Building Plans Committee
If does not
comply with
requirements,
letter
requesting
revision will be
prepared and
If complies with
requirements,
approval letter will be
prepared.
The consultant will be
contacted to collect the
building plan which has been
endorsed with approval
The approved
plan is filed.

Contenu connexe

Tendances

BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
jolynnTJL
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
Soh Shing
 

Tendances (20)

Housing Policies in Malaysia
Housing Policies in Malaysia Housing Policies in Malaysia
Housing Policies in Malaysia
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Part 3 exam preparation and practical experience log book
Part 3 exam preparation and practical experience log bookPart 3 exam preparation and practical experience log book
Part 3 exam preparation and practical experience log book
 
Btech report final
Btech report finalBtech report final
Btech report final
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
BS M'sia
BS M'siaBS M'sia
BS M'sia
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
ECA form
ECA formECA form
ECA form
 
Chapter 4 case studies characteristics
Chapter 4   case studies characteristicsChapter 4   case studies characteristics
Chapter 4 case studies characteristics
 
Telekom Tower
Telekom TowerTelekom Tower
Telekom Tower
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
 
Building Plan Approvals.pptx
Building Plan Approvals.pptxBuilding Plan Approvals.pptx
Building Plan Approvals.pptx
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 

Plus de chiasueyi

Plus de chiasueyi (20)

Csi outdoor
Csi outdoorCsi outdoor
Csi outdoor
 
20 sketch
20 sketch20 sketch
20 sketch
 
20 sketch
20 sketch20 sketch
20 sketch
 
Week3
Week3Week3
Week3
 
Week2
Week2Week2
Week2
 
Cnc documentary
Cnc documentaryCnc documentary
Cnc documentary
 
Design journal 5
Design journal 5Design journal 5
Design journal 5
 
Design journal 4
Design journal 4Design journal 4
Design journal 4
 
Psy final project
Psy final projectPsy final project
Psy final project
 
psy Report (1)
psy Report (1)psy Report (1)
psy Report (1)
 
Psy journal 2
Psy journal 2Psy journal 2
Psy journal 2
 
Psy journal 1
Psy journal 1Psy journal 1
Psy journal 1
 
Animated movies
Animated moviesAnimated movies
Animated movies
 
Animated movies (1) new
Animated movies (1) newAnimated movies (1) new
Animated movies (1) new
 
Object essay final
Object essay finalObject essay final
Object essay final
 
Design journal 2
Design journal 2Design journal 2
Design journal 2
 
Design journal 2
Design journal 2Design journal 2
Design journal 2
 
Project
Project Project
Project
 
Ici company profile
Ici company profileIci company profile
Ici company profile
 
Ici
IciIci
Ici
 

Flow chart of the process of application for build

  • 1. Flow chart of the process of application for building plan approval Consultant prepare and submit the building plan MPSJ Plan is checked for compliance of basic requirements for submission of plan. If incomplete, prepare letter of non-compliance and return to consultant If complied, open file, calculate plan processing fee and send payment notice to Circulate plan to relevant departments, i.e. Jabatan Bomba, Health Department and other departments, where Jabatan Bomba, Health Department and other departments give comments regarding the plan Plan will be checked and if there are complications or case is not " straight forward " one, the plan will be referred to the Building Plans Committee If does not comply with requirements, letter requesting revision will be prepared and If complies with requirements, approval letter will be prepared. The consultant will be contacted to collect the building plan which has been endorsed with approval The approved plan is filed.