SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
ESI LAND ASSESSMENTS
Phase 1 land quality assessments
ESI’s Phase 1 contaminated land assessments are part of a range of services designed specifically to
help identify and manage environmental risk. Our Phase 1 report is a literature based review designed to
provide clear & pragmatic advice regarding the nature & potential significance of any land quality hazards
which may be present at a study site.

Features of our Phase 1 land quality assessments
                                                    •	 Collates all relevant                •	   Presents a robust conceptual site
                                                       environmental data, historical            understanding and a considered
                                                       land use mapping, geological              assessment of land quality risks
                                                       records and other documentary        •	   Provides clear judgement on
                                                       and online information relating to        both the level of risk likely to be
                                                       the site setting                          present and also the degree of
                                                    •	 Through targeted consultation,            uncertainty relating to these risks
                                                       clarifies the position of key        •	   Our ‘Phase 1 Plus’ service can
                                                       regulators                                offer targeted site investigation
                                                    •	 Reviews all risk components               data (by selected low-cost
                                                       using a visual, easy to read,             sampling and insitu testing)
                                                       ‘traffic light’ reporting system          to enable a more robust risk
                                                                                                 evaluation at an early stage



Benefits of ESI’s land quality assessments
•	   Clear, well structured, and easy          ESI are dedicated to providing
     to understand reports. Key                expert interpretation & opinion
     information immediately visible           as derived from undertaking
•	   Concise presentation of                   hundreds of land quality
     regulator requirements &                  assessments across the UK
     associated actions/implications      •	   We respond to all queries within
•	   Provides real clarification of            24 hours, and deliver reports
     whether a site has potential land         within 1 - 3 days
     or groundwater contamination         •	   We have specialists who are
     issues and the likely scale of any        perfectly placed to undertake
     such risks                                quantitative Phase 2 land
•	   Whilst many Phase 1 products              investigation and assessment,
     are essentially data reports,             should this be required


Dedicated points of contact:                                    “It is without hesitation that I can strongly recommend ESI Ltd”
                                                                                           Paul Lawrie, London Borough of Sutton
Andy Singleton
Technical Director                                        “Our experience of ESI is one of professionalism, care and diligence.
andrewsingleton@esinternational.com                         Works were carried out on time and on budget to our satisfaction”
                                                                                        Iain Wheeler, Telford and Wrekin Council
Lisa Murray
Project Consultant                                                              “We cannot speak too highly of the work team.
lisamurray@esinternational.com                                      From a householders point of view this was excellent work”
                                                                            Letter received from a private home owner in Stroud
01743 276100
                                                                                                                           Cost
                                                                                                           From £495 + vat
                                                                                                 Subject to site area & setting
                                  Shrewsbury
                                  Reading
                                  London                                                                             Delivery
                                  esinternational.com                                       Typically 1-3 working days

Contenu connexe

Plus de chrisberryman

Esi Water Resources Brochure
Esi Water Resources BrochureEsi Water Resources Brochure
Esi Water Resources Brochurechrisberryman
 
Esi Focus On The South East
Esi Focus On The South EastEsi Focus On The South East
Esi Focus On The South Eastchrisberryman
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochurechrisberryman
 
Esi Catchment Management
Esi Catchment ManagementEsi Catchment Management
Esi Catchment Managementchrisberryman
 
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...chrisberryman
 
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...chrisberryman
 
Geological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme FinalGeological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme Finalchrisberryman
 
CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4chrisberryman
 
CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3chrisberryman
 
CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2chrisberryman
 

Plus de chrisberryman (12)

Esi Year In Review
Esi Year In ReviewEsi Year In Review
Esi Year In Review
 
Esi Water Resources Brochure
Esi Water Resources BrochureEsi Water Resources Brochure
Esi Water Resources Brochure
 
Esi Focus On The South East
Esi Focus On The South EastEsi Focus On The South East
Esi Focus On The South East
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochure
 
Esi Expert Witness
Esi Expert WitnessEsi Expert Witness
Esi Expert Witness
 
Esi Catchment Management
Esi Catchment ManagementEsi Catchment Management
Esi Catchment Management
 
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...
 
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
 
Geological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme FinalGeological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme Final
 
CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4
 
CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3
 
CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2
 

ESI Phase 1 Land Assessments

  • 1. ESI LAND ASSESSMENTS Phase 1 land quality assessments ESI’s Phase 1 contaminated land assessments are part of a range of services designed specifically to help identify and manage environmental risk. Our Phase 1 report is a literature based review designed to provide clear & pragmatic advice regarding the nature & potential significance of any land quality hazards which may be present at a study site. Features of our Phase 1 land quality assessments • Collates all relevant • Presents a robust conceptual site environmental data, historical understanding and a considered land use mapping, geological assessment of land quality risks records and other documentary • Provides clear judgement on and online information relating to both the level of risk likely to be the site setting present and also the degree of • Through targeted consultation, uncertainty relating to these risks clarifies the position of key • Our ‘Phase 1 Plus’ service can regulators offer targeted site investigation • Reviews all risk components data (by selected low-cost using a visual, easy to read, sampling and insitu testing) ‘traffic light’ reporting system to enable a more robust risk evaluation at an early stage Benefits of ESI’s land quality assessments • Clear, well structured, and easy ESI are dedicated to providing to understand reports. Key expert interpretation & opinion information immediately visible as derived from undertaking • Concise presentation of hundreds of land quality regulator requirements & assessments across the UK associated actions/implications • We respond to all queries within • Provides real clarification of 24 hours, and deliver reports whether a site has potential land within 1 - 3 days or groundwater contamination • We have specialists who are issues and the likely scale of any perfectly placed to undertake such risks quantitative Phase 2 land • Whilst many Phase 1 products investigation and assessment, are essentially data reports, should this be required Dedicated points of contact: “It is without hesitation that I can strongly recommend ESI Ltd” Paul Lawrie, London Borough of Sutton Andy Singleton Technical Director “Our experience of ESI is one of professionalism, care and diligence. andrewsingleton@esinternational.com Works were carried out on time and on budget to our satisfaction” Iain Wheeler, Telford and Wrekin Council Lisa Murray Project Consultant “We cannot speak too highly of the work team. lisamurray@esinternational.com From a householders point of view this was excellent work” Letter received from a private home owner in Stroud 01743 276100 Cost From £495 + vat Subject to site area & setting Shrewsbury Reading London Delivery esinternational.com Typically 1-3 working days