SlideShare une entreprise Scribd logo
1  sur  5
1
Rana Muhammad Ali Danish
Address: Madina Manawara
Email: engdanish8@gmail.com
Mobile #:00966-591632699
OBJECTIVES:
Aim to work in the field of Telecommunication for progressive and dynamic organization in challenging,
Hi-tech and fast paced working environment.
QUALIFICATION:
Degree:
Institute: B.Tech (Electronics)
Preston University, Pakistan
DAE (Electronics)
Diploma in Telecommunication and System engineering of One year
WORK EXPERIENCE:
Organization: FCGI(NSN Project)
Position:
FLM and NIEngineer Jeddah andMakkah
FIVEHajj Projects
Aug 2009 To jan 2015
Organization: Nokia Solution Network(STCMentinence Madina)
Position: FLM Engnieer
Feb 2015 To still
Job Responsibilities:
Microwave Project:
 NSN Flexi Hybrid New Implementation Project Jeddah
 NSN Flexi Packet FPH800, FPFM200 Project NI & Maintenance
 NSN Flexi Hybrid Up gradation Makkah
 New Sites Integration of Flexi Multi Radio 2G, 3G& 4G LTE Jeddah
 HAJJ 3G ExpansionProject Makkah
 Clean up Project of New Integrated sites and clear pending Alarms,
(Makkah,Jeddah&Taif)
2
Job Description:
New Implementation (NI):
 To Develop and Deal with Vendor, Operator and coordination of all types of Work
with them
 Installation and Commissioning of NSNFlexi Packet Multi-Radio
MicrowaveFPH800 & FPFM200 (Software Run CT)
 NSN Flexi Hybrid Microwave Installation and Commissioning
 Installation Commissioning and Cross-Connections of NSN Flexi Hopper
Microwave
 E1 Traffic Management, Ethernet Services, CES services, and Traffic Shifting
 Operation& Maintenance of the Microwave Network &Troubleshooting of the
Microwaves Links and Re-commissioning
 Installation and Commissioning of Nokia Flexi WCDMA BTS 3G, Modules
Include FRGF,FRGL,FRGP & FRGC using FSMD& FMSE System Modules.
 Supervise The Team in Installation of Nokia Flexi BTS 2G& 3G, Dual Band
Antenna and feeder cable installations
 Sites PM, Periodic Management and Technical Reports, Bill Of Quantity
verifications,Call-Off, MDRs and Standard Operating Procedure (SOPs)Of the
Sites Installations
FLM (First line Maintenance)& Hajj Projects
 Clearance of All Kind Alarms of 2G, 3G & 4G LTE of Nokia Equipment.
 Troubleshooting all kind of alarms at Transmission and rectify the alarms.
 Flexi Packet 800 and FPFM200, Can do 1+0, 1+1 HSB, 1+1 HSB Space
diversity and 2+0 Xpic Commissioning, Ethernet services, E1 CES service and
QoS services ODU and IDU.
 Working with repeater sites and troubleshoot the Micro wave links Alarms
using repeaters on Cores sites. .
 Integration of Problematic 2G, 3G and 4G LTE sites,
 Clear the VSWR and RX Noise level using Site Master,
 Troubleshooting of E1’s from Core sites to End sites,
 Problematic ODU’s &IDU’s changing during Trouble Ticket.
 Integration of 2G & 3G &E1 ExpansionFor Mina, Arafat &Muzdalifa Sites
(Makkah).
3
 Rectify 3G swap & Replacements of 3G RF Modules cards (FRGC & FSMD)
at Makkah Hajj
 Site Master-Supervise RSSI Faults Rectification, VSWR & DTF
Measurements(Anritsu S332B)
 Performs Microwave Links Preliminary Acceptance and Final Acceptance Test
(PATs & FATs)
 Cross connection for TransmissionCards using(FTIF,FIFA& FIU 19E) for 2G
& 3G BTS.
 Cell Sectorization, TRX Expansions & TRX testsin 2G (900 & 1800)
 Core Sites E1 Patching and Traffic Management
 TI BOQ and Invoices verification
 Sites On-Air acceptance- verifications of SOPs, Long and short term battery tests
and Auto operations
 Internal and External Alarms patching and Verifications(software BTS
MANAGER/ LMT)
 Performed Pre-PATs (Preliminary Acceptance Tests)and FATs (Final
Acceptance Tests) of MW Links, 2G, 3G & 4G LTE BTS Major Modules and
Equipment of Nokia New Sites
 Have adequate knowledge and understanding of organization and operation of
GSM infrastructure,2G and 3G&4G LTENetworks
 Understand theworking methodology and organization of O & M with Vendors.
 Remote use of Net Viewer for Transmission Equipments,
 Clear the SDH, and Flexi Metro Alarms,
 Commissioning of Flexi Metro links and troubleshooting the Problematic issues.
 Knowledge of connectivity of STC Lease lines using at Core sites.
 Troubleshooting of Road Protections sites and Repeaters sites,
FLM (First line Maintenance) STC (Madina)
 Clearance of All Kind Alarms of 2G, 3G & 4G LTE of Nokia Equipment.
 Troubleshooting all kind of alarms at Transmission and rectify the alarms.
 Flexi Packet 800 and FPFM200, Can do 1+0, 1+1 HSB, 1+1 HSB Space
diversity and 2+0 Xpic Commissioning, Ethernet services, E1 CES service and
QoS services ODU and IDU.
 Working with repeater sites and troubleshoot the Micro wave links Alarms
using repeaters on Cores sites. .
4
 Integration of Problematic 2G, 3G and 4G LTE sites,
 Clear the VSWR and RX Noise level using Site Master,
 Troubleshooting of E1’s from Core sites to End sites,
 Problematic ODU’s &IDU’s changing during Trouble Ticket.
FLM (First line Maintenance) STC (Al Hasu madina)
 Clearance of All Kind Alarms of 2G, 3G & 4G LTE of Nokia Equipment.
 Troubleshooting all kind of alarms at Transmission and rectify the alarms.
 Flexi Packet 800 and FPFM200, Can do 1+0, 1+1 HSB, 1+1 HSB Space
diversity and 2+0 Xpic Commissioning, Ethernet services, E1 CES service and
QoS services ODU and IDU.
 Working with repeater sites and troubleshoot the Micro wave links Alarms
using repeaters on Cores sites. .
 Integration of Problematic 2G, 3G and 4G LTE sites,
 Clear the VSWR and RX Noise level using Site Master,
 Troubleshooting of E1’s from Core sites to End sites,
 Problematic ODU’s &IDU’s changing during Trouble Ticket.
OTHERS SKILLS
 Strong communication skills and proficient in speaking, reading and writing English,
Team work collaboration and Excellent Report/Technical Writing skills
 MS Office (Word, Excel,PowerPoint), Front Page, MS Visio Professional, Adobe
Acrobat Professional, Windows 7/XP, Internet (browsing& surfing)
5
PERSONAL INFORMATION
Name: Rana Muhammad Ali Danish
Father’s Name: Shoukat Ali
Nationality: Pakistani
Current Location: Saudi Arabia
Marital Status: Married
Languages: English, Urdu, Arabic, Punjabi
Iqama: Transferable
Driving License: Valid Saudi Driving License

Contenu connexe

Tendances

Tendances (20)

Voice over LTE report
Voice over LTE reportVoice over LTE report
Voice over LTE report
 
Mohit resume 1
Mohit resume 1Mohit resume 1
Mohit resume 1
 
VIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CVVIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CV
 
Mark G Quiambao's CV
Mark G Quiambao's CVMark G Quiambao's CV
Mark G Quiambao's CV
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
BSS Updated cv
BSS Updated cvBSS Updated cv
BSS Updated cv
 
Jun5 kassa-adhoc net-arch-vo_lte
Jun5 kassa-adhoc net-arch-vo_lteJun5 kassa-adhoc net-arch-vo_lte
Jun5 kassa-adhoc net-arch-vo_lte
 
Pakistan cv 1
Pakistan  cv 1Pakistan  cv 1
Pakistan cv 1
 
GPON-Tester (EN)
GPON-Tester (EN)GPON-Tester (EN)
GPON-Tester (EN)
 
KUNAL CV jan
KUNAL CV janKUNAL CV jan
KUNAL CV jan
 
MTA
MTAMTA
MTA
 
imran cv (1)
imran cv (1)imran cv (1)
imran cv (1)
 
CV_ Sudhir
CV_ Sudhir CV_ Sudhir
CV_ Sudhir
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
Asif-Res-2015
Asif-Res-2015Asif-Res-2015
Asif-Res-2015
 
ZTE VoLTE Solutions
ZTE VoLTE SolutionsZTE VoLTE Solutions
ZTE VoLTE Solutions
 
VOLTE Presentation
VOLTE PresentationVOLTE Presentation
VOLTE Presentation
 

En vedette

Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.pptAIRTEL
 
3g-lte-oss-performance-management
3g-lte-oss-performance-management3g-lte-oss-performance-management
3g-lte-oss-performance-managementvishal123
 
Nokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheetNokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheetRaafat younis
 
Lte àà¿ë ±â¼ú ±³à°
Lte àà¿ë ±â¼ú ±³à°Lte àà¿ë ±â¼ú ±³à°
Lte àà¿ë ±â¼ú ±³à°Birendra Yadav
 
Nokia Siemens Networks Lte Analyst Webcast Dec10
Nokia Siemens Networks  Lte Analyst Webcast Dec10Nokia Siemens Networks  Lte Analyst Webcast Dec10
Nokia Siemens Networks Lte Analyst Webcast Dec10Sylwia Boguszewska
 
219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptanceashok kumar
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsAchmad Salsabil
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioningAIRTEL
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationYogender Singh Rana
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennasnimay1
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTESofian .
 
Nokia kpi and_core_optimization
Nokia kpi and_core_optimizationNokia kpi and_core_optimization
Nokia kpi and_core_optimizationdebasish goswami
 
Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installationAli Usman
 

En vedette (17)

Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
LTE crash course
LTE crash courseLTE crash course
LTE crash course
 
3g-lte-oss-performance-management
3g-lte-oss-performance-management3g-lte-oss-performance-management
3g-lte-oss-performance-management
 
Nokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheetNokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheet
 
Lte àà¿ë ±â¼ú ±³à°
Lte àà¿ë ±â¼ú ±³à°Lte àà¿ë ±â¼ú ±³à°
Lte àà¿ë ±â¼ú ±³à°
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
Nokia Siemens Networks Lte Analyst Webcast Dec10
Nokia Siemens Networks  Lte Analyst Webcast Dec10Nokia Siemens Networks  Lte Analyst Webcast Dec10
Nokia Siemens Networks Lte Analyst Webcast Dec10
 
219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirements
 
lte advanced
lte advancedlte advanced
lte advanced
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennas
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTE
 
Failure of nokia
Failure of nokiaFailure of nokia
Failure of nokia
 
Nokia kpi and_core_optimization
Nokia kpi and_core_optimizationNokia kpi and_core_optimization
Nokia kpi and_core_optimization
 
Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installation
 

Similaire à Rana Ali CV

Similaire à Rana Ali CV (20)

Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
shriram2016
shriram2016shriram2016
shriram2016
 
Mehmood._Ahmed
Mehmood._AhmedMehmood._Ahmed
Mehmood._Ahmed
 
Resume
ResumeResume
Resume
 
CV Hamed Sabbah
CV Hamed SabbahCV Hamed Sabbah
CV Hamed Sabbah
 
Mohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed MustafaMohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed Mustafa
 
Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012
 
Ahmed Ibrahim.pdf
Ahmed Ibrahim.pdfAhmed Ibrahim.pdf
Ahmed Ibrahim.pdf
 
Ahmed Ibrahim.pdf
Ahmed Ibrahim.pdfAhmed Ibrahim.pdf
Ahmed Ibrahim.pdf
 
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
Jeffin_BSS_CV
Jeffin_BSS_CVJeffin_BSS_CV
Jeffin_BSS_CV
 
Vaijanath resume Updated
Vaijanath resume UpdatedVaijanath resume Updated
Vaijanath resume Updated
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
Avinash_cv for Txn
Avinash_cv for TxnAvinash_cv for Txn
Avinash_cv for Txn
 
Curriculum Vitae-Yeswanthvadlamoodi2016
Curriculum Vitae-Yeswanthvadlamoodi2016Curriculum Vitae-Yeswanthvadlamoodi2016
Curriculum Vitae-Yeswanthvadlamoodi2016
 

Rana Ali CV

  • 1. 1 Rana Muhammad Ali Danish Address: Madina Manawara Email: engdanish8@gmail.com Mobile #:00966-591632699 OBJECTIVES: Aim to work in the field of Telecommunication for progressive and dynamic organization in challenging, Hi-tech and fast paced working environment. QUALIFICATION: Degree: Institute: B.Tech (Electronics) Preston University, Pakistan DAE (Electronics) Diploma in Telecommunication and System engineering of One year WORK EXPERIENCE: Organization: FCGI(NSN Project) Position: FLM and NIEngineer Jeddah andMakkah FIVEHajj Projects Aug 2009 To jan 2015 Organization: Nokia Solution Network(STCMentinence Madina) Position: FLM Engnieer Feb 2015 To still Job Responsibilities: Microwave Project:  NSN Flexi Hybrid New Implementation Project Jeddah  NSN Flexi Packet FPH800, FPFM200 Project NI & Maintenance  NSN Flexi Hybrid Up gradation Makkah  New Sites Integration of Flexi Multi Radio 2G, 3G& 4G LTE Jeddah  HAJJ 3G ExpansionProject Makkah  Clean up Project of New Integrated sites and clear pending Alarms, (Makkah,Jeddah&Taif)
  • 2. 2 Job Description: New Implementation (NI):  To Develop and Deal with Vendor, Operator and coordination of all types of Work with them  Installation and Commissioning of NSNFlexi Packet Multi-Radio MicrowaveFPH800 & FPFM200 (Software Run CT)  NSN Flexi Hybrid Microwave Installation and Commissioning  Installation Commissioning and Cross-Connections of NSN Flexi Hopper Microwave  E1 Traffic Management, Ethernet Services, CES services, and Traffic Shifting  Operation& Maintenance of the Microwave Network &Troubleshooting of the Microwaves Links and Re-commissioning  Installation and Commissioning of Nokia Flexi WCDMA BTS 3G, Modules Include FRGF,FRGL,FRGP & FRGC using FSMD& FMSE System Modules.  Supervise The Team in Installation of Nokia Flexi BTS 2G& 3G, Dual Band Antenna and feeder cable installations  Sites PM, Periodic Management and Technical Reports, Bill Of Quantity verifications,Call-Off, MDRs and Standard Operating Procedure (SOPs)Of the Sites Installations FLM (First line Maintenance)& Hajj Projects  Clearance of All Kind Alarms of 2G, 3G & 4G LTE of Nokia Equipment.  Troubleshooting all kind of alarms at Transmission and rectify the alarms.  Flexi Packet 800 and FPFM200, Can do 1+0, 1+1 HSB, 1+1 HSB Space diversity and 2+0 Xpic Commissioning, Ethernet services, E1 CES service and QoS services ODU and IDU.  Working with repeater sites and troubleshoot the Micro wave links Alarms using repeaters on Cores sites. .  Integration of Problematic 2G, 3G and 4G LTE sites,  Clear the VSWR and RX Noise level using Site Master,  Troubleshooting of E1’s from Core sites to End sites,  Problematic ODU’s &IDU’s changing during Trouble Ticket.  Integration of 2G & 3G &E1 ExpansionFor Mina, Arafat &Muzdalifa Sites (Makkah).
  • 3. 3  Rectify 3G swap & Replacements of 3G RF Modules cards (FRGC & FSMD) at Makkah Hajj  Site Master-Supervise RSSI Faults Rectification, VSWR & DTF Measurements(Anritsu S332B)  Performs Microwave Links Preliminary Acceptance and Final Acceptance Test (PATs & FATs)  Cross connection for TransmissionCards using(FTIF,FIFA& FIU 19E) for 2G & 3G BTS.  Cell Sectorization, TRX Expansions & TRX testsin 2G (900 & 1800)  Core Sites E1 Patching and Traffic Management  TI BOQ and Invoices verification  Sites On-Air acceptance- verifications of SOPs, Long and short term battery tests and Auto operations  Internal and External Alarms patching and Verifications(software BTS MANAGER/ LMT)  Performed Pre-PATs (Preliminary Acceptance Tests)and FATs (Final Acceptance Tests) of MW Links, 2G, 3G & 4G LTE BTS Major Modules and Equipment of Nokia New Sites  Have adequate knowledge and understanding of organization and operation of GSM infrastructure,2G and 3G&4G LTENetworks  Understand theworking methodology and organization of O & M with Vendors.  Remote use of Net Viewer for Transmission Equipments,  Clear the SDH, and Flexi Metro Alarms,  Commissioning of Flexi Metro links and troubleshooting the Problematic issues.  Knowledge of connectivity of STC Lease lines using at Core sites.  Troubleshooting of Road Protections sites and Repeaters sites, FLM (First line Maintenance) STC (Madina)  Clearance of All Kind Alarms of 2G, 3G & 4G LTE of Nokia Equipment.  Troubleshooting all kind of alarms at Transmission and rectify the alarms.  Flexi Packet 800 and FPFM200, Can do 1+0, 1+1 HSB, 1+1 HSB Space diversity and 2+0 Xpic Commissioning, Ethernet services, E1 CES service and QoS services ODU and IDU.  Working with repeater sites and troubleshoot the Micro wave links Alarms using repeaters on Cores sites. .
  • 4. 4  Integration of Problematic 2G, 3G and 4G LTE sites,  Clear the VSWR and RX Noise level using Site Master,  Troubleshooting of E1’s from Core sites to End sites,  Problematic ODU’s &IDU’s changing during Trouble Ticket. FLM (First line Maintenance) STC (Al Hasu madina)  Clearance of All Kind Alarms of 2G, 3G & 4G LTE of Nokia Equipment.  Troubleshooting all kind of alarms at Transmission and rectify the alarms.  Flexi Packet 800 and FPFM200, Can do 1+0, 1+1 HSB, 1+1 HSB Space diversity and 2+0 Xpic Commissioning, Ethernet services, E1 CES service and QoS services ODU and IDU.  Working with repeater sites and troubleshoot the Micro wave links Alarms using repeaters on Cores sites. .  Integration of Problematic 2G, 3G and 4G LTE sites,  Clear the VSWR and RX Noise level using Site Master,  Troubleshooting of E1’s from Core sites to End sites,  Problematic ODU’s &IDU’s changing during Trouble Ticket. OTHERS SKILLS  Strong communication skills and proficient in speaking, reading and writing English, Team work collaboration and Excellent Report/Technical Writing skills  MS Office (Word, Excel,PowerPoint), Front Page, MS Visio Professional, Adobe Acrobat Professional, Windows 7/XP, Internet (browsing& surfing)
  • 5. 5 PERSONAL INFORMATION Name: Rana Muhammad Ali Danish Father’s Name: Shoukat Ali Nationality: Pakistani Current Location: Saudi Arabia Marital Status: Married Languages: English, Urdu, Arabic, Punjabi Iqama: Transferable Driving License: Valid Saudi Driving License