Program briefing for Deutsche Bank
Tom Williams
EVP Programs
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
Single Aisle Family
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A320 Family - Main Highlights
• 4291 A320 Family aircraft delivered
224 customers and 246 operators
• 4000th A320 Family aircraft delivered to TAM on August 2009
• A backlog of >2200 aircraft, representing more than 5 years of
production
• Production rate will be increased from 34 to 36 aircraft per month in
December 2010 (Toulouse 15, Hamburg 18, Tianjin 3)
• First delivery from Final Assembly Line in Tianjin China in June 2009
• 50 Million revenue take-offs since 1988
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
Page 4
A320 Family major improvements
• Passenger to Freighter
Development of Passenger Aircraft to Freighter Conversion ongoing with
Russian Partner Irkut and EADS- EFW
Concept phase concluded
Mock up tests started
• Fuel Tank Inerting System
First embodiment on serial aircraft done
11 aircraft expected for FTIS delivery in 2010
• Life Time Extension project (ESG)
ESG1 with 60000 FC/ 120000 FH as new Limit of Validity (LoV)
For ESG2 all fatigue tests are ahead of schedule with very encouraging
results so far -between 139000 and 170000 simulated flights are achieved.
Parallel system and structure justification activities are in progress
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A320 Family major improvements
June 2010 Program overview for DB
• Continuous weight reduction development in progress
• Re-design of around 40 computers & systems to bring them to the most
enhanced technology standard
• Several Aerostructure redesign and Weight saving projects running in
2010
• Cabin innovations projects under investigation
o Cabin Efficiency & Earning Capacity improvements
(e.g. Cabin furnishing redesign to increase seat count)
o Airbus Productivity optimisation
→ Opportunity for A380 Design Language application
Continuously improving a successful product Family
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A320 Family major improvements
• Sharklet development
Development launched for EIS end 2012
Fuel savings of up to 3.5%
• Feasibility study to Re-engining
Investigation with engine and nacelles suppliers on-going
Results ready for decision in 2010
• Wing equipping FAL China: 1st wing delivery in February 2010
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330/A340 Programme
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330/A340 Programme Main Highlights
• 1,068 A330/A340 aircraft delivered by end of May 2010
116 customers and 111 operators
• 86 A330/A340 aircraft delivered in 2009
38 A330-200, 38 A330-300, 8 A340-600, 2 A340-500
• A healthy backlog of around 400 aircraft, representing almost five
years of production
• Production rate capped at 8.5 aircraft per month
June 2010 Program overview for DB Page 8
1000th A330/A340 delivered to
Thai Airways in July 2009
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330 Dispatch reliability
A330 Operational Reliability (%)
• A330 Operational Dispatch reliability :
99.64% for A330-300 SIA with first FHS contract
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330 : an increasingly versatile Family
June 2010 Program overview for DB
• A330-200 MRTT : 28 commitments with four customers
Fuel transfer tests successfully achieved
EASA civil certification granted on 17 Mar 2010
Military certification planned by the end of 2010
• KC 45 for US Air Force:
Final RFP released on 24 Feb 2010
Northrop Grumman Corporation decision to not bid on 8 Mar 2010
EADS NA intends to submit proposal to US Air Force as a prime contractor
Proposal submission (with 60 days extension) to be made latest 9 July 2010
A330 MRTT has won five competitions in a row
Page 10
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330 : an increasingly versatile Family
• A330-200 Freighter:
64 orders from 10 customers
First flight on 5 Nov 2009
EASA certification granted on 9 Apr 2010
First delivery to Etihad in Summer 2010
Five aircraft to be delivered in 2010
June 2010 Program overview for DB Page 11
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330-200: More Range, More Payload
June 2010 Program overview for DB
London
Santiago
Manilla
Singapore
Jakarta
Buenos Aires
Brunei
A330-200, CF6-80E1-A4
JAR 3%, ISA +0, 200nm Alternate
95kg Pax & Bags, Typical Airline Rules
MTOW 233 t
MTOW 238 t
EIS : September 2010 with Korean Airlines
Page 12
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330/A340 Family Innovations
June 2010 Program overview for DB
GSM on-board and Live Internet for
passengers certified and in operation
since February 2010
Electronic Flight Bag
certified and in operation
allowing “paperless” cockpit
Page 13
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
Page 14
Continuous A330/A340 Improvements
• A330 ETOPS 240 minute certification granted on 14 Oct 2009 by EASA
• New PW 4000 Advantage70 engine:
EIS in June 2009, basic on A330 Freighter
• Enhanced Trent 700 engine:
EIS in 2009, basic on A330 Freighter
• Design Service Goal extension
Intermediate Service Goals (ISG) granted by EASA on 15 Dec 2009
Extended Service Goals (ESG) in preparation for 2012
• Maintenance programme improvement
Check A: now 800 Flight hours (was 600 hours)
Check C: 21/24 months (was 18 months)
June 2010 Program overview for DB
The right aircraft, right now
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A330/A340 Programme – Main challenges in 2010
• Deliver ~ 8 aircraft per month
while managing customers base and suppliers (e.g BFE seats)
continuing to maintain quality
• Reduce costs with implementation of Power 8
Lean, smart buying, leadtime reduction, Cabin Business model, ROC.
• Deliver the first A330-200 Freighter in Summer 2010
Deliver four more by end 2010
Support Freighter business strategy to capture additional orders.
• Continue to improve the performance of the A330
e.g lower fuel consumption, weight savings, MTOW increase, ESG, FHS
• Support military derivatives business and the bid for the KC-45
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380 industrialisation
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
Market validation
All 3 alliances
represented
234
firm orders from
17 Customers
6 A380
15 A380
10 A380
5 A380
10 A380
4 a/c
5 A380
12 A380
19 A380
5 A380
6 A380
1 A380
20 A380
6 A380
12 A380
10 A380
90 A380
2 A3802 A380
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380 Moving Forward
• Major challenges behind us
• Out of sequence work decreasing constantly
• Focus is on stabilising production
Page 18June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380: Brake to Vacate (BTV)
• Certified in October 2009 for Air France delivery
• Optimizes braking energy and Turn Around Time
• Guarantee to vacate at the assigned exit
• Optimize Runway Occupancy Time
Page 19June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380: Runway Overrun Protection System
• Certified in October 2009 for Air France delivery
• Runway Overrun Warning (ROW):
Provides an early real time warning in case of anticipated runway overrun situation
• Runway Overrun Protection (ROP):
Provides a real time auto max braking and crew alert in case of detected runway
overrun situation at landing
Page 20June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380: Head Up Display
• Certified in dual configuration (Captain & First Officer) in July 2009
for Air France delivery
Increase approach stability
Lower visibility take-off minima
Lower approach minima
Page 21June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380: Connectivity
• ALNAv2 with High Speed Satcom Swift 64 certified in August 2009
for Qantas delivery in November 2009
• Swift BroadBand (SBB) Certified in November 2009
Provides passenger in flight webmail, webchat service with Onair
Supports telemedecine data transmission
Supports Electronic Flight Folder data transmission
Page 22June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380 New Design Weights Option
• From 2013 onwards for new aircraft deliveries, airlines will be able to select
increased design weights:
Current variant : 569 t / 391 t / 366 t for MTOW/MLW/MZFW
Increased Variant : 573 t / 393 t / 368 t
• Adds ~100nm range on MTOW-limited missions
Range capability increased to 8,300nm
Adds ~ 1.5t (3300lb) max. structural payload on MZFW-limited missions
• Leveraging output from more than 45,000 Flight Cycles (end April 2010) of full-
scale fatigue test so far
That is 2.4 DSG (“aircraft lives”) and test continuing to > 2.5 aircraft lives
• Achieved through loads reductions (Partly through flight control laws optimisation)
and minor local modifications
Page 23
The new A380 design weights option brings
increased revenue generation potential
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
A380 Program… To Conclude
• Significant and measurable improvements achieved
• Strong convergence in all industrial phases
• Strong measures deployed
• High reactivity implemented to address and fix any
problem (Stop & Fix)
• A380 Continuous development
Page 24June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
… to conclude
• Significant and measurable improvements achieved
• Strong convergence in all industrial phases
• Strong measures deployed to secure all success critical
actions
• Strict discipline in adhering to each milestone
• High reactivity implemented to address and fix any
problem
June 2010 Program overview for DB
©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument.
June 2010 Program overview for DB
© AIRBUS S.A.S. All rights reserved. Confidential and
proprietary document.
This document and all information contained herein is the sole
property of AIRBUS S.A.S.. No intellectual property rights are
granted by the delivery of this document or the disclosure of
its content. This document shall not be reproduced or
disclosed to a third party without the express written consent
of AIRBUS S.A.S. This document and its content shall not be
used for any purpose other than that for which it is supplied.
The statements made herein do not constitute an offer. They
are based on the mentioned assumptions and are expressed
in good faith. Where the supporting grounds for these
statements are not shown, AIRBUS S.A.S. will be pleased to
explain the basis thereof.
AIRBUS, its logo, A300, A310, A318, A319, A320, A321,
A330, A340, A350, A380, A400M are registered trademarks.

Contenu connexe

Tendances

Vrp conference final
Vrp conference finalVrp conference final
Vrp conference finalTextronCorp
 
Airbus military customer services update 2012
Airbus military customer services update 2012Airbus military customer services update 2012
Airbus military customer services update 2012ICSA, LLC
 
Jefferies 2015 Industrials Conference
Jefferies 2015 Industrials ConferenceJefferies 2015 Industrials Conference
Jefferies 2015 Industrials ConferenceTextronCorp
 
European Rotors - Contributing to the Swiss Innovation Day
European Rotors - Contributing to the Swiss Innovation Day European Rotors - Contributing to the Swiss Innovation Day
European Rotors - Contributing to the Swiss Innovation Day Leonardo
 
Txt baird conference final
Txt baird conference finalTxt baird conference final
Txt baird conference finalTextronCorp
 
European Rotors - Certification by Simulation
European Rotors - Certification by SimulationEuropean Rotors - Certification by Simulation
European Rotors - Certification by SimulationLeonardo
 
A400 m training 2012
A400 m training 2012A400 m training 2012
A400 m training 2012ICSA, LLC
 
ComAv 2015 Overview Presentation
ComAv 2015 Overview PresentationComAv 2015 Overview Presentation
ComAv 2015 Overview PresentationCraig Garrick, Jr.
 
Txt morgan stanley conference final
Txt morgan stanley conference finalTxt morgan stanley conference final
Txt morgan stanley conference finalTextronCorp
 
Textron Aviation 2015 Analyst Meeting
Textron Aviation 2015 Analyst MeetingTextron Aviation 2015 Analyst Meeting
Textron Aviation 2015 Analyst MeetingTextronCorp
 
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...Leonardo
 
European Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft OperationsEuropean Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft OperationsLeonardo
 
Cowen 02 05-15 final
Cowen 02 05-15 finalCowen 02 05-15 final
Cowen 02 05-15 finalTextronCorp
 
Wells fargo final
Wells fargo finalWells fargo final
Wells fargo finalTextronCorp
 
Textron Inc. at Vertical Research Partners Industrial Conference
Textron Inc. at Vertical Research Partners Industrial ConferenceTextron Inc. at Vertical Research Partners Industrial Conference
Textron Inc. at Vertical Research Partners Industrial ConferenceTextronCorp
 
RBC Industrials Conference
RBC Industrials ConferenceRBC Industrials Conference
RBC Industrials ConferenceTextronCorp
 
Brochure AgustaWestland AW159
Brochure AgustaWestland AW159Brochure AgustaWestland AW159
Brochure AgustaWestland AW159Leonardo
 

Tendances (20)

Vrp conference final
Vrp conference finalVrp conference final
Vrp conference final
 
Airbus military customer services update 2012
Airbus military customer services update 2012Airbus military customer services update 2012
Airbus military customer services update 2012
 
Epg conference
Epg conferenceEpg conference
Epg conference
 
Jefferies 2015 Industrials Conference
Jefferies 2015 Industrials ConferenceJefferies 2015 Industrials Conference
Jefferies 2015 Industrials Conference
 
European Rotors - Contributing to the Swiss Innovation Day
European Rotors - Contributing to the Swiss Innovation Day European Rotors - Contributing to the Swiss Innovation Day
European Rotors - Contributing to the Swiss Innovation Day
 
Txt baird conference final
Txt baird conference finalTxt baird conference final
Txt baird conference final
 
European Rotors - Certification by Simulation
European Rotors - Certification by SimulationEuropean Rotors - Certification by Simulation
European Rotors - Certification by Simulation
 
Rbc conference
Rbc conferenceRbc conference
Rbc conference
 
A400 m training 2012
A400 m training 2012A400 m training 2012
A400 m training 2012
 
ComAv 2015 Overview Presentation
ComAv 2015 Overview PresentationComAv 2015 Overview Presentation
ComAv 2015 Overview Presentation
 
Txt morgan stanley conference final
Txt morgan stanley conference finalTxt morgan stanley conference final
Txt morgan stanley conference final
 
Textron Aviation 2015 Analyst Meeting
Textron Aviation 2015 Analyst MeetingTextron Aviation 2015 Analyst Meeting
Textron Aviation 2015 Analyst Meeting
 
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
 
European Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft OperationsEuropean Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft Operations
 
Cowen 02 05-15 final
Cowen 02 05-15 finalCowen 02 05-15 final
Cowen 02 05-15 final
 
OnYourWing0002_eng
OnYourWing0002_engOnYourWing0002_eng
OnYourWing0002_eng
 
Wells fargo final
Wells fargo finalWells fargo final
Wells fargo final
 
Textron Inc. at Vertical Research Partners Industrial Conference
Textron Inc. at Vertical Research Partners Industrial ConferenceTextron Inc. at Vertical Research Partners Industrial Conference
Textron Inc. at Vertical Research Partners Industrial Conference
 
RBC Industrials Conference
RBC Industrials ConferenceRBC Industrials Conference
RBC Industrials Conference
 
Brochure AgustaWestland AW159
Brochure AgustaWestland AW159Brochure AgustaWestland AW159
Brochure AgustaWestland AW159
 

Similaire à Db presentation1

Airbus annual press_conference_2013_slides_-_bre
Airbus annual press_conference_2013_slides_-_breAirbus annual press_conference_2013_slides_-_bre
Airbus annual press_conference_2013_slides_-_brefEngel
 
Big picture framework Airbus
Big picture framework  AirbusBig picture framework  Airbus
Big picture framework AirbusUrooj Ansari
 
Dedienne Mro Management 2011 March Edition
Dedienne   Mro Management 2011 March EditionDedienne   Mro Management 2011 March Edition
Dedienne Mro Management 2011 March EditionAmir MEKHAEIL
 
The Benefits for Business of Forging Closer China EU Trade and Investment Rel...
The Benefits for Business of Forging Closer China EU Trade and Investment Rel...The Benefits for Business of Forging Closer China EU Trade and Investment Rel...
The Benefits for Business of Forging Closer China EU Trade and Investment Rel...Asia Matters
 
Service Solutions December 2006
Service Solutions December 2006Service Solutions December 2006
Service Solutions December 2006RobertBarton
 
dane_mcmillan August 2015 CV
dane_mcmillan August 2015 CVdane_mcmillan August 2015 CV
dane_mcmillan August 2015 CVDane McMillan
 
Qatar airways presentation
Qatar airways presentationQatar airways presentation
Qatar airways presentationRaju Dong
 
Airbus Ppt
Airbus PptAirbus Ppt
Airbus PptUmesh
 
Elements Of Aircraft Maintenance Reserve Development Iata Mcc
Elements Of Aircraft Maintenance Reserve Development   Iata MccElements Of Aircraft Maintenance Reserve Development   Iata Mcc
Elements Of Aircraft Maintenance Reserve Development Iata Mccspackert
 
Newswatch Volume 11 issue 35 - september 16
Newswatch Volume 11   issue 35 - september 16Newswatch Volume 11   issue 35 - september 16
Newswatch Volume 11 issue 35 - september 16benjacques
 
AerSale MRO Presentation
AerSale MRO PresentationAerSale MRO Presentation
AerSale MRO PresentationSteven Lyons
 
Aeronautical New Projects in different parts of the world
Aeronautical New Projects in different parts of the worldAeronautical New Projects in different parts of the world
Aeronautical New Projects in different parts of the worldEduardoFalco16
 
Adu all energy diversification 160505
Adu all energy diversification 160505Adu all energy diversification 160505
Adu all energy diversification 160505BVG Associates
 
Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification StephenGeoMills
 
Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016ICSA, LLC
 
Technology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveTechnology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveICSA, LLC
 

Similaire à Db presentation1 (20)

Airbus annual press_conference_2013_slides_-_bre
Airbus annual press_conference_2013_slides_-_breAirbus annual press_conference_2013_slides_-_bre
Airbus annual press_conference_2013_slides_-_bre
 
Big picture framework Airbus
Big picture framework  AirbusBig picture framework  Airbus
Big picture framework Airbus
 
Dedienne Mro Management 2011 March Edition
Dedienne   Mro Management 2011 March EditionDedienne   Mro Management 2011 March Edition
Dedienne Mro Management 2011 March Edition
 
The Benefits for Business of Forging Closer China EU Trade and Investment Rel...
The Benefits for Business of Forging Closer China EU Trade and Investment Rel...The Benefits for Business of Forging Closer China EU Trade and Investment Rel...
The Benefits for Business of Forging Closer China EU Trade and Investment Rel...
 
Airbus a380 details 9939393
Airbus a380 details 9939393Airbus a380 details 9939393
Airbus a380 details 9939393
 
Service Solutions December 2006
Service Solutions December 2006Service Solutions December 2006
Service Solutions December 2006
 
dane_mcmillan August 2015 CV
dane_mcmillan August 2015 CVdane_mcmillan August 2015 CV
dane_mcmillan August 2015 CV
 
Qatar airways presentation
Qatar airways presentationQatar airways presentation
Qatar airways presentation
 
Blended Wing Body Aircraft
Blended Wing Body AircraftBlended Wing Body Aircraft
Blended Wing Body Aircraft
 
Airbus Ppt
Airbus PptAirbus Ppt
Airbus Ppt
 
Elements Of Aircraft Maintenance Reserve Development Iata Mcc
Elements Of Aircraft Maintenance Reserve Development   Iata MccElements Of Aircraft Maintenance Reserve Development   Iata Mcc
Elements Of Aircraft Maintenance Reserve Development Iata Mcc
 
Newswatch Volume 11 issue 35 - september 16
Newswatch Volume 11   issue 35 - september 16Newswatch Volume 11   issue 35 - september 16
Newswatch Volume 11 issue 35 - september 16
 
AerSale MRO Presentation
AerSale MRO PresentationAerSale MRO Presentation
AerSale MRO Presentation
 
Aeronautical New Projects in different parts of the world
Aeronautical New Projects in different parts of the worldAeronautical New Projects in different parts of the world
Aeronautical New Projects in different parts of the world
 
Adu all energy diversification 160505
Adu all energy diversification 160505Adu all energy diversification 160505
Adu all energy diversification 160505
 
Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification
 
Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016
 
Technology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveTechnology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space Perspective
 
NetJets Overview Presentation
NetJets Overview PresentationNetJets Overview Presentation
NetJets Overview Presentation
 
Raj
RajRaj
Raj
 

Dernier

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Dernier (20)

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Db presentation1

  • 1. Program briefing for Deutsche Bank Tom Williams EVP Programs June 2010 Program overview for DB
  • 3. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A320 Family - Main Highlights • 4291 A320 Family aircraft delivered 224 customers and 246 operators • 4000th A320 Family aircraft delivered to TAM on August 2009 • A backlog of >2200 aircraft, representing more than 5 years of production • Production rate will be increased from 34 to 36 aircraft per month in December 2010 (Toulouse 15, Hamburg 18, Tianjin 3) • First delivery from Final Assembly Line in Tianjin China in June 2009 • 50 Million revenue take-offs since 1988 June 2010 Program overview for DB
  • 4. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. Page 4 A320 Family major improvements • Passenger to Freighter Development of Passenger Aircraft to Freighter Conversion ongoing with Russian Partner Irkut and EADS- EFW Concept phase concluded Mock up tests started • Fuel Tank Inerting System First embodiment on serial aircraft done 11 aircraft expected for FTIS delivery in 2010 • Life Time Extension project (ESG) ESG1 with 60000 FC/ 120000 FH as new Limit of Validity (LoV) For ESG2 all fatigue tests are ahead of schedule with very encouraging results so far -between 139000 and 170000 simulated flights are achieved. Parallel system and structure justification activities are in progress June 2010 Program overview for DB
  • 5. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A320 Family major improvements June 2010 Program overview for DB • Continuous weight reduction development in progress • Re-design of around 40 computers & systems to bring them to the most enhanced technology standard • Several Aerostructure redesign and Weight saving projects running in 2010 • Cabin innovations projects under investigation o Cabin Efficiency & Earning Capacity improvements (e.g. Cabin furnishing redesign to increase seat count) o Airbus Productivity optimisation → Opportunity for A380 Design Language application Continuously improving a successful product Family
  • 6. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A320 Family major improvements • Sharklet development Development launched for EIS end 2012 Fuel savings of up to 3.5% • Feasibility study to Re-engining Investigation with engine and nacelles suppliers on-going Results ready for decision in 2010 • Wing equipping FAL China: 1st wing delivery in February 2010 June 2010 Program overview for DB
  • 8. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330/A340 Programme Main Highlights • 1,068 A330/A340 aircraft delivered by end of May 2010 116 customers and 111 operators • 86 A330/A340 aircraft delivered in 2009 38 A330-200, 38 A330-300, 8 A340-600, 2 A340-500 • A healthy backlog of around 400 aircraft, representing almost five years of production • Production rate capped at 8.5 aircraft per month June 2010 Program overview for DB Page 8 1000th A330/A340 delivered to Thai Airways in July 2009
  • 9. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330 Dispatch reliability A330 Operational Reliability (%) • A330 Operational Dispatch reliability : 99.64% for A330-300 SIA with first FHS contract June 2010 Program overview for DB
  • 10. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330 : an increasingly versatile Family June 2010 Program overview for DB • A330-200 MRTT : 28 commitments with four customers Fuel transfer tests successfully achieved EASA civil certification granted on 17 Mar 2010 Military certification planned by the end of 2010 • KC 45 for US Air Force: Final RFP released on 24 Feb 2010 Northrop Grumman Corporation decision to not bid on 8 Mar 2010 EADS NA intends to submit proposal to US Air Force as a prime contractor Proposal submission (with 60 days extension) to be made latest 9 July 2010 A330 MRTT has won five competitions in a row Page 10
  • 11. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330 : an increasingly versatile Family • A330-200 Freighter: 64 orders from 10 customers First flight on 5 Nov 2009 EASA certification granted on 9 Apr 2010 First delivery to Etihad in Summer 2010 Five aircraft to be delivered in 2010 June 2010 Program overview for DB Page 11
  • 12. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330-200: More Range, More Payload June 2010 Program overview for DB London Santiago Manilla Singapore Jakarta Buenos Aires Brunei A330-200, CF6-80E1-A4 JAR 3%, ISA +0, 200nm Alternate 95kg Pax & Bags, Typical Airline Rules MTOW 233 t MTOW 238 t EIS : September 2010 with Korean Airlines Page 12
  • 13. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330/A340 Family Innovations June 2010 Program overview for DB GSM on-board and Live Internet for passengers certified and in operation since February 2010 Electronic Flight Bag certified and in operation allowing “paperless” cockpit Page 13
  • 14. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. Page 14 Continuous A330/A340 Improvements • A330 ETOPS 240 minute certification granted on 14 Oct 2009 by EASA • New PW 4000 Advantage70 engine: EIS in June 2009, basic on A330 Freighter • Enhanced Trent 700 engine: EIS in 2009, basic on A330 Freighter • Design Service Goal extension Intermediate Service Goals (ISG) granted by EASA on 15 Dec 2009 Extended Service Goals (ESG) in preparation for 2012 • Maintenance programme improvement Check A: now 800 Flight hours (was 600 hours) Check C: 21/24 months (was 18 months) June 2010 Program overview for DB The right aircraft, right now
  • 15. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A330/A340 Programme – Main challenges in 2010 • Deliver ~ 8 aircraft per month while managing customers base and suppliers (e.g BFE seats) continuing to maintain quality • Reduce costs with implementation of Power 8 Lean, smart buying, leadtime reduction, Cabin Business model, ROC. • Deliver the first A330-200 Freighter in Summer 2010 Deliver four more by end 2010 Support Freighter business strategy to capture additional orders. • Continue to improve the performance of the A330 e.g lower fuel consumption, weight savings, MTOW increase, ESG, FHS • Support military derivatives business and the bid for the KC-45 June 2010 Program overview for DB
  • 17. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. Market validation All 3 alliances represented 234 firm orders from 17 Customers 6 A380 15 A380 10 A380 5 A380 10 A380 4 a/c 5 A380 12 A380 19 A380 5 A380 6 A380 1 A380 20 A380 6 A380 12 A380 10 A380 90 A380 2 A3802 A380
  • 18. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380 Moving Forward • Major challenges behind us • Out of sequence work decreasing constantly • Focus is on stabilising production Page 18June 2010 Program overview for DB
  • 19. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380: Brake to Vacate (BTV) • Certified in October 2009 for Air France delivery • Optimizes braking energy and Turn Around Time • Guarantee to vacate at the assigned exit • Optimize Runway Occupancy Time Page 19June 2010 Program overview for DB
  • 20. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380: Runway Overrun Protection System • Certified in October 2009 for Air France delivery • Runway Overrun Warning (ROW): Provides an early real time warning in case of anticipated runway overrun situation • Runway Overrun Protection (ROP): Provides a real time auto max braking and crew alert in case of detected runway overrun situation at landing Page 20June 2010 Program overview for DB
  • 21. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380: Head Up Display • Certified in dual configuration (Captain & First Officer) in July 2009 for Air France delivery Increase approach stability Lower visibility take-off minima Lower approach minima Page 21June 2010 Program overview for DB
  • 22. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380: Connectivity • ALNAv2 with High Speed Satcom Swift 64 certified in August 2009 for Qantas delivery in November 2009 • Swift BroadBand (SBB) Certified in November 2009 Provides passenger in flight webmail, webchat service with Onair Supports telemedecine data transmission Supports Electronic Flight Folder data transmission Page 22June 2010 Program overview for DB
  • 23. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380 New Design Weights Option • From 2013 onwards for new aircraft deliveries, airlines will be able to select increased design weights: Current variant : 569 t / 391 t / 366 t for MTOW/MLW/MZFW Increased Variant : 573 t / 393 t / 368 t • Adds ~100nm range on MTOW-limited missions Range capability increased to 8,300nm Adds ~ 1.5t (3300lb) max. structural payload on MZFW-limited missions • Leveraging output from more than 45,000 Flight Cycles (end April 2010) of full- scale fatigue test so far That is 2.4 DSG (“aircraft lives”) and test continuing to > 2.5 aircraft lives • Achieved through loads reductions (Partly through flight control laws optimisation) and minor local modifications Page 23 The new A380 design weights option brings increased revenue generation potential June 2010 Program overview for DB
  • 24. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. A380 Program… To Conclude • Significant and measurable improvements achieved • Strong convergence in all industrial phases • Strong measures deployed • High reactivity implemented to address and fix any problem (Stop & Fix) • A380 Continuous development Page 24June 2010 Program overview for DB
  • 25. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. … to conclude • Significant and measurable improvements achieved • Strong convergence in all industrial phases • Strong measures deployed to secure all success critical actions • Strict discipline in adhering to each milestone • High reactivity implemented to address and fix any problem June 2010 Program overview for DB
  • 26. ©AIRBUSS.A.S.Allrightsreserved.Confidentialandproprietarydocument. June 2010 Program overview for DB © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S.. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.