Asset Reliability Overview




            Allied Reliability
         Phased Approach to a Successful Reliability Initiative




Presented by:
                                                            What would you do
  Chris Colson                                              with more free time?




                                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Agenda


• Who is Allied

• Overview of Approach

• Overview of Tools

• Questions / Answers



                                               Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Allied’s Reliability Success Formula




                                          Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Impact of a Complete Reliability Initiative
     High

                                                                           +75%
                                      +27%
                                                                   • Significantly Improved
                                  • Improved Bottom
                                                                         Bottom Line
                                   Line Performance
    Business Process and




                                                                         Performance
      Culture Maturity




                                   • Lack of System
                                                                   • Practices and Systems
                                       Support
                                                                            Aligned


                                   Baseline                                   -7%
                                                                     • Systems are not
                                       •Informal
                                                                  Complemented by Effective
                                   • Manual Planning
                                                                    Business Processes
                                       Processes
                                                                   • Significant Inefficiencies
                                   • Below Average
                                 Business Performance
       Low
                                                                                                  High
                           Low                 Technology Maturity

                                     Source: Brynjolfsson (MIT), Wireman, Troyer, Allied
                                                                                                  Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview




                             Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview


Focused Improvement the Allied Reliability
   Transformational Analytics – “5-R” Improvement Process
Way…
                                                    Rationalize                                                Ratify
  Recognize
                                                                                                       Develop
                                                                                   Create and                               Identify
       Known
                                          PR Simulation           Conduct                             Prioritized
                         (Baseline)                                              Educate Process
     Problem or                                                                                                           Internal and
                                         and/or Reliability      FMEA Blitz                         Improvement
                          PR Plots                                                Improvement
    Value Stream
                                                                                                                         External Non
                                             Modeling                                                    Plan
                                                                                   Team (PIT)
      Mapping
                                                                                                                           Value-Add
        (VSM)
                                                                                                                          And Wastes
                                                                                  Eliminate ALL
                                                                              Manufacturing Wastes…
                                                 Overproduction
                         Transporting


                                                    FMECA
                             RCA

            Quality
                                        Inventory
         (All Defects)                                               Motion


                             RCM

                                                                                             Sustain the Gains…
                                                    Processing
                          Waiting
                                                                                              Train To New          Audit/Monitor
                                                                         Document
                                                                                                Process              Continually
                                                                        New Process


                             Resolve                                                        Realize


                                                                                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview
Allied Reliability – Overall AHA Workstream


Asset Registry Module           Asset Analysis Module           Asset Integration Module


                  Installed           Asset
                 Component          Criticality
                 Verification        Analysis
                                                                                      Technology
                                                                                       Sourcing
                                                                                       Strategy
     Asset
                                                     RCM            Equipment
   Definition
                                                    Analysis       Maintenance
                                                                                                              Phase
                                                                   Plans (EMP’s)
                                                  (top 5-20%)
                                                                                                                3

                                                                                      Technology
                                    Failure
                    Asset                                                              Standards
                                     Mode
                  Hierarchy                                                           OP1 & OP2
                                    Analysis




                                                                                      Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Asset Registry Module
                                Goals:                                         Benefits:
Asset Registry Module
                                •Defines criteria for Asset selection          •Increased planning efficiency due to
                                •Identifies desired attributes by Asset type     hierarchy structure
                                •Uncovers Asset types requiring                •Increased scheduling efficiency due
                  Installed       Failure Mode Analysis (FMA's)                  to hierarchy structure
                 Component      •Verify/identify installed Components          •Hierarchy provides added granularity
                 Verification   •Creation of logical system to                   when criticality performed
                                  Asset structure                              •Components tracking through tagging
                                                                                 and functional location
                                                                               •Improved cost tracking through
                                Deliverables:
     Asset
                                                                                 hierarchy structure
                                •Accurate Asset count
   Definition
                                                                               •Increased MRO efficiency through
                                •Complete hierarchy for Assets
                                                                                 accurate Asset list
                                •Component change control through tracking
                                                                               •Improved CMMS through addition
                                •Multiple level cost tracking
                                                                                 of hierarchy structure
                                •Attribute data for Asset
                    Asset        repairs/replacement
                  Hierarchy     •Logical functional location
                                •Hierarchy template for CMMS upload
                                •Targeted seminars supporting
                                 reliability program
                                •Site support for installed processes




                                                                                           Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview
Allied Reliability Phase 2 – Workflow
Asset Analysis Module
                                Goals:                                        Benefits:
Asset Analysis Module
                                •Rank Assets using multiple criteria          •Additional scheduling efficiency through
                                •Refines planning and scheduling                use of Asset ranking
                                •Refine Maintenance, Repair and Operational   •Input to critical spares through
      Asset
                                Assets (MRO)                                    Asset criticality
    Criticality
                                •Categorize failure modes                     •Further CMMS improvement by
     Analysis
                                                                                addition of attribute & criticality
                                                                              •Improved MRO function through
                                Deliverables:
                                                                               use of CMMS data
                                •Ranked Asset list
                                                                              •Ability to prioritize failures and create
                                •Defined failure modes for Asset types
                     RCM                                                       “bad actors” list
                                •Attribute template for CMMS upload
                    Analysis    •Targeted seminars supporting reliability
                  (top 5-20%)   program
                                •Site support for installed processes
    Failure
     Mode
    Analysis




                                                                                       Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

   Allied Reliability Phase 2 – Workflow
   Asset Integration Module
                                            Goals:                                  Benefits:
Asset Integration Module
                                            •Apply failure modes to Assets          •Engineered equipment
                                            •Select Asset coverage model            maintenance plans (EMP’s)
                                            •Facilitate condition monitoring        •Further planning efficiency gains
                                              sourcing strategy                     through EMP’s
                                            •Identify PdM/PM gaps                   •Additional CMMS gains through
                      Technology            •Create condition monitoring              creation of PdM & PM tasks
                       Sourcing               operational procedures                •Consistent measures and
                       Strategy                                                     reporting across technologies
    Equipment                                                                       •Identify PM’s required to address
                                            Deliverables:
                                                                                      Asset failure modes
    Maintenance                             •Equipment Maintenance Plan for in
      Plans                                  scope Assets
                                    Phase
     (EMP’s)                                •Coaching/Mentoring template
                                      3
                                            development for PM’s that address
                      Technology            targeted failure modes
                       Standards            •Documented and maintainable
                      OP1 & OP2              equipment maintenance plan
                                            •Condition monitoring (CM)
                                             operational standards
                                            •Recommended condition monitoring
                                             sourcing strategy
                                            •Targeted seminars supporting
                                             reliability program
                                            •Site support for installed processes




                                                                                       Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Processes and Tools
•   Based on the collection of Best Practices
•   Built by “Users”
•   Integration Theme
•   Enforces Discipline to Standards
•   Drives Transparency




                                              Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Walkdown Tool




                                        Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Walkdown Tool – Component Mapping




                                        Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Walkdown Tool-Attribute Entry




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Criticality Tool




                                           Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Criticality Tool- Category Management




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Criticality Tool-Ranking




                                          Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Asset Health Matrix (AHM) Tool




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

AHM-Component Management




                                       Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

AHM-Failure Mode Management




                                        Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

AHM- CBM Technology Coverage




                                        Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

AHM-Coverage Model




                                        Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

RCM Blitz Tool




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

RCM Blitz




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

RCM Blitz - FMECA




                                        Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

PM Evaluation Tool




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

PME Tool



                   •A PM classification sort is
                   applied.



                               •A PM recommendation sort
                               is applied.




                                           •Comments are added to
                                           clarify recommendations
                                           and classifications.




                                                                     Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

PME Tool – Sample Summary Output
PME Classification                      Total Number        %
Administration & Safety                      4342         64.39%
Asset Care                                   491          7.28%
Inspection                                   1405         20.84%
Quantitative PM                              464          6.88%
Regulatory                                    3           0.04%
Time Based Replacement                       38           0.56%




 PME Recommendation (Without Safety tasks)             Total Number                 %
 No Changes                                                653                  27.20%
 No Value Added (Delete)                                   313                  13.04%
 Re-Engineer                                               883                  36.78%
 Replace with PdM or NDT                                   552                  22.99%




                                                                 Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Developing Effective Work Procedures Tool




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

What is required in a procedure?




                                          Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

Driving consistency in procedures




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview

DEWP Tool




                                         Copyright 2007 Allied Reliability, Inc.
Asset Reliability Overview




Questions?


                               Copyright 2007 Allied Reliability, Inc.

Contenu connexe

Tendances

Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration Basics
Aras
 
raytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning SessionraytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning Session
finance12
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
Leanleaders.org
 

Tendances (20)

Adapting agile to the entreprise
Adapting agile to the entreprise Adapting agile to the entreprise
Adapting agile to the entreprise
 
What makes Agile Development so different?
What makes Agile Development so different?What makes Agile Development so different?
What makes Agile Development so different?
 
Instantis RMMM
Instantis RMMMInstantis RMMM
Instantis RMMM
 
Heizer 17
Heizer 17Heizer 17
Heizer 17
 
Heizer 16
Heizer 16Heizer 16
Heizer 16
 
Value Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge MgtValue Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge Mgt
 
Va Field Ops And It Governance
Va Field Ops And It GovernanceVa Field Ops And It Governance
Va Field Ops And It Governance
 
Proj desresdeliv gsw
Proj desresdeliv gswProj desresdeliv gsw
Proj desresdeliv gsw
 
About DD Consulting
About DD ConsultingAbout DD Consulting
About DD Consulting
 
Erp Logic Corporate Brochure
Erp Logic Corporate BrochureErp Logic Corporate Brochure
Erp Logic Corporate Brochure
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration Basics
 
Heizer supp 11
Heizer supp 11Heizer supp 11
Heizer supp 11
 
Heizer 10
Heizer 10Heizer 10
Heizer 10
 
ASUG 2010 - Structuring your Testing Chaos with Solution Manager
ASUG 2010 - Structuring your Testing Chaos with Solution ManagerASUG 2010 - Structuring your Testing Chaos with Solution Manager
ASUG 2010 - Structuring your Testing Chaos with Solution Manager
 
Risk management competency dictionary0
Risk management competency dictionary0Risk management competency dictionary0
Risk management competency dictionary0
 
T bone brochure en(1)
T bone brochure en(1)T bone brochure en(1)
T bone brochure en(1)
 
Snp T bone-dpm_overview
Snp T bone-dpm_overviewSnp T bone-dpm_overview
Snp T bone-dpm_overview
 
raytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning SessionraytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning Session
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
 

En vedette

En vedette (7)

Reliability Centered Commissioning Maturity Matrix
Reliability Centered Commissioning Maturity MatrixReliability Centered Commissioning Maturity Matrix
Reliability Centered Commissioning Maturity Matrix
 
Equipment Criticality
Equipment CriticalityEquipment Criticality
Equipment Criticality
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
RCM
RCMRCM
RCM
 
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made SimpleReliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made Simple
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 

Similaire à Allied Reliability Phase II EMP Development Overview (March 2009)

Performanceleadership
PerformanceleadershipPerformanceleadership
Performanceleadership
maxvink
 
Talk IT_ Oracle_정봉기_111025
Talk IT_ Oracle_정봉기_111025Talk IT_ Oracle_정봉기_111025
Talk IT_ Oracle_정봉기_111025
Cana Ko
 
Emids Afternoon Msi Case Study V1
Emids   Afternoon Msi Case Study V1Emids   Afternoon Msi Case Study V1
Emids Afternoon Msi Case Study V1
techcouncil
 
Business Governance Of Enterprise It
Business Governance Of Enterprise ItBusiness Governance Of Enterprise It
Business Governance Of Enterprise It
jponnoly
 
Forchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration ProfileForchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration Profile
Charles Forchu
 
Agile Framework
Agile FrameworkAgile Framework
Agile Framework
Subbuiyer
 
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
ARC Advisory Group
 

Similaire à Allied Reliability Phase II EMP Development Overview (March 2009) (20)

Performanceleadership
PerformanceleadershipPerformanceleadership
Performanceleadership
 
Value And Opportunity Identification
Value And Opportunity IdentificationValue And Opportunity Identification
Value And Opportunity Identification
 
Value And Opportunity Identification
Value And Opportunity IdentificationValue And Opportunity Identification
Value And Opportunity Identification
 
Talk IT_ Oracle_정봉기_111025
Talk IT_ Oracle_정봉기_111025Talk IT_ Oracle_정봉기_111025
Talk IT_ Oracle_정봉기_111025
 
EPM Roadmap - presented to OAUG
EPM Roadmap - presented to OAUGEPM Roadmap - presented to OAUG
EPM Roadmap - presented to OAUG
 
Emids Afternoon Msi Case Study V1
Emids   Afternoon Msi Case Study V1Emids   Afternoon Msi Case Study V1
Emids Afternoon Msi Case Study V1
 
Business Governance Of Enterprise It
Business Governance Of Enterprise ItBusiness Governance Of Enterprise It
Business Governance Of Enterprise It
 
Professional Support Services
Professional Support ServicesProfessional Support Services
Professional Support Services
 
Professional Support Services
Professional Support ServicesProfessional Support Services
Professional Support Services
 
Insight SaaS Overview - Cloud Computing
Insight SaaS Overview - Cloud ComputingInsight SaaS Overview - Cloud Computing
Insight SaaS Overview - Cloud Computing
 
Forchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration ProfileForchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration Profile
 
Transforming the Washington Metro\'s IT Renewal Program
Transforming the Washington Metro\'s IT Renewal ProgramTransforming the Washington Metro\'s IT Renewal Program
Transforming the Washington Metro\'s IT Renewal Program
 
Historical Perspective of the SCOR Model
Historical Perspective of the SCOR ModelHistorical Perspective of the SCOR Model
Historical Perspective of the SCOR Model
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation Overview
 
How to implement ECM?
How to implement ECM?How to implement ECM?
How to implement ECM?
 
SME Corp SCORE
SME Corp SCORESME Corp SCORE
SME Corp SCORE
 
Agile Framework
Agile FrameworkAgile Framework
Agile Framework
 
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
 
Quantificient Demo
Quantificient DemoQuantificient Demo
Quantificient Demo
 
Installing PMS in shamelin - a proposal
Installing PMS in shamelin -  a proposalInstalling PMS in shamelin -  a proposal
Installing PMS in shamelin - a proposal
 

Dernier

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 

Allied Reliability Phase II EMP Development Overview (March 2009)

  • 1. Asset Reliability Overview Allied Reliability Phased Approach to a Successful Reliability Initiative Presented by: What would you do Chris Colson with more free time? Copyright 2007 Allied Reliability, Inc.
  • 2. Asset Reliability Overview Agenda • Who is Allied • Overview of Approach • Overview of Tools • Questions / Answers Copyright 2007 Allied Reliability, Inc.
  • 3. Asset Reliability Overview Allied’s Reliability Success Formula Copyright 2007 Allied Reliability, Inc.
  • 4. Asset Reliability Overview Impact of a Complete Reliability Initiative High +75% +27% • Significantly Improved • Improved Bottom Bottom Line Line Performance Business Process and Performance Culture Maturity • Lack of System • Practices and Systems Support Aligned Baseline -7% • Systems are not •Informal Complemented by Effective • Manual Planning Business Processes Processes • Significant Inefficiencies • Below Average Business Performance Low High Low Technology Maturity Source: Brynjolfsson (MIT), Wireman, Troyer, Allied Copyright 2007 Allied Reliability, Inc.
  • 5. Asset Reliability Overview Copyright 2007 Allied Reliability, Inc.
  • 6. Asset Reliability Overview Focused Improvement the Allied Reliability Transformational Analytics – “5-R” Improvement Process Way… Rationalize Ratify Recognize Develop Create and Identify Known PR Simulation Conduct Prioritized (Baseline) Educate Process Problem or Internal and and/or Reliability FMEA Blitz Improvement PR Plots Improvement Value Stream External Non Modeling Plan Team (PIT) Mapping Value-Add (VSM) And Wastes Eliminate ALL Manufacturing Wastes… Overproduction Transporting FMECA RCA Quality Inventory (All Defects) Motion RCM Sustain the Gains… Processing Waiting Train To New Audit/Monitor Document Process Continually New Process Resolve Realize Copyright 2007 Allied Reliability, Inc.
  • 7. Asset Reliability Overview Allied Reliability – Overall AHA Workstream Asset Registry Module Asset Analysis Module Asset Integration Module Installed Asset Component Criticality Verification Analysis Technology Sourcing Strategy Asset RCM Equipment Definition Analysis Maintenance Phase Plans (EMP’s) (top 5-20%) 3 Technology Failure Asset Standards Mode Hierarchy OP1 & OP2 Analysis Copyright 2007 Allied Reliability, Inc.
  • 8. Asset Reliability Overview Asset Registry Module Goals: Benefits: Asset Registry Module •Defines criteria for Asset selection •Increased planning efficiency due to •Identifies desired attributes by Asset type hierarchy structure •Uncovers Asset types requiring •Increased scheduling efficiency due Installed Failure Mode Analysis (FMA's) to hierarchy structure Component •Verify/identify installed Components •Hierarchy provides added granularity Verification •Creation of logical system to when criticality performed Asset structure •Components tracking through tagging and functional location •Improved cost tracking through Deliverables: Asset hierarchy structure •Accurate Asset count Definition •Increased MRO efficiency through •Complete hierarchy for Assets accurate Asset list •Component change control through tracking •Improved CMMS through addition •Multiple level cost tracking of hierarchy structure •Attribute data for Asset Asset repairs/replacement Hierarchy •Logical functional location •Hierarchy template for CMMS upload •Targeted seminars supporting reliability program •Site support for installed processes Copyright 2007 Allied Reliability, Inc.
  • 9. Asset Reliability Overview Allied Reliability Phase 2 – Workflow Asset Analysis Module Goals: Benefits: Asset Analysis Module •Rank Assets using multiple criteria •Additional scheduling efficiency through •Refines planning and scheduling use of Asset ranking •Refine Maintenance, Repair and Operational •Input to critical spares through Asset Assets (MRO) Asset criticality Criticality •Categorize failure modes •Further CMMS improvement by Analysis addition of attribute & criticality •Improved MRO function through Deliverables: use of CMMS data •Ranked Asset list •Ability to prioritize failures and create •Defined failure modes for Asset types RCM “bad actors” list •Attribute template for CMMS upload Analysis •Targeted seminars supporting reliability (top 5-20%) program •Site support for installed processes Failure Mode Analysis Copyright 2007 Allied Reliability, Inc.
  • 10. Asset Reliability Overview Allied Reliability Phase 2 – Workflow Asset Integration Module Goals: Benefits: Asset Integration Module •Apply failure modes to Assets •Engineered equipment •Select Asset coverage model maintenance plans (EMP’s) •Facilitate condition monitoring •Further planning efficiency gains sourcing strategy through EMP’s •Identify PdM/PM gaps •Additional CMMS gains through Technology •Create condition monitoring creation of PdM & PM tasks Sourcing operational procedures •Consistent measures and Strategy reporting across technologies Equipment •Identify PM’s required to address Deliverables: Asset failure modes Maintenance •Equipment Maintenance Plan for in Plans scope Assets Phase (EMP’s) •Coaching/Mentoring template 3 development for PM’s that address Technology targeted failure modes Standards •Documented and maintainable OP1 & OP2 equipment maintenance plan •Condition monitoring (CM) operational standards •Recommended condition monitoring sourcing strategy •Targeted seminars supporting reliability program •Site support for installed processes Copyright 2007 Allied Reliability, Inc.
  • 11. Asset Reliability Overview Processes and Tools • Based on the collection of Best Practices • Built by “Users” • Integration Theme • Enforces Discipline to Standards • Drives Transparency Copyright 2007 Allied Reliability, Inc.
  • 12. Asset Reliability Overview Walkdown Tool Copyright 2007 Allied Reliability, Inc.
  • 13. Asset Reliability Overview Walkdown Tool – Component Mapping Copyright 2007 Allied Reliability, Inc.
  • 14. Asset Reliability Overview Walkdown Tool-Attribute Entry Copyright 2007 Allied Reliability, Inc.
  • 15. Asset Reliability Overview Criticality Tool Copyright 2007 Allied Reliability, Inc.
  • 16. Asset Reliability Overview Criticality Tool- Category Management Copyright 2007 Allied Reliability, Inc.
  • 17. Asset Reliability Overview Criticality Tool-Ranking Copyright 2007 Allied Reliability, Inc.
  • 18. Asset Reliability Overview Asset Health Matrix (AHM) Tool Copyright 2007 Allied Reliability, Inc.
  • 19. Asset Reliability Overview AHM-Component Management Copyright 2007 Allied Reliability, Inc.
  • 20. Asset Reliability Overview AHM-Failure Mode Management Copyright 2007 Allied Reliability, Inc.
  • 21. Asset Reliability Overview AHM- CBM Technology Coverage Copyright 2007 Allied Reliability, Inc.
  • 22. Asset Reliability Overview AHM-Coverage Model Copyright 2007 Allied Reliability, Inc.
  • 23. Asset Reliability Overview RCM Blitz Tool Copyright 2007 Allied Reliability, Inc.
  • 24. Asset Reliability Overview RCM Blitz Copyright 2007 Allied Reliability, Inc.
  • 25. Asset Reliability Overview RCM Blitz - FMECA Copyright 2007 Allied Reliability, Inc.
  • 26. Asset Reliability Overview PM Evaluation Tool Copyright 2007 Allied Reliability, Inc.
  • 27. Asset Reliability Overview PME Tool •A PM classification sort is applied. •A PM recommendation sort is applied. •Comments are added to clarify recommendations and classifications. Copyright 2007 Allied Reliability, Inc.
  • 28. Asset Reliability Overview PME Tool – Sample Summary Output PME Classification Total Number % Administration & Safety 4342 64.39% Asset Care 491 7.28% Inspection 1405 20.84% Quantitative PM 464 6.88% Regulatory 3 0.04% Time Based Replacement 38 0.56% PME Recommendation (Without Safety tasks) Total Number % No Changes 653 27.20% No Value Added (Delete) 313 13.04% Re-Engineer 883 36.78% Replace with PdM or NDT 552 22.99% Copyright 2007 Allied Reliability, Inc.
  • 29. Asset Reliability Overview Developing Effective Work Procedures Tool Copyright 2007 Allied Reliability, Inc.
  • 30. Asset Reliability Overview What is required in a procedure? Copyright 2007 Allied Reliability, Inc.
  • 31. Asset Reliability Overview Driving consistency in procedures Copyright 2007 Allied Reliability, Inc.
  • 32. Asset Reliability Overview DEWP Tool Copyright 2007 Allied Reliability, Inc.
  • 33. Asset Reliability Overview Questions? Copyright 2007 Allied Reliability, Inc.