Rebuilding ofthe District Cooling Plantat theWorld Trade Center 	Hemant Mehta, P.E.	and	Christopher Tso, P.E. 	WM Group Engineers, P.C.		CRC Engineering, P.C.
Executive Summary Project highlights and challenges: 12,500 ton central chiller plant, river water systems and site chilled water distribution system design Provides ten (10) stakeholders with CHW for cooling Uses river water from the Hudson River for condensing Rehabilitation of the existing river water pump station Compliance with environmental permit (SPDES) for river water use Salt water (river water) systems design Chiller plant energy modeling and configuration study Site chilled water distribution system design passing through other stakeholder areas Extensive coordination with other projects onsite at varying stages of design / construction
Project Highlights 12,500 ton chiller plant and distribution system Five 2500 ton electric centrifugal chillers Five 300 hp chilled water pumps with VFDs Two 1000 ton free/pre-cooling plate & frame heat exchangers (chilled water / river water) River water pump station rehabilitation Environmental permit requirements Four 500 hp vertical turbine river water pumps with VFDs Replacement/rehabilitation of traveling screens and sluice gates
Stakeholders Served National September 11 Memorial & Museum Freedom Tower retail Transportation Hub Performing Arts Center East Bathtub retail Vehicle Security Center Master Manager MTA Cortland Street 	‘1-train’ Subway Station North Access South Projection
Project Challenges Rigging of equipment Coordination with many other projects onsite at varying stages of design/construction Central chiller plant is located below grade inside the National September 11 Memorial & Museum Site chilled water distribution passes through other stakeholder spaces Phased stakeholder loads Construction staging/logistics Site wide systems integration
World Trade Center Site
World Trade Center Site Chiller Plant Below Memorial Plaza
Chiller Plant Configuration Study Detailed energy and operating cost modeling Hourly weather data Hourly river water temperature data Equipment part-load performance VFDs vs constant speed drives for the chillers Free cooling operation Utility rate schedule Procurement considerations Multiple bidders required
Cooling Load Profile
River Water Temperature
Free Cooling Operation
River Water Systems Design Condition survey River water pump station equipment River water pump station diver inspection River water pump station ductbank condition survey Interior piping inspection of 60 and 66 inch underground river water mains Environmental permit requirements (SPDES) VFDs for river water pumps Metering/logging of flows and temperatures
River Water Pump Station
Existing River Water Piping Inspection
River Water Systems Design Salt water system design Materials and coatings Cathodic protection Dual headered piping system for seasonal interior river water piping inspection Replacement/refurbishment of traveling screens and sluice gates
Interior River Water Piping Inspection
Stakeholder Chilled Water Interface Interface at each stakeholder mechanical room Flow meter, temperature & pressure transmitters Monitoring of interface at chiller plant
Phased Stakeholder Loads Phased loads Memorial:  September 2011 (partial opening) Freedom Tower:  October 2011 Transportation Hub:  November 2012 East Bathtub Retail:  November 2012 Two chillers with hot gas bypass to serve the Memorial partial opening
Construction Logistics Chiller plant is below grade inside the Memorial The Memorial plaza at grade must be completed for partial opening (September 2011) Plant access through equipment rigging hatch and shared freight elevator Site access from Route 9A River water pump station Located below grade, under a pedestrian plaza Equipment access via hatches in plaza Pedestrian plaza owned by Battery Park City
Construction Logistics Coordination with other projects onsite National September 11 Memorial & Museum Freedom Tower Vehicle Security Center West Vent Structure South Projection Route 9A Relocation
Construction Logistics
Construction Logistics
Site Wide Systems Integration Fire Alarm Radio systems Telecommunications BMS
Contact Information Hemant Mehta, P.E. President WM Group Engineers, P.C. 370 Seventh Avenue, Suite 701 New York, NY  10001 (646) 827-6500 hmehta@wmgroupeng.com http://www.wmgroupeng.com Christopher Tso, P.E. President CRC Engineering, P.C. 1261 Broadway, Suite 608 New York, NY  10001 (212) 889-1233 ctso@crc-eng.com http://www.crc-eng.com

Contenu connexe

Tendances

Diagrid structure system - شبكات العقد الاطارية
Diagrid structure system -    شبكات العقد الاطاريةDiagrid structure system -    شبكات العقد الاطارية
Diagrid structure system - شبكات العقد الاطاريةDr.Youssef Hammida
 
Sadhgraha hrds India Tribal Housing Project
Sadhgraha hrds India Tribal Housing ProjectSadhgraha hrds India Tribal Housing Project
Sadhgraha hrds India Tribal Housing ProjectRinto Ignatious
 
Louis kahn
Louis kahnLouis kahn
Louis kahnalbertrk
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopesDanishPathan7
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridgemrzislion
 
The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...
The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...
The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...Svenska Betongföreningen
 
Indian habitatcentre
Indian habitatcentreIndian habitatcentre
Indian habitatcentreLatika Singh
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structuresAnupama Krishnan
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptxPrituJadhav1
 
VVIP Circuit House Pune
VVIP Circuit House PuneVVIP Circuit House Pune
VVIP Circuit House PuneGRIHA India
 
Landscape study of Fatehpur sikri
Landscape study of Fatehpur sikriLandscape study of Fatehpur sikri
Landscape study of Fatehpur sikriAbu Shahma Rasheed
 
Case study of Pushpa Gujral Science City.
Case study of Pushpa Gujral Science City.Case study of Pushpa Gujral Science City.
Case study of Pushpa Gujral Science City.Manoj Kumar
 
Analyzing Double Skin Façades for Different Global Climate Regions
Analyzing Double Skin Façades for Different Global Climate RegionsAnalyzing Double Skin Façades for Different Global Climate Regions
Analyzing Double Skin Façades for Different Global Climate RegionsIES VE
 
high rise seismic resistant buildings
 high rise seismic resistant buildings high rise seismic resistant buildings
high rise seismic resistant buildingsAr.Farooqh A
 
The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...
The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...
The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...Janmejoy Gupta
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3chuhonsan
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawanpraveen rohilla
 

Tendances (20)

Diagrid structure system - شبكات العقد الاطارية
Diagrid structure system -    شبكات العقد الاطاريةDiagrid structure system -    شبكات العقد الاطارية
Diagrid structure system - شبكات العقد الاطارية
 
Sadhgraha hrds India Tribal Housing Project
Sadhgraha hrds India Tribal Housing ProjectSadhgraha hrds India Tribal Housing Project
Sadhgraha hrds India Tribal Housing Project
 
Louis kahn
Louis kahnLouis kahn
Louis kahn
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridge
 
Passive House for New Orleans
Passive House for New OrleansPassive House for New Orleans
Passive House for New Orleans
 
The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...
The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...
The Shard, elegant och miljösmart byggande i London - Christer Isgren, OtB Co...
 
Indian habitatcentre
Indian habitatcentreIndian habitatcentre
Indian habitatcentre
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structures
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
VVIP Circuit House Pune
VVIP Circuit House PuneVVIP Circuit House Pune
VVIP Circuit House Pune
 
Landscape study of Fatehpur sikri
Landscape study of Fatehpur sikriLandscape study of Fatehpur sikri
Landscape study of Fatehpur sikri
 
Case study of Pushpa Gujral Science City.
Case study of Pushpa Gujral Science City.Case study of Pushpa Gujral Science City.
Case study of Pushpa Gujral Science City.
 
Analyzing Double Skin Façades for Different Global Climate Regions
Analyzing Double Skin Façades for Different Global Climate RegionsAnalyzing Double Skin Façades for Different Global Climate Regions
Analyzing Double Skin Façades for Different Global Climate Regions
 
hot-dry climate
hot-dry climatehot-dry climate
hot-dry climate
 
Gherkin london
Gherkin londonGherkin london
Gherkin london
 
high rise seismic resistant buildings
 high rise seismic resistant buildings high rise seismic resistant buildings
high rise seismic resistant buildings
 
The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...
The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...
The need for vernacular mud huts of Ranchi to re-adapt in response to the cha...
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 

En vedette

Indoor Air Quality and HVAC . . . a Correlation
Indoor Air Quality and HVAC . . . a CorrelationIndoor Air Quality and HVAC . . . a Correlation
Indoor Air Quality and HVAC . . . a Correlationdebbiezp
 
Cold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. Chennai
Cold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. ChennaiCold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. Chennai
Cold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. ChennaiIndiaMART InterMESH Limited
 
HVAC for Beginners an Insight
HVAC for Beginners an InsightHVAC for Beginners an Insight
HVAC for Beginners an InsightArun Prakash
 
Best practice manual hvac chillers
Best practice manual hvac chillersBest practice manual hvac chillers
Best practice manual hvac chillersMohan Ningegowda
 
HVAC to Home Performance - A Quick Business Case
HVAC to Home Performance - A Quick Business CaseHVAC to Home Performance - A Quick Business Case
HVAC to Home Performance - A Quick Business CaseMike Rogers
 
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011abdnakhi
 
IHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationIHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationHydroChem
 
Field Checking and Maintenance of HVAC Humidity and CO2 Sensors
Field Checking and Maintenance of HVAC Humidity and CO2 SensorsField Checking and Maintenance of HVAC Humidity and CO2 Sensors
Field Checking and Maintenance of HVAC Humidity and CO2 SensorsVaisala Group
 
HVAC Service Class
HVAC Service ClassHVAC Service Class
HVAC Service Classadadams
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance AC Repair Local
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Palash Das
 

En vedette (20)

Indoor Air Quality and HVAC . . . a Correlation
Indoor Air Quality and HVAC . . . a CorrelationIndoor Air Quality and HVAC . . . a Correlation
Indoor Air Quality and HVAC . . . a Correlation
 
Cold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. Chennai
Cold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. ChennaiCold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. Chennai
Cold Rooms by Shri Ram HVAC Technologies Pvt. Ltd. Chennai
 
HVAC for Beginners an Insight
HVAC for Beginners an InsightHVAC for Beginners an Insight
HVAC for Beginners an Insight
 
Best practice manual hvac chillers
Best practice manual hvac chillersBest practice manual hvac chillers
Best practice manual hvac chillers
 
Hvac
HvacHvac
Hvac
 
HVAC to Home Performance - A Quick Business Case
HVAC to Home Performance - A Quick Business CaseHVAC to Home Performance - A Quick Business Case
HVAC to Home Performance - A Quick Business Case
 
S. Inc. Basic
S. Inc. BasicS. Inc. Basic
S. Inc. Basic
 
HVAC Mechanical CV
HVAC Mechanical CVHVAC Mechanical CV
HVAC Mechanical CV
 
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
 
Hvac systems
Hvac systemsHvac systems
Hvac systems
 
IHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationIHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant Optimisation
 
Field Checking and Maintenance of HVAC Humidity and CO2 Sensors
Field Checking and Maintenance of HVAC Humidity and CO2 SensorsField Checking and Maintenance of HVAC Humidity and CO2 Sensors
Field Checking and Maintenance of HVAC Humidity and CO2 Sensors
 
HVAC introduction
HVAC introductionHVAC introduction
HVAC introduction
 
Cooling Tower Applications
Cooling Tower ApplicationsCooling Tower Applications
Cooling Tower Applications
 
HVAC Service Class
HVAC Service ClassHVAC Service Class
HVAC Service Class
 
RESNET: HVAC Presentation
RESNET: HVAC PresentationRESNET: HVAC Presentation
RESNET: HVAC Presentation
 
HVAC Fundamentals
HVAC  FundamentalsHVAC  Fundamentals
HVAC Fundamentals
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance
 
AIR CONDITIONING SYSTEM DESINGING
AIR CONDITIONING SYSTEM DESINGINGAIR CONDITIONING SYSTEM DESINGING
AIR CONDITIONING SYSTEM DESINGING
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
 

Similaire à Rebuilding the World Trade Center

resume mechanical
resume mechanicalresume mechanical
resume mechanicalravi a
 
Town Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesTown Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesCity of Tempe, Arizona
 
Piping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserPiping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserIJSRD
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stationsebiskis
 
Case Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent AnalysisCase Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent AnalysisFlex Process
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16Tim Bail
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012
Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012
Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012Robert A. Preston
 
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power PlantStudy on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power PlantIRJET Journal
 
Hydraulic Ram Pump: Consumers guide - Delft University of Technology
Hydraulic Ram Pump: Consumers guide - Delft University of TechnologyHydraulic Ram Pump: Consumers guide - Delft University of Technology
Hydraulic Ram Pump: Consumers guide - Delft University of TechnologyFatin62c
 
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...Fatin62c
 
Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...
Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...
Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...Michael Interbartolo
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsAreej Al-Azzawi
 

Similaire à Rebuilding the World Trade Center (20)

resume mechanical
resume mechanicalresume mechanical
resume mechanical
 
Town Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesTown Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology Choices
 
Piping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserPiping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and Condenser
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stations
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Case Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent AnalysisCase Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent Analysis
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012
Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012
Beyond_the_Flange_Reprint_ACHRtheNews_Feb2012
 
Appsolu
AppsoluAppsolu
Appsolu
 
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power PlantStudy on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
 
Hydraulic Ram Pump: Consumers guide - Delft University of Technology
Hydraulic Ram Pump: Consumers guide - Delft University of TechnologyHydraulic Ram Pump: Consumers guide - Delft University of Technology
Hydraulic Ram Pump: Consumers guide - Delft University of Technology
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_Reume
 
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hyd...
 
Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...
Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...
Prototype Development of an Integrated Mars Atmosphere and Soil Processing Sy...
 
Condenser performance test
Condenser performance testCondenser performance test
Condenser performance test
 
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hydram
An Experimental Prototype for Low Head Small Hydro Power Generation Using HydramAn Experimental Prototype for Low Head Small Hydro Power Generation Using Hydram
An Experimental Prototype for Low Head Small Hydro Power Generation Using Hydram
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutions
 
Plumbing training
Plumbing training Plumbing training
Plumbing training
 
2018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 1012018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 101
 

Rebuilding the World Trade Center

  • 1. Rebuilding ofthe District Cooling Plantat theWorld Trade Center Hemant Mehta, P.E. and Christopher Tso, P.E. WM Group Engineers, P.C. CRC Engineering, P.C.
  • 2. Executive Summary Project highlights and challenges: 12,500 ton central chiller plant, river water systems and site chilled water distribution system design Provides ten (10) stakeholders with CHW for cooling Uses river water from the Hudson River for condensing Rehabilitation of the existing river water pump station Compliance with environmental permit (SPDES) for river water use Salt water (river water) systems design Chiller plant energy modeling and configuration study Site chilled water distribution system design passing through other stakeholder areas Extensive coordination with other projects onsite at varying stages of design / construction
  • 3. Project Highlights 12,500 ton chiller plant and distribution system Five 2500 ton electric centrifugal chillers Five 300 hp chilled water pumps with VFDs Two 1000 ton free/pre-cooling plate & frame heat exchangers (chilled water / river water) River water pump station rehabilitation Environmental permit requirements Four 500 hp vertical turbine river water pumps with VFDs Replacement/rehabilitation of traveling screens and sluice gates
  • 4. Stakeholders Served National September 11 Memorial & Museum Freedom Tower retail Transportation Hub Performing Arts Center East Bathtub retail Vehicle Security Center Master Manager MTA Cortland Street ‘1-train’ Subway Station North Access South Projection
  • 5. Project Challenges Rigging of equipment Coordination with many other projects onsite at varying stages of design/construction Central chiller plant is located below grade inside the National September 11 Memorial & Museum Site chilled water distribution passes through other stakeholder spaces Phased stakeholder loads Construction staging/logistics Site wide systems integration
  • 7. World Trade Center Site Chiller Plant Below Memorial Plaza
  • 8. Chiller Plant Configuration Study Detailed energy and operating cost modeling Hourly weather data Hourly river water temperature data Equipment part-load performance VFDs vs constant speed drives for the chillers Free cooling operation Utility rate schedule Procurement considerations Multiple bidders required
  • 12. River Water Systems Design Condition survey River water pump station equipment River water pump station diver inspection River water pump station ductbank condition survey Interior piping inspection of 60 and 66 inch underground river water mains Environmental permit requirements (SPDES) VFDs for river water pumps Metering/logging of flows and temperatures
  • 13. River Water Pump Station
  • 14. Existing River Water Piping Inspection
  • 15. River Water Systems Design Salt water system design Materials and coatings Cathodic protection Dual headered piping system for seasonal interior river water piping inspection Replacement/refurbishment of traveling screens and sluice gates
  • 16. Interior River Water Piping Inspection
  • 17. Stakeholder Chilled Water Interface Interface at each stakeholder mechanical room Flow meter, temperature & pressure transmitters Monitoring of interface at chiller plant
  • 18. Phased Stakeholder Loads Phased loads Memorial: September 2011 (partial opening) Freedom Tower: October 2011 Transportation Hub: November 2012 East Bathtub Retail: November 2012 Two chillers with hot gas bypass to serve the Memorial partial opening
  • 19. Construction Logistics Chiller plant is below grade inside the Memorial The Memorial plaza at grade must be completed for partial opening (September 2011) Plant access through equipment rigging hatch and shared freight elevator Site access from Route 9A River water pump station Located below grade, under a pedestrian plaza Equipment access via hatches in plaza Pedestrian plaza owned by Battery Park City
  • 20. Construction Logistics Coordination with other projects onsite National September 11 Memorial & Museum Freedom Tower Vehicle Security Center West Vent Structure South Projection Route 9A Relocation
  • 23. Site Wide Systems Integration Fire Alarm Radio systems Telecommunications BMS
  • 24. Contact Information Hemant Mehta, P.E. President WM Group Engineers, P.C. 370 Seventh Avenue, Suite 701 New York, NY 10001 (646) 827-6500 hmehta@wmgroupeng.com http://www.wmgroupeng.com Christopher Tso, P.E. President CRC Engineering, P.C. 1261 Broadway, Suite 608 New York, NY 10001 (212) 889-1233 ctso@crc-eng.com http://www.crc-eng.com