SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
1
Power Grid Corporation of India Ltd.



                   Presentation
                        on
             Investment Opportunities
             in Transmission Sector
                     in India
Indian Power Sector – A Profile
 Installed capacity – 1,12, 000 MW
 (Thermal – 76% Hydro – 23% Nuclear –
 1%)
 Peak Demand – 86,000 MW
 Transmission lines – More than 5 Million
 Ckt. Kms
 Regional Grids – 5
 National Grid under various stages of
 implementation
 Growth Rate of energy – 9% per annum
About POWERGRID
One of the largest and best managed
transmission utility in the World, owning and
operating network of over 48,000 ckt. Kms. of
transmission lines at 765 kV, 400 kV & 132 kV
levels and 82 sub-stations with transformation
capacity of about 46,500 MVA.

One amongst six transmission utilities in the
World    achieving 99%    line    availability,
consistently.

Wheels more than 200 billion units (worth Rs.
400 billion) per year - 40% of total generated
power in the country.
POWERGRID Growth profile
                            1992-93     2003-04   Growth(%)
Physical Performance
  No. of Sub-stations              39      82      110
  MVA capacity               13,200       46500    252
  Circuit kms                23,000       48000    108
  Inter-regional transfer       500        8500   1600
  capacity (MW)
Financial Performance (Rs Crore)
  Net profit                 237         748      217
  Turnover                   634        2805      342
No.of employees              5,725       6,925      21
The Goal
By year 2012 :
  Additional 100,000 MW capacity.
  Integrating Regional Grids into National Grid
  with 30,000 MW of Inter Regional transfer
  capacity.
  Access to 45 % remaining households.

Investment requirement of about US$ 200 Billion
for Generation, Transmission & Distribution.
Investment Outlay for Transmission

                     (Rs. in crore)
                     X Plan     XI Plan   Total

Central Sector       31,080     39,443    70,523
(Transmission +
Telecom)
Private Sector       9,710      11,185    20,895
Contribution
POWERGRID’s Outlay   21,370     28,258    49,628
POWERGRID’s Investment(Rs.in crore)
                                     X Plan   XI Plan   Total

A. Transmission                      19,130   27,999    47,129

Generation Linked Projects           7,436    4,020     11,456

Grid Strengthening Projects          3,192              3,192

Inter-regional/Inter Country Links   7,199    21,960    29,159

ULDC Projects                        1,016              1,016

Investments in JV                    204                204
Others                               83       2,019     2,102
B.Telecom                            2,240    260       2,500
Base Network                         1,004              1,004
Equity in NLDO                       1,236    260       1,496
Total(A+B)                           21,370   28,258    49,628
POWERGRID’s Investment during X
Plan (Rs. in Crore)
                       02-03   03-04   04-05   05-06   06-07   X Plan

A.Transmission         3086    4186    4441    3820    3597    19,130

Generation Linked      799     1130    1598    1983    1926    7,436
Projects
Grid Strengthening     860     1307    845     180     0       3,192
Projects
Inter-regional/Inter   1052    1268    1729    1507    1643    7,199
Country Links
ULDC Projects          355     401     196     64      0       1,016

Investments in JV      0       17      73      86      28      204

Others                 26      63      0       0       0       83
B. Telecom             266     930     427     318     299     2,240

Base Network           266     616     122     0       0       1,004

Equity in NLDO         0       314     305     318     299     1,236
Total (A+B)            3352    5116    4868    4138    3896    21,370
Private Sector Participation through
Joint Venture Route

A. Project Finalised under JV Route
   The 1st Inter State Transmission Line Project
   associated with Tala HEP being set up through
   Joint Venture with Tata Power on BOOT basis –
   July, 2003.
   Transmission License granted to the JVC viz;
   Powerlinks by CERC in Nov. 2003 & a new
   chapter in Transmission starts.
                                      ……Contd.
Financial Closure achieved in May 2004 with
   funding from IFC, ADB, IDFC and SBI (Rs.9800
   million), estimated project cost Rs. 14000 million
   and route length 1171 kms.
B. Projects under finalisation on JV Route
   Part of the Transmission system associated with
   Parvati-II (800 MW) & Koldam HEP (800 MW)
   Estimated project cost-Rs. 4650 m (US $ 100 m)
   Part of the Transmission system associated with
   Maithon TPS (1000 MW)
   Estimated project cost – Rs. 8100 m (US $ 160 m)
                                           …..Contd.
C. New Projects on JV Route

   Western Region System Strengthening Scheme
   – II under two Projects – A & B.
   Consists of 800 ckt. kms of 765 kV lines, 6300
   ckt. kms of 400 kV lines, augmentation of 18
   substations & setting up of 3 new substations.
   Estimated cost Rs. 48300 m
   Two part Solicitation process consisting of RfQ
   & RfP stages.
                                         ….Contd.
Modus Operandi for WR SSS-II
Short-listed bidders to quote base price of the
project which shall be subject to price variation
as per specified formula with financial package.
D:E ratio to be 70:30
JVP to contribute equity in the range of 51-74 %
Lowest evaluated bidder to be selected as Joint
Venture Partner.
SHA & IA to be signed with POWERGRID.
TSA to be signed with SEBs/Beneficiaries.
Thank You

Contenu connexe

Tendances

2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
Tuong Do
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
Rupesh Bobbili
 
The electricity act,1910
The electricity act,1910The electricity act,1910
The electricity act,1910
Leo Lukose
 

Tendances (20)

2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
2013 EVN Smart Grid Plan, Nguyen Hai Ha (EN)
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003
 
Esp update 7th september 2010
Esp update 7th september 2010Esp update 7th september 2010
Esp update 7th september 2010
 
Electricity act 2003
Electricity act 2003Electricity act 2003
Electricity act 2003
 
Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forward
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Electricity act 2003 INDIA
Electricity act 2003 INDIAElectricity act 2003 INDIA
Electricity act 2003 INDIA
 
Presentation By N.A. Zuberi
Presentation By N.A. ZuberiPresentation By N.A. Zuberi
Presentation By N.A. Zuberi
 
The electricity act,1910
The electricity act,1910The electricity act,1910
The electricity act,1910
 
Elecact2003
Elecact2003Elecact2003
Elecact2003
 
NG map
NG mapNG map
NG map
 
Electricity act2003
Electricity act2003Electricity act2003
Electricity act2003
 
Energy Service Demands projections in transport sector for SSPs
Energy Service Demands projections in transport sector for SSPsEnergy Service Demands projections in transport sector for SSPs
Energy Service Demands projections in transport sector for SSPs
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra
 
HIGHWAYS
HIGHWAYS HIGHWAYS
HIGHWAYS
 
Epira ra9136
Epira ra9136Epira ra9136
Epira ra9136
 
Renewable Energy for Cell-Phone Towers
Renewable Energy for Cell-Phone TowersRenewable Energy for Cell-Phone Towers
Renewable Energy for Cell-Phone Towers
 
能源民主工作坊 - 電力自由化與綠能發展 2015.08.14
能源民主工作坊 - 電力自由化與綠能發展 2015.08.14能源民主工作坊 - 電力自由化與綠能發展 2015.08.14
能源民主工作坊 - 電力自由化與綠能發展 2015.08.14
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 

En vedette

Micro-Grid in India
Micro-Grid in IndiaMicro-Grid in India
Micro-Grid in India
sanjeevirny
 

En vedette (15)

Reactive power
Reactive powerReactive power
Reactive power
 
Final presentation on power sector t&d
Final presentation on power sector  t&dFinal presentation on power sector  t&d
Final presentation on power sector t&d
 
Power scenario and approach in india
Power scenario and approach in indiaPower scenario and approach in india
Power scenario and approach in india
 
IESA special webinar on energy storage project (MNRE, PGCIL) opportunities in...
IESA special webinar on energy storage project (MNRE, PGCIL) opportunities in...IESA special webinar on energy storage project (MNRE, PGCIL) opportunities in...
IESA special webinar on energy storage project (MNRE, PGCIL) opportunities in...
 
Powergridppt
PowergridpptPowergridppt
Powergridppt
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
PPT POWER GRID CORPORATION OF INDIA LIMITED
PPT POWER GRID CORPORATION OF INDIA LIMITED PPT POWER GRID CORPORATION OF INDIA LIMITED
PPT POWER GRID CORPORATION OF INDIA LIMITED
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in India
 
A present energy scenario
A present energy scenarioA present energy scenario
A present energy scenario
 
DIT-Radix-2-FFT in SPED
DIT-Radix-2-FFT in SPEDDIT-Radix-2-FFT in SPED
DIT-Radix-2-FFT in SPED
 
Radix 4 FFT algorithm and it time complexity computation
Radix 4 FFT algorithm and it time complexity computationRadix 4 FFT algorithm and it time complexity computation
Radix 4 FFT algorithm and it time complexity computation
 
Fast Fourier Transform
Fast Fourier TransformFast Fourier Transform
Fast Fourier Transform
 
3F3 – Digital Signal Processing (DSP) - Part1
3F3 – Digital Signal Processing (DSP) - Part13F3 – Digital Signal Processing (DSP) - Part1
3F3 – Digital Signal Processing (DSP) - Part1
 
Micro-Grid in India
Micro-Grid in IndiaMicro-Grid in India
Micro-Grid in India
 
Decimation in time and frequency
Decimation in time and frequencyDecimation in time and frequency
Decimation in time and frequency
 

Similaire à Power gridaug04

Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sector
Rahul Gupta
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution new
Shivansh Tyagi
 
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
WondererBack
 
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyPower Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
IndiaNotes.com
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
Abanihi
 

Similaire à Power gridaug04 (20)

Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sector
 
Mohammad Hossain - Bangladesh Presentation.pdf
Mohammad Hossain - Bangladesh Presentation.pdfMohammad Hossain - Bangladesh Presentation.pdf
Mohammad Hossain - Bangladesh Presentation.pdf
 
Power sector mis
Power sector misPower sector mis
Power sector mis
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution new
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution new
 
Presentation steel
 Presentation steel  Presentation steel
Presentation steel
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
 
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
 
CCXG Forum, September 2023, Mawufemo Modjinous
CCXG Forum, September 2023, Mawufemo ModjinousCCXG Forum, September 2023, Mawufemo Modjinous
CCXG Forum, September 2023, Mawufemo Modjinous
 
2012-17 India Infrastructure Needs
2012-17 India Infrastructure Needs2012-17 India Infrastructure Needs
2012-17 India Infrastructure Needs
 
Electricity Grids and Secure Energy Transitions: Enhancing the foundations of...
Electricity Grids and Secure Energy Transitions: Enhancing the foundations of...Electricity Grids and Secure Energy Transitions: Enhancing the foundations of...
Electricity Grids and Secure Energy Transitions: Enhancing the foundations of...
 
Ptti2112011 (!)
Ptti2112011 (!)Ptti2112011 (!)
Ptti2112011 (!)
 
ATS Company Reports: Finolex cables ltd
ATS Company Reports: Finolex cables ltdATS Company Reports: Finolex cables ltd
ATS Company Reports: Finolex cables ltd
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyPower Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
 
Vietnam – Power Development Plan 8 – Estimated Issuance Date
Vietnam – Power Development Plan 8 – Estimated Issuance DateVietnam – Power Development Plan 8 – Estimated Issuance Date
Vietnam – Power Development Plan 8 – Estimated Issuance Date
 
Paresh presentation jan 2012
Paresh presentation jan 2012Paresh presentation jan 2012
Paresh presentation jan 2012
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy system
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Dernier (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

Power gridaug04

  • 1. 1 Power Grid Corporation of India Ltd. Presentation on Investment Opportunities in Transmission Sector in India
  • 2. Indian Power Sector – A Profile Installed capacity – 1,12, 000 MW (Thermal – 76% Hydro – 23% Nuclear – 1%) Peak Demand – 86,000 MW Transmission lines – More than 5 Million Ckt. Kms Regional Grids – 5 National Grid under various stages of implementation Growth Rate of energy – 9% per annum
  • 3. About POWERGRID One of the largest and best managed transmission utility in the World, owning and operating network of over 48,000 ckt. Kms. of transmission lines at 765 kV, 400 kV & 132 kV levels and 82 sub-stations with transformation capacity of about 46,500 MVA. One amongst six transmission utilities in the World achieving 99% line availability, consistently. Wheels more than 200 billion units (worth Rs. 400 billion) per year - 40% of total generated power in the country.
  • 4. POWERGRID Growth profile 1992-93 2003-04 Growth(%) Physical Performance No. of Sub-stations 39 82 110 MVA capacity 13,200 46500 252 Circuit kms 23,000 48000 108 Inter-regional transfer 500 8500 1600 capacity (MW) Financial Performance (Rs Crore) Net profit 237 748 217 Turnover 634 2805 342 No.of employees 5,725 6,925 21
  • 5. The Goal By year 2012 : Additional 100,000 MW capacity. Integrating Regional Grids into National Grid with 30,000 MW of Inter Regional transfer capacity. Access to 45 % remaining households. Investment requirement of about US$ 200 Billion for Generation, Transmission & Distribution.
  • 6. Investment Outlay for Transmission (Rs. in crore) X Plan XI Plan Total Central Sector 31,080 39,443 70,523 (Transmission + Telecom) Private Sector 9,710 11,185 20,895 Contribution POWERGRID’s Outlay 21,370 28,258 49,628
  • 7. POWERGRID’s Investment(Rs.in crore) X Plan XI Plan Total A. Transmission 19,130 27,999 47,129 Generation Linked Projects 7,436 4,020 11,456 Grid Strengthening Projects 3,192 3,192 Inter-regional/Inter Country Links 7,199 21,960 29,159 ULDC Projects 1,016 1,016 Investments in JV 204 204 Others 83 2,019 2,102 B.Telecom 2,240 260 2,500 Base Network 1,004 1,004 Equity in NLDO 1,236 260 1,496 Total(A+B) 21,370 28,258 49,628
  • 8. POWERGRID’s Investment during X Plan (Rs. in Crore) 02-03 03-04 04-05 05-06 06-07 X Plan A.Transmission 3086 4186 4441 3820 3597 19,130 Generation Linked 799 1130 1598 1983 1926 7,436 Projects Grid Strengthening 860 1307 845 180 0 3,192 Projects Inter-regional/Inter 1052 1268 1729 1507 1643 7,199 Country Links ULDC Projects 355 401 196 64 0 1,016 Investments in JV 0 17 73 86 28 204 Others 26 63 0 0 0 83 B. Telecom 266 930 427 318 299 2,240 Base Network 266 616 122 0 0 1,004 Equity in NLDO 0 314 305 318 299 1,236 Total (A+B) 3352 5116 4868 4138 3896 21,370
  • 9. Private Sector Participation through Joint Venture Route A. Project Finalised under JV Route The 1st Inter State Transmission Line Project associated with Tala HEP being set up through Joint Venture with Tata Power on BOOT basis – July, 2003. Transmission License granted to the JVC viz; Powerlinks by CERC in Nov. 2003 & a new chapter in Transmission starts. ……Contd.
  • 10. Financial Closure achieved in May 2004 with funding from IFC, ADB, IDFC and SBI (Rs.9800 million), estimated project cost Rs. 14000 million and route length 1171 kms. B. Projects under finalisation on JV Route Part of the Transmission system associated with Parvati-II (800 MW) & Koldam HEP (800 MW) Estimated project cost-Rs. 4650 m (US $ 100 m) Part of the Transmission system associated with Maithon TPS (1000 MW) Estimated project cost – Rs. 8100 m (US $ 160 m) …..Contd.
  • 11. C. New Projects on JV Route Western Region System Strengthening Scheme – II under two Projects – A & B. Consists of 800 ckt. kms of 765 kV lines, 6300 ckt. kms of 400 kV lines, augmentation of 18 substations & setting up of 3 new substations. Estimated cost Rs. 48300 m Two part Solicitation process consisting of RfQ & RfP stages. ….Contd.
  • 12. Modus Operandi for WR SSS-II Short-listed bidders to quote base price of the project which shall be subject to price variation as per specified formula with financial package. D:E ratio to be 70:30 JVP to contribute equity in the range of 51-74 % Lowest evaluated bidder to be selected as Joint Venture Partner. SHA & IA to be signed with POWERGRID. TSA to be signed with SEBs/Beneficiaries.