PRESENTATION ON OPERATION MANAGEMENT TOPIC WORK BREAKDOWN STRUCTURE AND   CRITICAL PATH SUBMITTED BY:-                                                                   HASAN RAZA                                                                   ANGAD  JASPAL                                                                     SAALIM KOLA	                                                                   RAHIL AHMAD                                                                 HUSSAIN BADRI                                                                HUSSAM  MULLA                                                                   SHADAB AHMAD
Introduction Today is truly an exciting time to study operation management. The change brought by new technologies keep operation manager on their toes, and require them to study up – to date on the latest development in operation technology . Advance in computer technologies and software application have had broad- reaching  impact across all industries to stay competitive, manufacturer as well as service organization must adopt new technologies.                   		                                   Our company( 7STAR AUTOMATION TECHNOLOGY COMPANY LTD.) which fulfill the large companies dreams by implementing  a new automation technologies in there manufacturing and production process. The term automation totally  return to the integration of a full range of advance information and engineering discoveries into operation process for strategic purpose.                               Today , automation project are initiated not only for labor cost saving but also for improved quality , faster production and delivery of product and service with increased flexibility to be the best in market.
PROJECT  TAKEN BY COMPANY To implement a advanced Automation technology in a nut and bolt making plant company [ they had a bulk order of nut and bolt to be produced in there plant and had to complete a order in a given period of time which is not possible in there manual technique of technology going right now in there company ,so to achieve the order the board had decided to switch to a automated technology  in there plant  like CNC/NC,ROBOTS,AVGIS,CIM,FMS and  etc  So they approached our company to know more details of automated technology  and the  Manual technology they are using right now ,so they want to know the difference between these technology s. So  we  had a meeting to  there board of directors (including  technical and management department )there and had to satisfy them on this auto mated  technology with the help of  work break down structure and critical path with Gantt chart . So here we are to satisfy them .
Little bit about our company Business transformation + advanced technology = progressive / profit manufacturing  We a 7 star automation managing company develops technologies and provide service that a leading manufacture around the world used to their competitive advantage, weather running a single machine or entire supply chain, now a days manufactures rely on its automation technology , power control and conversion product and service to manage information flow from plant to plant , plant floor to the front office , even country to country. So it get their product  and service to market faster ,reduces cost ,better utilization of power and plant floor assets ,and minimize the risk in their manufacturing environment. So to get all these above factor we implement  this automated technology in there factory  to get the best . So we always says that there is a better way to put our advanced automation technology software and a machine capable to work for your company to place you in competition with market needs .Here are the machine which our company installs with software in factory operation area .
WORK BREAKDOWN STRUCTURE/CRITICAL PATH WITH GANTT CHART WORK BREAKDOWN  STRUCTURE- A complex project is made manageable  by first breaking it down into individual components in a hierarchical structure .Such structure defines tasks that can  be completed independently of other tasks . It can be illustrated in a block diagram as shown below ; CRITICAL PATH AND GANTT CHART-Critical path method is designed to provide intense micro control over the project  in phase ,where Gantt chart co-ordinates work center schedules by showing the progress of each job in relation to its scheduled finish dates .
HOW IT WORKS How it works as we all know that the key benefit of integration in manufacturing system  is to consistently deliver the right information to the right component at the right time ,regardless of there physical location . After  thinking  about this automated technology  many question arises ,how it work ,what about the maintenance ,weather productivity will increase or not …so many thing arise in mind, So first of all we clear it how it works . So the question came in mind What is CAD- It’s a COMPUTER AIDED DESIGN AND DRAFTING (CADD) from of automation that helps designer prepare Drawing ,specifications part list and other design related elements by using special graphics, calculations and Intensive computer programs.  So software are available for CADD For analyzing  geometric modeling we use a software like AUTOCAD,PRO-E AND               CATIAV5. For doing Engineering analysis we use MISC,NASTRAN AND ANSYS. All  the above software are used for design review and evaluation  with automated drafting . So after getting this CADD, next query arise uhuhu
What is COMPUTER AIDED MANUFACTURING (CAM)? Then its simple CAM include manufacturing process Planning ,process controlling  and process monitoring by a computer aided inspection. As we all know that its complicated to handle machine  manually because error rate are more and quality cannot be as perfect as needed, and it’s a time taking procedure also, need extra labor on every machine ,as every  worker knows his machine and it work, weather its lathe, cutter, threaded, grinding, polishing machine and etc one also. so to get a word complicated eliminated from work area, we use the auto mated technology, so CAM is used to include all the manufacturing process, having a sub process in it can be easily monitored by the programmer sitting in the office or the factory operation area. Hence CAM is used to simplify the machining ,design , planning and controlling process. It simple to understand  the procedure  of it working , first the data flow in with the help of built-in  software and programs .then the information of the product is imported in CAM system by use of CAD software, then  CAM calculate the tool path and then cuts the material as the programmer had entered the specification of the product with it details (like height ,width, length .thickness, grooves. Threads ,design, stress and strain factors and etc);all tool path is written in CL data and then the post processor which we install converts those CL data into NC programs for specific machine operation and hence the manufacturing process begins. So as said earlier Automation technologies are not initiated only for labor cost saving ,but also for improved Quality, faster production and delivery of product and service with increase  flexibility to cope with market.
IF  WORKING  ON MANUAL TECHNOLOGY  WE CAN’T  HAVE A CRITICAL PATH  AS IT CAN BE SEEN  BELOW
AFTER INSTALLED  THE AUTOMATION TECHNOLOGY  IN FACTORY  WE HAVE A CRITICAL PATH AND THAT IS STARTING FROM  1-2-6-7-8-9-10-11-16-17-18=12 WEEKS
No. of period each task take are mentioned below: DETAILS            NO. OF PERIOD 1.Factory  operation to design section                                                 1 weeks 2.Design to inter active graphics                                                           1 weeks         3.Inter active design  to computer aided design and drafting          2 weeks 4. CAM                                                                                                       1 weeks 5.Factory  automation                                                                             2 weeks 6.Process &line management control                                                   1 weeks 7.Computer aided inspection                                                                 1 weeks  8. Quality control inspection                                                                   1weeks 9.database/central service                                                                      1 weeks 10.Final delivery of product                                                                    1 weeks total no . Of  period  for a project                                                         (12 weeks)
SCOPE AND BENEFIT WHY SHOULD WE HAVE THIS TECHNOLOGY INSTALLED IN FACTORY 1-Its Faster, Lower cost change from one part to another which will improve capital    utilization. 2-lower labor cost. 3-Reduced inventory, due to planning and programming precision. 4-consistent and better Quality due to the automated control. 5-Reduced process planning & production lead time faster response to engineering changes. 6-Greater process plan consistency, access to up-to-date information in a central database . 7-Improved cost estimating procedures and fewer calculation errors. 8-More complete and detailed process plans. 9-Delivery of product service with increase flexibility. 10-Less amount of time required for implementation of production. 11-tools of software as backup for production. 12- complete the inter related activities with proper way. 13-And the last , improved production scheduling and capacity utilization.

Contenu connexe

Tendances

Process modeler data_sheet
Process modeler data_sheetProcess modeler data_sheet
Process modeler data_sheetD S
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessW3 Group Canada Inc.
 
2013 Preactor Partner Meeting riteTIME Presentation
2013 Preactor Partner Meeting riteTIME Presentation2013 Preactor Partner Meeting riteTIME Presentation
2013 Preactor Partner Meeting riteTIME PresentationriteSOFT
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceTri Dung Nguyen
 
Use of ict in organisation Methods of production
Use of ict in organisation Methods of production Use of ict in organisation Methods of production
Use of ict in organisation Methods of production asad6103
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsMarvin Norona
 
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapMaximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapHelen Fisher
 
Sirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harolSirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harolSirris
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover TimeDamian Denis
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee incrementVinoth Axus
 
Top OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedTop OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedJon Addison
 
Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market Capgemini
 
Improve SMT Labor Margin Per Unit
Improve SMT Labor Margin Per UnitImprove SMT Labor Margin Per Unit
Improve SMT Labor Margin Per UnitDamian Denis
 

Tendances (20)

Process modeler data_sheet
Process modeler data_sheetProcess modeler data_sheet
Process modeler data_sheet
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
2013 Preactor Partner Meeting riteTIME Presentation
2013 Preactor Partner Meeting riteTIME Presentation2013 Preactor Partner Meeting riteTIME Presentation
2013 Preactor Partner Meeting riteTIME Presentation
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
NCG CAM
NCG CAMNCG CAM
NCG CAM
 
Use of ict in organisation Methods of production
Use of ict in organisation Methods of production Use of ict in organisation Methods of production
Use of ict in organisation Methods of production
 
Tpm
TpmTpm
Tpm
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapMaximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmap
 
Sirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harolSirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harol
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover Time
 
CMMS Web Browser Brochure
CMMS Web Browser BrochureCMMS Web Browser Brochure
CMMS Web Browser Brochure
 
Indonesia texbook
Indonesia texbookIndonesia texbook
Indonesia texbook
 
TPT 2011
TPT  2011TPT  2011
TPT 2011
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
Top OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedTop OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms Explained
 
The benefits of ALM and PLM Integration
The benefits of ALM and PLM IntegrationThe benefits of ALM and PLM Integration
The benefits of ALM and PLM Integration
 
Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market
 
Improve SMT Labor Margin Per Unit
Improve SMT Labor Margin Per UnitImprove SMT Labor Margin Per Unit
Improve SMT Labor Margin Per Unit
 

En vedette

WBS Principles
WBS PrinciplesWBS Principles
WBS Principlesdmdk12
 
Food Truck Comidinha de Buteco
Food Truck Comidinha de ButecoFood Truck Comidinha de Buteco
Food Truck Comidinha de ButecoMarco Coghi
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.sanjeeev bahadur, m.tech,mba
 
92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)Pegah Hamidkhani
 
Critical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDashCritical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDashCA Technologies
 
Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016Boris Polyak
 
Wrench Enterprise - Online Project Control System
Wrench Enterprise - Online Project Control SystemWrench Enterprise - Online Project Control System
Wrench Enterprise - Online Project Control Systemjunejalok
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structureStefan Csosz
 
Itec640 work breakdown structure
Itec640   work breakdown structureItec640   work breakdown structure
Itec640 work breakdown structurescotyh
 
Work breakdown structure (wbs)
Work breakdown structure (wbs)Work breakdown structure (wbs)
Work breakdown structure (wbs)Mateen Altaf
 
Operations Research
Operations ResearchOperations Research
Operations Researchmini244
 
Work breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaWork breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaMuhammad Talha
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsJeremie Averous
 
Production vs operations management
Production vs operations managementProduction vs operations management
Production vs operations managementAnupam Kumar
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 

En vedette (20)

WBS Principles
WBS PrinciplesWBS Principles
WBS Principles
 
Food Truck Comidinha de Buteco
Food Truck Comidinha de ButecoFood Truck Comidinha de Buteco
Food Truck Comidinha de Buteco
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.
 
95 Theses: Part3
95 Theses: Part395 Theses: Part3
95 Theses: Part3
 
92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)
 
Critical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDashCritical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDash
 
Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016
 
Wrench Enterprise - Online Project Control System
Wrench Enterprise - Online Project Control SystemWrench Enterprise - Online Project Control System
Wrench Enterprise - Online Project Control System
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structure
 
Itec640 work breakdown structure
Itec640   work breakdown structureItec640   work breakdown structure
Itec640 work breakdown structure
 
Work breakdown structure (wbs)
Work breakdown structure (wbs)Work breakdown structure (wbs)
Work breakdown structure (wbs)
 
Payback Analysis
Payback AnalysisPayback Analysis
Payback Analysis
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
Work breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaWork breakdown structure by muhammad talha
Work breakdown structure by muhammad talha
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex Projects
 
Production vs operations management
Production vs operations managementProduction vs operations management
Production vs operations management
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 

Similaire à presentation on work breakdown structure and critical path

Whitepaper DPE.pptx
Whitepaper DPE.pptxWhitepaper DPE.pptx
Whitepaper DPE.pptxAndyPenfold2
 
Employee Management System
Employee Management SystemEmployee Management System
Employee Management Systemvivek shah
 
Next generation business automation with the red hat decision manager and red...
Next generation business automation with the red hat decision manager and red...Next generation business automation with the red hat decision manager and red...
Next generation business automation with the red hat decision manager and red...Masahiko Umeno
 
Gaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.docGaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.docGaurav Dhawan
 
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...IRJET Journal
 
SuccessStory_Wonderware_SA Mint
SuccessStory_Wonderware_SA MintSuccessStory_Wonderware_SA Mint
SuccessStory_Wonderware_SA MintVernon Naidoo
 
Siemens EA ltd. Internship report
Siemens EA ltd. Internship reportSiemens EA ltd. Internship report
Siemens EA ltd. Internship reportPianca Gracias
 
Factory Automation Development | Maxmites
Factory Automation Development | MaxmitesFactory Automation Development | Maxmites
Factory Automation Development | MaxmitesMax Mites
 
PLC AND SCADA SYSTEM By Briight Industrial Solution
PLC AND SCADA SYSTEM By Briight Industrial SolutionPLC AND SCADA SYSTEM By Briight Industrial Solution
PLC AND SCADA SYSTEM By Briight Industrial SolutionIndiaMART InterMESH Limited
 
Web Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment GatewayWeb Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment GatewayIRJET Journal
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEPiyush Agarwal
 
The New Frontier For Business Agility Intelligent Bpm
The New Frontier For Business Agility   Intelligent BpmThe New Frontier For Business Agility   Intelligent Bpm
The New Frontier For Business Agility Intelligent BpmNat Evans
 
Automating the Enterprise with CloudForms & Ansible
Automating the Enterprise with CloudForms & AnsibleAutomating the Enterprise with CloudForms & Ansible
Automating the Enterprise with CloudForms & AnsibleJerome Marc
 
Sachin 5 Yrs Telecom Ba Pmp Resume
Sachin 5 Yrs Telecom Ba Pmp ResumeSachin 5 Yrs Telecom Ba Pmp Resume
Sachin 5 Yrs Telecom Ba Pmp ResumeSachin P, PMP®
 
Path to Production: Value Stream Mapping in a DevOps World
Path to Production: Value Stream Mapping in a DevOps WorldPath to Production: Value Stream Mapping in a DevOps World
Path to Production: Value Stream Mapping in a DevOps WorldVMware Tanzu
 
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAMCOMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAMshishirrathod1
 

Similaire à presentation on work breakdown structure and critical path (20)

Whitepaper DPE.pptx
Whitepaper DPE.pptxWhitepaper DPE.pptx
Whitepaper DPE.pptx
 
Employee Management System
Employee Management SystemEmployee Management System
Employee Management System
 
Next generation business automation with the red hat decision manager and red...
Next generation business automation with the red hat decision manager and red...Next generation business automation with the red hat decision manager and red...
Next generation business automation with the red hat decision manager and red...
 
Gaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.docGaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.doc
 
Resume_Dhananjay_Bhave
Resume_Dhananjay_BhaveResume_Dhananjay_Bhave
Resume_Dhananjay_Bhave
 
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
 
Rajendra_Nimonkar
Rajendra_NimonkarRajendra_Nimonkar
Rajendra_Nimonkar
 
SuccessStory_Wonderware_SA Mint
SuccessStory_Wonderware_SA MintSuccessStory_Wonderware_SA Mint
SuccessStory_Wonderware_SA Mint
 
Siemens EA ltd. Internship report
Siemens EA ltd. Internship reportSiemens EA ltd. Internship report
Siemens EA ltd. Internship report
 
Factory Automation Development | Maxmites
Factory Automation Development | MaxmitesFactory Automation Development | Maxmites
Factory Automation Development | Maxmites
 
PLC AND SCADA SYSTEM By Briight Industrial Solution
PLC AND SCADA SYSTEM By Briight Industrial SolutionPLC AND SCADA SYSTEM By Briight Industrial Solution
PLC AND SCADA SYSTEM By Briight Industrial Solution
 
merged_document
merged_documentmerged_document
merged_document
 
Web Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment GatewayWeb Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment Gateway
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IE
 
The New Frontier For Business Agility Intelligent Bpm
The New Frontier For Business Agility   Intelligent BpmThe New Frontier For Business Agility   Intelligent Bpm
The New Frontier For Business Agility Intelligent Bpm
 
Automating the Enterprise with CloudForms & Ansible
Automating the Enterprise with CloudForms & AnsibleAutomating the Enterprise with CloudForms & Ansible
Automating the Enterprise with CloudForms & Ansible
 
Sachin 5 Yrs Telecom Ba Pmp Resume
Sachin 5 Yrs Telecom Ba Pmp ResumeSachin 5 Yrs Telecom Ba Pmp Resume
Sachin 5 Yrs Telecom Ba Pmp Resume
 
Path to Production: Value Stream Mapping in a DevOps World
Path to Production: Value Stream Mapping in a DevOps WorldPath to Production: Value Stream Mapping in a DevOps World
Path to Production: Value Stream Mapping in a DevOps World
 
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAMCOMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAM
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 

Dernier

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Dernier (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

presentation on work breakdown structure and critical path

  • 1. PRESENTATION ON OPERATION MANAGEMENT TOPIC WORK BREAKDOWN STRUCTURE AND CRITICAL PATH SUBMITTED BY:- HASAN RAZA ANGAD JASPAL SAALIM KOLA RAHIL AHMAD HUSSAIN BADRI HUSSAM MULLA SHADAB AHMAD
  • 2. Introduction Today is truly an exciting time to study operation management. The change brought by new technologies keep operation manager on their toes, and require them to study up – to date on the latest development in operation technology . Advance in computer technologies and software application have had broad- reaching impact across all industries to stay competitive, manufacturer as well as service organization must adopt new technologies. Our company( 7STAR AUTOMATION TECHNOLOGY COMPANY LTD.) which fulfill the large companies dreams by implementing a new automation technologies in there manufacturing and production process. The term automation totally return to the integration of a full range of advance information and engineering discoveries into operation process for strategic purpose. Today , automation project are initiated not only for labor cost saving but also for improved quality , faster production and delivery of product and service with increased flexibility to be the best in market.
  • 3. PROJECT TAKEN BY COMPANY To implement a advanced Automation technology in a nut and bolt making plant company [ they had a bulk order of nut and bolt to be produced in there plant and had to complete a order in a given period of time which is not possible in there manual technique of technology going right now in there company ,so to achieve the order the board had decided to switch to a automated technology in there plant like CNC/NC,ROBOTS,AVGIS,CIM,FMS and etc So they approached our company to know more details of automated technology and the Manual technology they are using right now ,so they want to know the difference between these technology s. So we had a meeting to there board of directors (including technical and management department )there and had to satisfy them on this auto mated technology with the help of work break down structure and critical path with Gantt chart . So here we are to satisfy them .
  • 4. Little bit about our company Business transformation + advanced technology = progressive / profit manufacturing We a 7 star automation managing company develops technologies and provide service that a leading manufacture around the world used to their competitive advantage, weather running a single machine or entire supply chain, now a days manufactures rely on its automation technology , power control and conversion product and service to manage information flow from plant to plant , plant floor to the front office , even country to country. So it get their product and service to market faster ,reduces cost ,better utilization of power and plant floor assets ,and minimize the risk in their manufacturing environment. So to get all these above factor we implement this automated technology in there factory to get the best . So we always says that there is a better way to put our advanced automation technology software and a machine capable to work for your company to place you in competition with market needs .Here are the machine which our company installs with software in factory operation area .
  • 5.
  • 6. WORK BREAKDOWN STRUCTURE/CRITICAL PATH WITH GANTT CHART WORK BREAKDOWN STRUCTURE- A complex project is made manageable by first breaking it down into individual components in a hierarchical structure .Such structure defines tasks that can be completed independently of other tasks . It can be illustrated in a block diagram as shown below ; CRITICAL PATH AND GANTT CHART-Critical path method is designed to provide intense micro control over the project in phase ,where Gantt chart co-ordinates work center schedules by showing the progress of each job in relation to its scheduled finish dates .
  • 7.
  • 8.
  • 9. HOW IT WORKS How it works as we all know that the key benefit of integration in manufacturing system is to consistently deliver the right information to the right component at the right time ,regardless of there physical location . After thinking about this automated technology many question arises ,how it work ,what about the maintenance ,weather productivity will increase or not …so many thing arise in mind, So first of all we clear it how it works . So the question came in mind What is CAD- It’s a COMPUTER AIDED DESIGN AND DRAFTING (CADD) from of automation that helps designer prepare Drawing ,specifications part list and other design related elements by using special graphics, calculations and Intensive computer programs. So software are available for CADD For analyzing geometric modeling we use a software like AUTOCAD,PRO-E AND CATIAV5. For doing Engineering analysis we use MISC,NASTRAN AND ANSYS. All the above software are used for design review and evaluation with automated drafting . So after getting this CADD, next query arise uhuhu
  • 10. What is COMPUTER AIDED MANUFACTURING (CAM)? Then its simple CAM include manufacturing process Planning ,process controlling and process monitoring by a computer aided inspection. As we all know that its complicated to handle machine manually because error rate are more and quality cannot be as perfect as needed, and it’s a time taking procedure also, need extra labor on every machine ,as every worker knows his machine and it work, weather its lathe, cutter, threaded, grinding, polishing machine and etc one also. so to get a word complicated eliminated from work area, we use the auto mated technology, so CAM is used to include all the manufacturing process, having a sub process in it can be easily monitored by the programmer sitting in the office or the factory operation area. Hence CAM is used to simplify the machining ,design , planning and controlling process. It simple to understand the procedure of it working , first the data flow in with the help of built-in software and programs .then the information of the product is imported in CAM system by use of CAD software, then CAM calculate the tool path and then cuts the material as the programmer had entered the specification of the product with it details (like height ,width, length .thickness, grooves. Threads ,design, stress and strain factors and etc);all tool path is written in CL data and then the post processor which we install converts those CL data into NC programs for specific machine operation and hence the manufacturing process begins. So as said earlier Automation technologies are not initiated only for labor cost saving ,but also for improved Quality, faster production and delivery of product and service with increase flexibility to cope with market.
  • 11. IF WORKING ON MANUAL TECHNOLOGY WE CAN’T HAVE A CRITICAL PATH AS IT CAN BE SEEN BELOW
  • 12. AFTER INSTALLED THE AUTOMATION TECHNOLOGY IN FACTORY WE HAVE A CRITICAL PATH AND THAT IS STARTING FROM 1-2-6-7-8-9-10-11-16-17-18=12 WEEKS
  • 13. No. of period each task take are mentioned below: DETAILS NO. OF PERIOD 1.Factory operation to design section 1 weeks 2.Design to inter active graphics 1 weeks 3.Inter active design to computer aided design and drafting 2 weeks 4. CAM 1 weeks 5.Factory automation 2 weeks 6.Process &line management control 1 weeks 7.Computer aided inspection 1 weeks 8. Quality control inspection 1weeks 9.database/central service 1 weeks 10.Final delivery of product 1 weeks total no . Of period for a project (12 weeks)
  • 14. SCOPE AND BENEFIT WHY SHOULD WE HAVE THIS TECHNOLOGY INSTALLED IN FACTORY 1-Its Faster, Lower cost change from one part to another which will improve capital utilization. 2-lower labor cost. 3-Reduced inventory, due to planning and programming precision. 4-consistent and better Quality due to the automated control. 5-Reduced process planning & production lead time faster response to engineering changes. 6-Greater process plan consistency, access to up-to-date information in a central database . 7-Improved cost estimating procedures and fewer calculation errors. 8-More complete and detailed process plans. 9-Delivery of product service with increase flexibility. 10-Less amount of time required for implementation of production. 11-tools of software as backup for production. 12- complete the inter related activities with proper way. 13-And the last , improved production scheduling and capacity utilization.